CN201809774U - Foundation ditch support replacement and inner support removal construction structure - Google Patents

Foundation ditch support replacement and inner support removal construction structure Download PDF

Info

Publication number
CN201809774U
CN201809774U CN2010205314163U CN201020531416U CN201809774U CN 201809774 U CN201809774 U CN 201809774U CN 2010205314163 U CN2010205314163 U CN 2010205314163U CN 201020531416 U CN201020531416 U CN 201020531416U CN 201809774 U CN201809774 U CN 201809774U
Authority
CN
China
Prior art keywords
support replacement
foundation ditch
basement
bored pile
support
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2010205314163U
Other languages
Chinese (zh)
Inventor
李鹏
李继承
安鹏
熊德成
马泉
姜川
马军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Third Engineering Bureau Co Ltd
Original Assignee
China Construction Third Engineering Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Third Engineering Bureau Co Ltd filed Critical China Construction Third Engineering Bureau Co Ltd
Priority to CN2010205314163U priority Critical patent/CN201809774U/en
Application granted granted Critical
Publication of CN201809774U publication Critical patent/CN201809774U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Working Measures On Existing Buildindgs (AREA)

Abstract

The utility model relates to a foundation ditch support replacement and inner support removal construction structure. A water prevention cement injection pile is arranged on the periphery inside a foundation ditch, a cast-in-situ bored pile is arranged at the inner side of the water prevention cement injection pile, a carrying pile is arranged at the inner side of the cast-in-situ bored pile, the upper part of the carrying pile is a carrying table, the upper part of the carrying table is a basement external wall, the inner side of the carrying table is a basement bottom plate, a top beam is arranged at the upper end of the cast-in-situ bored pile, the inner side of the top beam is connected with an inner support, the inner support passes through the basement external wall, a hidden beam is arranged in the basement external wall arranged at the outer side of a basement floor slab, a support replacement beam is arranged outside the hidden beam, and both ends of the support replacement beam are respectively supported between the cast-in-situ bored pile and the hidden beam. The construction structure can effectively improve the construction quality, reasonably reduces the engineering manufacture cost, shortens the construction period and has the practical social benefits and economic benefits.

Description

Foundation ditch support replacement and interior supporting removal constructing structure
Technical field
The utility model relates to a kind of technical field of building construction, particularly relates to a kind of foundation ditch support replacement and interior supporting removal constructing structure.
Background technology
In the urban architecture compact district, owing to be subjected to the influence of surrounding enviroment, pattern foundation pit supporting structure can only adopt inner supporting body system.Common square foundation ditch adopts steel hoop concrete support system; The strip foundation ditch adopts reinforced concrete truss to support body to be.And as temporary support structure, because of its many places in the business district, city, on every side or building intensive, or close on operated subway, this just also proposes higher challenge to method for dismounting.Concrete removal method commonly used has gunpowder demolition blasting, mechanical removal, artificial dismounting etc.Gunpowder explosion abrupt release impact force is big, the mechanical removal vibration is big, noise is big, manually removes long in time limit.In order to ensure temporary supporting system, the permanent structure engineering of having constructed and neighboring buildings, underground installation not being caused adverse effect, the distortion that strict control support system is removed the back foundation ditch, consider factors such as safety, quality, duration, quiet quick-fried dismounting becomes first-selection, therefore improving the quiet quick-fried dismounting of the interim support of deep foundation ditch level is a new problem, has the realistic meaning of highly significant.Particularly in the construction of support replacement beam.
The utility model content
The purpose of this utility model is at the problems referred to above, proposes a kind of foundation ditch support replacement and interior supporting removal constructing structure.
The technical solution of the utility model is: a kind of foundation ditch support replacement and interior supporting removal constructing structure, water powder spray piling till the foundation ditch inner peripheral, in sealing powder spray piling inboard is bored pile, inboard at bored pile for holding stake, holding a top is cushion cap, cushion cap top is outer wall of basement, the cushion cap inboard is a basement bottom board, described bored pile upper end is provided with Guan Liang, hat beam inboard is connected with interior support, supports in this and passes outer wall of basement, is provided with dark beam in the outer wall of basement in the basement floor floor outside, this dark beam outside is provided with the support replacement beam, and these support replacement beam two ends are supported on respectively between bored pile and the dark beam.
Described support replacement beam inner end is connected in the described dark beam by being anchored reinforcing bar, and described support replacement beam outer end is arranged at the arc of bored pile form fit.
Described anchor reinforcing bar is two-layer up and down.
Described support replacement beam is a reinforced concrete structure, and its inside is provided with reinforcing bar.
Described sealing powder spray piling is double-deck.
The beneficial effects of the utility model
This constructing structure can effectively improve construction quality, reasonably reduce construction costs and reduction of erection time, has very real social benefit and economic benefit.
Description of drawings
Fig. 1 is the schematic diagram of this foundation ditch support replacement and interior supporting removal constructing structure
Fig. 2 is the partial schematic diagram of this foundation ditch support replacement and interior supporting removal constructing structure
Fig. 3 is for being the I portion structure for amplifying schematic diagram among Fig. 2
Fig. 4 is the local schematic top plan view of this foundation ditch support replacement and interior supporting removal constructing structure
Fig. 5 is the 1-1 cross section structure schematic diagram among Fig. 4
The specific embodiment
Referring to Fig. 1-Fig. 5,1. Guan Liang among the figure, 2. outer wall of basement, 3. underground two floor laminates, support in 4., 5. the B1 floor plates, 6. basement bottom board, 7. hold stake, 8. cushion cap, 9. bored pile, 10. support replacement beam, 11. sealing powder spray pilings, wherein 10-1. is anchored reinforcing bar, 10-2. reinforcing bar.
Embodiment: a kind of foundation ditch support replacement and interior supporting removal constructing structure, water powder spray piling till the foundation ditch inner peripheral, in sealing powder spray piling inboard is bored pile, inboard at bored pile for holding stake, holding a top is cushion cap, cushion cap top is outer wall of basement, the cushion cap inboard is a basement bottom board, described bored pile upper end is provided with Guan Liang, hat beam inboard is connected with interior support, supports in this and passes outer wall of basement, is provided with dark beam in the outer wall of basement in the basement floor floor outside, this dark beam outside is provided with the support replacement beam, and these support replacement beam two ends are supported on respectively between bored pile and the dark beam.Described support replacement beam inner end is connected in the described dark beam by being anchored reinforcing bar, and described support replacement beam outer end is arranged at the arc of bored pile form fit.Described anchor reinforcing bar is two-layer up and down.Described support replacement beam is a reinforced concrete structure, and its inside is provided with reinforcing bar.Described sealing powder spray piling is double-deck.

Claims (5)

1. supporting removal constructing structure in a foundation ditch support replacement reaches, water powder spray piling till the foundation ditch inner peripheral, in sealing powder spray piling inboard is bored pile, inboard at bored pile for holding stake, holding a top is cushion cap, cushion cap top is outer wall of basement, the cushion cap inboard is a basement bottom board, it is characterized in that: described bored pile upper end is provided with Guan Liang, hat beam inboard is connected with interior support, supports in this and passes outer wall of basement, is provided with dark beam in the outer wall of basement in the basement floor floor outside, this dark beam outside is provided with the support replacement beam, and these support replacement beam two ends are supported on respectively between bored pile and the dark beam.
2. foundation ditch support replacement according to claim 1 and interior supporting removal constructing structure is characterized in that: described support replacement beam inner end is connected in the described dark beam by being anchored reinforcing bar, and described support replacement beam outer end is arranged at the arc of bored pile form fit.
3. foundation ditch support replacement according to claim 1 and interior supporting removal constructing structure is characterized in that: described anchor reinforcing bar is for two-layer up and down.
4. foundation ditch support replacement according to claim 1 and interior supporting removal constructing structure, it is characterized in that: described support replacement beam is a reinforced concrete structure, and its inside is provided with reinforcing bar.
5. foundation ditch support replacement according to claim 1 and interior supporting removal constructing structure is characterized in that: described sealing powder spray piling is for double-deck.
CN2010205314163U 2010-09-16 2010-09-16 Foundation ditch support replacement and inner support removal construction structure Expired - Fee Related CN201809774U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010205314163U CN201809774U (en) 2010-09-16 2010-09-16 Foundation ditch support replacement and inner support removal construction structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010205314163U CN201809774U (en) 2010-09-16 2010-09-16 Foundation ditch support replacement and inner support removal construction structure

Publications (1)

Publication Number Publication Date
CN201809774U true CN201809774U (en) 2011-04-27

Family

ID=43892715

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010205314163U Expired - Fee Related CN201809774U (en) 2010-09-16 2010-09-16 Foundation ditch support replacement and inner support removal construction structure

Country Status (1)

Country Link
CN (1) CN201809774U (en)

Cited By (22)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102444142A (en) * 2011-09-20 2012-05-09 新世纪建设集团有限公司 Pile group column replacement expanded basement and construction method of same
CN102720201A (en) * 2012-07-02 2012-10-10 中建三局第二建设工程有限责任公司 Support change construction building method implemented by using main structure of building
CN102747736A (en) * 2012-07-12 2012-10-24 中建一局集团第三建筑有限公司 Combination tool type inner bracing changing method
CN102758454A (en) * 2012-07-24 2012-10-31 华东建筑设计研究院有限公司 Structure capable of transmitting horizontal force between neighboring independent basements
CN102828520A (en) * 2012-09-11 2012-12-19 中煤科工集团武汉设计研究院中汉岩土工程分公司 Ring-shaped inner supporting structure used in deep peat soil deep foundation pit
CN102966108A (en) * 2012-11-23 2013-03-13 中铁四局集团建筑工程有限公司 Construction method of deep foundation pit close to building and adopting underground structure as internal support
CN103205970A (en) * 2012-01-16 2013-07-17 苏州设计研究院股份有限公司 Foundation pit enclosure supporting plate structure
CN103233477A (en) * 2013-04-25 2013-08-07 温州天然工程勘察有限公司 Method for pouring open type reinforced concrete support and baseboard floor in deep foundation pit supporting engineering
CN103243722A (en) * 2012-02-13 2013-08-14 郑鸿彰 Construction method of novel inner support of foundation trench
CN104032744A (en) * 2014-05-21 2014-09-10 中国建筑第八工程局有限公司 Support replacing construction method in group pit project
CN104328789A (en) * 2014-10-31 2015-02-04 天津三建建筑工程有限公司 Overhanging type support changing construction method for reinforced concrete horizontal inner support
CN104631824A (en) * 2014-12-28 2015-05-20 上海建工一建集团有限公司 Support-changing construction method of structural slabs at temporary division walls
CN104831738A (en) * 2015-05-25 2015-08-12 成都市第六建筑工程公司 Internal support replacement construction method for concrete beam of anchoring dado pile
CN104878835A (en) * 2015-05-19 2015-09-02 叶长青 Strip-shaped foundation house rear basement structure
CN105239583A (en) * 2015-09-07 2016-01-13 中铁三局集团有限公司 Construction method applicable to dismantling of special-shaped big deep crossing joint foundation pit annular support
CN105735325A (en) * 2016-04-20 2016-07-06 山东大学 Intensified permanent support assembly type basement structure system and construction method
CN108824483A (en) * 2018-07-23 2018-11-16 中国建筑第八工程局有限公司 The external wall structure and its construction method of multi-storey basement
CN109371982A (en) * 2018-12-07 2019-02-22 武汉丰达地质工程有限公司 A kind of construction method of basement bottom board support replacement
CN110029674A (en) * 2019-04-18 2019-07-19 江苏省华建建设股份有限公司 A kind of bracing demolition and basement construction method for deep basal pit
CN112240033A (en) * 2019-07-18 2021-01-19 重庆建工第七建筑工程有限责任公司 Construction method of unconventional reverse construction outer wall structure in high slope area
JP2022125318A (en) * 2018-01-24 2022-08-26 株式会社竹中工務店 Construction method of structure
JP2022132363A (en) * 2018-01-24 2022-09-08 株式会社竹中工務店 Structure construction method

Cited By (33)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102444142A (en) * 2011-09-20 2012-05-09 新世纪建设集团有限公司 Pile group column replacement expanded basement and construction method of same
CN102444142B (en) * 2011-09-20 2014-01-15 新世纪建设集团有限公司 Pile group column replacement expanded basement and construction method of same
CN103205970B (en) * 2012-01-16 2015-07-08 苏州设计研究院股份有限公司 Foundation pit enclosure supporting plate structure
CN103205970A (en) * 2012-01-16 2013-07-17 苏州设计研究院股份有限公司 Foundation pit enclosure supporting plate structure
CN103243722A (en) * 2012-02-13 2013-08-14 郑鸿彰 Construction method of novel inner support of foundation trench
CN103243722B (en) * 2012-02-13 2015-10-28 郑鸿彰 The construction method of novel inner support of foundation trench
CN102720201A (en) * 2012-07-02 2012-10-10 中建三局第二建设工程有限责任公司 Support change construction building method implemented by using main structure of building
CN102720201B (en) * 2012-07-02 2014-10-29 中建三局第二建设工程有限责任公司 Support change construction building method implemented by using main structure of building
CN102747736B (en) * 2012-07-12 2014-06-11 中建一局集团第三建筑有限公司 Combination tool type inner bracing changing method
CN102747736A (en) * 2012-07-12 2012-10-24 中建一局集团第三建筑有限公司 Combination tool type inner bracing changing method
CN102758454A (en) * 2012-07-24 2012-10-31 华东建筑设计研究院有限公司 Structure capable of transmitting horizontal force between neighboring independent basements
CN102828520A (en) * 2012-09-11 2012-12-19 中煤科工集团武汉设计研究院中汉岩土工程分公司 Ring-shaped inner supporting structure used in deep peat soil deep foundation pit
CN102966108A (en) * 2012-11-23 2013-03-13 中铁四局集团建筑工程有限公司 Construction method of deep foundation pit close to building and adopting underground structure as internal support
CN103233477A (en) * 2013-04-25 2013-08-07 温州天然工程勘察有限公司 Method for pouring open type reinforced concrete support and baseboard floor in deep foundation pit supporting engineering
CN104032744A (en) * 2014-05-21 2014-09-10 中国建筑第八工程局有限公司 Support replacing construction method in group pit project
CN104032744B (en) * 2014-05-21 2016-05-04 中国建筑第八工程局有限公司 Support replacement construction method in the engineering of group hole
CN104328789B (en) * 2014-10-31 2016-04-13 天津三建建筑工程有限公司 The overhanging type support replacement construction method of the horizontal inner support of a kind of steel concrete
CN104328789A (en) * 2014-10-31 2015-02-04 天津三建建筑工程有限公司 Overhanging type support changing construction method for reinforced concrete horizontal inner support
CN104631824A (en) * 2014-12-28 2015-05-20 上海建工一建集团有限公司 Support-changing construction method of structural slabs at temporary division walls
CN104878835A (en) * 2015-05-19 2015-09-02 叶长青 Strip-shaped foundation house rear basement structure
CN104831738A (en) * 2015-05-25 2015-08-12 成都市第六建筑工程公司 Internal support replacement construction method for concrete beam of anchoring dado pile
CN105239583A (en) * 2015-09-07 2016-01-13 中铁三局集团有限公司 Construction method applicable to dismantling of special-shaped big deep crossing joint foundation pit annular support
CN105239583B (en) * 2015-09-07 2017-03-29 中铁三局集团有限公司 Suitable for the construction method that special-shaped deep big crossover node foundation ditch annular brace is removed
CN105735325A (en) * 2016-04-20 2016-07-06 山东大学 Intensified permanent support assembly type basement structure system and construction method
CN105735325B (en) * 2016-04-20 2018-01-23 山东大学 A kind of intensive permanent support assembled basement structure system and construction method
JP2022125318A (en) * 2018-01-24 2022-08-26 株式会社竹中工務店 Construction method of structure
JP2022132363A (en) * 2018-01-24 2022-09-08 株式会社竹中工務店 Structure construction method
JP7293567B2 (en) 2018-01-24 2023-06-20 株式会社竹中工務店 Construction method of structures
JP7293568B2 (en) 2018-01-24 2023-06-20 株式会社竹中工務店 Construction method of structures
CN108824483A (en) * 2018-07-23 2018-11-16 中国建筑第八工程局有限公司 The external wall structure and its construction method of multi-storey basement
CN109371982A (en) * 2018-12-07 2019-02-22 武汉丰达地质工程有限公司 A kind of construction method of basement bottom board support replacement
CN110029674A (en) * 2019-04-18 2019-07-19 江苏省华建建设股份有限公司 A kind of bracing demolition and basement construction method for deep basal pit
CN112240033A (en) * 2019-07-18 2021-01-19 重庆建工第七建筑工程有限责任公司 Construction method of unconventional reverse construction outer wall structure in high slope area

Similar Documents

Publication Publication Date Title
CN201809774U (en) Foundation ditch support replacement and inner support removal construction structure
CN201546227U (en) Steel support beam for supporting foundation pit bracing piling wall and basement structure outer wall
CN101914925A (en) Basement by using optimized composite prefabricated arch wall as external wall
CN101235649A (en) Covered digging system for pit
CN109356169B (en) Foundation pit row pile supporting system and construction method thereof
CN103103988A (en) Foundation ditch construction method of horizontal bracing structure of central island floor slaps
CN201581409U (en) Combined tower crane foundation of cross beam supported by steel latticework columns in deep foundation pit
CN103306301A (en) Pile foundation structure and construction method thereof based on fender post and basement baseplate
CN201746839U (en) Low-environment-disturbance device for removing supports from foundation pit
CN102031785A (en) Foundation pit supporting technique for replacing temporary enclosing purlin by using plate belt of permanent structure
CN113622464A (en) Anti-cracking waterproof construction process for basement outer wall post-cast strip
CN103790185A (en) Shock insulation groove enclosure wall for deep foundation shock insulation structure and constructing method of shock insulation groove enclosure wall
CN110593306A (en) Large-area underground space structure spanning operation subway tunnel and construction method thereof
CN102953385B (en) Construction method for changing support of foundation pit at irregular place of rampway
CN208415293U (en) Integral prefabricated assembled main transformer foundation for indoor substation
CN209855277U (en) Conversion layer structure for underground added layer of existing building
CN216041201U (en) Earlier prop and dig double-deck diagonal bracing foundation ditch enclosure system afterwards
CN107938707A (en) Prefabricated assembled underground subway station top board structure
CN204898717U (en) Shaft major structure of built -in lattice stand
CN103015432A (en) Construction method for changing steel pipe supports of ramp foundation pit
CN206128077U (en) Dark excavation supporting's interior bearing structure
CN107313551A (en) A kind of concrete prefabricated wallboard of steel bar girder and structural system and its construction method
CN203782544U (en) Combined bracket for river-crossing section of elevated bridge
CN207376945U (en) A kind of concrete prefabricated wallboard of steel bar girder and structural system
CN216713040U (en) Full-prefabricated pier type portal inclined support pile structure system

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110427

Termination date: 20180916

CF01 Termination of patent right due to non-payment of annual fee