CN202989197U - 改进的高炉热风炉废气排放管道 - Google Patents
改进的高炉热风炉废气排放管道 Download PDFInfo
- Publication number
- CN202989197U CN202989197U CN 201220697061 CN201220697061U CN202989197U CN 202989197 U CN202989197 U CN 202989197U CN 201220697061 CN201220697061 CN 201220697061 CN 201220697061 U CN201220697061 U CN 201220697061U CN 202989197 U CN202989197 U CN 202989197U
- Authority
- CN
- China
- Prior art keywords
- exhaust gas
- pipeline
- hot blast
- blast stove
- flue
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Exhaust Silencers (AREA)
Abstract
本实用新型提供一种改进的高炉热风炉废气排放管道,每座热风炉通过废气阀与烟道相连,烟道经过换热器与制粉***相通,其特征在于:每座热风炉通向烟道的第一废气管道通过隔断装置断开,该排放管道增设有通向烟囱的第二废气管道,每座热风炉与增设的通向烟囱的第二废气管道相连通。该排放管道还增设有通向大气的第三废气管道,每座热风炉和第三废气管道相连通。所述第三废气管道上还安装有消音器。本实用新型的有益效果:高炉热风炉将通入烟道的第一废气管道断开,消除了制粉******的危险源,提高了制粉磨煤机的台时产量,节约成本;只有管道施工,无控制***项目,施工简便,时间短,制粉安全生产有保障,产生效益高。
Description
技术领域
本实用新型涉及高炉热风炉领域,具体涉及一种改进的高炉热风炉废气排放管道。
背景技术
设计制粉***正常生产时,布袋箱出口(***尾端)氧气含量≤12%(氧气含量>12%时遇火源极易产生***)。在***氧气含量>12%时为防止***产生,就要自动开启防爆N2,以惰化***气氛。
如图1所示,2002年7月以前,某炼铁厂高炉热风炉燃烧产生的烟气与热风炉送风转燃烧时排放的空气排入烟道,通过烟囱排入大气。2002年7月,炼铁厂高炉烟煤工程制粉升温炉首次引入高炉热风炉烟气作为二次能源(约占70%左右)利用,用于磨煤机磨制原煤时烘干原煤中水分,其后高炉烟煤工程制粉升温炉分别于2004年7月、2005年8月、2006年6月引入高炉热风炉烟气作为二次能源利用,用于磨煤机磨制原煤时烘干原煤中水分。
热风炉燃烧时烟气中氧气含量只有1~3%,但由送风转燃烧的热风炉需开启废气阀(DN400mm)排空0.4+MPa空气(俗称废气,约60分钟1次),造成大量空气进入烟道,在烟道中与热风炉燃烧产生的烟气混合进入制粉***,造成制粉***氧气含量>12%时间达20分钟左右,此时开启防爆N2(约60分钟1次),不仅造成大量N2浪费,而且破坏制粉***工况使台时产量降低。
发明内容
本实用新型要解决的技术问题是,针对现有技术中存在的上述缺陷,提供一种改进的高炉热风炉废气排放管道。
本实用新型为解决上述技术问题所采用的技术方案是:
改进的高炉热风炉废气排放管道,每座热风炉通过废气阀与烟道相连,烟道经过换热器与制粉***相通,每座热风炉通向烟道的第一废气管道通过隔断装置断开,该排放管道增设有通向烟囱的第二废气管道,每座热风炉与增设的通向烟囱的第二废气管道相连通。
在上述方案中,该排放管道还增设有通向大气的第三废气管道,每座热风炉和第三废气管道相连通。
在上述方案中,所述第三废气管道上还安装有消音器。
本实用新型的工作原理是采用两种技术方案进行废气排放:
(1)将热风炉废气管道通向烟道的第一废气管道通过隔断装置断开,改接第二废气管道,第二废气管道与烟囱相连通。
(2)将热风炉废气管道通向烟道的第一废气管道通过隔断装置断开,改接第三废气管道,第三废气管道与大气相通,从而将空气排入大气。由于热风炉排放0.4+MPa空气时产生较大噪音,因此在第三废气管道上安装有消音器。
本实用新型的有益效果:高炉热风炉将通入烟道的第一废气管道断开,使得每隔60分钟 1次制粉***氧气含量>12%时就要开启防爆氮气的现象消除,节约了大量氮气,消除了制粉******的危险源,提高了制粉磨煤机的台时产量,节约成本;只有管道施工,无控制***项目,施工简便,时间短,制粉安全生产有保障,产生效益高。
附图说明
图1是现有技术中废气排放管道的结构示意图。
图2是本实用新型实施例一的结构示意图。
图3是本实用新型实施例二的结构示意图。
图中,1.第一废气管道,2.第一废气管道,3.第一废气管道,4.废气阀,5.隔断装置,6.消音器。
具体实施方式
下面结合附图和实施例对本实用新型的技术方案做进一步详细的说明。
参照图2所示,本实用新型所述的改进的高炉热风炉废气排放管道,每座热风炉通过废气阀4与烟道相连,烟道经过换热器与制粉***相通,每座热风炉通向烟道的第一废气管道1通过隔断装置5断开,该排放管道增设有通向烟囱的第二废气管道2,每座热风炉与增设的通向烟囱的第二废气管道2相连通。
参照图3所示,该排放管道还增设有通向大气的第三废气管道3,每座热风炉和第三废气管道3相连通。所述第三废气管道3上还安装有消音器6。
本实用新型的工作原理是采用两种技术方案进行废气排放:
(1)如图2所示,将热风炉废气管道通向烟道的第一废气管道1(a-f段、b-g段、c-h段)通过隔断装置5断开,改接第二废气管道2(a-b-c-d-e段),第二废气管道2与烟囱相连通;接入d-e段主要是防止空气反窜进入制粉***。
(2)如图3所示,将热风炉废气管道通向烟道的第一废气管道1(a-f段、b-g段、c-h段)通过隔断装置4断开,改接第三废气管道3(a-b-c段相通后再接i-j段),第三废气管道3与大气相通,从而将空气排入大气。由于热风炉排放0.4+MPa空气时产生较大噪音,因此在i-j段安装有消音器6。
以上所述的仅为本实用新型的较佳实施例而已,当然不能以此来限定本实用新型之权利范围,因此依本实用新型申请专利范围所作的等效变化,仍属本实用新型的保护范围。
Claims (3)
1.改进的高炉热风炉废气排放管道,每座热风炉通过废气阀与烟道相连,烟道经过换热器与制粉***相通,其特征在于:每座热风炉通向烟道的第一废气管道通过隔断装置断开,该排放管道增设有通向烟囱的第二废气管道,每座热风炉与增设的通向烟囱的第二废气管道相连通。
2.如权利要求1所述的改进的高炉热风炉废气排放管道,其特征在于:该排放管道还增设有通向大气的第三废气管道,每座热风炉和第三废气管道相连通。
3.如权利要求1所述的改进的高炉热风炉废气排放管道,其特征在于:所述第三废气管道上还安装有消音器。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201220697061 CN202989197U (zh) | 2012-12-17 | 2012-12-17 | 改进的高炉热风炉废气排放管道 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201220697061 CN202989197U (zh) | 2012-12-17 | 2012-12-17 | 改进的高炉热风炉废气排放管道 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202989197U true CN202989197U (zh) | 2013-06-12 |
Family
ID=48560393
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201220697061 Expired - Fee Related CN202989197U (zh) | 2012-12-17 | 2012-12-17 | 改进的高炉热风炉废气排放管道 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202989197U (zh) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104950826A (zh) * | 2014-03-28 | 2015-09-30 | 上海宝冶集团有限公司 | 热风炉模拟热负荷联动试车方法 |
CN110617715A (zh) * | 2019-10-14 | 2019-12-27 | 云南德胜钢铁有限公司 | 一种热风炉高温废气循环利用方法 |
CN113278747A (zh) * | 2020-02-20 | 2021-08-20 | 宝山钢铁股份有限公司 | 一种防止冒灰的高炉炉顶放散方法 |
-
2012
- 2012-12-17 CN CN 201220697061 patent/CN202989197U/zh not_active Expired - Fee Related
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104950826A (zh) * | 2014-03-28 | 2015-09-30 | 上海宝冶集团有限公司 | 热风炉模拟热负荷联动试车方法 |
CN104950826B (zh) * | 2014-03-28 | 2018-02-16 | 上海宝冶集团有限公司 | 热风炉模拟热负荷联动试车方法 |
CN110617715A (zh) * | 2019-10-14 | 2019-12-27 | 云南德胜钢铁有限公司 | 一种热风炉高温废气循环利用方法 |
CN113278747A (zh) * | 2020-02-20 | 2021-08-20 | 宝山钢铁股份有限公司 | 一种防止冒灰的高炉炉顶放散方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102840593B (zh) | 烟气干燥褐煤中速磨制粉*** | |
CN203116490U (zh) | 一种具有乏气热能暨水回收功能的褐煤干燥燃煤*** | |
CN103925605B (zh) | 煤粉燃烧加热一次风的高水分褐煤中速磨煤机制粉*** | |
CN103834755A (zh) | 一种高炉喷煤***煤粉预热工艺方法 | |
CN202989197U (zh) | 改进的高炉热风炉废气排放管道 | |
CN102840594B (zh) | 烟气干燥褐煤中速磨直吹式制粉*** | |
CN206127346U (zh) | 一种欧冶炉喷煤烟气自循环结构 | |
CN203771439U (zh) | 煤粉燃烧加热一次风的高水分褐煤中速磨煤机制粉*** | |
CN103486867A (zh) | 水泥窑旁路放风工艺及*** | |
CN102748956A (zh) | 一种陶瓷行业喷雾干燥塔回收利用窑炉余热的方法及装置 | |
CN205174413U (zh) | 锅炉烟尘旋风分离回收利用装置 | |
CN103206717B (zh) | 冷热烟气干燥褐煤中速磨制粉*** | |
CN202195494U (zh) | 烟气干燥褐煤中速磨直吹式制粉*** | |
CN204718348U (zh) | 煤矿低浓度瓦斯氧化制取高温热风及煤泥干燥控制*** | |
CN105170296A (zh) | 一种全周期惰化的制粉***精细防爆*** | |
CN202253598U (zh) | 一种燃用高水分褐煤的锅炉*** | |
CN102607286A (zh) | 熔盐炉余热发电燃烧综合利用*** | |
CN104848674A (zh) | 煤矿低浓度瓦斯氧化制取高温热风及煤泥干燥工艺 | |
CN203771438U (zh) | 煤气燃烧加热一次风的高水分褐煤中速磨煤机制粉*** | |
CN202770228U (zh) | 一种陶瓷行业喷雾干燥塔回收利用窑炉余热的装置 | |
CN203464764U (zh) | 水泥窑旁路放风*** | |
CN102607049A (zh) | 工业锅炉循环风送煤粉燃烧技术 | |
CN105485706A (zh) | 锅炉烟尘旋风分离回收利用装置及其烟尘回收利用的方法 | |
CN202814129U (zh) | 回转窑-矿热炉工艺镍铁生产线的余热利用*** | |
CN205065701U (zh) | 一种降低无烟煤锅炉一次风温的实现装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20130612 Termination date: 20171217 |