CN202117341U - Template for embedding foundation bolts of steel structures of buildings - Google Patents
Template for embedding foundation bolts of steel structures of buildings Download PDFInfo
- Publication number
- CN202117341U CN202117341U CN2011201931695U CN201120193169U CN202117341U CN 202117341 U CN202117341 U CN 202117341U CN 2011201931695 U CN2011201931695 U CN 2011201931695U CN 201120193169 U CN201120193169 U CN 201120193169U CN 202117341 U CN202117341 U CN 202117341U
- Authority
- CN
- China
- Prior art keywords
- steel plate
- template
- steel
- foundation bolts
- embedding
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Foundations (AREA)
Abstract
The utility model discloses a template for embedding foundation bolts of steel structures of buildings, which comprises a flat plate type steel plate, wherein a casting opening is arranged at the center of the steel plate, and the frame of the steel plate is provided with bolt holes for connecting the foundation bolts in penetrating mode. The steel plate is a rectangular flat plate, and the casting opening is a square with a 200-milimeter width and a 400-milimeter length. A center line for calibration is scored on the surface of the steel plate. The template for embedding foundation bolts of steel structures of buildings serves as a special template to be applied to construction of steel structure main bodies and concrete independent foundations, and not only can enable embedding of the foundation bolts to be accurate, but also is convenient to mount and reusable, thereby facilitating improvement of embedding quality of the foundation bolts of the structural engineering with small input.
Description
Technical field
The utility model relates to a kind of a kind of template of burying underground of building engineering construction design field, particularly a kind ofly is used for the template that the construction steel structure stone bolt is buried underground.
Background technology
In building operations, concrete foundation and steel work main body are composite entities indispensable in the construction project, and be especially common in industrial premises, warehouse and commerce and trade building.Mix on the earth basis in order to be installed in the steel work main body, need before concrete foundation is built, preset a large amount of stone bolt.After completion was built, the lower end of stone bolt was embedded on the concrete foundation, and the upper end is then stretched out the upper surface of concrete foundation and passed the bolt hole that presets on the steel work main body, and concrete foundation and steel work main body are coupled together.Because the construction of concrete foundation need be by the steel bar framework of horizontal and vertical colligations such as reinforcing bar and the support shuttering that is erected at the steel bar framework both sides; Stone bolt is then mostly to be to adopt the method for welding or colligation that stone bolt is fixed the position by steel bar framework, carries out concrete building afterwards again.Mostly welding or colligation are to link with the reinforcing bar on basis, for example be welded on the vertical reinforcement of concrete foundation or colligation on vertical reinforcement and stirrup, be convenient to definite steel work stone bolt position.But the hole that is used to wear stone bolt on the steel work generally uses the machine drilling mode to confirm already in processing factory; Therefore must guarantee that when burying the steel work stone bolt underground the position of each stone bolt is accurate, the requirement that this is just high to being fixed with of every stone bolt.
Use the fixed form of colligation, although it has easy operating and the advantage that can often adjust, its solidness is not enough, and the displacement that bumps easily needs the running check correction to fix; Weld and use; Because stone bolt is general and the diameter difference distance of reinforcing bar is bigger, therefore also higher to welder's technical requirements, though welding is relatively firm; But the reinforcing bar that links to each other with it is when making colligation; With the link of ground be not immovable, in case the displacement that bumps after the machine-shaping can only be proofreaied and correct welding again with weld cutting.This has just caused the intensity heavy losses of reinforcing bar, and this is unconformable in construction.
The utility model content
The utility model technical issues that need to address provide a kind of stone bolt that not only can make and bury template accurate, easy for installation, that can reusable construction steel structure stone bolt bury underground underground.
For solving the problems of the technologies described above, the technical scheme that the utility model adopted is:
The template that the construction steel structure stone bolt is buried underground comprises plate steel plate, and the center of steel plate is provided with and builds mouth, and the frame of steel plate is provided with the bolt hole that is used for the cross-under stone bolt.
The further improvement of the utility model is: said steel plate is the rectangular flat plate of thickness greater than 8mm, builds mouth and is set to width 200mm, and length is square greater than 400mm's.
The further improvement of the utility model is: the surface delineation of said steel plate has the center line of calibration usefulness.
Because the technological progress of having adopted technique scheme, the utility model to obtain is:
The utility model in use; Stone bolt is passed bolt hole and is fixed on the template; During concreting the support shuttering of template and concrete foundation is fixed; By center line on the steel plate and measuring apparatus calibration positioning stone bolt, after concrete setting, get final product stripping and be used for next flowing water construction.Thickness that is provided with and the size of building mouth more help guaranteeing working strength and pouring quality.
The utility model is applied to as dedicated templates in the construction of steel work main body and concrete foundation (or other bases) stone bolt is buried underground accurately; And easy for installation, can reuse, the stone bolt that helps improving with less input structural steelwork is buried quality underground.
Description of drawings
Fig. 1 is the structural representation of the utility model.
Wherein, 1. steel plate is 2. built mouth, 3. bolt hole.
The specific embodiment
Below in conjunction with accompanying drawing the utility model is explained further details:
The template that a kind of building structure stone bolt as shown in Figure 1 is buried underground; The steel plate 1 that the matrix adopting of template is plate, the centre of steel plate has width 200mm, and length is greater than the square mouth 2 of building of 400mm; Steel plate frame position on demand is drilled with bolt hole 3, and steel plate thickness is greater than 8mm.The surface delineation center line of steel plate.
The utility model is applied in the construction of steel work main body and concrete foundation (or other bases); The stone bolt of during construction need being buried underground is through in the bolt hole of steel plate; The stone bolt that passes steel plate is provided with a nut in the both sides up and down of steel plate on each, and on fasten, after accomplishing concrete foundation (or other bases) reinforcing bar binding, support shuttering and installing; Steel plate is fixed on the concrete support shuttering; Make stone bolt be able to the location, can also cooperate transit and level gauge to check the position by the center line of delineating on the steel plate.
Claims (3)
1. the template buried underground of construction steel structure stone bolt, it is characterized in that: comprise plate steel plate (1), the center of steel plate is provided with builds mouthful (2), and the frame of steel plate is provided with the bolt hole (3) that is used for the cross-under stone bolt.
2. the template that construction steel structure stone bolt according to claim 1 is buried underground is characterized in that: said steel plate is the rectangular flat plate of thickness greater than 8mm, builds mouth and is set to width 200mm, and length is square greater than 400mm's.
3. the template that construction steel structure stone bolt according to claim 1 and 2 is buried underground is characterized in that: the surface delineation of said steel plate (1) has the center line of calibration usefulness.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011201931695U CN202117341U (en) | 2011-06-09 | 2011-06-09 | Template for embedding foundation bolts of steel structures of buildings |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011201931695U CN202117341U (en) | 2011-06-09 | 2011-06-09 | Template for embedding foundation bolts of steel structures of buildings |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202117341U true CN202117341U (en) | 2012-01-18 |
Family
ID=45458415
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2011201931695U Expired - Fee Related CN202117341U (en) | 2011-06-09 | 2011-06-09 | Template for embedding foundation bolts of steel structures of buildings |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202117341U (en) |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102619235A (en) * | 2012-04-17 | 2012-08-01 | 中国建筑第五工程局有限公司 | Concrete foundation embedded bolt bracket and embedding method for concrete foundation embedded bolts |
CN102797360A (en) * | 2012-08-06 | 2012-11-28 | 华为技术有限公司 | Positioning template used in cabinet installation |
CN106352776A (en) * | 2016-09-27 | 2017-01-25 | 中铁五局集团有限公司 | Tool plate for embedded bolt assembly installation and checking |
CN109853610A (en) * | 2019-01-30 | 2019-06-07 | 山西三建集团有限公司 | Steel pipe column concrete foundation pre-embedded anchoring bolts precise positioning mechanism and localization method |
CN112127641A (en) * | 2020-08-28 | 2020-12-25 | 上海二十冶建设有限公司 | Accurate fixing method for anchor plate foundation bolt |
CN113802697A (en) * | 2021-08-31 | 2021-12-17 | 中冶(上海)钢结构科技有限公司 | Machining and embedding method for steel structure embedded part in dense steel bar area |
CN114809673A (en) * | 2022-05-08 | 2022-07-29 | 山西三建集团有限公司 | Rear-buried foundation bolt suspension positioning method in street lamp concrete foundation pouring |
-
2011
- 2011-06-09 CN CN2011201931695U patent/CN202117341U/en not_active Expired - Fee Related
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102619235A (en) * | 2012-04-17 | 2012-08-01 | 中国建筑第五工程局有限公司 | Concrete foundation embedded bolt bracket and embedding method for concrete foundation embedded bolts |
CN102797360A (en) * | 2012-08-06 | 2012-11-28 | 华为技术有限公司 | Positioning template used in cabinet installation |
CN102797360B (en) * | 2012-08-06 | 2016-08-10 | 华为技术有限公司 | The locating template that a kind of rack is installed |
CN106352776A (en) * | 2016-09-27 | 2017-01-25 | 中铁五局集团有限公司 | Tool plate for embedded bolt assembly installation and checking |
CN109853610A (en) * | 2019-01-30 | 2019-06-07 | 山西三建集团有限公司 | Steel pipe column concrete foundation pre-embedded anchoring bolts precise positioning mechanism and localization method |
CN112127641A (en) * | 2020-08-28 | 2020-12-25 | 上海二十冶建设有限公司 | Accurate fixing method for anchor plate foundation bolt |
CN113802697A (en) * | 2021-08-31 | 2021-12-17 | 中冶(上海)钢结构科技有限公司 | Machining and embedding method for steel structure embedded part in dense steel bar area |
CN114809673A (en) * | 2022-05-08 | 2022-07-29 | 山西三建集团有限公司 | Rear-buried foundation bolt suspension positioning method in street lamp concrete foundation pouring |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202117341U (en) | Template for embedding foundation bolts of steel structures of buildings | |
CN204054323U (en) | Steel construction assembled beam making bench | |
CN102926504B (en) | Construction method of steel and concrete overlapped beam combined part | |
CN108005401A (en) | A kind of support and change method of the column of existing frame structure base isolation reinforcement | |
CN103334379A (en) | Construction method for hanging part of anti-collision guardrail on expressway | |
CN207944708U (en) | Assembled steel modular system for underground shear wall structure reverse construction | |
CN102518300A (en) | Embedded conical bearing joint type steel structural support and construction method thereof | |
CN208733666U (en) | A kind of fixing bolt preformed hole template tool | |
CN111218983A (en) | Lattice formula structure concrete frame house | |
CN112302209B (en) | Steel and concrete shear wall mixed structure and manufacturing method thereof | |
CN114215090A (en) | Construction method of raft and compression pile in closed space | |
CN205296197U (en) | Prefabricated cushion cap of anticorrosive industry factory building concrete rim of a cup formula | |
CN204173804U (en) | A kind of inside-climbing tower crane of structural beams bearing-type is installed and climbing structure | |
CN111441513A (en) | Cast-in-place concrete wall body combining truss reinforcing steel bars and steel plates and construction method | |
CN103132494A (en) | Embedded anchor cone accurate positioning method | |
CN105275198B (en) | A kind of shear-wall strengthening formwork structure and its construction method | |
CN201915420U (en) | Foundation of temporary gate building | |
CN102454298B (en) | Large-sized reinforced concrete construction of frame beam method | |
CN103898835B (en) | The anti-back of the body of bridge draws load-bearing construction bracket and construction method | |
CN205224420U (en) | Anticorrosive industry factory building precast concrete stand | |
CN209760295U (en) | Pre-buried T type bolt fixed knot of underground pipe gallery electric power support constructs | |
CN113622328A (en) | Box culvert construction assembly, application thereof and box culvert construction method | |
CN109826186B (en) | General prefabricated reinforced concrete guide wall for underground diaphragm wall and implementation method | |
CN202323896U (en) | Accurate positioning device for embedded anchor cone | |
CN112479027A (en) | Gantry crane prefabricated foundation and installation method thereof |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20120118 Termination date: 20150609 |
|
EXPY | Termination of patent right or utility model |