CN201347538Y - 钢-混凝土组合梁的整体活动式支架 - Google Patents

钢-混凝土组合梁的整体活动式支架 Download PDF

Info

Publication number
CN201347538Y
CN201347538Y CNU2008201934047U CN200820193404U CN201347538Y CN 201347538 Y CN201347538 Y CN 201347538Y CN U2008201934047 U CNU2008201934047 U CN U2008201934047U CN 200820193404 U CN200820193404 U CN 200820193404U CN 201347538 Y CN201347538 Y CN 201347538Y
Authority
CN
China
Prior art keywords
steel
bed die
bracket
combination beam
support
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CNU2008201934047U
Other languages
English (en)
Inventor
秦顺全
陈理平
黄旺明
胡勇
蒋稳齐
黄勇
缪玉卢
陈蛟
倪庆
王士祥
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Major Bridge Engineering Group Co Ltd MBEC
Original Assignee
China Railway Major Bridge Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Major Bridge Engineering Co Ltd filed Critical China Railway Major Bridge Engineering Co Ltd
Priority to CNU2008201934047U priority Critical patent/CN201347538Y/zh
Application granted granted Critical
Publication of CN201347538Y publication Critical patent/CN201347538Y/zh
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

本实用新型公开了一种钢-混凝土组合梁的整体活动式支架,它包括支撑桁架,支撑桁架下端连接在滑移台车上,滑移台车下设滚轮;支撑桁架上设钢-混凝土组合梁边板支撑底模。该整体活动式支架结构简单,便于移运、拆装、组合,能满足组合梁不同平面和竖向线形的叠合要求;支架结构简单,可在施工现场生产,纵向长度不受限制,能满足各种梁长的组合梁叠合施工;支架整体性好、稳定性强,提高了组合梁施工质量;支架安装方法简单,叠合施工速度快,便于推广,且具有一定的经济性。

Description

钢-混凝土组合梁的整体活动式支架
技术领域
本实用新型属于钢-混凝土组合梁施工用具,具体涉及一种钢-混凝土组合梁的支架。
背景技术
钢-混凝土组合结构连续箱梁以其结构新颖、轻巧、美观、跨越能力大,在海上、大江大河的桥梁建设中逐渐受到重视。国内在钢-混凝土组合桥梁结构研究及应用方面相对落后,在最普遍使用的梁式桥中,预应力混凝土结构仍然占有绝对多数。它是在采用了梁场预制组合梁桥面板横断面中板和两块边板、然后将预制的一块中板和两块边板在焊有剪力钉的顶板处浇筑纵向湿接缝混凝土连接而成。最后利用大型浮吊海上长距离运输架设。对于如何实现大跨度的钢-混凝土组合结构连续箱梁的边板与中板处浇筑纵向湿接缝混凝土连接的叠合施工现在上没有可借鉴的技术。
发明内容
本实用新型的目的在于提供一种能实现边板与中板之间连接浇筑叠合施工用的整体活动式支架。
本实用新型的技术方案为:钢-混凝土组合梁的整体活动式支架,它包括支撑桁架,支撑桁架下端连接在滑移台车上,滑移台车下设滚轮;支撑桁架上设钢-混凝土组合梁边板支撑底模。
支撑桁架下端与滑移台车之间螺栓连接
支撑桁架与钢-混凝土组合梁边板支撑底模之间设有底模托架,底模托架与支撑底模之间螺栓连接。
该整体活动式支架结构简单,便于移运、拆装、组合,能满足组合梁不同平面和竖向线形的叠合要求;支架结构简单,可在施工现场生产,纵向长度不受限制,能满足各种梁长的组合梁叠合施工;支架整体性好、稳定性强,提高了组合梁施工质量;支架安装方法简单,叠合施工速度快,便于推广,且具有一定的经济性。
附图说明
图1钢-混凝土组合梁的整体活动式支架结构示意图。
图2钢-混凝土组合梁的整体活动式支架纵向示意图。
图3整体活动式叠合支架总体布置形式示意图
图4整体活动式叠合支架安装就位前组合梁所处状态。
具体实施方式
如图1所示,支撑桁架8下端与滑移台车7之间螺栓连接。滑移台车7为多台间隔(如图2所示)设置在轨道6上。支撑桁架8下设千斤顶14。支撑桁架8上连接底模托架9,底模托架连接垫块15,垫块15的高度依据施工的要求而定。垫块15上设有边板支撑底模10,边板支撑底模10上表面设有橡胶垫17。图中2-中板3-两块边板4-剪力钉。
组合梁钢-混凝土叠合施工如图3所示,第一步,槽型钢梁1在钢梁总拼胎架13上拼焊成型,整体活动式叠合支架5在叠合台座12外侧轨道上拼装好。第二步,在叠合台座12上进行槽型钢梁与混凝土桥面板的叠合。首先槽型钢梁通过横移台车沿两条滑道11滑移至叠合台座上,然后起顶形成四点支撑状态,并调整槽型钢梁的线形,在槽型钢梁上安装完混凝土桥面板中板,之后,整体活动式叠合支架通过牵引,沿支架轨道6就位,并调整线形,准备桥面板边板安装。
在叠合过程中,钢梁底下横移台车并未取出,因此组合梁在四点支撑状态下拱度线形是控制边板安装高程的决定因素。按组合梁构造特点,桥面板边板安装高程步骤为:
(1)横移槽型钢梁,并降低钢梁高度至设计拱度曲线,然后复测钢梁线形;
(2)如图2所示,中板位置放样后,安装中板,再进行钢梁与中板拱度曲线复测并确认;
(3)按拱度曲线反算边板施工标高并放样,牵引整体活动式叠合支架就位(滑移台车上采用马凳和千斤顶1 4将支架定位),安装托架上垫块(此时垫块与托架栓接但不紧固),安装底模;
(4)边板方位放样,安装边板,复测边板标高,利用托架上小型千斤顶调整边板安装标高,同时托架上垫块螺栓紧固即全部支架定位。
其中工艺关键点为:
支架整体标高比边板安装施工标高低8-10cm,待支架就位后,通过滑移台车上千斤顶将支架整体起顶5cm,使边板标高沿钢梁纵向基本与拱度曲线接近,同时支架上的全部施工荷载由千斤顶及台车钢支座承担,确保支架整体稳定性。
待滑移台车上马凳定位后,再对托架上底模垫块进行微调3-5cm,最终使边板标高沿钢梁纵向与中板同步,误差应满足规范预制梁尺寸偏差。
2、为适应组合梁平曲线需要,滑移台车、主桁架均与钢梁之间预留有足够空间,确保支架一次性就位,调整时仅将底模做横向移位即可。
3、为适应上下行箱梁预制箱梁横坡反向的要求,底模托架设计成与主桁架主体栓接的结构,当预制梁变向时,将底模和底模托架***与主桁架主体脱离,然后两侧对调,即可实现反向横坡的预制要求。
4、每套外模配备8台滑移台车,每侧4台。叠合时,滑移台车将整体活动式叠合支架运送到与钢梁相对应的位置,然后在下方起顶,调整支架到相应的高度,支架外支腿采用钢垫块支撑。拆模时动作相反,松开起顶的千斤顶,边板支架靠自重下落,使湿接缝底模与箱梁翼缘脱离,再用滑移台车将支架移出至存放检修区域。整体活动式叠合支架起顶位置为每根立柱下方,采用50吨千斤顶,每侧60个,每套模板共需120个。
5、当整体活动式叠合支架需移出至存放检修区时,利用1吨卷扬机作为动力牵引支架滑动。
6、湿接缝底模与钢梁顶板间的缝隙(30mm)采用橡胶垫块封闭,以防漏浆。

Claims (6)

1、一种钢-混凝土组合梁的整体活动式支架,它包括支撑桁架,其特征在于支撑桁架下端连接在滑移台车上,滑移台车下设滚轮;支撑桁架上设钢-混凝土组合梁边板支撑底模。
2、如权利要求1所述钢-混凝土组合梁的整体活动式支架,其特征在于支撑桁架与钢-混凝土组合梁边板支撑底模之间设有底模托架,底模托架与支撑底模之间螺栓连接。
3、如权利要求1所述钢-混凝土组合梁的整体活动式支架,其特征在于钢-混凝土组合梁边板支撑底模上表面设有橡胶垫。
4、如权利要求1所述钢-混凝土组合梁的整体活动式支架,其特征在于支撑桁架下端与滑移台车之间螺栓连接。
5、如权利要求2所述钢-混凝土组合梁的整体活动式支架,其特征在于底模托架与支撑底模之间设有垫块。
6、如权利要求1所述钢-混凝土组合梁的整体活动式支架,其特征在于支撑桁架下设有千斤顶。
CNU2008201934047U 2008-12-04 2008-12-04 钢-混凝土组合梁的整体活动式支架 Expired - Lifetime CN201347538Y (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2008201934047U CN201347538Y (zh) 2008-12-04 2008-12-04 钢-混凝土组合梁的整体活动式支架

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2008201934047U CN201347538Y (zh) 2008-12-04 2008-12-04 钢-混凝土组合梁的整体活动式支架

Publications (1)

Publication Number Publication Date
CN201347538Y true CN201347538Y (zh) 2009-11-18

Family

ID=41367010

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2008201934047U Expired - Lifetime CN201347538Y (zh) 2008-12-04 2008-12-04 钢-混凝土组合梁的整体活动式支架

Country Status (1)

Country Link
CN (1) CN201347538Y (zh)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101974884A (zh) * 2010-10-22 2011-02-16 山东省路桥集团有限公司 三角塔式支架***
CN102140779A (zh) * 2011-01-14 2011-08-03 中铁大桥局集团第六工程有限公司 一种移动式现浇支架及箱梁现浇支架移动施工方法
CN102198695A (zh) * 2011-04-19 2011-09-28 中铁二十四局集团有限公司 箱梁外膜之外侧模的纵向移动方法
CN102773915A (zh) * 2012-07-12 2012-11-14 江苏省交通工程集团有限公司 悬拼梁段长线法预制的三维移动模架
CN108708292A (zh) * 2018-05-02 2018-10-26 中铁大桥局集团有限公司 一种工字型钢混组合梁混凝土叠合施工装置及施工方法
CN114934658A (zh) * 2022-06-02 2022-08-23 北京城建集团有限责任公司 一种建筑用便于移动携带的拼装组合式桁架
CN116335019A (zh) * 2023-04-27 2023-06-27 中铁大桥局集团第二工程有限公司 一种预制架设钢混组合梁及施工方法

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101974884A (zh) * 2010-10-22 2011-02-16 山东省路桥集团有限公司 三角塔式支架***
CN102140779A (zh) * 2011-01-14 2011-08-03 中铁大桥局集团第六工程有限公司 一种移动式现浇支架及箱梁现浇支架移动施工方法
CN102140779B (zh) * 2011-01-14 2012-11-28 中铁大桥局集团第六工程有限公司 一种移动式现浇支架及箱梁现浇支架移动施工方法
CN102198695A (zh) * 2011-04-19 2011-09-28 中铁二十四局集团有限公司 箱梁外膜之外侧模的纵向移动方法
CN102773915A (zh) * 2012-07-12 2012-11-14 江苏省交通工程集团有限公司 悬拼梁段长线法预制的三维移动模架
CN108708292A (zh) * 2018-05-02 2018-10-26 中铁大桥局集团有限公司 一种工字型钢混组合梁混凝土叠合施工装置及施工方法
CN114934658A (zh) * 2022-06-02 2022-08-23 北京城建集团有限责任公司 一种建筑用便于移动携带的拼装组合式桁架
CN114934658B (zh) * 2022-06-02 2023-08-01 北京城建集团有限责任公司 一种建筑用便于移动携带的拼装组合式桁架
CN116335019A (zh) * 2023-04-27 2023-06-27 中铁大桥局集团第二工程有限公司 一种预制架设钢混组合梁及施工方法

Similar Documents

Publication Publication Date Title
CN201347538Y (zh) 钢-混凝土组合梁的整体活动式支架
CN201406638Y (zh) 滑移式混凝土现浇梁外模结构
CN201003145Y (zh) 上行自行式移动模架
CN201473871U (zh) 中低速磁浮列车轨道梁
CN201801818U (zh) 在隧道口零距离架设双线并置梁的架桥机
CN103485279A (zh) 用于跨座式单轨交通的湿接缝
CN204282185U (zh) 一种抱轨式磁浮轨道交通桥梁
CN201381482Y (zh) 叠梁下行式移动模架造桥机
CN101885206B (zh) 高速铁路预制箱梁液压内模桁架式行走轨***
CN203452009U (zh) 一种钢梁安装用自行走装置
KR100692952B1 (ko) 철도 크레인 및 이를 이용한 철도교의 상부구조물 교체 시공방법
CN102286931B (zh) 一种专用于双t型桥梁施工的上承式移动模架造桥机
CN201390928Y (zh) 双线铁路内承轨连续梁
CN201496071U (zh) 栈桥式全圆针梁台车
CN107642010A (zh) 中低速磁浮交通***直线段承轨梁
CN210826953U (zh) 一种用于磁悬浮线路的迭合式轨道梁
CN201776835U (zh) 高速铁路预制箱梁液压内模销装液压机构
CN205276073U (zh) 一种磁悬浮抱轨式轨道交通双线轨道梁
CN202164548U (zh) 一种专用于双t型桥梁施工的上承式移动模架造桥机
CN2385085Y (zh) 双可调模筑衬砌台车
CN202830760U (zh) 一种铁路钢桁梁桥无砟轨道铺设构造
CN210826952U (zh) 一种宽翼缘梁上板式轨道梁
CN210506997U (zh) 用于磁浮线路的梁上梁式复合轨道梁
CN202530365U (zh) 一种中承式的开口箱形截面钢-混凝土组合梁
CN202945544U (zh) 新型无砟轨道

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
EE01 Entry into force of recordation of patent licensing contract

Assignee: No. 5 Enginering Co., Ltd. Of China Zhongtie Major Bridge Engineering

Assignor: China Zhongtie Major Bridge Engineering Co., Ltd.

Contract record no.: 2010420000042

Denomination of utility model: Integral movable-type bracket of steel-concrete combination beam

Granted publication date: 20091118

License type: Exclusive License

Record date: 20100505

ASS Succession or assignment of patent right

Owner name: GROUP CO., LTD., ZHONGTIE DAQIAO BUREAU

Free format text: FORMER OWNER: CHINA ZHONGTIE MAJOR BRIDGE ENGINEERING CO., LTD.

Effective date: 20150204

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20150204

Address after: 430050 Hanyang Road, Hanyang District, Hubei, No. 38, No.

Patentee after: Group Co., Ltd., Zhongtie Daqiao Bureau

Address before: 430050 Hanyang Road, Hanyang District, Hubei, No. 38, No.

Patentee before: China Zhongtie Major Bridge Engineering Co., Ltd.

CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20091118