Prior art keywords
well
shaft
lattice column
side wall
main body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201520621524.2U
Other languages
Chinese (zh)
Inventor
王飞
陈海军
徐冲
向亮
刘赪
靳宝成
黄双林
刘国庆
何冠男
程芳卉
张泰�
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway First Survey and Design Institute Group Ltd
Original Assignee
China Railway First Survey and Design Institute Group Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway First Survey and Design Institute Group Ltd filed Critical China Railway First Survey and Design Institute Group Ltd
Priority to CN201520621524.2U priority Critical patent/CN204898717U/en
Application granted granted Critical
Publication of CN204898717U publication Critical patent/CN204898717U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

The utility model relates to a shaft major structure of built -in lattice stand. The additional work of conventional shaft reverse construction method is more, destroys the waterproof system of major structure periphery. The utility model discloses a shaft envelope has certain inserting and compares, be provided with in orthogonal, the multiply horizontal well longeron in crossbeam and the well in the shaft in the shaft envelope inner circle side wall of giving first place to, main part side wall, correspond in every layer of well crossbeam and well in longeron graphic settings have the medium plate, in the well in crossbeam and the well longeron intersect and be provided with well internal frame stand, be provided with the side wall lattice column of pouring in the lump in the main part side wall, the interior longeron position department of crossbeam and well is provided with the interior lattice column of the well of pouring in the lump in the well. The utility model discloses the pattern is simple and clear, and the atress is reasonable, and the strong and easy to carry out of implementation nature can satisfy shaft reverse construction method's implementation requirement, has realized really again that shaft major structure periphery waterproofing membrane's harmless full package lays under the reverse construction method prerequisite, has improved the security and the durability of shaft structure.

Description

A kind of shaft main body structure of built-in lattice column
Technical field
The utility model belongs to tunnels and underground engineering technical field, is specifically related to a kind of shaft main body structure of built-in lattice column.
Background technology
Along with improving constantly of the technology of building, its construction level and construction requirements, increasing new technology, new technology, novel construction method are applied in the construction of tunnels and underground engineering.In recent years, vertical shaft is on the increase in railway, highway, diversion, subway and municipal engineering, or operation ventilation or auxiliary construction or forever use, under all kinds of complicated periphery and geological conditions dark, pozo engineering is also more and more many, adopts contrary sequence method to be the implementation method that a kind of safer economy is safe.
Conventional vertical shaft contrary sequence method is generally by establishing waist rail, joint bar along well bore longitudinal separation, or adopt anchor pole to encorbelment, be preced with the modes such as beam convex inverted side-wall, superimposed wall stress system, support or carry the agent structure that " from top to bottom " builds, until vertical shaft is built complete, additional work and operation are all more, especially destroy and split the waterproofing system of agent structure periphery, be difficult to realize " entirely wrapping " waterproof, later stage easily produces the hidden danger such as percolating water, affects the safety of shaft main body structure and normally uses.
Summary of the invention
The purpose of this utility model is to provide a kind of shaft main body structure of built-in lattice column, ensures that shaft structure is implemented safely and fast under the prerequisite of contrary sequence method, and realizes full bag waterproof truly.
The technical scheme that the utility model adopts is:
A shaft main body structure for built-in lattice column, is characterized in that:
Comprise the shaft enclosure structure be made up of diaphragm wall or fender post, shaft enclosure structure inserts below shaft excavation foundation ditch;
Shaft enclosure structure inner ring is main body side wall and base plate, is provided with that multilayer is mutually perpendicular, crossbeam and well interior beam in the well of horizontal direction in main body side vertical shaft within the walls, as inner supporting structure; In corresponding well, the plan-position of crossbeam and well interior beam is provided with middle plate, and in well, the intersection of crossbeam and well interior beam is provided with well inner frame column;
Main body side is provided with the side wall lattice column of building in the lump within the walls, and in well, crossbeam and well interior beam position are provided with lattice column in the well of building in the lump.
In side wall lattice column and well, lattice column is welded to form by the batten plate at angle steel and four sides.
In side wall lattice column and well, lattice column is all by monobloc cast after the reinforcing bar binding of crossbeam or well interior beam in anchor bar and main body side wall, well.
Main body side wall periphery is entirely coated is provided with waterproof roll.
Lattice column foundation pile is provided with bottom lattice column in side wall lattice column and well.
Be provided with waist rail in multilayer side wall in main body side wall, in multilayer side wall, waist rail is in identical horizontal plane with crossbeam in every layer of well and well interior beam.
Shaft enclosure structure top is provided with top board and leaves air holes, and shaft enclosure structure top is provided with Guan Liang;
The Guan Liang of shaft enclosure structure adopts and builds one to projecting inward mode and agent structure side wall.
The utility model has the following advantages:
1, realize contrary sequence method by the mode of the built-in lattice column of shaft main body structure, in implementation process, operation interference is few, convenient safely and fast;
2, lattice column first performs aspire to earth's surface, and easily implement, can implement, quality can ensure;
3, the lattice column later stage of side wall scope forever builds in main body side within the walls, also can increase rigidity and the stress performance of body of wall to a certain extent;
4, lattice column is built in main body side wall and well, and the later stage can entirely coated the establishing of realization body structure periphery waterproof roll, and design concept is more rationally perfect, is conducive to structurally waterproof and the durability of vertical shaft operational phase;
5, lattice column first performs aspire to earth's surface, later stage appears gradually along with the stage excavation of vertical shaft and acting in conjunction, using deposited reinforced concrete pile as its basis, adopt the integrated mode of " angle steel+batten plate welding+anchor bar ", lattice column is distributed in main body side wall and well, fully anchoring each other, shaft main body structure " from top to bottom " of bearing that can be evenly firm builds formed load, ensure agent structure safety, harmless, complete inversely to build, finally guarantee the safe successful implementation of vertical shaft contrary sequence method.
Accompanying drawing explanation
Fig. 1 is the utility model structural plan figure (shaft structure plane).
Fig. 2 is the utility model section of structure (shaft structure section).
Fig. 3 is the utility model lattice column and agent structure anchoring plan view (normal reach anchoring plane).
Fig. 4 is the utility model lattice column and agent structure anchoring plan view (corner's anchoring plane).
Fig. 5 is the utility model lattice column and structure anchor sectional drawing.
In figure, 1-Guan Liang, 2-top board, plate in 3-, 4-base plate, crossbeam in 5-well, 6-diaphragm wall or fender post, 7-main body side wall, waist rail in 8-side wall, 9-side wall lattice column, lattice column in 10-well, 11-lattice column foundation pile, 12-main body periphery waterproof roll, 13-well interior beam, 14-well inner frame column, 15-angle steel, 16-batten plate, 17-intermediate anchor muscle, 18-both sides anchor rib, 19-air holes.
Detailed description of the invention
Below in conjunction with detailed description of the invention, the utility model is described in detail.
The utility model relates to the shaft main body structure of built-in lattice column, comprises the shaft enclosure structure be made up of diaphragm wall or fender post 6, and space enclosing structure inserts certain depth below shaft excavation foundation ditch.Shaft enclosure structure inner ring is main body side wall 7 and base plate 4, and main body side wall 7 is outer thoroughly coatedly establishes waterproof roll 12.Crossbeam 5 and well interior beam 13 in the well being provided with mutually perpendicular, multiple-layer horizontal in vertical shaft in main body side wall 7, in corresponding every layer of well, the plan-position of crossbeam 5 and well interior beam 13 is provided with plate 3 in each layer, and in well, the intersection of crossbeam 5 and well interior beam 13 is provided with well inner frame column 14.
Be provided with the side wall lattice column 9 of building in the lump in main body side wall 7, in well, crossbeam 5 and well interior beam 13 position are provided with lattice column 10 in the well of building in the lump.In side wall lattice column 9 and well, lattice column 10 is welded to form by the batten plate 16 at angle steel 15 and four sides, all by formed by integrally casting after crossbeam 5 in anchor bar and main body side wall 7, well or well interior beam 13 overall binding.Lattice column foundation pile 11 is provided with bottom lattice column 10 in side wall lattice column 9 and well.
Be provided with waist rail 8 in multilayer side wall in main body side wall 7, be in identical horizontal plane with crossbeam 5 in every layer of well and well interior beam 13.Shaft main body structural top is provided with top board 2 and leaves air holes 19, and shaft enclosure structure top is provided with hat beam 1.
The shaft main body structure of above-mentioned built-in lattice column is inverse makes formula construction process, is realized by following steps:
Step one: perform the shaft enclosure structure be made up of diaphragm wall or fender post 6;
Step 2: utilize angle steel 15 and batten plate 16 to weld prefabricated lattice column, shaft enclosure structure inner ring is placed in by shifting to an earlier date prefabricated lattice column, as side wall lattice column 9, and lattice column horizontal, longitudinally prefabricated in advance in latticed layout in shaft enclosure structure, as lattice column in well 10;
Lattice column bottom is all built with lattice column foundation pile 11;
Step 3: excavating shaft, arranges hat beam 1 and the shaft main body structure roof 2 at shaft enclosure structure top simultaneously.
Step 4: continue excavating shaft, inside diaphragm wall or fender post 6, namely entirely coatedly outside main body side wall 7 establishes main body periphery waterproof roll 12;
Step 5: from top to bottom against making shaft main body structure, comprise crossbeam 5 and well interior beam 13 in main body side wall 7, well, all also builds jointly with lattice column and anchor bar colligation one thereof;
Main body side wall 7 arranges waist rail 8 in multilayer side wall, and bottom arranges base plate 4, arranges upright of frame 14 in well;
In corresponding well, crossbeam 5 and well interior beam 13 plane place arrange middle plate 3;
Step 6: in well, lattice column 10 later stage cuts off, shaft main body structure is later stage permanent carrying force structure;
Vertical shaft permanent structure has: crossbeam, well interior beam, side wall lattice column, anchor bar, main body periphery waterproof roll in waist rail, well inner frame column, well in Guan Liang, top board, main body side wall, base plate, middle plate, side wall.
Vertical shaft temporary structure has: lattice column, lattice column foundation pile in shaft enclosure structure (diaphragm wall or fender post or all the other go along with sb. to guard him pattern), well.
According to situations such as periphery hydrogeological and building distributions, the concrete structural parameters of vertical shaft are determined by Force Calculation, and consider the most unfavorable processing condition between construction and operating period.Shaft structure planar dimension and the inner space using function demand different according to vertical shaft, is determined by building arrangements; Shaft depths is comprehensively determined in conjunction with the buried depth and ground condition etc. of running tunnel; According to vertical shaft stress and well depth classifying rationally the vertical shaft inner number of plies and floor height etc.
In implementation process, according to the Different structural parameters of different vertical shaft, determine size and the distribution mode of lattice column, make it guarantee to bear the gravity load of agent structure in vertical shaft reverse construction process, in well, the layout of lattice column is not to disturb To Construction of Silo for principle to greatest extent.After the load that single lattice column is born is determined, in conjunction with geology and groundwater condition, extrapolate the relevant parameter of reinforced concrete foundation castinplace pile below lattice column, form complete stress system.
The utility model is a kind of contrary sequence method embodiment for the built-in lattice column of shaft main body structure, when vertical shaft planar dimension is comparatively large, the degree of depth is comparatively dark, periphery geology and hydrologic condition is more complicated or when there are sensitiveness building, employing contrary sequence method is the implementation method of the safe economy of a kind of safety, can not only guarantee that safety implemented by vertical shaft self, and can minimum level be down to the impact of periphery.Adopt the vertical shaft that built-in lattice column contrary sequence method is implemented, according to the needs of using function, its planar dimension is changeable, and the degree of depth can deeply can be shallow, and the scope of application widely.
According to the vertical load that single lattice column is born, choose suitable lattice column cross section type, the integrated mode that four angle steel, three angle steel or channel-section steel, i iron etc. are different can be adopted, in well lattice column also to need in conjunction with each layer between height checking computations strut buckling, guarantee vertical bearing safety.Lattice column is first implemented aspire to earth's surface, need guarantee the verticality that drilling quality and column are installed, vertical setting is not tilted as far as possible, ensures that column is to bear axial compression load, do not bear or bear the load such as moment of flexure and shearing less, thus playing carrying effect of lattice column to greatest extent.Lattice column need insert lower rebar concrete foundation pile certain depth, to guarantee the solid and reliable of build-in intensity and column.
The contrary sequence method that the utility model realizes vertical shaft by the built-in lattice column of structure is implemented.Lattice column is arranged in vertical shaft side wall and beam body, and arrangement of reinforcement and the lattice column of shaft structure self do not interfere with each other as far as possible, interts and arranges; For strengthening shaft structure concrete and mutual the bonding property of lattice column, make relative displacement not to occur between lattice column and structural body, corresponding lattice column utilize the component such as batten plate and angle steel to increase anchor bar, and then increase the globality of shaft structure and lattice column, enable lattice column better bear dead load, guarantee that entirety is jointly stressed.
After application the utility model, along with the vertical shaft plane adopted in concrete engineering and depth dimensions, vertical shaft pattern, the differences such as vertical shaft internal construction and periphery geological conditions, its relevant parameter is as shaft enclosure structure pattern, space enclosing structure parameter, the top board of shaft main body structure, side wall, base plate, plate in each layer, waist rail, the parameters such as well inner frame column, horizontal in well, longitudinal bracing beam size, the flat cutting face of lattice column is arranged, cross section type, material, Component composition mode, the anchorage style of lattice column and structural body, Anchorage Parameters, the parameter of lattice column infrastructure stake, vertical shaft waterproof roll pattern etc. all can according to actual requirement of engineering, suit measures to local conditions, either large or small, more or less, long or short, strong or weak.
The utility model meets vertical shaft contrary sequence method urban d evelopment, ensure that shaft structure is implemented safely and fast under the prerequisite of contrary sequence method, realize full bag waterproof truly, especially can be used as first-selected embodiment that is dark under complicated periphery and geological conditions, pozo, more be conducive to building up safely and fast of vertical shaft, enhance reliability and the durability of agent structure.
Content of the present utility model is not limited to cited by embodiment, and the conversion of those of ordinary skill in the art by reading the utility model manual to any equivalence that technical solutions of the utility model are taked, is claim of the present utility model and contains.

Claims (7)

1. a shaft main body structure for built-in lattice column, is characterized in that:
Comprise the shaft enclosure structure be made up of diaphragm wall or fender post (6), shaft enclosure structure inserts below shaft excavation foundation ditch;
Shaft enclosure structure inner ring is main body side wall (7) and base plate (4), is provided with that multilayer is mutually perpendicular, crossbeam (5) and well interior beam (13) in the well of horizontal direction in the vertical shaft in main body side wall (7), as inner supporting structure; In corresponding well, the plan-position of crossbeam (5) and well interior beam (13) is provided with middle plate (3), and in well, the intersection of crossbeam (5) and well interior beam (13) is provided with well inner frame column (14);
Be provided with the side wall lattice column (9) of building in the lump in main body side wall (7), in well, crossbeam (5) and well interior beam (13) position are provided with lattice column (10) in the well of building in the lump.
2. the shaft main body structure of a kind of built-in lattice column according to claim 1, is characterized in that:
In side wall lattice column (9) and well, lattice column (10) is welded to form by the batten plate (16) at angle steel (15) and four sides.
3. the shaft main body structure of a kind of built-in lattice column according to claim 2, is characterized in that:
In side wall lattice column (9) and well, lattice column (10) is all by monobloc cast after the reinforcing bar binding of crossbeam (5) or well interior beam (13) in anchor bar and main body side wall (7), well.
4. the shaft main body structure of a kind of built-in lattice column according to claim 3, is characterized in that:
Main body side wall (7) is thorough outward is coatedly provided with waterproof roll (12).
5. the shaft main body structure of a kind of built-in lattice column according to claim 4, is characterized in that:
In side wall lattice column (9) and well, lattice column (10) bottom is provided with lattice column foundation pile (11).
6. the shaft main body structure of a kind of built-in lattice column according to claim 5, is characterized in that:
Be provided with waist rail (8) in multilayer side wall in main body side wall (7), in multilayer side wall, waist rail (8) is in identical horizontal plane with crossbeam (5) in every layer of well and well interior beam (13).
7. the shaft main body structure of a kind of built-in lattice column according to claim 6, is characterized in that:
Shaft enclosure structure top is provided with top board (2) and leaves air holes (19), and shaft enclosure structure top is provided with Guan Liang (1);
The Guan Liang (1) of shaft enclosure structure adopts and builds one to projecting inward mode and agent structure side wall (7).
CN201520621524.2U 2015-08-18 2015-08-18 Shaft major structure of built -in lattice stand Active CN204898717U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520621524.2U CN204898717U (en) 2015-08-18 2015-08-18 Shaft major structure of built -in lattice stand

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520621524.2U CN204898717U (en) 2015-08-18 2015-08-18 Shaft major structure of built -in lattice stand

Publications (1)

Publication Number Publication Date
CN204898717U true CN204898717U (en) 2015-12-23

Family

ID=54920906

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520621524.2U Active CN204898717U (en) 2015-08-18 2015-08-18 Shaft major structure of built -in lattice stand

Country Status (1)

Country Link
CN (1) CN204898717U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105133645A (en) * 2015-08-18 2015-12-09 中铁第一勘察设计院集团有限公司 Vertical shaft body structure internally provided with lattice stand columns and reverse construction method of vertical shaft body structure
CN109797753A (en) * 2019-03-11 2019-05-24 深圳宏业基岩土科技股份有限公司 Suitable for the stand column pile of high scar place foundation pit and the construction method of lattice column
CN111927464A (en) * 2020-08-14 2020-11-13 中建三局集团有限公司 Prefabricated assembled shaft inner supporting structure
CN116006183A (en) * 2023-03-28 2023-04-25 中国电建集团北京勘测设计研究院有限公司 Supporting system and method suitable for circular pressure regulating well under poor geological conditions

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105133645A (en) * 2015-08-18 2015-12-09 中铁第一勘察设计院集团有限公司 Vertical shaft body structure internally provided with lattice stand columns and reverse construction method of vertical shaft body structure
CN109797753A (en) * 2019-03-11 2019-05-24 深圳宏业基岩土科技股份有限公司 Suitable for the stand column pile of high scar place foundation pit and the construction method of lattice column
CN111927464A (en) * 2020-08-14 2020-11-13 中建三局集团有限公司 Prefabricated assembled shaft inner supporting structure
CN116006183A (en) * 2023-03-28 2023-04-25 中国电建集团北京勘测设计研究院有限公司 Supporting system and method suitable for circular pressure regulating well under poor geological conditions

Similar Documents

Publication Publication Date Title
CN101914925B (en) Basement by using optimized composite prefabricated arch wall as external wall
CN103195085B (en) Downward story-adding basement and construction method thereof
CN204898717U (en) Shaft major structure of built -in lattice stand
CN101418569B (en) Optimization complex arch wall combining prefabricated arch leaf, support and major structure
CN102704957A (en) Shed-frame method for shallowly burying large-sized underground structure construction
CN105178327A (en) Composite retaining structure of foundation pit project and construction method thereof
CN108005399A (en) Add the construction method for building multi-layer underground space under a kind of existing building group
CN105239594A (en) Prestressed pipe pile upright
CN112575670B (en) T-shaped rigid frame bridge suitable for tunnel to pass through giant karst cave and construction technology thereof
CN104895089A (en) Construction method of permanent retaining system characterized by joint work of basement floor slabs and retaining piles
CN104818728A (en) Permanent supporting system with basement floor and supporting piles capable of working together
CN103898914A (en) Method of using precast square pile as concrete supporting upright
CN105421477A (en) Construction method for tower crane foundation
CN107489106A (en) A kind of rocky bed subaqueous bearing platform construction method
CN204940298U (en) A kind of Composite Enclosure Structure of base pit engineering
CN103510458B (en) Pile type continuous rigid frame bridge and construction method thereof
CN203475289U (en) Pile type continuous rigid frame bridge
CN105133645B (en) The shaft main body structure of built-in lattice column and inverse make formula construction method
CN207597914U (en) Add the construction stress structure for building multi-layer underground space under a kind of existing building group
CN207728018U (en) The building structure of skyscraper is built suitable for tier building set
CN203429661U (en) Basement with additional downward layers
CN205857198U (en) Subway station construction main body building enclosure
CN112627002B (en) Continuous beam bridge suitable for tunnel to pass through giant karst cave and construction technical method thereof
CN107916798A (en) The building structure of skyscraper is built suitable for tier building set
JP3930954B2 (en) Construction method of structure

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant