CN201151867Y - Double tower oblique pulling type overbridge - Google Patents

Double tower oblique pulling type overbridge Download PDF

Info

Publication number
CN201151867Y
CN201151867Y CNU2008200043007U CN200820004300U CN201151867Y CN 201151867 Y CN201151867 Y CN 201151867Y CN U2008200043007 U CNU2008200043007 U CN U2008200043007U CN 200820004300 U CN200820004300 U CN 200820004300U CN 201151867 Y CN201151867 Y CN 201151867Y
Authority
CN
China
Prior art keywords
bridge
bank
china
cable
people
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNU2008200043007U
Other languages
Chinese (zh)
Inventor
张国志
袁悦
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
BEIJING HYPER STRONG BRIDGE TECHNOLOGY Co.,Ltd.
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CNU2008200043007U priority Critical patent/CN201151867Y/en
Application granted granted Critical
Publication of CN201151867Y publication Critical patent/CN201151867Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

A double-tower cable-stayed overpass comprises a pier and a pedestrian bridge. The utility model is characterized in that the two ends of the pedestrian bridge are arranged on the pier; two cable-stayed towers are respectively arranged in the two piers; the two cable-stayed towers are connected with the pedestrian overpass through a cable. The double-tower cable-stayed overpass with the advantages of reasonable structure and design, small construction difficulty, short time, pleasant appearance and low production cost can meet the needs of pedestrian overpass construction and development with larger span and high safety and fastness, satisfy the optimal performance price ratio of the pedestrian overpass construction, increase the aesthetic outlook and reduce the adverse effects of the pedestrian overpass on road traffic.

Description

Double tower cable-stayed type overline bridge
Technical field
The utility model belongs to particularly overpass field of bridge construction structure, is specifically related to the double tower cable-stayed type overline bridge of a kind of novel structure, sturdy and durable and low cost of manufacture.
Background technology
Increase day by day along with urbanization construction and road traffic pressure, increasing city and area are selected to build on vehicle pass-through flow road, build overpass to alleviate traffic pressure, avoid the contradiction between pedestrian and the motor vehicle, improve the traffic safety degree.The overpass of various moulding has also beautified urban construction in addition, becomes a place or zonal sign.
At present China builds and the overline bridge in building all adopts the pontic of steel framework or reinforced concrete structure, its construction period is longer, making and installation cost are higher, application life is very limited, this becomes the deadly defect that the city overline bridge is built, therefore a lot of places have to adopt cost higher, administer and maintain comparatively that the underground passage of difficulty replaces overpass, and underground passage can be given moving to change and bringing bigger influence and defective of city and road pipe network.Say objectively, the traffic guiding effect of People's Bank of China's overpass is stronger than underground passage, construction period is shorter relatively, cost is lower, can in the shortest time, mix the contradiction of going by transport solution node people car, by adopting the pedestrian overcrossing of new structure and material, can be good at solving the problems that present overline bridge construction exists.
Fibre reinforced composites (FRP) are to use increasingly extensive a kind of novel structural meterials in recent years in civil engineering.It has high-strength, lightweight, remarkable advantage such as corrosion-resistant, at the reinforcement and strengthening of structure, go along with sb. to guard him aspect such as anticorrosion and obtained good application.Along with the superior function of FRP material is approved by engineering circle gradually, external many engineerings begin it is applied in the newly-built bridge, or even in the Longspan Bridge.Since the seventies in last century, the FRP material just begins to attempt using in bridge engineering.Britain, the U.S. and Israel use this new material at first as the main member in building structure and the bridge construction, and what adopted mostly at that time is GFRP (glass fibre reinforced composion, i.e. glass fiber reinforced plastic).In the later stage seventies, China also begins GFRP is studied.In nineteen eighty-two, Beijing Miyun has built up strides 20.7 meters in footpath, wide 9.2 meters GFRP freely-supported honeycomb case beam road bridge, design load grade vapour-15, hangs-80, and has carried out on-the-spot loading test, has proved the feasibility of FRP as supporting member.Occurring the honeycomb unstability after being open to traffic causes bridge floor to sink and the problem of case web top secondary buckling.Overhauled in 1987, bearing system is transformed into the GFRP-concrete combined structure, use so far, operation conditions is good.
The engineering bridge that bridge that present employing fibre reinforced composites are constructed and bridge construction attractive in appearance such as cable stayed bridge, cable-suspended bridge all are used for long span, high load-bearing is because difficulty of design and construction is never built application in the Selection of Urban Pedestrian Overpass construction.
The utility model content
The purpose of this utility model provides the double tower cable-stayed type overline bridge fast, handsome in appearance between a kind of reasonable in design, difficulty of construction hour, that the cost cost is low, he can adapt to span and require the pedestrian overcrossing construction increasing, that the firm performance of safety is high and the needs of development, satisfy the optimality price ratio that pedestrian overcrossing is built, and the raising aesthetic measure reduces the adverse effect of pedestrian overcrossing to road traffic.
For achieving the above object, the technical solution adopted in the utility model is as follows:
A kind of double tower cable-stayed type overline bridge comprises bridge pier and People's Bank of China gap bridge, it is characterized in that the two ends that described People's Bank of China passes a bridge are erected on the bridge pier, and two Tower Column of A Cable Stayed Bridge are set respectively in two bridge piers, and two Tower Column of A Cable Stayed Bridge connect humanoid gap bridge by drag-line.
Concretely, described People's Bank of China passes a bridge and is the girder formation of single or the plural fibre reinforced composites that link together, the length direction that machine direction in the described fiber-reinforced composite material girder is passed a bridge along People's Bank of China extends, and described girder is hollow tubular, entity or the cellular structure of square-section.
It is the main beam structure that steel structure or steel concrete are constructed that described People's Bank of China passes a bridge.
The two ends that described People's Bank of China passes a bridge are provided with People's Bank of China Pan Qiao passageway or stair, two of being provided with for the both sides of passing a bridge along People's Bank of China of described People's Bank of China Pan Qiao passageway or stair or pass a bridge that a side is provided with in People's Bank of China.
Described Tower Column of A Cable Stayed Bridge is a steel structure arc support, its upper end tilts to the bridge pier direction at described pedestrian overcrossing two ends, be provided with by the drag-line that connects humanoid overline bridge both sides girder on two Tower Column of A Cable Stayed Bridge, described drag-line is positioned at the inboard of two Tower Column of A Cable Stayed Bridge, and its outside is provided with dorsal funciculus respectively.
Distance between described Tower Column of A Cable Stayed Bridge and bridge pier is a sidewalk width, the width between two Tower Column of A Cable Stayed Bridge for across main stem degree of having a lot of social connections, the bottom of Tower Column of A Cable Stayed Bridge lays respectively at the both sides that People's Bank of China passes a bridge.
The two ends that described People's Bank of China passes a bridge are provided with People's Bank of China Pan Qiao passageway or stair, and described People's Bank of China gap bridge and People's Bank of China Pan Qiao passageway or stair both sides are provided with handrail, and described handrail installs and fixes by baluster.
Also be set with protected apron between the described baluster, described protected apron is the plural layer transparent material, is provided with lighting between transparent material.
The step of described People's Bank of China Pan Qiao passageway or stair is stepped on beam and is provided with antiskid plate, and it is translucent structure that this step is stepped on beam.
This double tower cable-stayed type overline bridge can satisfy the high span needs of present road construction, and the girder that can adopt fibre reinforced composites to pass a bridge as People's Bank of China, can effectively reduce the weighted design requirement of drag-line and Tower Column of A Cable Stayed Bridge, People's Bank of China's gap bridge of while drag-line resiliency supported is striden resiliency supported for a short time as many skies and can be worked by continuous beam, internal stress is very little, building intensity is low, from heavy and light, easy construction, and the two ends that People's Bank of China passes a bridge adopt bridge pier to support, and bridge pier also can be used for supporting the People's Bank of China Pan Qiao passageway or the stair at People's Bank of China gap bridge two ends simultaneously.
Tower Column of A Cable Stayed Bridge can adopt metal tube, reduces difficulty of construction, and all parts of overline bridge can adopt batch production production, have promptly saved cost of manufacture and construction intensity, can guarantee the precision of whole assembling again.For the pedestrian overcrossing of crossing over city garage sidewalk.Can say that Tower Column of A Cable Stayed Bridge is arranged on People's Bank of China and passes a bridge between the sidewalk of crossing over and major trunk roads, structure and handsome in appearance, and do not influence the function setting that it crosses over road.
The People's Bank of China of these fibre reinforced composites crosses bridge girder and changes the form of structure that connects to form the bridge floor main body both at home and abroad after the transverse fiber reinforced composite bridge member that generally uses is laid, but adopt single longitudinal fiber reinforced composite main beam member or combination, can realize single girder, big span and bigger span, effectively reduced the potential safety hazard that connects existence because of transverse fiber reinforced composite bridge member, eliminate the influence of local resonance again, improved girder intensity and security performance that People's Bank of China passes a bridge.
The advantage that fibre reinforced composites have is in light weight, intensity is high, corrosion resistance is strong, hot strength is high, as the specific strength of the reinforced plastic glass fibre FRP Composite Material of routine is 20~50 times of steel, adopts fibre reinforced composites will alleviate dead load greatly.In the pedestrian overcrossing engineering, use the limit span of bridge is increased greatly, and can reduce the influence of geological process.
Handrail hurdle, handrail and the step of People's Bank of China's gap bridge, People's Bank of China Pan Qiao passageway or stair both sides stepped on can adopt between beam and cooperated the back bonding of pegging graft to fix or bolt fixed mode, realize the convenient and swift of dismounting and replacing, lighting installation is set on protected apron, has more eliminated the difficult problem that circuit is laid.
The beneficial effects of the utility model are, fast, handsome in appearance between the reasonable in design of this double tower cable-stayed type overline bridge, difficulty of construction hour, the cost cost is low, span be can adapt to and the pedestrian overcrossing construction increasing, that the firm performance of safety is high and the needs of development required, satisfy the optimality price ratio that pedestrian overcrossing is built, and the raising aesthetic measure reduces the adverse effect of pedestrian overcrossing to road traffic.
Description of drawings
Fig. 1 is the composition structural representation of the utility model specific embodiment;
Fig. 2 is that the A of Fig. 1 is to structural representation.
The specific embodiment
As depicted in figs. 1 and 2, this double tower cable-stayed type overline bridge mainly contains People's Bank of China's gap bridge, the Pan Qiaoloudao of People's Bank of China, Tower Column of A Cable Stayed Bridge and bridge pier and forms, the two ends of People's Bank of China's gap bridge 9 are erected on the bridge pier 6,1 and 1 ', two Tower Column of A Cable Stayed Bridge of two Tower Column of A Cable Stayed Bridge are set respectively in two bridge piers connect humanoid gap bridge by drag-line 8.People's Bank of China's gap bridge 9 is that the girder of single fibre reinforced composites constitutes, and the length direction that the machine direction in the fiber-reinforced composite material girder is passed a bridge along People's Bank of China extends, and girder is the cellular structure of square-section.The two ends that People's Bank of China passes a bridge are provided with People's Bank of China and climb bridge ladder 3 and 3 ', and it is two that are provided with along the both sides that People's Bank of China passes a bridge that bridge ladder is climbed by the People's Bank of China of every end.Tower Column of A Cable Stayed Bridge is a steel structure arc support, its upper end tilts to the bridge pier direction at People's Bank of China gap bridge two ends, be provided with on two Tower Column of A Cable Stayed Bridge by the drag-line 8 that connects humanoid overline bridge both sides girder, drag-line is single rope face and is fan-shaped distribution and is positioned at the inboard of two Tower Column of A Cable Stayed Bridge that its outside is provided with dorsal funciculus 7 and 7 ' respectively.Distance between Tower Column of A Cable Stayed Bridge and bridge pier is a sidewalk width, the width between two Tower Column of A Cable Stayed Bridge for across main stem degree of having a lot of social connections, the bottom of Tower Column of A Cable Stayed Bridge lays respectively at the both sides that People's Bank of China passes a bridge.People's Bank of China's gap bridge and People's Bank of China climb the bridge ladder both sides and are provided with handrail 4, and handrail installs and fixes by baluster 2, also is set with protected apron 5 between the baluster, and described protected apron is the plural layer transparent material, is provided with lighting between transparent material.The step that bridge ladder is climbed by People's Bank of China is stepped on beam and is provided with antiskid plate, and it is translucent structure that this step is stepped on beam.

Claims (9)

1. a double tower cable-stayed type overline bridge comprises bridge pier and People's Bank of China gap bridge, it is characterized in that the two ends that described People's Bank of China passes a bridge are erected on the bridge pier, and two Tower Column of A Cable Stayed Bridge are set respectively in two bridge piers, and two Tower Column of A Cable Stayed Bridge connect humanoid gap bridge by drag-line.
2. double tower cable-stayed type overline bridge according to claim 1, it is characterized in that it is the girder formation of single or the plural fibre reinforced composites that link together that described People's Bank of China passes a bridge, the length direction that machine direction in the described fiber-reinforced composite material girder is passed a bridge along People's Bank of China extends, and described girder is hollow tubular, entity or the cellular structure of square-section.
3. double tower cable-stayed type overline bridge according to claim 1 is characterized in that it is the main beam structure that steel structure or steel concrete are constructed that described People's Bank of China passes a bridge.
4. double tower cable-stayed type overline bridge according to claim 1, it is characterized in that the two ends that described People's Bank of China passes a bridge are provided with People's Bank of China Pan Qiao passageway or stair, two of being provided with for the both sides of passing a bridge of described People's Bank of China Pan Qiao passageway or stair or pass a bridge that a side is provided with in People's Bank of China along People's Bank of China.
5. double tower cable-stayed type overline bridge according to claim 1, it is characterized in that described Tower Column of A Cable Stayed Bridge is a steel structure arc support, its upper end tilts to the bridge pier direction at described pedestrian overcrossing two ends, be provided with on two Tower Column of A Cable Stayed Bridge by the drag-line that connects humanoid overline bridge both sides girder, described drag-line is positioned at the inboard of two Tower Column of A Cable Stayed Bridge, and its outside is provided with dorsal funciculus respectively.
6. double tower cable-stayed type overline bridge according to claim 5, it is characterized in that the distance between described Tower Column of A Cable Stayed Bridge and bridge pier is a sidewalk width, width between two Tower Column of A Cable Stayed Bridge for across main stem degree of having a lot of social connections, the bottom of Tower Column of A Cable Stayed Bridge lays respectively at the both sides that People's Bank of China passes a bridge.
7. double tower cable-stayed type overline bridge according to claim 1, it is characterized in that the two ends that described People's Bank of China passes a bridge are provided with People's Bank of China Pan Qiao passageway or stair, described People's Bank of China gap bridge and People's Bank of China Pan Qiao passageway or stair both sides are provided with handrail, and described handrail installs and fixes by baluster.
8. double tower cable-stayed type overline bridge according to claim 7 is characterized in that also being set with protected apron between the described baluster, and described protected apron is the plural layer transparent material, is provided with lighting between transparent material.
9. double tower cable-stayed type overline bridge according to claim 7, the step that it is characterized in that described People's Bank of China Pan Qiao passageway or stair is stepped on beam and is provided with antiskid plate, and it is translucent structure that this step is stepped on beam.
CNU2008200043007U 2008-01-29 2008-01-29 Double tower oblique pulling type overbridge Expired - Fee Related CN201151867Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2008200043007U CN201151867Y (en) 2008-01-29 2008-01-29 Double tower oblique pulling type overbridge

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2008200043007U CN201151867Y (en) 2008-01-29 2008-01-29 Double tower oblique pulling type overbridge

Publications (1)

Publication Number Publication Date
CN201151867Y true CN201151867Y (en) 2008-11-19

Family

ID=40127545

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2008200043007U Expired - Fee Related CN201151867Y (en) 2008-01-29 2008-01-29 Double tower oblique pulling type overbridge

Country Status (1)

Country Link
CN (1) CN201151867Y (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104632246A (en) * 2014-09-01 2015-05-20 北车建设工程有限责任公司 Large-span underground structure
CN105714670A (en) * 2016-04-19 2016-06-29 林同棪国际工程咨询(中国)有限公司 Single-piece joist type annular passenger overcrossing
CN108330813A (en) * 2018-03-07 2018-07-27 西华大学 A kind of novel bridge
CN110761162A (en) * 2019-10-31 2020-02-07 长安大学 Anti-congestion pedestrian overpass
CN112050156A (en) * 2020-08-31 2020-12-08 中铁大桥勘测设计院集团有限公司 Bridge stay cable night scene illumination projection lamp installation method
CN113174870A (en) * 2021-04-27 2021-07-27 郑州铁路职业技术学院 Pier position transformation method of overline overbridge
CN114575235A (en) * 2022-04-09 2022-06-03 中交二公局第五工程有限公司 Bridge structure with separated people and vehicles

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104632246A (en) * 2014-09-01 2015-05-20 北车建设工程有限责任公司 Large-span underground structure
CN105714670A (en) * 2016-04-19 2016-06-29 林同棪国际工程咨询(中国)有限公司 Single-piece joist type annular passenger overcrossing
CN105714670B (en) * 2016-04-19 2017-04-05 林同棪国际工程咨询(中国)有限公司 Monolithic purlin formula Annular Pedestrian Overpass
CN108330813A (en) * 2018-03-07 2018-07-27 西华大学 A kind of novel bridge
CN108330813B (en) * 2018-03-07 2019-07-30 西华大学 A kind of novel bridge
CN110761162A (en) * 2019-10-31 2020-02-07 长安大学 Anti-congestion pedestrian overpass
CN112050156A (en) * 2020-08-31 2020-12-08 中铁大桥勘测设计院集团有限公司 Bridge stay cable night scene illumination projection lamp installation method
CN113174870A (en) * 2021-04-27 2021-07-27 郑州铁路职业技术学院 Pier position transformation method of overline overbridge
CN113174870B (en) * 2021-04-27 2022-12-02 郑州铁路职业技术学院 Pier position transformation method of overline overbridge
CN114575235A (en) * 2022-04-09 2022-06-03 中交二公局第五工程有限公司 Bridge structure with separated people and vehicles
CN114575235B (en) * 2022-04-09 2024-01-26 中交二公局第五工程有限公司 Bridge structure with separated vehicles and people

Similar Documents

Publication Publication Date Title
CN201151867Y (en) Double tower oblique pulling type overbridge
CN106245511A (en) A kind of two-fold shape combined beam structure and construction method thereof
CN104988844B (en) Two times tensioning prestressing force assembled Wavelike steel webplate combination beam
CN204185755U (en) A kind of Wavelike steel webplate post-stressed concrete T beam
CN2878478Y (en) Fabricated grooved beam for rear extending pre-stress segment pre-formation
CN106978777A (en) A kind of make-shift bridge device
CN201151868Y (en) Single tower oblique pulling type overbridge
CN201151866Y (en) Arch beam type overbridge
CN203741690U (en) Pedestrian overcrossing assembling type steel truss girder
CN106758741B (en) Modular box type plate beam structure and pontic erection method based on box type plate beam structure
CN201228341Y (en) The suspension cable overpass
CN204151663U (en) A kind of hybrid beam is without dorsal funciculus low-pylon cable-stayed bridge
CN201158796Y (en) Bridge body structure of overpass
CN201158797Y (en) Inhaul cable structure of inclined dragging type overpass
CN201187035Y (en) Overhead walkway cable-stayed bridge tower
CN101451339B (en) Fiber reinforcement composite material rope bridge and preparation method thereof
CN211472116U (en) Railway assembled steel diagonal brace combination PC roof beam
CN201224864Y (en) Suspension cable type pedestrian overpass
CN201176560Y (en) Cable structure for overpass
CN208183503U (en) A kind of large-scale steel structure overline bridge
CN207210930U (en) A kind of highway steel reinforced concrete combined beam structure based on assembling
CN201183930Y (en) Cable length regulating apparatus
CN212801166U (en) Closed pedestrian bridge
CN201158800Y (en) Guard bar structure of overpass
Subramanian Transportation Infrastructure Needs and Developments

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: BEIJING HAIBO SI QIANG BRIDGE NEW TECHNOLOGY CO.,

Free format text: FORMER OWNER: ZHANG GUOZHI

Effective date: 20091023

C41 Transfer of patent application or patent right or utility model
C53 Correction of patent of invention or patent application
C56 Change in the name or address of the patentee

Owner name: BEIJING HAIBO SI QIANG BRIDGE NEW TECHNOLOGY CO.,

Free format text: NEW ADDRESS: B607, SCIENCE WEALTH CENTER, NO.8, XUEQING ROAD, HAIDIAN DISTRICT, BEIJING CITY, ZIP CODE:100192

CB03 Change of inventor or designer information

Inventor after: Yuan Yue

Inventor before: Zhang Guozhi

Inventor before: Yuan Yue

CP02 Change in the address of a patent holder

Address after: B607, science and technology center, No. 8 Xue Jie Road, Beijing, Haidian District 100192, China

Patentee after: BEIJING HYPER STRONG BRIDGE TECHNOLOGY Co.,Ltd.

Address before: Room B607, fortune 8, science and technology center, No. 100192 Xue Qing Road, Beijing, Haidian District

Patentee before: BEIJING HYPER STRONG BRIDGE TECHNOLOGY Co.,Ltd.

TR01 Transfer of patent right

Effective date of registration: 20091023

Address after: Room B607, fortune 8, science and technology center, No. 100192 Xue Qing Road, Beijing, Haidian District

Patentee after: BEIJING HYPER STRONG BRIDGE TECHNOLOGY Co.,Ltd.

Address before: Liaoning province Jinzhou City Heping Road, Linghe District No. 16-82 five, zip code: 121002

Co-patentee before: Yuan Yue

Patentee before: Zhang Guozhi

DD01 Delivery of document by public notice

Addressee: Beijing Haibo Siqiang Bridge Technology Co.,Ltd. Chen Liang

Document name: Notification to Pay the Fees

DD01 Delivery of document by public notice

Addressee: BEIJING HYPER STRONG BRIDGE TECHNOLOGY Co.,Ltd.

Document name: Notification of Termination of Patent Right

C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20081119

Termination date: 20120129