CN1858353A - Cement asphalt mortar injection bag type pouring method - Google Patents

Cement asphalt mortar injection bag type pouring method Download PDF

Info

Publication number
CN1858353A
CN1858353A CN 200610020623 CN200610020623A CN1858353A CN 1858353 A CN1858353 A CN 1858353A CN 200610020623 CN200610020623 CN 200610020623 CN 200610020623 A CN200610020623 A CN 200610020623A CN 1858353 A CN1858353 A CN 1858353A
Authority
CN
China
Prior art keywords
mortar
pouring method
bag type
type pouring
injection bag
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN 200610020623
Other languages
Chinese (zh)
Inventor
钱振地
江成
肖俊恒
刘振民
王智勇
吴海涛
张雷
白昆华
吴利清
杨先凤
王江
张志红
龚斯昆
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway No 8 Engineering Group Co Ltd
Original Assignee
China Railway No 8 Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway No 8 Engineering Group Co Ltd filed Critical China Railway No 8 Engineering Group Co Ltd
Priority to CN 200610020623 priority Critical patent/CN1858353A/en
Publication of CN1858353A publication Critical patent/CN1858353A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Revetment (AREA)

Abstract

The present invention discloses cement asphalt (CA) mortar injection bag type pouring method, and belongs to the field of building construction technology. The pouring method includes the following steps: spreading injected bags, spreading and regulating positioning track boards, pouring CA mortar, and removing support screws after 24 hr and reaching strength of 0.1 MPa. The present invention is used for jointing between the track board and the pedestal, and can reach the close jointing and long service life of the track, and produce certain regulating and buffering effect.

Description

Cement asphalt mortar injection bag type pouring method
Technical field
The present invention relates to a kind of constructional materials, be specifically related to a kind of method for filling of mortar.
Background technology
Along with the development of society, the common target of pursuing in high-speed railway transportation having become countries in the world.For the requirement of the high stationarity that adapts to high-speed railway, high-durability, comfortableness, need to adopt and the ballastless track of the few maintenance of development.The rail that ballastless track adopts is directly installed on the track plate, and track slab pavement is on footing foundation.Because footing foundation and track plate all are steel concrete builds and form, both can not direct closely connected joint, therefore, need add between footing foundation and track plate and adjust layer, makes both tightly engage.
Summary of the invention
The objective of the invention is to: provide a kind of cement asphalt mortar that will have adjustment, shock-absorbing capacity to be poured into method between footing foundation and the track plate.
Technical scheme of the present invention is: a kind of cement asphalt mortar injection bag type pouring method is characterized in that:
Mainly contain following steps:
A, cement asphalt mortar is injected bag be tiled on the rail bed basis, and it is folding fixing; On the track plate carrying bolt is installed, carrying bolt props up and stands on the footing foundation; The laid rail guidance tape also is adjusted to desired location with it; Open cement asphalt mortar and inject bag, and wrinkle must not be arranged;
B, the perfusing hole of mixer and cement asphalt mortar are injected a bag inlet firmly be connected, open the perfusing hole by-pass valve control, cement asphalt mortar injects cement asphalt mortar and injects in the bag, the cement asphalt mortar height reaches more than the 70mm in the perfusing hole of cement asphalt mortar injection bag opposite side, and after closely connected at the bottom of the plate, perfusion finishes;
The perfusion of c, cement asphalt mortar finish reach 0.1MPa through 24 hours and intensity after, in time remove carrying bolt.In order to reach better technique effect, the present invention can also have following feature:
Every block of track plate is poured into by the fill orifice of a side.
The cement injection asphalt mortar, bituminous mortar should carry out under 5~25 ℃ environment temperature.
Cement asphalt mortar if be placed in the surge tank, must keep 10~30 rev/mins mixing speed after mixing and stirring.
In longitudinal gradient and curve area, should be from low side inlet cement injection asphalt mortar, bituminous mortar, and cement asphalt mortar injects bag and be fixed on the footing foundation with the footing foundation contact surface, prevent that cement asphalt mortar from injecting that bag slides or displacement.
Cement asphalt mortar should once pour into and finish under every block of track plate.
After described carrying bolt is removed,, make it be beneficial to draining by designing requirement finishing cement asphalt mortar layer edge.
Paste the section of rubber spacer in track plate bottom, the thickness range of cement asphalt mortar layer is 30~100mm; The thickness range of other section cement asphalt mortar layers at the bottom of the track plate is 40~100mm.
Described track plate or slab track plate, or frame rail plate.
Described carrying bolt is installed on the lifting nut of track plate.
Need to prove: cement asphalt mortar is commonly called the CA mortar on engineering.
The invention has the beneficial effects as follows: can be so that track plate and footing foundation tightly engage, and have and adjust and the buffering effect, make track have certain elasticity simultaneously, thereby can strengthen the application life of track.
Description of drawings
Fig. 1 is that the present invention pours into the front view when finishing;
Fig. 2 is the lateral view of Fig. 1;
Fig. 3 is the vertical view of embodiment 1;
Wherein, Reference numeral is, 1 is footing foundation, and 2 is the slab track plate, and 3 is the cement asphalt mortar layer, and 4 is carrying bolt, and 5 is connecting bolt, and 6 is that cement asphalt mortar injects a bag inlet, and 7 be the frame rail plate, and 8 is that the track plate lifts by crane nut.
The specific embodiment
Embodiment 1
As Fig. 1, Fig. 2 and shown in Figure 3, a kind of cement asphalt mortar injection bag type pouring method mainly contains following steps:
A, cement asphalt mortar is injected bag be tiled on the rail bed basis 1, and it is folding fixing; The connecting bolt 5 of level is housed on track plate lifting nut 8, and the steel plate on the connecting bolt 5 is provided with screwed hole, and carrying bolt 4 passes this screwed hole and props up and stands on the footing foundation 1; Laid rail guidance tape 2 also is adjusted to desired location with it; It is folding to open cement asphalt mortar injection bag, and wrinkle must not be arranged;
B, the perfusing hole of mixer and cement asphalt mortar are injected a bag inlet 6 firmly be connected, open the perfusing hole by-pass valve control, cement asphalt mortar injects cement asphalt mortar and injects in the bag, the cement asphalt mortar height reaches more than the 70mm in the perfusing hole of cement asphalt mortar injection bag opposite side, and after closely connected at the bottom of the plate, perfusion finishes; Cement asphalt mortar under every block of track plate should once pour into to be finished;
The perfusion of c, cement asphalt mortar finish reach 0.1MPa through 24 hours and intensity after, in time remove carrying bolt;
D, by the edge of designing requirement finishing screed 3, make it be beneficial to draining.
Embodiment 2
As Fig. 1, Fig. 2 and shown in Figure 4, a kind of cement asphalt mortar injection bag type pouring method mainly contains following steps:
A, cement asphalt mortar is injected bag be tiled on the rail bed basis 1, and it is folding fixing; The connecting bolt 5 of level is housed on track plate lifting nut 8, and the steel plate on the connecting bolt 5 is provided with screwed hole, and carrying bolt 4 passes this screwed hole and props up and stands on the footing foundation 1; Lay frame rail plate 7 and it is adjusted to desired location; It is folding to open cement asphalt mortar injection bag, and wrinkle must not be arranged; Paste the section of rubber spacer in frame rail plate 7 bottoms, the thickness of cement asphalt mortar layer 3 is 30~100mm; The thickness of other section cement asphalt mortar layers at 7 ends of frame rail plate is 40~100mm.
B, in longitudinal gradient and curve area, should be from low side inlet cement injection asphalt mortar, bituminous mortar, and cement asphalt mortar injects bag and be fixed on the footing foundation with the footing foundation contact surface, prevent that cement asphalt mortar from injecting that bag slides or displacement;
C, cement injection asphalt mortar, bituminous mortar carry out under 5~25 ℃ environment temperature;
D, the perfusing hole of mixer and cement asphalt mortar are injected a bag inlet 6 firmly be connected, open the perfusing hole by-pass valve control, cement asphalt mortar injects cement asphalt mortar and injects in the bag, the cement asphalt mortar height reaches more than the 70mm in the perfusing hole of cement asphalt mortar injection bag opposite side, and after closely connected at the bottom of the plate, perfusion finishes;
The perfusion of e, cement asphalt mortar finish reach 0.1MPa through 24 hours and intensity after, in time remove carrying bolt 4;
F, by the edge of designing requirement finishing screed 3.
In filling process, note following item:
1. cement asphalt mortar is placed in the surge tank after mixing and stirring, and must keep 10~30 rev/mins mixing speed.
2. every block of track plate is poured into by the fill orifice of a side.
3. the cement asphalt mortar under every block of track plate should once pour into and finish.
4. mixing cement asphalt mortar after the system should pour at the appointed time and finish.

Claims (10)

1, a kind of CA mortar injection bag type pouring method is characterized in that: mainly contain following steps:
A, the CA mortar is injected bag be tiled on the rail bed basis (1), and it is folding fixing; Carrying bolt (4) is installed on the track plate, and carrying bolt (4) props up and stands on the footing foundation (1); Laid rail guidance tape (2) also is adjusted to desired location with it; Open the CA mortar and inject bag, and wrinkle must not be arranged;
B, the perfusing hole of mixer and CA mortar are injected a bag inlet (6) firmly be connected, open the perfusing hole by-pass valve control, the CA mortar injects the CA mortar and injects in the bag, and CA mortar height reaches more than the 70mm in the perfusing hole of CA mortar injection bag opposite side, and after closely connected at the bottom of the plate, perfusion finishes;
C, CA mortar injection finish reach 0.1MPa through 24 hours and intensity after, in time remove carrying bolt.
2, CA mortar injection bag type pouring method according to claim 1 is characterized in that: every block of track plate is poured into by the fill orifice that injects bag one side.
3, CA mortar injection bag type pouring method according to claim 1 is characterized in that: perfusion CA mortar should carry out under 5~25 ℃ environment temperature.
4, according to claim 1 or 3 described CA mortar injection bag type pouring methods, it is characterized in that: the CA mortar if be placed in the buffering perfusion jar, must keep 10~30 rev/mins mixing speed after mixing and stirring.
5, CA mortar injection bag type pouring method according to claim 1 is characterized in that: in longitudinal gradient and curve area, should pour into the CA mortar from low side inlet, and CA mortar injection bag is fixed on the footing foundation (1) with footing foundation (1) contact surface.
6, CA mortar injection bag type pouring method according to claim 1 is characterized in that: the CA mortar should once pour into and finish under every block of track plate.
7, CA mortar injection bag type pouring method according to claim 1 is characterized in that: after described carrying bolt (4) is removed, by designing requirement finishing CA screed (3) edge.
8, CA mortar injection bag type pouring method according to claim 1 is characterized in that: paste the section of rubber spacer in track plate bottom, the thickness range of CA screed (3) is 30~100mm; The thickness range of other sections CA screed (3) at the bottom of the track plate is 40~100mm.
9, CA mortar injection bag type pouring method according to claim 1 is characterized in that: described track plate or slab track plate (2), or frame rail plate (7).
10, CA mortar injection bag type pouring method according to claim 1 is characterized in that: described carrying bolt (4) is installed on the lifting nut (8) of track plate.
CN 200610020623 2006-03-30 2006-03-30 Cement asphalt mortar injection bag type pouring method Pending CN1858353A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200610020623 CN1858353A (en) 2006-03-30 2006-03-30 Cement asphalt mortar injection bag type pouring method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200610020623 CN1858353A (en) 2006-03-30 2006-03-30 Cement asphalt mortar injection bag type pouring method

Publications (1)

Publication Number Publication Date
CN1858353A true CN1858353A (en) 2006-11-08

Family

ID=37297304

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200610020623 Pending CN1858353A (en) 2006-03-30 2006-03-30 Cement asphalt mortar injection bag type pouring method

Country Status (1)

Country Link
CN (1) CN1858353A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101851884A (en) * 2010-03-23 2010-10-06 中国建筑股份有限公司 Construction method for paving CRTS I-type plate-type ballastless track plate in severe cold area
CN101245580B (en) * 2007-12-28 2011-03-16 中铁二局股份有限公司 Asphalt mortar bottling method for rail plate
CN101748665B (en) * 2009-12-22 2011-07-27 中铁二局股份有限公司 Fragment-free track slab pavement method
CN102433809A (en) * 2011-10-08 2012-05-02 中铁十二局集团有限公司 Hopper for pouring cement emulsified asphalt mortar and pouring method thereof
CN102535274A (en) * 2012-02-19 2012-07-04 中交第四公路工程局有限公司 Closure and edge-banding device and edge-banding method for CA (cement asphalt) mortar injection for high-speed rail ballastless track
CN103757993A (en) * 2013-12-27 2014-04-30 北京中铁瑞威基础工程有限公司 System and method for high-speed railway subgrade settlement restoration

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101245580B (en) * 2007-12-28 2011-03-16 中铁二局股份有限公司 Asphalt mortar bottling method for rail plate
CN101748665B (en) * 2009-12-22 2011-07-27 中铁二局股份有限公司 Fragment-free track slab pavement method
CN101851884A (en) * 2010-03-23 2010-10-06 中国建筑股份有限公司 Construction method for paving CRTS I-type plate-type ballastless track plate in severe cold area
CN102433809A (en) * 2011-10-08 2012-05-02 中铁十二局集团有限公司 Hopper for pouring cement emulsified asphalt mortar and pouring method thereof
CN102433809B (en) * 2011-10-08 2013-07-17 中铁十二局集团有限公司 Hopper for pouring cement emulsified asphalt mortar and pouring method thereof
CN102535274A (en) * 2012-02-19 2012-07-04 中交第四公路工程局有限公司 Closure and edge-banding device and edge-banding method for CA (cement asphalt) mortar injection for high-speed rail ballastless track
CN103757993A (en) * 2013-12-27 2014-04-30 北京中铁瑞威基础工程有限公司 System and method for high-speed railway subgrade settlement restoration
CN103757993B (en) * 2013-12-27 2016-02-17 北京中铁瑞威基础工程有限公司 High-speed railway subgrade sedimentation repair system and method

Similar Documents

Publication Publication Date Title
CN1858353A (en) Cement asphalt mortar injection bag type pouring method
CN100346033C (en) Pre-assembled plate consisting of armoured concrete
CN1948622A (en) Polymer modified cement hole concrete road surface structure and construction method
CN102839601A (en) Fixed connection structure for steel pier column and cushion cap of portal rigid frame overbridge and construction method of fixed connection structure
CN202787055U (en) Pier fixed connection structure of steel structure overhead bridge
CN103321111A (en) Tramcar track continuous-laying construction method
CN1587531A (en) Method for anti-cracking in hogging moment area of steel-concrete combined beam
CN102102315B (en) Method for constructing sleeper bolted elastic crossing
CN1858354A (en) Cement asphalt mortar vertical mould type pouring method
CN105239502A (en) Uniform force transmission device used for bridge support and installation method of uniform force transmission device
CN215947749U (en) Prefabricated assembled ballast bed
CN112176813B (en) Asphalt concrete pavement maintenance structure and method thereof
CN105239484A (en) Road surface structure suitable for heavy-duty traffic
CN105297620A (en) Steel plate spherical crown polymer mortar structure support and construction method thereof
CN112030630A (en) Grouting bag for ballastless track adjusting layer and using method thereof
JP2010053511A (en) Method for constructing road with smooth face material
CN204000522U (en) A kind of novel roadbed retaining structure
CN1818212A (en) Plated rail without ballast
RU2318947C2 (en) Road paving construction method
CN207176527U (en) Bridge Crack bracing means
CN205188803U (en) Steel sheet spherical crown polymer mortar structure support
CN211522841U (en) Road bridge transition lap joint plate device
CN1222617A (en) Composite concrete floor board with stone facing and its fabrication and paving process
CN108894098B (en) Bridge slab base for solving problem of vehicle bump at bridge head and method for solving problem of vehicle bump at bridge head
CN102296969A (en) Tunnel compartment wall lining construction method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Open date: 20061108