CN1361372A - 一种钢管长距离顶进误差的控制方法 - Google Patents

一种钢管长距离顶进误差的控制方法 Download PDF

Info

Publication number
CN1361372A
CN1361372A CN 00136204 CN00136204A CN1361372A CN 1361372 A CN1361372 A CN 1361372A CN 00136204 CN00136204 CN 00136204 CN 00136204 A CN00136204 A CN 00136204A CN 1361372 A CN1361372 A CN 1361372A
Authority
CN
China
Prior art keywords
steel pipe
steel
error
pipe
joint
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 00136204
Other languages
English (en)
Other versions
CN1133030C (zh
Inventor
靳水明
张富田
付爱荣
刘林海
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
BEIJING WUWEI UNDERGROUND ENGINEERING Co Ltd
Original Assignee
BEIJING WUWEI UNDERGROUND ENGINEERING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by BEIJING WUWEI UNDERGROUND ENGINEERING Co Ltd filed Critical BEIJING WUWEI UNDERGROUND ENGINEERING Co Ltd
Priority to CN 00136204 priority Critical patent/CN1133030C/zh
Publication of CN1361372A publication Critical patent/CN1361372A/zh
Application granted granted Critical
Publication of CN1133030C publication Critical patent/CN1133030C/zh
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

本发明涉及一种钢管长距离顶进误差的控制方法,该方法将以往钢管顶进施工中的多节钢管的刚性焊接改为多节钢管子母口接头的可动型连接,使顶进误差积累大大减小,使施工精度大幅提高,为满足钢管顶进(特别是小缝隙范围内的钢管顶进时)的高精度要求提供了可靠的优良保证。该方法设计构思具有独创性,方法简单易行,具有事半功倍的显著效果,在施工中可最大限度的保护现存环境和设施不受影响,节约巨额资金,具有卓著的社会效益和经济效益。

Description

一种钢管长距离顶进误差的控制方法
本发明涉及钢管长距离顶进技术。
钢管长距离顶进是七十年代开始发展起来的一项新技术,采用这种方法敷设管道,不需要挖槽,可在土层中长距离顶进,直接穿越河流建筑物或地面建筑物,可避免施工对航运、铁路或公路交通造成的影响,避免大量的土方工程,在市区施工可避免大量的拆迁,具有施工速度快、造价低和对地面影响小等优点。然而长距离钢管顶进方法也存在问题,即其顶进误差难以控制。因为随着顶进长度的增加,误差会越来越大。例如:按传统的做法,钢管每顶进一节焊一节,边顶边焊,这样在顶进过程中多节钢管被焊成刚性整体,一组钢管对口不正,管线中线有偏差,造成的方向偏斜将很难调整。目前大直径(1.5cm以上)钢管顶进的施工误差大致为:每50米35cm左右,一些世界上先进的非开挖设备的顶进误差也在30-50cm之间。尽管微型顶管盾构设备可以适当提高精度,但其造价每台至少千万元以上,而且要根据施工要求事先定做,加工周期往往一年左右,很不实用。如果说,因施工精度要求不高,靠纠偏尚可解决问题的话,那么在一些苛刻的施工条件下(例如在构筑物间小缝隙范围内施工,缝隙高度在2m以下,顶进误差不得超过5cm),因受空间限制,只能采用钢管顶进工艺,而30cm以上的顶进误差会彻底否定施工的可能性,严重阻碍施工的进行。若选择改线施工,将会造成人力、物力、财力的重大损失与浪费。因此顶进钢管施工工艺的关键环节在于如何控制顶进误差。
本发明的目的旨在提供一种钢管长距离顶进误差的控制方法。使用该方法可大大提高顶管精度,尤其适用于构筑物小缝隙范围内的顶管施工,可解决顶管误差这一大技术难题,创造巨大社会效益和经济效益。
该方法是这样实现的:在顶进钢管过程中,相邻的钢管暂不焊成刚性整体,而是在后一节钢管1的管口内加设一个钢胀圈2。将钢胀圈2宽度的一部分焊接在钢管1管口内,另一部分露在钢管1管口外部,这样就使钢胀圈2的露出部分与前一节钢管1的连结处形成子母口接头,使在顶进过程中前后两节钢管形成可动型连接。当钢管1全部顶进到位后,将全部钢胀圈2去掉,然后将相邻钢管1满焊。
本发明钢管长距离顶进误差的控制方法,设计思想独创,构思巧妙,方案简单易行,具有事半功倍的卓著成效。该方法改多节钢管的刚性焊接为多节钢管子母口接头的可动型连接,从根本上减少了钢管顶进时的误差积累,为适时灵活的调整顶进偏差,防止误差过大提供了优良的保证。实施该发明,可最大限度的保护现有环境和设施不受破坏,避免大量拆迁,节约巨额资金,社会效益和经济效益非常卓著。
附图所示为该钢管顶进施工及钢管和胀圈构成的子母口可动型连接示意图。
实施例:选宽2m,厚20mm钢板,卷成Φ1560钢管,两节钢管对焊制成每节4m长的成型钢管,这样做的目的是既方便运输又减轻纠偏难度。
在顶进过程中,前后相邻钢管暂不焊成刚性整体,而是在Φ1560mm钢管1的管口内加设一个钢胀圈2,钢胀圈2宽100mm,其中50mm焊接在钢管1内侧,另外50mm伸出钢管1管口,这样就使前后两节钢管1在联结处子母口接头,在顶进过程中前后两节钢管1形成可动型连接。第一节钢管1需要纠偏时,每顶入300mm测量中线和高程一次,在正常情况下,每顶入1m测量一次。当钢管1全部顶进到位后,将端部钢胀圈2去掉,然后将相邻钢管1满焊。
实践证明,在1.7m×1.7m的构筑物缝隙断面内,顶入Φ1560mm钢管100m,精度要求误差不超过50mm,使用该方法施工后测量结果显示:顶进过程中误差不超过1.5cm,顶进结束后累计误差不超过30mm,绝对满足施工的高精度要求。

Claims (1)

1.一种钢管长距离顶进误差的控制方法,其特征在于在顶进钢管过程中,相邻的钢管暂不焊成刚性整体,而是在后一节钢管1内加设一个钢胀圈2,将钢胀圈2宽度的一部分焊接在钢管1管口内,另一部分露在钢管1管口外部,这样就使钢胀圈2的露出部分与前一节钢管1的连结处形成子母口接头,使在顶进过程中前后两节钢管形成可动型连接;当钢管1全部顶进到位后,将全部钢胀圈2去样,然后将相邻钢管1满焊。
CN 00136204 2000-12-25 2000-12-25 一种钢管长距离顶进误差的控制方法 Expired - Fee Related CN1133030C (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 00136204 CN1133030C (zh) 2000-12-25 2000-12-25 一种钢管长距离顶进误差的控制方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 00136204 CN1133030C (zh) 2000-12-25 2000-12-25 一种钢管长距离顶进误差的控制方法

Publications (2)

Publication Number Publication Date
CN1361372A true CN1361372A (zh) 2002-07-31
CN1133030C CN1133030C (zh) 2003-12-31

Family

ID=4597131

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 00136204 Expired - Fee Related CN1133030C (zh) 2000-12-25 2000-12-25 一种钢管长距离顶进误差的控制方法

Country Status (1)

Country Link
CN (1) CN1133030C (zh)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101982688A (zh) * 2010-09-30 2011-03-02 中铁四局集团有限公司 一种大口径长距离钢顶管施工***
CN102278117A (zh) * 2011-04-29 2011-12-14 上海交通大学 平行顶管顶进施工模拟装置
CN102564389A (zh) * 2010-12-13 2012-07-11 上海市基础工程有限公司 顶管工程自动测量***及其方法
WO2015158079A1 (zh) * 2014-04-15 2015-10-22 黄欣 一种用于市政地下钢管连接快速更换的防错位装置

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101982688A (zh) * 2010-09-30 2011-03-02 中铁四局集团有限公司 一种大口径长距离钢顶管施工***
CN101982688B (zh) * 2010-09-30 2012-11-21 中铁四局集团有限公司 一种大口径长距离钢顶管施工***
CN102564389A (zh) * 2010-12-13 2012-07-11 上海市基础工程有限公司 顶管工程自动测量***及其方法
CN102278117A (zh) * 2011-04-29 2011-12-14 上海交通大学 平行顶管顶进施工模拟装置
CN102278117B (zh) * 2011-04-29 2013-03-20 上海交通大学 平行顶管顶进施工模拟装置
WO2015158079A1 (zh) * 2014-04-15 2015-10-22 黄欣 一种用于市政地下钢管连接快速更换的防错位装置

Also Published As

Publication number Publication date
CN1133030C (zh) 2003-12-31

Similar Documents

Publication Publication Date Title
WO2021189813A1 (zh) 一种富水砂层盾构近距离上跨既有线下穿污水顶管的施工方法
US20210301660A1 (en) Construction method for making water-rich sand layer shield over cross existing line and underneath cross sewage push pipe at close range
CN104089089B (zh) 压力回填式弹性埋管施工方法
CN206035500U (zh) 一种采用预应力钢筋的管片连接装置
CN1133030C (zh) 一种钢管长距离顶进误差的控制方法
CN202450428U (zh) 一种小口径管道跨越输水结构
CN208685678U (zh) 一种地铁车站的抗浮结构
CN104214454B (zh) 固废处理场渗滤液导排管与穿坝管连接结构及施工方法
CN107940102B (zh) 地下原水管道保护施工方法
CN208136954U (zh) 预制拼装式管廊结构
CN216008513U (zh) 一种铁路盾构隧道管片环分块结构
CN105133646A (zh) 地下钢混结构管道及其制作方法
CN206034485U (zh) 一种波纹状环形管结构综合管廊
CN204570718U (zh) 一种带有液体管道通路的筏板基础
CN112726667A (zh) 一种半刚性装配式综合管廊及其施工方法
CN218208122U (zh) 一种横穿基坑的管线的支撑结构
CN216839587U (zh) 一种填埋场防渗***双管双层管穿膜防渗结构
CN104746526B (zh) 一种带有液体管道通路的筏板基础
CN215442040U (zh) 一种管线大跨度跨槽保护用素混凝土板结构
CN218844318U (zh) 盾构下穿风险源的加固结构
CN213625602U (zh) 内凹式承压止水型钢结构基坑支护装置
CN219491087U (zh) 一种协调地下管廊变形缝两侧结构不均匀沉降的装置
Compston et al. Design and construction of buried thin-wall pipes
CN218911599U (zh) 一种给水管保护结构
CN115324060B (zh) 一种水坝混凝土浇筑的冷却通水仓内并管结构及其方法

Legal Events

Date Code Title Description
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C06 Publication
PB01 Publication
C14 Grant of patent or utility model
GR01 Patent grant
C19 Lapse of patent right due to non-payment of the annual fee
CF01 Termination of patent right due to non-payment of annual fee