CN201713940U - 一种钢柱脚结构 - Google Patents

一种钢柱脚结构 Download PDF

Info

Publication number
CN201713940U
CN201713940U CN2010202379575U CN201020237957U CN201713940U CN 201713940 U CN201713940 U CN 201713940U CN 2010202379575 U CN2010202379575 U CN 2010202379575U CN 201020237957 U CN201020237957 U CN 201020237957U CN 201713940 U CN201713940 U CN 201713940U
Authority
CN
China
Prior art keywords
steel column
rebound
column base
crab
basis
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2010202379575U
Other languages
English (en)
Inventor
宋泽恒
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guiyang Aluminum Magnesium Design and Research Institute Co Ltd
Original Assignee
Guiyang Aluminum Magnesium Design and Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guiyang Aluminum Magnesium Design and Research Institute Co Ltd filed Critical Guiyang Aluminum Magnesium Design and Research Institute Co Ltd
Priority to CN2010202379575U priority Critical patent/CN201713940U/zh
Application granted granted Critical
Publication of CN201713940U publication Critical patent/CN201713940U/zh
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

本实用新型公开了一种钢柱脚结构,包括基础(1),在基础(1)中预埋有一组锚栓(2),锚栓(2)上端与过渡板(3)焊接,过渡板(3)与基础(1)之间设有二次灌浆层(5);过渡板(3)的上平面与钢柱(6)底部的底板(7)焊接;所述锚栓(2)上端与过渡板(3)之间经塞焊(4)连接。本实用新型的方法便于安装,可避免现有技术因钢柱脚锚拴位置发生偏差时,需要拆除混凝土基础重新施工,造成材料和工时的浪费。本实用新型的结构简单,施工费用低,并可保证安装的安全性和可靠性。

Description

一种钢柱脚结构
技术领域
本实用新型涉及一种钢柱脚结构,属于建筑工程技术领域。
背景技术
目前建筑工程中钢柱脚的施工方法是,在混凝土基础中预埋钢柱脚的锚拴,锚拴的端部设有螺纹。安装钢柱时,钢柱底部的底板用螺母固定在露出基础顶面的锚拴上,然后在钢柱底部的底板与基础顶面之间再做二次灌浆层,这样就能传递上部结构荷载。但在施工过程中,露出混凝土基础顶面的钢柱脚锚拴位置经常会发生偏差,使钢柱底部的底板安装困难或无法安装。有时虽然钢柱脚锚拴位置无偏差,但在安装钢柱时由于钢柱质量大,较重经常会碰坏钢柱脚锚拴上的螺纹,使螺母无法拧紧,影响连接的安全性和可靠性。
发明内容
本实用新型的目的在于,提供一种便于安装、结构简单、施工费用低、并能避免因钢柱脚锚拴位置出现偏差时需要拆除混凝土基础重新施工的情况发生、以及可保证安装的安全性和可靠性的钢柱脚结构,从而克服现有技术的不足。
本实用新型是这样构成的:包括基础,基础中预埋有一组锚栓,锚栓上端与过渡板焊接,过渡板与基础之间设有二次灌浆层;过渡板的上平面与钢柱底部的底板焊接。
前述的结构中,所述锚栓上端与过渡板之间经塞焊连接。
前述的结构中,所述过渡板的上平面经三角焊与钢柱底部的底板连接。
前述的结构中,所述二次灌浆层加上过渡板的厚度等于设计标高。
与现有技术相比,本实用新型是在锚栓上采用塞焊的方式焊接一块过渡板,然后再把钢柱的底板采用三角焊焊接在过渡板上,改原来的螺纹连接为焊接连接。本实用新型的方法便于安装,可避免现有技术因钢柱脚锚拴位置发生偏差时,需要拆除混凝土基础重新施工,本实用新型的结构简单,施工费用低,并可保证安装的安全性和可靠性。
附图说明
图1是本实用新型的结构示意图;
图2是图1的俯视图。
附图中的标记为:1-基础,2-锚栓,3-过渡板,4-塞焊,5-二次灌浆层,6-钢柱,7-底板,8-三角焊。
具体实施方式
下面结合附图和实施例对本实用新型作进一步的详细说明。
本实用新型的实施例:本实用新型的结构如图1和图2所示。在进行钢柱脚施工时,按下述步骤进行施工,
A、浇铸基础时在基础中预埋一组锚栓,待混凝土固结后,将锚栓找平,使锚栓露出基础的长度一致;
B、制作带孔的过渡板,孔的位置与锚栓位置相对应,将锚栓穿入过渡板的孔中1/3-1/2,并使过渡板与基础顶部留出二次灌浆的间隙,将过渡板找平,并保证过渡板上平面与基础顶之间的设计标高,然后在孔中将过渡板与锚栓塞焊,并将突出的焊料打磨平整;
C、在基础顶与过渡板底平面之间浇铸二次灌浆层;
D、待二次灌浆层固结后,将钢柱上的底板坐落在过渡板上平面,在钢柱底板的底边将钢柱底板与过渡板焊接在一起。
具体制作时,本实用新型的钢柱脚结构包括基础1,制作时,在基础1中预埋有一组锚栓2,将锚栓2上端与过渡板3之间经塞焊4连接;并在过渡板3与基础1之间设置二次灌浆层5;使二次灌浆层5加过渡板3的厚度等于设计标高;将过渡板3的上平面三角焊8与钢柱6底部的底板7连接上即成。

Claims (4)

1.一种钢柱脚结构,包括基础(1),其特征在于:在基础(1)中预埋有一组锚栓(2),锚栓(2)上端与过渡板(3)焊接,过渡板(3)与基础(1)之间设有二次灌浆层(5);过渡板(3)的上平面与钢柱(6)底部的底板(7)焊接。
2.根据权利要求1所述的钢柱脚结构,其特征在于:所述锚栓(2)上端与过渡板(3)之间经塞焊(4)连接。
3.根据权利要求1所述的钢柱脚结构,其特征在于:所述过渡板(3)的上平面经三角焊(8)与钢柱(6)底部的底板(7)连接。
4.根据权利要求1所述的钢柱脚结构,其特征在于:所述二次灌浆层(5)加过渡板(3)的厚度等于设计标高。
CN2010202379575U 2010-06-25 2010-06-25 一种钢柱脚结构 Expired - Fee Related CN201713940U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010202379575U CN201713940U (zh) 2010-06-25 2010-06-25 一种钢柱脚结构

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010202379575U CN201713940U (zh) 2010-06-25 2010-06-25 一种钢柱脚结构

Publications (1)

Publication Number Publication Date
CN201713940U true CN201713940U (zh) 2011-01-19

Family

ID=43459939

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010202379575U Expired - Fee Related CN201713940U (zh) 2010-06-25 2010-06-25 一种钢柱脚结构

Country Status (1)

Country Link
CN (1) CN201713940U (zh)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102425236A (zh) * 2011-10-24 2012-04-25 沈阳建筑大学 一种新型圆形钢管混凝土柱与基础连接形式
CN104005493A (zh) * 2014-06-18 2014-08-27 桂林理工大学 一种抗震结构柱脚的制造方法
CN109356192A (zh) * 2018-11-27 2019-02-19 中冶京诚工程技术有限公司 一种用于大跨钢结构刚性柱脚的基础连接结构和连接基础

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102425236A (zh) * 2011-10-24 2012-04-25 沈阳建筑大学 一种新型圆形钢管混凝土柱与基础连接形式
CN104005493A (zh) * 2014-06-18 2014-08-27 桂林理工大学 一种抗震结构柱脚的制造方法
CN109356192A (zh) * 2018-11-27 2019-02-19 中冶京诚工程技术有限公司 一种用于大跨钢结构刚性柱脚的基础连接结构和连接基础
CN109356192B (zh) * 2018-11-27 2024-02-06 中冶京诚工程技术有限公司 一种用于大跨钢结构刚性柱脚的基础连接结构和连接基础

Similar Documents

Publication Publication Date Title
CN102296813B (zh) 一种钢柱脚的施工方法及其钢柱脚结构
JP4702862B1 (ja) 構造物用高さ調整支承装置および構造物用支承装置の高さ調整工法
CN103422512B (zh) 可更换预埋螺栓式风机组混凝土基础及其施工方法
CN203296175U (zh) 矩形钢管柱装配式柱脚
CN203188470U (zh) 一种冷弯薄壁型钢柱柱脚结构
CN103806370B (zh) 钢箱梁防倾覆结构
CN201713940U (zh) 一种钢柱脚结构
CN103469735B (zh) 曲线超高型空心柱板式桥墩墩顶实心段模板的安装方法
CN101967795B (zh) 新型内置式索桁锚固结构及其施工方法
CN101736751A (zh) 海上风电场测风塔与桩基础之间的连接结构
CN101881029B (zh) 一种可拆卸的塔基
CN103161262B (zh) 一种钢管柱的施工方法及所用的柱脚结构
CN101736752A (zh) 塔桅式机械设备底架的垂直定位连接构造
CN204876084U (zh) 钢柱脚锚栓固定支架
CN102535507B (zh) 组合式塔基
CN215052155U (zh) 一种连续梁组合式剪力键结构装置
CN214574622U (zh) 一种pc预制柱连接结构
KR20110088283A (ko) 거더 및 이에 설치되는 거푸집 지지대, 작업발판 지지대
CN203320420U (zh) 钢混组合箱梁波形钢腹板临时锁定结构
CN201785874U (zh) 后加钢平台与钢筋混凝土烟囱壁连接结构
CN205347892U (zh) 防倾覆整体垫板及应用其的道岔转辙器
CN201296902Y (zh) 一种承载抱箍
CN203729195U (zh) 钢箱梁防倾覆结构
CN108342979B (zh) 一种桥梁快速更换支座及桥梁支座的快速更换方法
CN202644398U (zh) 预制桥面板精轧螺纹钢筋弧形连接构造

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: GUIYANG ALUMINUM AND MAGNESIUM DESIGN INSTITUTE CO

Free format text: FORMER OWNER: GUIYANG ALUMINIUM AND MAGNESIUM DESIGN INST.

Effective date: 20110602

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 550004 NO. 208, BEIJING ROAD, GUIYANG CITY, GUIZHOU PROVINCE TO: 550081 NO.2, JINZHU ROAD, JINYANG NEW DISTRICT, GUIYANG CITY, GUIZHOU PROVINCE

TR01 Transfer of patent right

Effective date of registration: 20110602

Address after: 550081 Guiyang Province, Jinyang New District, Zhu Zhu Road, No. 2

Patentee after: Guiyang Aluminum & Magnesium Design Institute Co., Ltd.

Address before: 550004 No. 208, Beijing Road, Guiyang, Guizhou

Patentee before: Guiyang Aluminium and Magnesium Design Inst.

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110119

Termination date: 20150625

EXPY Termination of patent right or utility model