CN103375025A CN2012101240412A CN201210124041A CN103375025A CN 103375025 A CN103375025 A CN 103375025A CN 2012101240412 A CN2012101240412 A CN 2012101240412A CN 201210124041 A CN201210124041 A CN 201210124041A CN 103375025 A CN103375025 A CN 103375025A
Authority
CN
China
Prior art keywords
scaffold
building
keeper
screw rod
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2012101240412A
Other languages
Chinese (zh)
Inventor
凌士山
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ANHUI SHUCHENG SANLE BABY CARRIAGE Co Ltd
Original Assignee
ANHUI SHUCHENG SANLE BABY CARRIAGE Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ANHUI SHUCHENG SANLE BABY CARRIAGE Co Ltd filed Critical ANHUI SHUCHENG SANLE BABY CARRIAGE Co Ltd
Priority to CN2012101240412A priority Critical patent/CN103375025A/en
Publication of CN103375025A publication Critical patent/CN103375025A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Movable Scaffolding (AREA)

Abstract

The invention discloses a wall connecting device for a building scaffold and relates to the field of building architectural equipment. The wall connecting device is composed of a positioning member, a bolt and a matched nut, wherein the positioning member is embedded in the outer side of a ring beam of a building, the tail end of a screw is fixed at the end of a short horizontal pipe of the scaffold, and the bolt head of the screw is sleeved in a long hole formed in the center of a front plate of the positioning member and locked by the nut, so that the scaffold and the building are connected fixedly. According to the wall connecting device, intermittent construction and secondary repair construction due to existence of the scaffold can be avoided while the construction stability of the scaffold is reliably guaranteed, and the construction smoothness is improved substantially.

Description

The wall attaching parts of building scaffold
Technical field
The present invention relates to building constructions construction equipment field, i.e. the wall attaching parts of building scaffold.
Background technology
In the building site of multistory building or highrise building, the scaffold that is formed by fixedly connecting by fastener by the steel pipe of three mutually perpendicular directions is indispensable auxiliary equipment.For guaranteeing that the anti-flare of scaffold homeostasis reaches and the constant maintenance suitable distance of building body, take at present an end of one section steel pipe (or reinforcing bar) is imbedded the cement casting body of building structure, long or the short steel pipe other end exposes floor side bar or floor face (the generally conveniently interim intercepting in the building site of tube material), one end of the scaffolding steel pipe (short transversal pipe) of building facade vertical direction is fixedly connected with by fastener with the steel pipe of imbedding the cement casting body, the other end of the scaffolding steel pipe of building facade vertical direction also uses fastener to be fixedly connected with the steel pipe of other both direction of scaffold, so realizes the rigid connection of scaffold and building body.The weak point of above-mentioned scaffold and building body method of attachment comprises: 1. scaffold is in the horizontal-extending of sustained height, in the extension of upward direction, because super high wall body is or/and the existence of super wide body of wall, alternating floor is that embedded steel tube, every horizontal interval one fan column are embedded steel tube (at once in the industry so-called " three steps two strode ") between being difficult to realize whenever upwards, and " three steps two strode " is the fundamental norms requirement of building site execution control, so there are potential safety hazard in present scaffold and building body connected mode; 2, when second pouring and body of wall filling, launch because stopping construction or inconvenience construction, embedded steel tube was whipped to remove by certain operation constructor with often being connected of scaffolding steel pipe, retained major safety risks; 3, after body frame construction in building is finished during filled wall, scaffold still need exist, the embedded steel tube place just retains the hole natch, before removing, scaffold need body of wall repairing, insulation repairing, metope paint to repair, but the body of wall compactness of mend is not enough, after the crackle crack appearred in the outer facade cement top layer of some time back wall, the phenomenon such as leak infiltration namely appearred even in mend indoor; 4, repair for the body of wall that carries out the embedded steel tube place, need to remove embedded steel tube at the external paragraph of cement casting, the removal method generally adopts the oxygen blast cutting, it is the common cause (so each building site all need be equipped with some fire extinguishers, this also is the mandatory provisions in the daily management standard) that causes the building site fire that high-temperature steel slag flashes; 5, remove embedded steel tube before the external paragraph of cement casting, need to utilize steel wire (or rope), lever that the scaffold tractive is located in wall body door or window, Lou Zhu etc., obtain to be connected again with the displacement of building body, again cause the amount of labour used to increase.
Summary of the invention
Task of the present invention provides a kind of wall attaching parts of novel building scaffold, in Reliable guarantee scaffold construction safety, also can reduce to greatest extent the obstruction to each link of building operations, improves efficiency of construction.
The feature of the wall attaching parts of the design's building scaffold is: it is comprised of keeper, bolt and matching nut, keeper is embedded in the body collar tie beam outside, building, there is elongated hole in its header board central authorities, thereafter plate and header board and the pipe fitting between them are integrated, the screw rod tail end is fixed in scaffold short transversal pipe end, screw rod bolt head and keeper header board pivot bush unit.
Has spring washer between nut and the screw rod bolt head.
What connect the keeper front and rear panels is square pipe fitting.
The mode of installing and using of the design's wall attaching parts: 1, keeper is embedded in the body collar tie beam outside, building, and the header board of keeper is concordant with the outer side elevation of collar tie beam; 2, screw rod is packed into successively spring washer, nut are fixed in the screw rod tail end one end of scaffold short transversal pipe again; 3, make screw rod bolt head insert header board central authorities' elongated hole and rotate 90 degree, screw nut again and pressing the keeper anter by spring washer, this moment, screw rod can not come off by self-align elongated hole, and the scaffold short transversal pipe of its connection is perpendicular to the building facade; 4, by existing building steel tube fastener short transversal pipe is fixed in the vertical steel pipe (or horizontal steel pipe of parallel building facade) of scaffold.As above then realized being fixedly connected with of scaffold and building body.
The contrary dismounting that is this wall attaching parts by said process.
Good effect of the present invention: screw rod spare can be reused, and only keeper is expendable part, obviously economical with materials; Keeper is embedded in the collar tie beam, and other parts all outside collar tie beam, do not hinder any middle operation construction, can not produce interrupted construction and secondary reparation construction because of the scaffold factor, and the lifting construction smooth degree is obviously saved man-hour; Pre-buried keeper exposed area is little, in practical product, 0.5 square decimeter of each junction exposed area less than, and to building body metope post processing without difficulty, without negative effect; Parts are few, cooperate succinctly, and the reliable in structure when assembling is used, safety guarantee obviously surmount present scaffold connecting mode in usefulness, and last top-down layering is removed also quite simple.
Description of drawings
Fig. 1 is the design's device, scaffold and building body (collar tie beam) position relationship floor map.
Fig. 2 a-b is respectively two kinds of to some extent keepers of difference.
Fig. 3 is scaffold short transversal pipe and the design's device explosion figure.
Fig. 4 is the connection status of the design's device.
Fig. 5 is that P-P cuts open the m of position to view among Fig. 4.
The specific embodiment
Embodiment 1.Referring to Fig. 1-3: the wall attaching parts of this building scaffold is by the keeper (1) of steel, bolt (2) and nut (3) form, keeper (1) is embedded in building body collar tie beam (6) outside, its header board (13) is concordant with the outer side elevation of collar tie beam (6), there is elongated hole (14) in header board (13) central authorities, thereafter plate (11) and header board (13) and the pipe fitting between them (12) are integrated, screw rod (21) tail end is fixed in scaffold short transversal pipe (4) end, bolt head (22) and keeper header board pivot bush unit.The internal diameter of circular pipe fitting (12) is not less than the length of elongated hole (14), namely when bolt head (22) after elongated hole (14) inserts, it can rotate 90 and spend in pipe, bolt head (22) is tangled by the avris of elongated hole (14).Referring to Fig. 4: after bolt head (22) inserts elongated hole (14) and tangled, screw nut (3) and pressing keeper anter (13), screw rod this moment (21) is fixed with keeper (1) relative position, the scaffold short transversal pipe (4) that screw rod (21) tail end connects is perpendicular to the building facade, short transversal pipe (4) is fixed in the vertical steel pipe (5) (referring to Fig. 1) of scaffold, and then scaffold is fixedly connected with Lou Tiyi.
Embodiment 2.Screw rod pack into successively spring washer, nut are fixed in the screw rod tail end one end of scaffold short transversal pipe again.Referring to Fig. 4-5: integrated with it between rear plate (11) and header board (13) is square pipe fitting (12).Micro-sedimentation appears in scaffold sometimes, under the prerequisite of loose nut (3) slightly, compare with circular pipe fitting, square pipe fitting (12) allows the amount of moving down of bolt head (22) (namely allowing bolt (2)) large, can effectively avoid screw rod (21) bending.In addition, between spring washer and bolt head (22), can also install again a pad that can only cover elongated hole (14) additional, flow into the internal cavity of keeper (1) and be difficult to discharge (this problem also can make the suitable downward solution of elongated hole (14)) with pre-rainwater-proof, remaining with embodiment 1.This example example 1 is optimized.

Claims (3)

1. the feature of the wall attaching parts of building scaffold is: it is comprised of keeper, bolt and matching nut, keeper is embedded in the body collar tie beam outside, building, there is elongated hole in its header board central authorities, thereafter plate and header board and the pipe fitting between them are integrated, the screw rod tail end is fixed in scaffold short transversal pipe end, screw rod bolt head and keeper header board pivot bush unit.
2. company's wall fastener of building scaffold according to claim 1 is characterized in that: have spring washer between nut and the screw rod bolt head.
3. company's wall fastener of building scaffold according to claim 1 is characterized in that: what connect the keeper front and rear panels is square pipe fitting.
CN2012101240412A 2012-04-14 2012-04-14 Wall connecting device for building scaffold Pending CN103375025A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012101240412A CN103375025A (en) 2012-04-14 2012-04-14 Wall connecting device for building scaffold

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012101240412A CN103375025A (en) 2012-04-14 2012-04-14 Wall connecting device for building scaffold

Publications (1)

Publication Number Publication Date
CN103375025A true CN103375025A (en) 2013-10-30

Family

ID=49460823

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012101240412A Pending CN103375025A (en) 2012-04-14 2012-04-14 Wall connecting device for building scaffold

Country Status (1)

Country Link
CN (1) CN103375025A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104264970A (en) * 2014-08-29 2015-01-07 中国建筑第八工程局有限公司 Method for installing through-wall bolt on ultrahigh shear wall

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE29612634U1 (en) * 1996-06-25 1996-09-12 Chiou, Hsiu-Hsing, Taoyuan Safety anchoring
CN2646282Y (en) * 2003-09-06 2004-10-06 江苏金土木建设集团有限公司第七分公司 Wall connecting member of scaffold
CA2623168A1 (en) * 2008-03-10 2009-09-10 David Vigneault Anchorage system for handrail
CN201635381U (en) * 2010-03-19 2010-11-17 宁波建工股份有限公司 Wall connecting piece
CN202627474U (en) * 2012-04-14 2012-12-26 安徽省舒城三乐童车有限责任公司 Wall connecting device of building scaffold

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE29612634U1 (en) * 1996-06-25 1996-09-12 Chiou, Hsiu-Hsing, Taoyuan Safety anchoring
CN2646282Y (en) * 2003-09-06 2004-10-06 江苏金土木建设集团有限公司第七分公司 Wall connecting member of scaffold
CA2623168A1 (en) * 2008-03-10 2009-09-10 David Vigneault Anchorage system for handrail
CN201635381U (en) * 2010-03-19 2010-11-17 宁波建工股份有限公司 Wall connecting piece
CN202627474U (en) * 2012-04-14 2012-12-26 安徽省舒城三乐童车有限责任公司 Wall connecting device of building scaffold

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104264970A (en) * 2014-08-29 2015-01-07 中国建筑第八工程局有限公司 Method for installing through-wall bolt on ultrahigh shear wall

Similar Documents

Publication Publication Date Title
CN202627474U (en) Wall connecting device of building scaffold
CN202139833U (en) Cantilever scaffold for building construction
CN106337555A (en) Method for constructing triangular steel support for cantilever structure of outer wall of building
CN205077845U (en) Hydraulic intelligent climbing operation scaffold for core barrel well of building
CN102561669B (en) Cantilever scaffold and construction method thereof
CN209099741U (en) A kind of bolt connecting type builder's jack
CN112144854A (en) Anchor pulling type section steel overhanging support operation scaffold combined system and construction method
CN202937005U (en) Cast-in-situ concrete beam lateral template reinforcement device
CN203961238U (en) Bolt anchor slab adjustable tool formula builder's jack
CN105507573B (en) The installation method of shaped steel Overhanging Outside Scaffold
CN104847102B (en) Attachment type raise scaffold is received attached wall method and the device thereof of section in external wall
CN106088447A (en) A kind of exterior wall builder's jack shaped steel eye protective brick device and construction method
CN207879008U (en) Diameter Silo structure roof support system
CN102720347B (en) Scaffold tool type wall connecting piece and construction method thereof
CN103375025A (en) Wall connecting device for building scaffold
CN208734057U (en) A kind of wall-connecting piece
CN207063177U (en) Cast-in-place concrete floor hanging built-in fitting
CN202047581U (en) Wall connecting piece for scaffold
CN107780644B (en) Operation platform for elevator shaft construction and use method thereof
CN105275198A (en) A shear wall formwork reinforcing construction method
CN207080169U (en) A kind of wall attaching parts for bridge construction safety climbing ladder
CN204343647U (en) A kind of the shaped steel suspension scaffolding bracing frame
CN210152143U (en) A connection structure for concrete cladding panel hoist and mount construction
CN209293436U (en) Giant superposed beam concrete pouring combination device
CN102605964B (en) Separately mounted grille on elevator shaft opening and construction method of separately mounted grille

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20131030