CN108330813B CN201810188392.7A CN201810188392A CN108330813B CN 108330813 B CN108330813 B CN 108330813B CN 201810188392 A CN201810188392 A CN 201810188392A CN 108330813 B CN108330813 B CN 108330813B
Authority
CN
China
Prior art keywords
bridge
drag
main
line
arch
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201810188392.7A
Other languages
Chinese (zh)
Other versions
CN108330813A (en
Inventor
瓮少彬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xihua University
Original Assignee
Xihua University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xihua University filed Critical Xihua University
Priority to CN201810188392.7A priority Critical patent/CN108330813B/en
Publication of CN108330813A publication Critical patent/CN108330813A/en
Application granted granted Critical
Publication of CN108330813B publication Critical patent/CN108330813B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D12/00Bridges characterised by a combination of structures not covered as a whole by a single one of groups E01D2/00 - E01D11/00
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/16Suspension cables; Cable clamps for suspension cables ; Pre- or post-stressed cables

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The invention discloses a kind of novel bridges, comprising: three arc main arch, drag-line, the main bridge of annular and access bridge;The arc main arch, which inclines towards each other, mutually to be drawn close, and a stress entirety is formed;Guy anchor is set along main arch surface, each guy anchor connects a drag-line;The main bridge surface of other end connection annular of drag-line;The access bridge is connected to the outer ring edge of main bridge, and according to landform and bridge erection position, the access bridge of seat or more is arranged.The present invention has the advantages that tilting the bridge structure of arc main arch oblique pull ring girder using three, only three arch springing landings are easily realized and cross over the water surface at three river interflow, do not fall stub in waters, while utilizing annular main bridging system multiple spot.In urban intersection, stub is not fallen on road surface, while liberating traffic, access bridge can be contacted according to landform and bridge erection position setting many places.

Description

A kind of novel bridge
Technical field
The present invention relates to bridge technology field, in particular to a kind of novel bridge.
Background technique
It is currently used for the foot bridge of connection urban transportation mouth, generallys use the connection of straight line two o'clock, and using the structure of multicolumn Form has certain obstruction to influence traffic, it is more difficult to realize multiple spot traffic connection using single bridge under the premise of not influencing traffic.
It is currently used for the bridge of three Jiang Heliu or the leap of multiple spot waters, has excessive stub in waters, influences passing through for waters Ability, stub construction can affect to ecology especially in ecological protection region, water.
Summary of the invention
The present invention in view of the drawbacks of the prior art, provides a kind of novel bridge, can effectively solve the above-mentioned prior art There are the problem of.
In order to realize the above goal of the invention, the technical solution adopted by the present invention is as follows:
A kind of novel bridge, comprising: three arc main arch 1, drag-line 2, the main bridge 3 of annular and access bridge;Three arc masters Arch 1 slopes inwardly each other mutually draws close and fixes mutual contact point, forms a stress entirety;If being arranged along 1 surface of main arch The dry identical guy anchor 4 of spacing, each guy anchor 4 connect a drag-line 2;Main 3 table of bridge of other end connection annular of drag-line 2 Face;The drag-line 2 follows quadrilateral rule, is decomposed into vertical component and horizontal component.The outer ring edge of main 3 upper surface of bridge and 2 junction of drag-line is equipped with railing or breast board;The access bridge is connected to the outer ring edge of main bridge 3, according to landform and bridge erection position It sets, the access bridge of setting 2 or more.
Further, a length of 11.2 meters of drag-line of guy anchor 4 highly most short on main arch 1, the drag-line of highest guy anchor 4 A length of 37.6 meters.
Further, the radian of the main arch 1 is 77 °, and tilt angle is 132 °.
Further, 1 surface of main arch is the steel 5 of 20 cm thicks, and inside is filled into concrete 6.
Further, it is provided with the duct passed through for drag-line 2 on main arch 1, is anchored by anchor.
Further, host bridge 3 is hollow, is made of the steel box beam that several cross sections are the flat pattern of falling wing; On box beam diaphragm plate, steel anchor box 7 is welded, drag-line is anchored after passing through steel anchor box.
Further, drag-line 2 connects the tie point of main bridge 3 apart from main 1 meter of 3 inner annular edge of bridge, and tie point is around entire bridge Face forms a circle, and the tie point spacing that drag-line 2 connects main bridge is identical.
Compared with prior art the present invention has the advantages that tilting the bridge of arc main arch oblique pull ring girder using three Structure, only three arch springing landings, easily realize and cross over the water surface at three river interflow, do not fall stub in waters, while utilizing ring The main bridging system multiple spot of shape.In urban intersection, not falling stub can be according to landform and bridge while liberating traffic on road surface Decorating position is arranged many places and contacts access bridge.
Detailed description of the invention
Fig. 1 is the main view of bridge of the embodiment of the present invention;
Fig. 2 is the top view of bridge of the embodiment of the present invention;
Fig. 3 is the lateral sectional schematic diagram of main arch of the embodiment of the present invention;
Fig. 4 is longitudinal sectional schematic diagram of main arch of the embodiment of the present invention;
Fig. 5 is the lateral sectional schematic diagram of the main bridge of the embodiment of the present invention;
Fig. 6 is longitudinal sectional schematic diagram of the main bridge of the embodiment of the present invention.
Specific embodiment
To make the objectives, technical solutions, and advantages of the present invention more comprehensible, right hereinafter, referring to the drawings and the embodiments, The present invention is described in further details.
As shown in Figure 1, 2, a kind of novel bridge, comprising: three arc main arch 1, drag-line 2, the main bridge 3 of annular and access bridge;Institute It states three arc main arch 1 and slopes inwardly each other and mutually draw close and fix mutual contact point, form a stress entirety, the master The radian of arch is 77 °, and tilt angle is 132 °.
The identical guy anchor 4 of several spacing of setting along 1 surface of main arch, each guy anchor connect a drag-line 2;
Main 3 surface of bridge of other end connection annular of drag-line, tie point is apart from main 1 meter of 3 inner annular edge of bridge, and tie point is around whole A bridge floor forms a circle, and the tie point spacing that drag-line 2 connects main bridge is identical.The drag-line follows quadrilateral rule, point Solution is vertical component and horizontal component.
A length of 11.2 meters of drag-line of the most short guy anchor 4 of height, the drag-line a length of 37.6 of highest guy anchor 4 on main arch 1 Rice.
In order to mitigate weight host bridge 3 be it is hollow, the outer ring edge and drag-line junction of main 3 upper surface of bridge are equipped with railing Or breast board.
The access bridge settable more, need to only connect the outer ring edge of itself and main bridge 3 according to landform and bridge erection position It is logical.
As shown in figure 3,1 surface of main arch is the Q345 steel 5 of 20 cm thicks, inside is filled into C50 concrete 6.
As shown in figure 4, drag-line, which passes through, encircles upper reserving hole channel, anchored by anchor.
As shown in Figure 5,6, host bridge 3 is made of the steel box beam that several cross sections are the flat pattern of falling wing;In case On beam diaphragm plate, steel anchor box 7 is welded, drag-line is anchored after passing through steel anchor box.
Those of ordinary skill in the art will understand that the embodiments described herein, which is to help reader, understands this hair Bright implementation method, it should be understood that protection scope of the present invention is not limited to such specific embodiments and embodiments.Ability The those of ordinary skill in domain disclosed the technical disclosures can make its various for not departing from essence of the invention according to the present invention Its various specific variations and combinations, these variations and combinations are still within the scope of the present invention.

Claims (7)

1. a kind of novel bridge characterized by comprising three arc main arch (1), drag-line (2), the main bridge (3) of annular and access bridge; Three arc main arch (1) slope inwardly each other mutually draws close and fixes mutual contact point, forms a stress entirety;Edge The identical guy anchor (4) of several spacing is arranged in main arch (1) surface, and each guy anchor (4) connects a drag-line (2);Drag-line (2) Main bridge (3) surface of other end connection annular;The drag-line (2) follows quadrilateral rule, is decomposed into vertical component and level Component;The outer ring edge and drag-line (2) junction of main bridge (3) upper surface are equipped with railing or breast board;The access bridge and main bridge (3) Outer ring edge connection, according to landform and bridge erection position, the access bridge of setting 2 or more.
2. a kind of novel bridge according to claim 1, it is characterised in that: the radian of the main arch (1) is 77 °, inclination Angle is 132 °.
3. a kind of novel bridge according to claim 2, it is characterised in that: be provided on main arch (1) and passed through for drag-line (2) Duct, anchored by anchor.
4. a kind of novel bridge according to claim 3, it is characterised in that: the most short guy anchor (4) of height on main arch (1) A length of 11.2 meters of drag-line, a length of 37.6 meters of the drag-line of highest guy anchor (4).
5. a kind of novel bridge according to claim 4, it is characterised in that: main arch (1) surface is 20 cm thicks Steel (5), inside are filled into concrete (6).
6. a kind of novel bridge according to claim 1, it is characterised in that: host bridge (3) be it is hollow, by several crosscutting Face is that the steel box beam for the flat pattern of falling wing forms;On box beam diaphragm plate, weld steel anchor box (7), drag-line passes through steel anchor box After anchored.
7. a kind of novel bridge according to claim 1, it is characterised in that: drag-line (2) connect the tie point of main bridge (3) away from 1 meter of inner annular edge from main bridge (3), tie point forms a circle around entire bridge floor, and drag-line (2) connects between the tie point of main bridge Away from identical.
CN201810188392.7A 2018-03-07 2018-03-07 A kind of novel bridge Expired - Fee Related CN108330813B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810188392.7A CN108330813B (en) 2018-03-07 2018-03-07 A kind of novel bridge

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810188392.7A CN108330813B (en) 2018-03-07 2018-03-07 A kind of novel bridge

Publications (2)

Publication Number Publication Date
CN108330813A CN108330813A (en) 2018-07-27
CN108330813B true CN108330813B (en) 2019-07-30

Family

ID=62930420

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810188392.7A Expired - Fee Related CN108330813B (en) 2018-03-07 2018-03-07 A kind of novel bridge

Country Status (1)

Country Link
CN (1) CN108330813B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111335142A (en) * 2020-03-31 2020-06-26 淮安市公路事业发展中心 Self-anchored cable-stayed bowstring arch bridge
CN111608065B (en) * 2020-04-27 2021-08-17 江苏华通工程检测有限公司 Three-leaf rose-line-shaped concrete filled steel tube flying swallow type cable-stayed arch bridge and construction method

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201151867Y (en) * 2008-01-29 2008-11-19 张国志 Double tower oblique pulling type overbridge
CN101349034A (en) * 2008-07-27 2009-01-21 张俊岭 Small-sized full intercommunication overpass road junction
CN202961980U (en) * 2012-12-06 2013-06-05 内蒙古伊利实业集团股份有限公司 Sling-type rotary safety protection device for sewage treatment tank
CN204356634U (en) * 2014-11-06 2015-05-27 中铁二院工程集团有限责任公司 X-shaped deck type is greatly across reinforced concrete arch bridge
CN104831615A (en) * 2015-05-25 2015-08-12 苏州规划设计研究院股份有限公司 Combined cable-stayed steel structure arch bridge in special-shaped spatial lattice form based on loop system
JP2016023523A (en) * 2014-07-24 2016-02-08 株式会社Ihiインフラシステム Construction method for arch bridge
CN205557290U (en) * 2016-04-19 2016-09-07 林同棪国际工程咨询(中国)有限公司 Monolithic purlin formula annular passenger footbridge
CN107245935A (en) * 2017-07-27 2017-10-13 重庆水利电力职业技术学院 Arch tower viaduct

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201151867Y (en) * 2008-01-29 2008-11-19 张国志 Double tower oblique pulling type overbridge
CN101349034A (en) * 2008-07-27 2009-01-21 张俊岭 Small-sized full intercommunication overpass road junction
CN202961980U (en) * 2012-12-06 2013-06-05 内蒙古伊利实业集团股份有限公司 Sling-type rotary safety protection device for sewage treatment tank
JP2016023523A (en) * 2014-07-24 2016-02-08 株式会社Ihiインフラシステム Construction method for arch bridge
CN204356634U (en) * 2014-11-06 2015-05-27 中铁二院工程集团有限责任公司 X-shaped deck type is greatly across reinforced concrete arch bridge
CN104831615A (en) * 2015-05-25 2015-08-12 苏州规划设计研究院股份有限公司 Combined cable-stayed steel structure arch bridge in special-shaped spatial lattice form based on loop system
CN205557290U (en) * 2016-04-19 2016-09-07 林同棪国际工程咨询(中国)有限公司 Monolithic purlin formula annular passenger footbridge
CN107245935A (en) * 2017-07-27 2017-10-13 重庆水利电力职业技术学院 Arch tower viaduct

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
世界自行车交通及有关设计一瞥(上);豫民;《美与时代(上旬刊)》;20150826(第6期);第5-8页 *
大跨度提篮式人行拱桥的振动病害分析与改造;黄侨、 赵银飞、孙永明;《公路交通科技》;20081031(第10期);第88-93页 *

Also Published As

Publication number Publication date
CN108330813A (en) 2018-07-27

Similar Documents

Publication Publication Date Title
CN108330813B (en) A kind of novel bridge
CN106012851A (en) Synchronous construction method of steel box girder and concrete pier studs
CN205775786U (en) A kind of novel railway curve Cable-stayed Bridge with Slanted Pylon
CN209227563U (en) High steep weathering seriously with the rock side slope supporting construction of joints development
CN105755945B (en) A kind of triangle steel truss bridge of Y shape point limb
CN202440766U (en) Water-drainage open cut tunnel aqueduct of road cut section
CN207904752U (en) Steep cliff position Bridge-wire fusing time overall structure
CN108193601B (en) Bridge construction method
CN209538021U (en) A kind of bridge drain system
CN211340256U (en) Long-distance passing culvert structure suitable for urban river
CN204530739U (en) A kind of super shallow-buried tunnel and it is also built the construction structure of building
CN206486798U (en) The bridgehead structures of overpass above underground rail
CN206956575U (en) Tunnel road structure
CN208201613U (en) A kind of asymmetric main push-towing rope railway Suspension bridge structure
CN213203761U (en) River channel water passing trestle
CN206902528U (en) Overpass structure-improved
RU2008118395A (en) COMPLEX OF DIVIDERS OF TRANSPORT AND PEDESTRIAN FLOWS CROSSING ON ROADS
CN205856952U (en) A kind of stretch-proof road structure
CN207176478U (en) A kind of karst depression people broker's storehouse road structure
CN206308613U (en) Beam-ends percolating water ejector at a kind of expansion joint
CN208151772U (en) Cross-saddle single-track traffic concrete track beam based on assembled technology
CN208965388U (en) A kind of highway bridge support device
CN204570486U (en) The formwork support structure of viaduct superstructure
CN108374322A (en) A kind of asymmetric main push-towing rope railway Suspension bridge structure
CN216074709U (en) Space double-helix steel structure bridge

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20191204

Address after: 610000, No. 999, Jin Zhou road, Jinniu District, Sichuan, Chengdu

Co-patentee after: Sichuan Chuangong Licheng Engineering Technology Service Co.,Ltd.

Patentee after: XIHUA University

Address before: 610039, No. 999, Jin Zhou road, Jinniu District, Sichuan, Chengdu

Patentee before: Xihua University

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20220415

Address after: 610000 Jinzhou Road, Jinniu District, Chengdu, Sichuan 999

Patentee after: XIHUA University

Address before: 610000 Jinzhou Road, Jinniu District, Chengdu, Sichuan 999

Patentee before: XIHUA University

Patentee before: Sichuan Chuangong Licheng Engineering Technology Service Co.,Ltd.

TR01 Transfer of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190730

CF01 Termination of patent right due to non-payment of annual fee