CN101982688A - 一种大口径长距离钢顶管施工*** - Google Patents
一种大口径长距离钢顶管施工*** Download PDFInfo
- Publication number
- CN101982688A CN101982688A CN 201010501830 CN201010501830A CN101982688A CN 101982688 A CN101982688 A CN 101982688A CN 201010501830 CN201010501830 CN 201010501830 CN 201010501830 A CN201010501830 A CN 201010501830A CN 101982688 A CN101982688 A CN 101982688A
- Authority
- CN
- China
- Prior art keywords
- pipe
- jacking
- steel
- construction system
- mud
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 38
- 239000010959 steel Substances 0.000 title claims abstract description 38
- 238000010276 construction Methods 0.000 title claims abstract description 20
- 230000007704 transition Effects 0.000 claims abstract description 13
- 238000009412 basement excavation Methods 0.000 claims abstract description 12
- 239000002002 slurry Substances 0.000 claims abstract description 6
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 claims description 22
- 229910052742 iron Inorganic materials 0.000 claims description 11
- 230000009974 thixotropic effect Effects 0.000 claims description 4
- 230000008676 import Effects 0.000 claims description 3
- 238000012856 packing Methods 0.000 claims description 3
- 239000002689 soil Substances 0.000 abstract description 3
- 235000000396 iron Nutrition 0.000 abstract 2
- 230000007547 defect Effects 0.000 abstract 1
- 230000005641 tunneling Effects 0.000 abstract 1
- 238000005259 measurement Methods 0.000 description 4
- 238000012546 transfer Methods 0.000 description 4
- 238000000034 method Methods 0.000 description 3
- 238000012937 correction Methods 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 2
- 238000005452 bending Methods 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 239000004927 clay Substances 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000007599 discharging Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000005065 mining Methods 0.000 description 1
- 238000000465 moulding Methods 0.000 description 1
- 238000005086 pumping Methods 0.000 description 1
- 230000009897 systematic effect Effects 0.000 description 1
- 230000001052 transient effect Effects 0.000 description 1
- 239000002912 waste gas Substances 0.000 description 1
- 239000003643 water by type Substances 0.000 description 1
Landscapes
- Excavating Of Shafts Or Tunnels (AREA)
Abstract
本发明公开了一种大口径长距离钢顶管施工***,钢顶管位于装入开挖洞口内,开挖洞口的前方设有顶管掘进机,钢顶管前端顶制有多个过渡管,过渡管内放置有输泥泵,输泥泵的进口连接有螺旋输送机,出口连接有输泥泵管,输泥泵管的末端伸入到地面上的储泥池;钢顶管后端设有主千斤顶,主千斤顶后侧顶置于后座墙上,主千斤顶与钢顶管后端之间垫置有多个弧形顶铁、环形顶铁。本发明在管道前方安装活塞式输送泵,将螺旋输送机输送出的流塑性泥土,通过管道进行长距离输送,效率很高,克服车辆输送和泥浆输送方式的缺点。
Description
技术领域
本发明的地下管道施工技术,具体属于一种大口径长距离钢顶管施工***。
背景技术
顶管是一种非开挖的管道施工技术,通过在后方的液压顶进设备将地下的管道向前顶进。长距离顶管一般指顶进距离超过400m以上的顶管。大口径钢顶管一般指被顶进管道口径超过2.5m的顶管,被顶进管道材质为钢管。一般顶管测量采用激光导向技术,激光导向有效距离只有300m,超过300m后只能采用人工测量,测量时需要中断顶进,不仅效率低,而且容易出现人为差错。本发明使用自动全站仪,通过计算机控制实现高效准确的自动测量,有效距离可达1500m。
大口径钢管弯曲变形困难,顶进方向不易控制,出现偏差后,纠偏困难,施工中经常出现方向失控,造成工程损失。本发明在顶管掘进机与被顶进的钢管之间设置3节过渡管,纠偏时3节过渡管可弯曲而使顶进方向回归,解决了钢管顶进的困难。
一般大口径顶管在管道内铺设轨道,用车辆输送挖掘下的泥土,效率极低。故也有进泥土变成泥浆,通过离心泵、泥浆管道***输送,但是这种方法需要消耗大量的施工用水,而且产生大量的废气泥浆,直接排放将对环境造成严重影响,而脱水处理成本极高。
发明内容
本发明的目的是提供一种大口径长距离钢顶管施工***,在管道前方安装活塞式输送泵,将螺旋输送机输送出的流塑性泥土,通过管道进行长距离输送,效率很高,克服车辆输送和泥浆输送方式的缺点。
本发明的技术方案如下:
一种大口径长距离钢顶管施工***,钢顶管位于装入开挖洞口内,开挖洞口 的前方设有顶管掘进机,钢顶管前端顶制有多个过渡管,过渡管内放置有输泥泵,输泥泵的进口连接有螺旋输送机,出口连接有输泥泵管,输泥泵管的末端伸入到地面上的储泥池;钢顶管后端设有主千斤顶,主千斤顶后侧顶置于后座墙上,主千斤顶与钢顶管后端之间垫置有多个弧形顶铁、环形顶铁。
所述的多个弧形顶铁的下方铺设有与其滑动安装的导轨。
所述的开挖洞口内设有压浆泵,压浆泵输入的压浆支托着钢顶管,压浆泵外连接着触变泥浆***。
所述的顶管掘进机上设有标靶棱镜,工作井的侧壁上分别固定有六个后视定向棱镜。
长距离顶管测量导向***主要由自动测量全站仪、工业电脑、数据电台、目标棱镜、定向棱镜组成的,可对顶进速度、顶管机的轴线偏差、旋转角、俯仰角、纠偏角度自动进行测量,不需要停止施工,随时进行导向,6个定向棱镜用膨胀螺栓固定在工作井的井壁上,相对于顶进轴线尽量对称。定向棱镜布置的高度必须便于地面和井下导向***测量。
一般大口径土压平衡顶管管内弃土水平运输,多采用电瓶车牵引的轨道运输的方式。但这种方式需要暂时中断顶进施工,在长距离顶进施工中效率极低,将严重制约施工速度。故在本工程中,管道内的土方运输采用管道泵送的方式,该泵可以直接泵出软塑状泥土,不需额外加水(出土太干太硬时可往料斗内加入少量水),泵出的土比泥浆便于存放和外运,大大节约了成本,螺旋输土机输出的土直接进入混凝土泵的料斗内,由混凝土泵直接泵送到地面泥浆池内。
由于顶进距离长,管道内采用普通380V的低压供电,面临的最大问题就是供电线路会产生很大压降,从而使这些设备无法正常运转或损坏。因此必须采取增加供电线路截面积和增设电力线路稳压装置,这样又导致管道内布置设备和电缆的困难。顶管施工由于空间有限,不能像盾构施工那样采用高压供电的方式。为了解决这些难题,在地面设置升压器将电压从380V升至660V,再通过电缆输送至顶管掘进机。
与已有技术相比,本发明的有益效果如下:
1、使用自动全站仪组成自动测量导向***指引顶进方向。
2、使用土压平衡顶管掘进机挖掘泥土,然后螺旋输送机将泥土传送到输送 泵,油输送泵将泥土通过管道泵送到地面。
3、顶管机和被顶进钢管之间设置3节过渡管,便于控制顶进方向。
4、通过660V低供电***,向顶管掘进机输送动力。
附图说明
图1为本发明的***原理图。
图中标号:1自卸车,2储泥池,3挖掘机,4钢顶管,5门吊,6护栏,7触变泥浆***,8主顶液压站,9后座墙,10主千斤顶,11导轨,12弧形顶铁,13环形顶铁,14洞口止水圈,15钢管,16输泥泵管,17压浆站,18过渡环,19过渡管,20输泥泵,22螺旋输送机,23顶管掘进机。
具体实施方式
参见附图,一种大口径长距离钢顶管施工***,钢顶管4位于装入开挖洞口内,开挖洞口的前方设有顶管掘进机23,钢顶管4前端顶制有多个过渡管,过渡管内放置有输泥泵20,输泥泵的进口连接有螺旋输送机22,出口连接有输泥泵管16,输泥泵管的末端伸入到地面上的储泥池2;钢顶管后端设有主千斤顶10,主千斤顶后侧顶置于后座墙9上,主千斤顶与钢顶管后端之间垫置有多个弧形顶铁12、环形顶铁13,多个弧形顶铁的下方铺设有与其滑动安装的导轨11;开挖洞口内设有压浆泵,压浆泵17输入的压浆支托着钢顶管4,压浆泵外连接着触变泥浆***7;顶管掘进机上设有标靶棱镜,工作井的侧壁上分别固定有六个后视定向棱镜。
Claims (4)
1.一种大口径长距离钢顶管施工***,钢顶管位于装入开挖洞口内,开挖洞口的前方设有顶管掘进机,其特征在于:钢顶管前端顶制有多个过渡管,过渡管内放置有输泥泵,输泥泵的进口连接有螺旋输送机,出口连接有输泥泵管,输泥泵管的末端伸入到地面上的储泥池;钢顶管后端设有主千斤顶,主千斤顶后侧顶置于后座墙上,主千斤顶与钢顶管后端之间垫置有多个弧形顶铁、环形顶铁。
2.根据权利要求1所述大口径长距离钢顶管施工***,其特征在于:所述的多个弧形顶铁的下方铺设有与其滑动安装的导轨。
3.根据权利要求1所述大口径长距离钢顶管施工***,其特征在于:所述的开挖洞口内设有压浆泵,压浆泵输入的压浆支托着钢顶管,压浆泵外连接着触变泥浆***。
4.根据权利要求1所述大口径长距离钢顶管施工***,其特征在于:所述的顶管掘进机上设有标靶棱镜,工作井的侧壁上分别固定有六个后视定向棱镜。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201010501830 CN101982688B (zh) | 2010-09-30 | 2010-09-30 | 一种大口径长距离钢顶管施工*** |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201010501830 CN101982688B (zh) | 2010-09-30 | 2010-09-30 | 一种大口径长距离钢顶管施工*** |
Publications (2)
Publication Number | Publication Date |
---|---|
CN101982688A true CN101982688A (zh) | 2011-03-02 |
CN101982688B CN101982688B (zh) | 2012-11-21 |
Family
ID=43619591
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201010501830 Expired - Fee Related CN101982688B (zh) | 2010-09-30 | 2010-09-30 | 一种大口径长距离钢顶管施工*** |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101982688B (zh) |
Cited By (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105065774A (zh) * | 2015-08-14 | 2015-11-18 | 腾达建设集团股份有限公司 | 一种地下管道支接施工方法 |
CN105442694A (zh) * | 2015-11-16 | 2016-03-30 | 中科路域(北京)生态投资有限公司 | 预应力钢筋混凝土污水截流管顶管施工方法 |
CN105465481A (zh) * | 2016-01-25 | 2016-04-06 | 杭州江润科技有限公司 | 顶管工作井顶进结构的施工方法 |
CN105570534A (zh) * | 2016-02-22 | 2016-05-11 | 中国水利水电第十一工程局有限公司 | 浅埋深顶管控制地面结构变形的设备及施工方法 |
CN106369223A (zh) * | 2016-10-31 | 2017-02-01 | 中铁二十局集团第五工程有限公司 | 一种粉砂土地层顶管施工方法 |
CN106402490A (zh) * | 2016-10-31 | 2017-02-15 | 中铁二十局集团第五工程有限公司 | 基于钢套头工具管的粉砂土地层顶管顶进施工方法 |
CN107191190A (zh) * | 2017-06-16 | 2017-09-22 | 成都金玉雄辉建筑工程有限公司 | 直插式顶管防偏装置 |
CN108915698A (zh) * | 2018-08-14 | 2018-11-30 | 中铁十四局集团有限公司 | 一种复杂条件下大直径管幕施工方法 |
CN111712613A (zh) * | 2018-02-13 | 2020-09-25 | 齐尔珀特伦齐莱斯有限公司 | 用于地下管道安装的***和方法 |
CN112922625A (zh) * | 2021-02-07 | 2021-06-08 | 南京工业大学 | 一种大型高压水射流自动纠偏顶管装置及施工方法 |
US11959338B2 (en) | 2022-09-15 | 2024-04-16 | Arcbyt, Inc. | Multi-tool boring systems and methods of operating such systems |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN88203459U (zh) * | 1988-02-13 | 1988-09-21 | 李勇 | 管道铺设机 |
US5846027A (en) * | 1996-02-22 | 1998-12-08 | Toyo Technos Co., Ltd. | Semi-shield method and apparatus for the same |
CN1361372A (zh) * | 2000-12-25 | 2002-07-31 | 北京五维地下工程有限责任公司 | 一种钢管长距离顶进误差的控制方法 |
CN2795599Y (zh) * | 2005-04-19 | 2006-07-12 | 天津第六市政公路工程有限公司 | 自动泥水出土顶管掘进机 |
-
2010
- 2010-09-30 CN CN 201010501830 patent/CN101982688B/zh not_active Expired - Fee Related
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN88203459U (zh) * | 1988-02-13 | 1988-09-21 | 李勇 | 管道铺设机 |
US5846027A (en) * | 1996-02-22 | 1998-12-08 | Toyo Technos Co., Ltd. | Semi-shield method and apparatus for the same |
CN1361372A (zh) * | 2000-12-25 | 2002-07-31 | 北京五维地下工程有限责任公司 | 一种钢管长距离顶进误差的控制方法 |
CN2795599Y (zh) * | 2005-04-19 | 2006-07-12 | 天津第六市政公路工程有限公司 | 自动泥水出土顶管掘进机 |
Cited By (16)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105065774A (zh) * | 2015-08-14 | 2015-11-18 | 腾达建设集团股份有限公司 | 一种地下管道支接施工方法 |
CN105442694A (zh) * | 2015-11-16 | 2016-03-30 | 中科路域(北京)生态投资有限公司 | 预应力钢筋混凝土污水截流管顶管施工方法 |
CN105442694B (zh) * | 2015-11-16 | 2017-07-25 | 中科路域(北京)生态投资有限公司 | 预应力钢筋混凝土污水截流管顶管施工方法 |
CN105465481A (zh) * | 2016-01-25 | 2016-04-06 | 杭州江润科技有限公司 | 顶管工作井顶进结构的施工方法 |
CN105570534A (zh) * | 2016-02-22 | 2016-05-11 | 中国水利水电第十一工程局有限公司 | 浅埋深顶管控制地面结构变形的设备及施工方法 |
CN105570534B (zh) * | 2016-02-22 | 2019-07-12 | 中国水利水电第十一工程局有限公司 | 浅埋深顶管控制地面结构变形的设备及施工方法 |
CN106369223A (zh) * | 2016-10-31 | 2017-02-01 | 中铁二十局集团第五工程有限公司 | 一种粉砂土地层顶管施工方法 |
CN106402490A (zh) * | 2016-10-31 | 2017-02-15 | 中铁二十局集团第五工程有限公司 | 基于钢套头工具管的粉砂土地层顶管顶进施工方法 |
CN107191190A (zh) * | 2017-06-16 | 2017-09-22 | 成都金玉雄辉建筑工程有限公司 | 直插式顶管防偏装置 |
CN107191190B (zh) * | 2017-06-16 | 2023-07-07 | 宿州百洲智能制造有限公司 | 直插式顶管防偏装置 |
US11287060B2 (en) | 2018-02-13 | 2022-03-29 | Zilper Trenchless, Inc. | Systems and methods for underground pipe installation and soil clearing |
CN111712613A (zh) * | 2018-02-13 | 2020-09-25 | 齐尔珀特伦齐莱斯有限公司 | 用于地下管道安装的***和方法 |
CN108915698A (zh) * | 2018-08-14 | 2018-11-30 | 中铁十四局集团有限公司 | 一种复杂条件下大直径管幕施工方法 |
CN112922625A (zh) * | 2021-02-07 | 2021-06-08 | 南京工业大学 | 一种大型高压水射流自动纠偏顶管装置及施工方法 |
CN112922625B (zh) * | 2021-02-07 | 2022-04-15 | 南京工业大学 | 一种大型高压水射流自动纠偏顶管装置及施工方法 |
US11959338B2 (en) | 2022-09-15 | 2024-04-16 | Arcbyt, Inc. | Multi-tool boring systems and methods of operating such systems |
Also Published As
Publication number | Publication date |
---|---|
CN101982688B (zh) | 2012-11-21 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101982688B (zh) | 一种大口径长距离钢顶管施工*** | |
CN106369223B (zh) | 一种粉砂土地层顶管施工方法 | |
CN1215276C (zh) | 土压平衡矩形顶管施工工艺 | |
CN109779651B (zh) | 一种砂姜黏土地层近距泥水平衡顶管施工方法 | |
CN102287207B (zh) | 一种有关小断面隧洞严重塌方的拼装顶进法 | |
CN110195597B (zh) | 一种适于tbm施工的抽水蓄能硐室及施工方法 | |
CN202629334U (zh) | 三维双曲线钢顶管施工*** | |
CN107131000B (zh) | 一种煤矿井下智能化喷射充填开采设备 | |
CN212054732U (zh) | 盾构机同步双液注浆*** | |
CN105134069A (zh) | 一种涉及瓦斯立井穿越强富水岩层反井法施工工艺 | |
CN205000973U (zh) | 一种河床底部大口径顶管施工设备 | |
CN2906065Y (zh) | 一种地下管道掘进机 | |
CN109119943A (zh) | 电缆在顶管两端的敷设方式优化方法 | |
CN112922625B (zh) | 一种大型高压水射流自动纠偏顶管装置及施工方法 | |
CN112728209B (zh) | 一种非开挖连通新旧管的工法 | |
CN114754194A (zh) | 一种调蓄池顶管安装装置及其施工方法 | |
CN113153321B (zh) | 用于盾构施工中的渣土改良***及其施工方法 | |
CN112855182A (zh) | 一种盾构用管片背后空隙填充***装置及其方法 | |
CN220977929U (zh) | 一种基于tbm的抽水蓄能电站引水斜井布置结构 | |
CN105178323A (zh) | 一种长距离、大口径退役管道的注浆处置方法 | |
JP3604209B2 (ja) | トンネル内における配管施工法 | |
CN112901175A (zh) | 一种应用tbm施工地下实验室螺旋向下斜坡道的方法 | |
CN110777812A (zh) | 一种电力沟道基坑两侧对称回填施工方法 | |
CN210344723U (zh) | 一种泥水盾构施工泥浆输送处置构件 | |
CN213392251U (zh) | 深井充填料浆***和深井充填料浆输送*** |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20121121 Termination date: 20150930 |
|
EXPY | Termination of patent right or utility model |