CN102296813B - 一种钢柱脚的施工方法及其钢柱脚结构 - Google Patents

一种钢柱脚的施工方法及其钢柱脚结构 Download PDF

Info

Publication number
CN102296813B
CN102296813B CN201010209782.1A CN201010209782A CN102296813B CN 102296813 B CN102296813 B CN 102296813B CN 201010209782 A CN201010209782 A CN 201010209782A CN 102296813 B CN102296813 B CN 102296813B
Authority
CN
China
Prior art keywords
rebound
crab
bolt
basis
steel column
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201010209782.1A
Other languages
English (en)
Other versions
CN102296813A (zh
Inventor
宋泽恒
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guiyang Aluminum Magnesium Design and Research Institute Co Ltd
Original Assignee
Guiyang Aluminum Magnesium Design and Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guiyang Aluminum Magnesium Design and Research Institute Co Ltd filed Critical Guiyang Aluminum Magnesium Design and Research Institute Co Ltd
Priority to CN201010209782.1A priority Critical patent/CN102296813B/zh
Publication of CN102296813A publication Critical patent/CN102296813A/zh
Application granted granted Critical
Publication of CN102296813B publication Critical patent/CN102296813B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

本发明公开了一种钢柱脚的施工方法及其钢柱脚结构,本发明是在锚栓上采用塞焊的方式焊接一块过渡板,然后再把钢柱的底板采用三角焊焊接在过渡板上,改原来的螺纹连接为焊接连接。本发明的方法便于安装,可避免现有技术因钢柱脚锚拴位置发生偏差时,需要拆除混凝土基础重新施工,造成材料和工时的浪费。本发明的结构简单,施工费用低,并可保证安装的安全性和可靠性。

Description

一种钢柱脚的施工方法及其钢柱脚结构
技术领域
本发明涉及一种钢柱脚的施工方法及其钢柱脚结构,属于建筑工程技术领域。
背景技术
目前建筑工程中钢柱脚的施工方法是,在混凝土基础中预埋钢柱脚的锚拴,锚拴的端部设有螺纹。安装钢柱时,钢柱底部的底板用螺母固定在露出基础顶面的锚拴上,然后在钢柱底部的底板与基础顶面之间再做二次灌浆层,这样就能传递上部结构荷载。但在施工过程中,露出混凝土基础顶面的钢柱脚锚拴位置经常会发生偏差,使钢柱底部的底板安装困难或无法安装。有时虽然钢柱脚锚拴位置无偏差,但在安装钢柱时由于钢柱质量大,较重经常会碰坏钢柱脚锚拴上的螺纹,使螺母无法拧紧,影响连接的安全性和可靠性。
发明内容
本发明的目的在于,提供一种便于安装、结构简单、施工费用低、并能避免因钢柱脚锚拴位置出现偏差时需要拆除混凝土基础重新施工的情况发生、以及可保证安装的安全性和可靠性的钢柱脚的施工方法及其钢柱脚结构,从而克服现有技术的不足。
本发明的技术方案:本发明的一种钢柱脚的施工方法为,按下述步骤施工,
A、浇铸基础时在基础中预埋一组锚栓,待混凝土固结后,将锚栓找平,使锚栓露出基础的长度一致;
B、制作带孔的过渡板,孔的位置与锚栓位置相对应,将锚栓穿入过渡板的孔中1/3-1/2,并使过渡板与基础顶部留出二次灌浆的间隙,将过渡板找平,并保证过渡板上平面与基础顶之间的设计标高,然后在孔中将过渡板与锚栓塞焊,并将突出的焊料打磨平整;
C、在基础顶与过渡板底平面之间浇铸二次灌浆层;
D、待二次灌浆层固结后,将钢柱上的底板坐落在过渡板上平面,在钢柱底板的底边将钢柱底板与过渡板焊接在一起。
按上述钢柱脚的施工方法构建的本发明的钢柱脚结构为:包括基础,基础中预埋有一组锚栓,锚栓上端与过渡板焊接,过渡板与基础之间设有二次灌浆层;过渡板的上平面与钢柱底部的底板焊接。
前述的结构中,所述锚栓上端与过渡板之间经塞焊连接。
前述的结构中,所述过渡板的上平面经三角焊与钢柱底部的底板连接。
前述的结构中,所述二次灌浆层加上过渡板的厚度等于设计标高。
与现有技术相比,本发明是在锚栓上采用塞焊的方式焊接一块过渡板,然后再把钢柱的底板采用三角焊焊接在过渡板上,改原来的螺纹连接为焊接连接。本发明的方法便于安装,可避免现有技术因钢柱脚锚拴位置发生偏差时,需要拆除混凝土基础重新施工,本发明的结构简单,施工费用低,并可保证安装的安全性和可靠性。
附图说明
图1是本发明的结构示意图;
图2是图1的俯视图。
附图中的标记为:1-基础,2-锚栓,3-过渡板,4-塞焊,5-二次灌浆层,6-钢柱,7-底板,8-三角焊。
具体实施方式
下面结合附图和实施例对本发明作进一步的详细说明。
实施例。本发明的结构如图1和图2所示。在进行钢柱脚施工时,按下述步骤进行施工,
A、浇铸基础时在基础中预埋一组锚栓,待混凝土固结后,将锚栓找平,使锚栓露出基础的长度一致;
B、制作带孔的过渡板,孔的位置与锚栓位置相对应,将锚栓穿入过渡板的孔中1/3-1/2,并使过渡板与基础顶部留出二次灌浆的间隙,将过渡板找平,并保证过渡板上平面与基础顶之间的设计标高,然后在孔中将过渡板与锚栓塞焊,并将突出的焊料打磨平整;
C、在基础顶与过渡板底平面之间浇铸二次灌浆层;
D、待二次灌浆层固结后,将钢柱上的底板坐落在过渡板上平面,在钢柱底板的底边将钢柱底板与过渡板焊接在一起。
按上述钢柱脚的施工方法构建的本发明的钢柱脚结构,包括基础1,制作时,在基础1中预埋有一组锚栓2,将锚栓2上端与过渡板3之间经塞焊4连接;并在过渡板3与基础1之间设置二次灌浆层5;使二次灌浆层5加过渡板3的厚度等于设计标高;将过渡板3的上平面三角焊8与钢柱6底部的底板7连接上即成。

Claims (2)

1.一种钢柱脚的施工方法,其特征在于:按下述步骤施工,
A、浇铸基础时在基础中预埋一组锚栓,待混凝土固结后,将锚栓找平,使锚栓露出基础的长度一致;
B、制作带孔的过渡板,孔的位置与锚栓位置相对应,将锚栓穿入过渡板的孔中1/3-1/2,并使过渡板与基础顶部留出二次灌浆的间隙,将过渡板找平,并保证过渡板上平面与基础顶之间的设计标高,然后在孔中将过渡板与锚栓塞焊,并将突出的焊料打磨平整;
C、在基础顶与过渡板底平面之间浇铸二次灌浆层;
D、待二次灌浆层固结后,将钢柱上的底板座落在过渡板上平面,在钢柱底板的底边将钢柱底板与过渡板焊接在一起。
2.一种按权利要求1所述方法构建的钢柱脚结构,包括基础(1),其特征在于:在基础(1)中预埋有一组锚栓(2),锚栓(2)上端与过渡板(3)焊接,过渡板(3)与基础(1)之间设有二次灌浆层(5);过渡板(3)的上平面与钢柱(6)底部的底板(7)焊接;所述锚栓(2)上端与过渡板(3)之间经塞焊(4)连接;所述过渡板(3)的上平面经三角焊(8)与钢柱(6)底部的底板(7)连接;所述二次灌浆层(5)加过渡板(3)的厚度等于设计标高。
CN201010209782.1A 2010-06-25 2010-06-25 一种钢柱脚的施工方法及其钢柱脚结构 Expired - Fee Related CN102296813B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201010209782.1A CN102296813B (zh) 2010-06-25 2010-06-25 一种钢柱脚的施工方法及其钢柱脚结构

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201010209782.1A CN102296813B (zh) 2010-06-25 2010-06-25 一种钢柱脚的施工方法及其钢柱脚结构

Publications (2)

Publication Number Publication Date
CN102296813A CN102296813A (zh) 2011-12-28
CN102296813B true CN102296813B (zh) 2015-09-30

Family

ID=45357469

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201010209782.1A Expired - Fee Related CN102296813B (zh) 2010-06-25 2010-06-25 一种钢柱脚的施工方法及其钢柱脚结构

Country Status (1)

Country Link
CN (1) CN102296813B (zh)

Families Citing this family (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102535850A (zh) * 2012-03-12 2012-07-04 中天建设集团有限公司 一种钢构底座注浆施工方法
CN102635064A (zh) * 2012-04-28 2012-08-15 西安建筑科技大学 先张法预应力钢管高强混凝土叠合桥墩及其施工方法
CN102635063A (zh) * 2012-04-28 2012-08-15 西安建筑科技大学 后张法预应力钢管高强混凝土叠合桥墩及其施工方法
CN104234070B (zh) * 2014-07-23 2016-08-17 杭州江润科技有限公司 一种钢结构与基础预埋连接结构及施工方法
CN105040826B (zh) * 2015-08-05 2018-03-13 中国电建集团贵阳勘测设计研究院有限公司 一种用于结构混凝土施工的标准化预埋组件及其施工方法
CN107604936A (zh) * 2017-08-31 2018-01-19 杭萧钢构(河南)有限公司 一种钢柱柱脚锚栓错位的补救方法
CN107905452A (zh) * 2017-10-25 2018-04-13 重庆建工第三建设有限责任公司 一种大截面超厚型钢混凝土方柱施工方法
CN108894335A (zh) * 2018-07-24 2018-11-27 中建八局第四建设有限公司 一种钢板预埋件施工方法及钢板预埋装置
CN109440948A (zh) * 2018-12-28 2019-03-08 上海建工七建集团有限公司 续建工程钢结构与主体结构的连接结构及方法
CN112144872A (zh) * 2019-09-30 2020-12-29 上海宝冶集团有限公司 大型钢结构桁架滚装/滑移安装方法
CN114277931B (zh) * 2022-01-07 2024-01-02 浙江西子联合工程有限公司 钢柱脚节点现场纠偏的方法

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2861328Y (zh) * 2005-12-19 2007-01-24 上海市第二建筑有限公司 逆作法工程劲性钢柱分段预埋结构
CN101105077A (zh) * 2006-07-11 2008-01-16 永都建设产业株式会社 钢筋混凝土结构物的连接方法
CN201133090Y (zh) * 2007-07-09 2008-10-15 李树林 一种房屋增层时使用的框架柱抗震结构
CN201406766Y (zh) * 2009-05-05 2010-02-17 中冶东方工程技术有限公司上海分公司 一种钢柱***式刚接柱脚

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2861328Y (zh) * 2005-12-19 2007-01-24 上海市第二建筑有限公司 逆作法工程劲性钢柱分段预埋结构
CN101105077A (zh) * 2006-07-11 2008-01-16 永都建设产业株式会社 钢筋混凝土结构物的连接方法
CN201133090Y (zh) * 2007-07-09 2008-10-15 李树林 一种房屋增层时使用的框架柱抗震结构
CN201406766Y (zh) * 2009-05-05 2010-02-17 中冶东方工程技术有限公司上海分公司 一种钢柱***式刚接柱脚

Also Published As

Publication number Publication date
CN102296813A (zh) 2011-12-28

Similar Documents

Publication Publication Date Title
CN102296813B (zh) 一种钢柱脚的施工方法及其钢柱脚结构
JP4702862B1 (ja) 構造物用高さ調整支承装置および構造物用支承装置の高さ調整工法
CN103422512B (zh) 可更换预埋螺栓式风机组混凝土基础及其施工方法
CN102926504B (zh) 一种钢混叠合梁结合部施工方法
CN103541365A (zh) 一种用于基坑工程内支撑的抱箍式活络头及其施工方法
CN204112525U (zh) 高强度混凝土预制框架内嵌带竖缝预制剪力墙结构
CN201713940U (zh) 一种钢柱脚结构
CN205502025U (zh) 一种基坑围护止水桩与型钢围檩之间的连接结构
CN106760014A (zh) 一种全装配式板式可调阻尼器埋件及安装方法
CN201284485Y (zh) 地脚螺栓的固定装置
CN103018114B (zh) 一种体外预应力预制拼装混凝土构件接缝抗剪强度试验装置
CN206337668U (zh) 一种全装配式板式可调阻尼器埋件
CN210263111U (zh) 一种土木工程施工用空心桩体
CN110863426A (zh) 锥形承插式牛腿、安装有该牛腿的墩身及其施工方法
CN102535507B (zh) 组合式塔基
CN106812252A (zh) 一种密封防滑预应力张拉端锚具
CN215052155U (zh) 一种连续梁组合式剪力键结构装置
CN108797381B (zh) 一种吊杆拆除更换方法
CN201915420U (zh) 临时门楼基础
KR20110088283A (ko) 거더 및 이에 설치되는 거푸집 지지대, 작업발판 지지대
CN105673354B (zh) 混凝土塔筒和钢塔筒之间的连接结构
CN203320420U (zh) 钢混组合箱梁波形钢腹板临时锁定结构
CN210712562U (zh) 斜拉桥现浇塔柱施工塔吊体系
CN207331470U (zh) 一种预埋盒锚固装配式牛腿
CN102704490A (zh) 一种装配式腰梁

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150930

Termination date: 20160625