CN1858354A - Cement asphalt mortar vertical mould type pouring method - Google Patents

Cement asphalt mortar vertical mould type pouring method Download PDF

Info

Publication number
CN1858354A
CN1858354A CN 200610020626 CN200610020626A CN1858354A CN 1858354 A CN1858354 A CN 1858354A CN 200610020626 CN200610020626 CN 200610020626 CN 200610020626 A CN200610020626 A CN 200610020626A CN 1858354 A CN1858354 A CN 1858354A
Authority
CN
China
Prior art keywords
mortar
track plate
track
template
formwork erection
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN 200610020626
Other languages
Chinese (zh)
Inventor
钱振地
江成
肖俊恒
刘振民
王智勇
吴海涛
张雷
白昆华
吴利清
杨先凤
王江
张志红
龚斯昆
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway No 8 Engineering Group Co Ltd
Original Assignee
China Railway No 8 Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway No 8 Engineering Group Co Ltd filed Critical China Railway No 8 Engineering Group Co Ltd
Priority to CN 200610020626 priority Critical patent/CN1858354A/en
Publication of CN1858354A publication Critical patent/CN1858354A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The present invention discloses cement asphalt (CA) mortar vertical formwork type pouring method, and belongs to the field of building construction technology. The pouring method includes the following steps: installing support screws on the pedestal, spreading track boards supported with the support screws, setting vertical formworks outside the track boards, pouring CA mortar, and removing support screws and formworks after 24 hr and reaching strength of 0.1 MPa. The present invention is used for jointing between the track board and the pedestal, and can reach the close jointing and long service life of the track, and produce certain regulating and buffering effect.

Description

Cement asphalt mortar vertical mould type pouring method
Technical field
The present invention relates to a kind of constructional materials, be specifically related to a kind of method for filling of mortar.
Background technology
Along with the development of society, the common target of pursuing in high-speed railway transportation having become countries in the world.For the requirement of the high stationarity that adapts to high-speed railway, high-durability, comfortableness, need to adopt and the ballastless track of the few maintenance of development.The rail that ballastless track adopts is directly installed on the track plate, and track slab pavement is on footing foundation.Because footing foundation and track plate all are steel concrete builds and form, both can not direct closely connected joint, therefore, need add between footing foundation and track plate and adjust layer, makes both closely connected joints.
Summary of the invention
The objective of the invention is to: provide a kind of cement asphalt mortar that will have adjustment, shock-absorbing capacity to be poured into method between footing foundation and the track plate.
Technical scheme of the present invention is: 1, a kind of cement asphalt mortar vertical mould type pouring method mainly contains following steps:
A, carrying bolt is installed in track plate side; Carrying bolt propped up stand on the footing foundation, and the track plate is adjusted to desired location;
B, on footing foundation, be provided with template and surround the track plate outside, and make and form chamber between track plate and the footing foundation, leave the wide eye split of 2~4mm between template and track plate side;
C, the mortar that will mix and stir inject in the described chamber from the cement asphalt mortar perfusing hole on the track plate, reach 70mm up to track edges of boards cement asphalt mortar influx height, and after at the bottom of the complete overlay, perfusion finishes;
The perfusion of d, cement asphalt mortar finish reach 0.1MPa through 24 hours and intensity after, in time remove carrying bolt and template.
The cement injection asphalt mortar, bituminous mortar should carry out under 5~25 ℃ environment temperature.
Cement asphalt mortar if be placed in the buffering perfusion jar, must be maintained to few 10~30 rev/mins mixing speed after mixing and stirring.
After described carrying bolt and the form removable, by designing requirement finishing cement asphalt mortar layer edge.
Paste the section of rubber spacer in track plate bottom, the thickness range of cement asphalt mortar layer is 30~100mm; The thickness range of other section cement asphalt mortar layers at the bottom of the track plate is 40~100mm.
On the lifting nut of carrying bolt mounting rail guidance tape side.
The invention has the beneficial effects as follows: can be so that track plate and footing foundation tightly engage, and have and adjust and the buffering effect, make track have certain elasticity simultaneously, thereby can strengthen the application life of track.
Description of drawings
Fig. 1 is a front view of the present invention;
Fig. 2 is that the A-A of Fig. 1 is to view;
Fig. 3 is the vertical view of Fig. 1;
Wherein, Reference numeral is, 1 is footing foundation, and 2 is the track plate, and 3 is the CA screed, and 4 is carrying bolt, and 5 is connecting bolt, and 6 is template, and 7 is eye split, and 8 is CA mortar injection mouth, and 9 are the lifting nut.
The specific embodiment
Embodiment 1
As Fig. 1, Fig. 2 and shown in Figure 3, a kind of CA mortar formwork erection formula method for filling mainly contains following steps:
A, on the lifting nut of track plate 2 sides, carrying bolts 4 are installed by connecting bolt 5; 4 of carrying bolts are stood on the footing foundation 1, and the track plate is adjusted to desired location;
B, on footing foundation, be provided with template 6 and surround track plates 2 outsides, and make and form chamber between track plate 2 and the footing foundation 1, leave the wide eye split of 2~4mm 7 between template and track plate side;
C, the mortar that will mix and stir inject in the described chamber from the CA mortar injection mouth 8 on the track plate 2, reach 70mm up to track edges of boards CA mortar injection height, and after at the bottom of the complete overlay, perfusion finish;
D, CA mortar injection finish reach 0.1MPa through 24 hours and intensity after, in time remove carrying bolt 4 and template 6.
In addition, perfusion CA mortar should carry out under 5~25 ℃ environment temperature.The CA mortar if be placed in the buffering perfusion jar, must be maintained to few 10~30 rev/mins mixing speed after mixing and stirring.
Embodiment 2
As Fig. 1, Fig. 2 and shown in Figure 3, a kind of CA mortar formwork erection formula method for filling mainly contains following steps:
A, on the lifting nut 9 of track plate 2 sides, carrying bolts 4 are installed by connecting bolt 5; 4 of carrying bolts are stood on the footing foundation 1, and the track plate is adjusted to desired location;
B, on footing foundation, be provided with template 6 and surround track plates 2 outsides, and make and form chamber between track plate 2 and the footing foundation 1, leave the wide eye split of 2~4mm 7 between template and track plate side;
C, the mortar that will mix and stir inject in the described chamber from the CA mortar injection mouth 8 on the track plate 2, reach 70mm up to track edges of boards CA mortar injection height, and after at the bottom of the complete overlay, perfusion finish;
D, CA mortar injection finish reach 0.1MPa through 24 hours and intensity after, in time remove carrying bolt 4 and template 6;
E, by designing requirement finishing CA screed 3 edges.
In addition, perfusion CA mortar should carry out under 5~25 ℃ environment temperature.The CA mortar if be placed in the buffering perfusion jar, must be maintained to few 10~30 rev/mins mixing speed after mixing and stirring.
Because some section of vibration damping type track plate bottom is pasted rubber spacer, pastes the section of rubber spacer in the bottom, the thickness range of CA screed 3 is 30~100mm; The thickness range of other sections CA screed 3 at the bottom of the track plate is 40~100mm.

Claims (6)

1, a kind of CA mortar formwork erection formula method for filling is characterized in that: mainly contain following steps:
A, carrying bolt (4) go up to be installed at track plate (2); Carrying bolt (4) is stood on the footing foundation (1), and the track plate is adjusted to desired location;
B, on footing foundation, be provided with template (6) and surround track plate (2) outside, and make and form chamber between track plate (2) and the footing foundation (1), leave the wide eye split of 2~4mm (7) between template and track plate side;
C, the mortar that will mix and stir inject in the described chamber from the CA mortar injection mouth (8) on the track plate (2), reach 70mm up to track edges of boards CA mortar injection height, and after at the bottom of the complete overlay, perfusion finish;
D, CA mortar injection finish reach 0.1MPa through 24 hours and intensity after, in time remove carrying bolt (4) and template (6).
2, CA mortar formwork erection formula method for filling according to claim 1 is characterized in that: perfusion CA mortar should carry out under 5~25 ℃ environment temperature.
3, CA mortar formwork erection formula method for filling according to claim 1 is characterized in that: the CA mortar if be placed in the buffering perfusion jar, must be maintained to few 10~30 rev/mins mixing speed after mixing and stirring.
4, according to claim 1 or 3 described CA mortar formwork erection formula method for filling, it is characterized in that: after described carrying bolt (4) and template (6) are removed, by designing requirement finishing CA screed (3) edge.
5, CA mortar formwork erection formula method for filling according to claim 1 is characterized in that: paste the section of rubber spacer in track plate bottom, the thickness range of CA screed (3) is 30~100mm; The thickness range of other sections CA screed (3) at the bottom of the track plate is 40~100mm.
6, CA mortar formwork erection formula method for filling according to claim 1, it is characterized in that: carrying bolt (4) is installed on the lifting nut (9) of track plate (2) side.
CN 200610020626 2006-03-30 2006-03-30 Cement asphalt mortar vertical mould type pouring method Pending CN1858354A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200610020626 CN1858354A (en) 2006-03-30 2006-03-30 Cement asphalt mortar vertical mould type pouring method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200610020626 CN1858354A (en) 2006-03-30 2006-03-30 Cement asphalt mortar vertical mould type pouring method

Publications (1)

Publication Number Publication Date
CN1858354A true CN1858354A (en) 2006-11-08

Family

ID=37297305

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200610020626 Pending CN1858354A (en) 2006-03-30 2006-03-30 Cement asphalt mortar vertical mould type pouring method

Country Status (1)

Country Link
CN (1) CN1858354A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101245580B (en) * 2007-12-28 2011-03-16 中铁二局股份有限公司 Asphalt mortar bottling method for rail plate
CN104452499A (en) * 2014-11-18 2015-03-25 中国铁道科学研究院铁道建筑研究所 Method for rapidly repairing open joint of cement-emulsified asphalt mortar of longitudinally-connected-plate type ballastless track
CN104480815A (en) * 2014-11-18 2015-04-01 中国铁道科学研究院铁道建筑研究所 Method for rapidly repairing cement emulsified asphalt mortar interface connection damage of unit slab ballastless track
CN105714619A (en) * 2016-04-21 2016-06-29 中铁二十四局集团有限公司 Construction method of plate type ballast-free bed structure
CN105735081A (en) * 2016-03-09 2016-07-06 广东工业大学 Novel vibration reduction road structure and construction method thereof

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101245580B (en) * 2007-12-28 2011-03-16 中铁二局股份有限公司 Asphalt mortar bottling method for rail plate
CN104452499A (en) * 2014-11-18 2015-03-25 中国铁道科学研究院铁道建筑研究所 Method for rapidly repairing open joint of cement-emulsified asphalt mortar of longitudinally-connected-plate type ballastless track
CN104480815A (en) * 2014-11-18 2015-04-01 中国铁道科学研究院铁道建筑研究所 Method for rapidly repairing cement emulsified asphalt mortar interface connection damage of unit slab ballastless track
CN105735081A (en) * 2016-03-09 2016-07-06 广东工业大学 Novel vibration reduction road structure and construction method thereof
CN105735081B (en) * 2016-03-09 2018-04-27 广东工业大学 A kind of vibration damping road structure and its construction method
CN105714619A (en) * 2016-04-21 2016-06-29 中铁二十四局集团有限公司 Construction method of plate type ballast-free bed structure

Similar Documents

Publication Publication Date Title
CN101748662B (en) Construction process for double-block ballastless track bed on subgrade
CN1858354A (en) Cement asphalt mortar vertical mould type pouring method
CN103321111B (en) Streetcar track connects the construction method of paving
CN1858353A (en) Cement asphalt mortar injection bag type pouring method
CN104234271A (en) Self-heat-preservation lightweight wallboard system and mounting method
CN104452554A (en) Road vertical side stone construction method and vertical side stone back concrete steel mold
CN1587531A (en) Method for anti-cracking in hogging moment area of steel-concrete combined beam
CN2823315Y (en) Wedge bottom plate for bridge pad
CN103821061B (en) Traction runway for automobile safety crash laboratory and layered construction method thereof
CN1563638A (en) Formwork metthod for paired drawing walls of furnace in integral cast structural furnace
CN216973019U (en) Prefabricated assembled temporary parking lot construction structure
CN102953336A (en) Modular construction method of cast-in-situ continuous box beam on deep soft foundation road segment
CN113585317B (en) Construction method for mucky soil support beam cushion layer
CN209890988U (en) Detachable mobile land platform pavement manufactured in factory
CN107034759A (en) Steel plate road pavement structure and construction method
CN101818501B (en) Construction method of reinforced concrete foundation on top of large-scale trenched pipe culvert
KR100408895B1 (en) Construction method of expansion joint for bridge
CN112045840A (en) Construction method of assembly type beam storage pedestal for prefabricating high-speed railway box beam
CN217104684U (en) Novel integral pavement and ballast blocking plate for railway bridge
CN206554239U (en) A kind of gate stack for the prefabricated installation of shear wall side door-window opening
CN110700122A (en) A antidumping reinforced structure for rectangle single-column mound bridge
CN110939214A (en) Concrete opposite-pulling mortise-tenon joint wall and building
CN219653517U (en) Vibrating beam supporting structure for highway bridge pavement construction
CN218090345U (en) Prefabricated assembled pavement slab
CN211848692U (en) Assembled cement concrete pavement structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication