CN201183930Y - Cable length regulating apparatus - Google Patents

Cable length regulating apparatus Download PDF

Info

Publication number
CN201183930Y
CN201183930Y CNU200820110728XU CN200820110728U CN201183930Y CN 201183930 Y CN201183930 Y CN 201183930Y CN U200820110728X U CNU200820110728X U CN U200820110728XU CN 200820110728 U CN200820110728 U CN 200820110728U CN 201183930 Y CN201183930 Y CN 201183930Y
Authority
CN
China
Prior art keywords
sleeve
drag
rope
line
internal thread
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNU200820110728XU
Other languages
Chinese (zh)
Inventor
张国志
袁悦
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
BEIJING HYPER STRONG BRIDGE TECHNOLOGY Co Ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CNU200820110728XU priority Critical patent/CN201183930Y/en
Application granted granted Critical
Publication of CN201183930Y publication Critical patent/CN201183930Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model relates to a rope length adjuster which comprises a pull rope and is characterized in that a sleeve is also comprised; the inner wall of the sleeve is provided with internal threads, and the sleeve is cooperatively connected with adjusting bolt threads. The inner walls at the two ends of the sleeve are provided with internal threads; the two adjusting bolts are cooperatively connected with the internal threads at two ends of the sleeve; the internal threads arranged at the inner walls at the two ends of the sleeve are arranged in a reverse revolving direction. The rope length adjuster has reasonable structural design, simple adjustment for the rope length, can realize the adjustment of the maximum rope length of 30 cm, and effectively ensures the stability of the extension bearing force of the rope. The rope length adjuster is applicable to the adjustment of the ropes of various rope type pedestrian overpasses and midfield spanning bridges.

Description

The long adjuster of rope
Technical field
The utility model belongs to the accessory device field of drag-line bridge building, is specifically related to a kind of long adjuster of rope that is used to regulate drag-line length.
Background technology
Increase day by day along with urbanization construction and road traffic pressure, increasing city and area are selected to build on vehicle pass-through flow road, build overpass to alleviate traffic pressure, avoid the contradiction between pedestrian and the motor vehicle, improve the traffic safety degree.The overpass of various moulding has also beautified urban construction in addition, becomes a place or zonal sign.At present China builds and the overline bridge in building all adopts the pontic of steel framework or reinforced concrete structure, its construction period is longer, making and installation cost are higher, application life is very limited, this becomes the deadly defect that the city overline bridge is built, therefore a lot of places have to adopt cost higher, administer and maintain comparatively that the underground passage of difficulty replaces overpass, and underground passage can be given moving to change and bringing bigger influence and defective of city and road pipe network.Say objectively, the traffic guiding effect of People's Bank of China's overpass is stronger than underground passage, construction period is shorter relatively, cost is lower, can in the shortest time, mix the contradiction of going by transport solution node people car, by adopting the pedestrian overcrossing of new structure and material, can be good at solving the problems that present overline bridge construction exists.
Fibre reinforced composites (FRP) are to use increasingly extensive a kind of novel structural meterials in recent years in civil engineering.It has high-strength, lightweight, remarkable advantage such as corrosion-resistant, at the reinforcement and strengthening of structure, go along with sb. to guard him aspect such as anticorrosion and obtained good application.Along with the superior function of FRP material is approved by engineering circle gradually, external many engineerings begin it is applied in the newly-built bridge, or even in the Longspan Bridge.Since the seventies in last century, the FRP material just begins to attempt using in bridge engineering.Britain, the U.S. and Israel use this new material at first as the main member in building structure and the bridge construction, and what adopted mostly at that time is GFRP (glass fibre reinforced composion, i.e. glass fiber reinforced plastic).
Since the light weight of fibre reinforced composites, and pedestrian overcrossing does not need bigger load-bearing, and therefore structure and the requirement of strength to Tower Column of A Cable Stayed Bridge needn't be too high, and should meet easy construction, sound construction and lightweight advantage.Simultaneously because the load-bearing of drag-line is less demanding, and drag-line after long-term the use tensioning and loosen adjusting and must become more frequent, to adapt to the needs of pontic and Tower Column of A Cable Stayed Bridge.
The utility model content
The purpose of this utility model provides a kind of reasonable in design, can realize the long adjuster of rope of drag-line length flexible modulation, it can realize prolongation and the shortening adjusting within the specific limits of drag-line length easily, realizes the equilibrium that drag-line draws load, guarantees the stability of drag-line bridge.
For achieving the above object, the technical solution adopted in the utility model is as follows:
The long adjuster of a kind of rope comprises drag-line, it is characterized in that the long adjuster of described rope also comprises a sleeve, and described sleeve lining is provided with internal thread, and sleeve is connected with the adjusting bolt thread.
Concretely, the two ends inwall of described sleeve is provided with internal thread, and two regulate bolt is connected with the screw-internal thread fit at sleeve two ends respectively, and the internal thread counter-rotating direction each other that described sleeve two ends inwall is provided with is provided with.
A described wherein other end of regulating bolt is fixedlyed connected the other end stay guy of drag-line connector with the drag-line connector.
Described drag-line connector comprises that end is provided with a drag-line anchor head, and a described drag-line anchor head and a drag-line fixed cover tensioning are fixed.
The middle part of described sleeve is provided with a through hole that can supply regulating arm to pass.
The long adjuster of this rope is provided with the sleeve of internal thread by one and the adjusting bolt that cooperates with internal thread of sleeve has been realized the long adjusting of rope, the adjusting bolt can be mounted in of sleeve one end, but also be installed in two of sleeve two ends respectively, by regulating sleeve and regulate the pitch length that cooperates between bolt, can realize controlling with the length of regulating the drag-line that bolt or sleeve be connected.
Drag-line can be connected and fixed with regulating bolt or sleeve by a drag-line connector, and the sleeve other end is connected with bridge main body syndeton by regulating bolt.
The beneficial effects of the utility model are that the long controller structure of this rope is reasonable in design, and the control manipulation long to rope is simple, can realize the drag-line length adjustment of maximum 30cm length, have guaranteed that effectively drag-line bears the stability of ability.The long adjuster of this rope goes for the drag-line of various drag-line pedestrian overcrossinges, midfield span bridge and regulates.
Description of drawings
Fig. 1 is the cross section structure schematic diagram of the utility model specific embodiment.
The specific embodiment
As shown in Figure 1, the long adjuster of this rope is made up of drag-line 1, drag-line connector, sleeve 5 and two adjusting bolts 4 and 6, the two ends inwall of sleeve 5 is provided with internal thread, the middle part of sleeve is provided with a through hole 7 that can supply regulating arm to pass, two regulate bolt is connected with the screw-internal thread fit at sleeve two ends respectively, and the internal thread counter-rotating direction each other that sleeve two ends inwall is provided with is provided with.The other end of regulating bolt 4 is fixedlyed connected the other end stay guy of drag-line connector with the drag-line connector.The drag-line connector comprises that end is provided with a drag-line anchor head 2, and drag-line anchor head 2 and a drag-line fixed cover 3 tensionings are fixed.

Claims (5)

1. the long adjuster of rope comprises drag-line, it is characterized in that the long adjuster of described rope also comprises a sleeve, and described sleeve lining is provided with internal thread, and sleeve is connected with the adjusting bolt thread.
2. the long adjuster of rope according to claim 1, the two ends inwall that it is characterized in that described sleeve is provided with internal thread, two regulate bolt is connected with the screw-internal thread fit at sleeve two ends respectively, and the internal thread counter-rotating direction each other that described sleeve two ends inwall is provided with is provided with.
3. the long adjuster of rope according to claim 2 is characterized in that a described wherein other end of regulating bolt fixedlys connected the other end stay guy of drag-line connector with the drag-line connector.
4. the long adjuster of rope according to claim 3 is characterized in that described drag-line connector comprises that end is provided with a drag-line anchor head, and a described drag-line anchor head and a drag-line fixed cover tensioning are fixed.
5. the long adjuster of rope according to claim 1 is characterized in that the middle part of described sleeve is provided with a through hole that can supply regulating arm to pass.
CNU200820110728XU 2008-04-28 2008-04-28 Cable length regulating apparatus Expired - Fee Related CN201183930Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU200820110728XU CN201183930Y (en) 2008-04-28 2008-04-28 Cable length regulating apparatus

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU200820110728XU CN201183930Y (en) 2008-04-28 2008-04-28 Cable length regulating apparatus

Publications (1)

Publication Number Publication Date
CN201183930Y true CN201183930Y (en) 2009-01-21

Family

ID=40271666

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU200820110728XU Expired - Fee Related CN201183930Y (en) 2008-04-28 2008-04-28 Cable length regulating apparatus

Country Status (1)

Country Link
CN (1) CN201183930Y (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104452595A (en) * 2014-11-12 2015-03-25 河海大学 Tensioning device for stay cable which is provided with single-lug or double-lug sleeve and can be adjusted in one direction or two directions and construction method of device
CN107910459A (en) * 2017-10-10 2018-04-13 浙江畅通科技有限公司 A kind of battery cell case with positioner
CN109989344A (en) * 2017-12-29 2019-07-09 建峰索具有限公司 A kind of wirerope drag-line and preparation method thereof
CN111730142A (en) * 2020-07-21 2020-10-02 常州天山重工机械有限公司 Tool for oversized heavy workpiece and machining process of oversized heavy workpiece

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104452595A (en) * 2014-11-12 2015-03-25 河海大学 Tensioning device for stay cable which is provided with single-lug or double-lug sleeve and can be adjusted in one direction or two directions and construction method of device
CN104452595B (en) * 2014-11-12 2016-05-25 河海大学 The construction method of the single, double tensioning equipment to adjusting suspension cable of single, double ear muff cylinder
CN107910459A (en) * 2017-10-10 2018-04-13 浙江畅通科技有限公司 A kind of battery cell case with positioner
CN107910459B (en) * 2017-10-10 2020-07-28 浙江畅通科技有限公司 Battery case with positioner
CN109989344A (en) * 2017-12-29 2019-07-09 建峰索具有限公司 A kind of wirerope drag-line and preparation method thereof
CN111730142A (en) * 2020-07-21 2020-10-02 常州天山重工机械有限公司 Tool for oversized heavy workpiece and machining process of oversized heavy workpiece

Similar Documents

Publication Publication Date Title
CN103088750B (en) Especial-big span suspension bridge of uniparted hyperboloid space rope net main cable and construction method thereof
CN106436569B (en) A kind of prestressing force bridge floor attachment means and its method for prefabricating and construction method
CN105064208B (en) A kind of deck structrue combined with steel bridge deck by prefabricated U HPC plate and construction method thereof
CN109610314B (en) Prefabricated bridge deck wet joint structure and assembling method
CN111335142A (en) Self-anchored cable-stayed bowstring arch bridge
CN201183930Y (en) Cable length regulating apparatus
CN106835981B (en) A kind of self-balance type inhaul cable anchorage structure suitable in bridge pier and bridge tower
CN207862749U (en) A kind of novel combination type sunpender
CN207919363U (en) A kind of Filled Steel Tubular Arch Bridge low level assembly lifting system
CN203080400U (en) Extra-large span suspension bridge with uniparted hyperboloid space cable net main cables
CN104032891A (en) Prestressed double-spliced glued wood beam
CN202064270U (en) Steering gear of adjustable prestress
CN201151867Y (en) Double tower oblique pulling type overbridge
CN109898550A (en) A kind of prefabricated assembled cantilever retaining wall being connected by screw bolts mode
CN202688857U (en) Steel-concrete combined trussed beam
CN103556563B (en) Steel-RPC combined bridge
CN202064276U (en) Cable-girder anchorage structure of railway steel truss cable stayed bridge
CN201228341Y (en) The suspension cable overpass
CN207453526U (en) A kind of ruggedized construction of building structure floorboard
CN207812185U (en) A kind of suspension type bottom plate opening combinations box prestressed rail beam system
CN203867064U (en) Prestressed double-spliced glued wood beam
CN203334182U (en) Structure used for connecting railway concrete retaining wall with steel bridge panel
CN201151866Y (en) Arch beam type overbridge
CN206616449U (en) A kind of pair of limb main pier hybrid structure of arch and beam formula concrete continuous rigid structure bridge structure
CN202073027U (en) Creep deformation adjustment structure for railway prestressed concrete continuous bridge

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: BEIJING HAIBO SI QIANG BRIDGE NEW TECHNOLOGY CO.,

Free format text: FORMER OWNER: ZHANG GUOZHI

Effective date: 20091016

C41 Transfer of patent application or patent right or utility model
C53 Correction of patent for invention or patent application
CB03 Change of inventor or designer information

Inventor after: Yuan Yue

Inventor before: Zhang Guozhi

Inventor before: Yuan Yue

TR01 Transfer of patent right

Effective date of registration: 20091016

Address after: B607, science and technology center, No. 8 Xue Jie Road, Beijing, Haidian District 100192, China

Patentee after: Beijing Hyper Strong Bridge Technology Co., Ltd.

Address before: Liaoning province Jinzhou City Heping Road, Linghe District No. 16-82 five, zip code: 121002

Co-patentee before: Yuan Yue

Patentee before: Zhang Guo Zhi

DD01 Delivery of document by public notice

Addressee: Beijing Hyper Strong Bridge Technology Co., Ltd. Chen Liang

Document name: Notification to Pay the Fees

DD01 Delivery of document by public notice

Addressee: Beijing Hyper Strong Bridge Technology Co., Ltd.

Document name: Notification of Termination of Patent Right

C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20090121

Termination date: 20120428