CN1171477A - 楼房移位新技术 - Google Patents

楼房移位新技术 Download PDF

Info

Publication number
CN1171477A
CN1171477A CN 97105941 CN97105941A CN1171477A CN 1171477 A CN1171477 A CN 1171477A CN 97105941 CN97105941 CN 97105941 CN 97105941 A CN97105941 A CN 97105941A CN 1171477 A CN1171477 A CN 1171477A
Authority
CN
China
Prior art keywords
building
raceway
chassis
build
jack
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN 97105941
Other languages
English (en)
Inventor
董显枢
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 97105941 priority Critical patent/CN1171477A/zh
Publication of CN1171477A publication Critical patent/CN1171477A/zh
Pending legal-status Critical Current

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

一种楼房移位新技术,采取凿孔建底盘、架千斤顶和筑滚道、安装滚动设备和断基拖动、拆辊连基等工序,具有施工安全系数高、牵引着力点设置合理、节省材料和工时,以及简化施工工艺等优点。

Description

楼房移位新技术
本发明属于一种建筑物移位技术。
在城市的建设过程中,时常要拆除某些布局不合理或影响规划的建筑物,但在这些建筑物中,有的使用年限不长,拆除重建要造成很大浪费,为此人们研制出建筑物平移技术,能将整座建筑物平移,节约了大量资金。本申请人研究的“建筑物平移新技术”(专利申请号95111898.6),具有简化施工工艺、提高施工质量、缩短施工时间、降低成本等优点。但经过几年来的施工实践,发现尚存在某些不足和需要改进的地方,例如在断基前要打洞、架设组合梁,降低楼体承重的安全系数;同时架设组合梁增加材料的消耗;拖动工序中,采用主、副牵引滑轮,牵引的着力点不集中在底盘梁纵梁横梁交汇点上,易使底盘梁产生形变,有受到破坏的可能;采用的拖车结构复杂一些,需要专门制作,提高了施工成本。
本发明的目的是提供一种楼房移动新技术,不必架设组合梁,可减少材料消耗;先建底盘梁,安全系数更大,保证楼房不受破坏;牵引着力点设置合理,底盘梁不变形,简化了拖车结构,降低了施工成本。
本发明的目的是这样实现的:它包括凿孔建底盘、架千斤顶和筑滚道、安装滚动设备和断基拖动、拆辊连基础等工序,其特征是:
(1)、凿孔建底盘工序中,先在建筑物的圈梁位置建造底盘梁:在原圈梁的两侧浇筑钢筋砼的夹板梁,在原圈梁的下方间隔凿孔,并浇筑钢筋砼系梁,由夹板梁、系梁和原圈梁整体构成底盘梁;
(2)、架千斤顶和筑滚道工序中:在原基础和夹板梁之间架千斤顶,千斤顶上安装托梁,切断滚动轴线上底盘梁下之基础;浇筑砼下滚道床,在下滚道床上铺设下滚板,其上摆放辊子,辊子上铺上滚板,上滚板上浇筑砼上滚道床;上滚板、上滚道床、底圈梁之间均用预埋件联接;
(3)、断基拖动工序中;拆除千斤顶,切断横向底盘下基础;在建筑物底盘梁的纵横梁交汇点上安装牵引双滑轮。
本发明和现有技术比较具有如下优点:
1、先筑底盘梁然后切断基础,提高楼房安全系数,不会对楼房产生破坏作用。
2、以托梁代替组合梁,节省材料和工时。
3、牵引的着力点设置在底盘梁的纵梁和横梁交汇点上,同时采用双滑轮牵引,受力合理,底盘梁不会产生变形而破坏。
4、将原来的拖车结构简化为上、下滚板和滚子,节约了制造拖车的成本,简化了施工工艺。
下面结合附图给出具体实施例。
图1是浇筑底盘梁的断面结构示意图。
图2是架设千斤顶和浇筑上下滚道示意图。
图3是千斤顶与托板安装示意图。
图4是下滚板联接示意图。
图5是滚动装置安装示意图。
图6是横向移楼千斤顶设置位置示意图。
图7是纵向移楼千斤顶设置位置示意图。
图8是牵引设备安装示意图。
实施例:
平移一栋两单元五层住宅楼,施工工序如下:
1、首先破土闪基础。所有基础处两侧均要破土闪开,闪宽一侧0.8m,深为原圈梁下0.5-0.6m,一层室内地面破土深度为原圈梁下0.3m。
2、凿孔建底盘。见图1,凡有基础处都要建造底盘梁:在原圈梁1的两则浇筑钢筋砼的夹板梁2,其断面为400×200mm,在原圈梁的下部原基础上间隔凿孔,每米一个,并在孔中浇筑钢筋砼的系梁3,规格为200×200×400mm,夹板梁2、系梁3和原圈梁1形成整体的底盘梁。
3、架千斤顶和筑滚道。见图2、3、6、7,按设计位置找平千斤顶底座,然后立好千斤顶12,千斤顶12上方安设托梁11,托梁11上垫一块硬木板,面积略大于托梁,摇动千斤顶手动杆,硬木板接触夹板梁2的底面,使千斤顶达到设计升力。当千斤顶升力都达到设计要求时,切断滚动轴线上底盘梁下之基础,切口高0.4m,切口要整齐。然后浇灌下滚道床13,下滚道床13上表面必须水平。
下滚道床13完工72小时后铺设钢板材料的下滚板5,见图4,下滚板5之间采取铆榫联接方式。见图2、5,下滚板5铺完后,在指定位置摆放辊子6,用白胶固定在下滚板5上。辊子上铺上滚板7,上滚板7上浇灌上滚道床9,上滚道床9与楼底盘梁间有4个予埋件10连接,上滚板7与上滚道床9间也有4个予埋件8连接,予埋件8采用螺检形式。上滚道床9之砼用风力砼充填机充填。过渡道下滚道工程,新位基础工程要同滚道工程同时施工,以保证有足够的砼凝固期,满足下道工序要求。
4、断基拖动工序:滚道砼强度全部达到设计要求时,拆除千斤顶,切断横向(或纵向)底盘下基础,切口高0.1m,经复检全部楼底盘梁均与原基础脱离,管线均改为软连接,并有足够的余量之后,此时楼房已处可移动的自由状态。
牵引设备由绞车15、滑轮12和钢绳14组成。见图8,绞车滑轮12用钢绳14系于牵引桩和楼房底盘梁上;联接在楼房底盘梁的横梁、纵梁交汇点上的牵引滑轮12a为上下设置的双滑轮,系于牵引桩上的牵引滑轮12b亦为双滑轮,滑轮组的数目根据移动轴线上牵引力的大小而定。钢绳14往复缠绕在滑轮12a和12b上,绳端连接在绞车15上。
牵引时,后方退出的辊子要及时填于其前方,牵引钢绳的末端固定处连接测力盒,以随时检查其钢绳拉力。
5、拆辊连基础。楼房牵引到位后,在指定位置架好千斤顶,按设计对千斤预施加升力,辊子压力释放后,拆除辊子及上、下漆板,及时用予制砼垫板将拆辊处垫实并保证有足够的抗压力,然后拆除千斤顶。最后在全部接缝处立好模板,用风力砼充填机将砼送于接缝处,72小时后拆除模板。平移工作即完成。

Claims (3)

1、一种楼房移位新技术,它包括凿孔、建底盘、架千斤顶和筑滚道、安装滚动设备和断基拖动、拆辊连基础等工序,其特征是:
(1)、凿孔建底盘工序中,先在建筑物的圈梁位置建造底盘梁:在原圈梁的两侧浇筑钢筋砼的夹板梁,在原圈梁的下方间隔凿孔,并浇筑钢筋砼系梁,由夹板梁、系梁和原圈梁整体构成底盘梁;
(2)、架千斤顶和筑滚道工序中:在原基础和夹板梁之间架千斤顶,千斤顶上安装托梁,切断滚动轴线上底盘梁下之基础;浇筑砼下滚道床,在下滚道床上铺设下滚板,其上摆放辊子,辊子上铺上滚板,上滚板上浇筑砼上滚道床;上滚板、上滚道床、底圈梁之间均用预埋件联接;
(3)、断基拖动工序中:拆除千斤顶,切断横向底盘下基础;在建筑物底盘梁的纵横梁交汇点上安装牵引双滑轮。
2、根据权利要求1所述的新技术,其特征是:下滚板之间采取铆榫联接结构。
3、根据权利要求1所述的新技术,其特征是:上滚道床与楼底盘梁间连接予埋件,上滚板与上滚道床间亦连接予埋件。
CN 97105941 1997-06-27 1997-06-27 楼房移位新技术 Pending CN1171477A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 97105941 CN1171477A (zh) 1997-06-27 1997-06-27 楼房移位新技术

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 97105941 CN1171477A (zh) 1997-06-27 1997-06-27 楼房移位新技术

Publications (1)

Publication Number Publication Date
CN1171477A true CN1171477A (zh) 1998-01-28

Family

ID=5168228

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 97105941 Pending CN1171477A (zh) 1997-06-27 1997-06-27 楼房移位新技术

Country Status (1)

Country Link
CN (1) CN1171477A (zh)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100334314C (zh) * 2005-06-09 2007-08-29 大连久鼎特种建筑工程有限公司 建筑物移位的转向方法
CN100334313C (zh) * 2005-06-09 2007-08-29 大连久鼎特种建筑工程有限公司 高层建筑物移位的抗倾覆和抗震方法
CN101429819B (zh) * 2007-11-07 2011-05-18 上海天演建筑物移位工程有限公司 墙体及柱托换方法
CN107119920A (zh) * 2017-04-19 2017-09-01 武汉大学 一种密集高层建筑物的逆向拆除装置及其使用方法
CN110005219A (zh) * 2019-04-24 2019-07-12 上海天演建筑物移位工程股份有限公司 一种基于分层间隔开挖的建筑物移位逆作式施工方法
CN110295765A (zh) * 2019-07-05 2019-10-01 杭州市市政工程集团有限公司 一种建筑遗址迁出保护的施工方法
CN110565980A (zh) * 2019-08-29 2019-12-13 上海建工一建集团有限公司 既有建筑物的滑动移位装置及方法
CN110565979A (zh) * 2019-08-29 2019-12-13 上海建工一建集团有限公司 滑脚及既有建筑物的平移方法

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100334314C (zh) * 2005-06-09 2007-08-29 大连久鼎特种建筑工程有限公司 建筑物移位的转向方法
CN100334313C (zh) * 2005-06-09 2007-08-29 大连久鼎特种建筑工程有限公司 高层建筑物移位的抗倾覆和抗震方法
CN101429819B (zh) * 2007-11-07 2011-05-18 上海天演建筑物移位工程有限公司 墙体及柱托换方法
CN107119920A (zh) * 2017-04-19 2017-09-01 武汉大学 一种密集高层建筑物的逆向拆除装置及其使用方法
CN110005219A (zh) * 2019-04-24 2019-07-12 上海天演建筑物移位工程股份有限公司 一种基于分层间隔开挖的建筑物移位逆作式施工方法
CN110295765A (zh) * 2019-07-05 2019-10-01 杭州市市政工程集团有限公司 一种建筑遗址迁出保护的施工方法
CN110565980A (zh) * 2019-08-29 2019-12-13 上海建工一建集团有限公司 既有建筑物的滑动移位装置及方法
CN110565979A (zh) * 2019-08-29 2019-12-13 上海建工一建集团有限公司 滑脚及既有建筑物的平移方法
CN110565979B (zh) * 2019-08-29 2024-05-28 上海建工一建集团有限公司 滑脚及既有建筑物的平移方法

Similar Documents

Publication Publication Date Title
CN104963301B (zh) 用于墩顶梁段与桥墩拆除的拖拉平移下放装置及方法
CN202245617U (zh) 一种采用组合式井架组装的电梯井道壁
CN106948268B (zh) 变截面钢箱梁顶推组合装置及使用方法
CN105735141A (zh) 一种箱梁侧模滑移装置及其施工方法
CN101649604A (zh) 一种斜拉桥1#块施工支架及其搭建方法
CN1171477A (zh) 楼房移位新技术
CN210597029U (zh) 一种用于桥梁湿接缝的模板悬吊装置
CN108979198A (zh) 一种高层建筑拆楼机及其拆楼方法
JPH09143933A (ja) 床版の撤去方法及び装置
CN203188942U (zh) 一种新型多功能二层台
CN109252448B (zh) 一种桥梁塔柱横梁支架的预压施工方法
CN216663832U (zh) 一种步进式爬升机
CN211285076U (zh) 一种铁路轨道架空加固结构
CN114772455A (zh) 一种临时吊点安装***及方法
CN211949548U (zh) 一种型钢悬挑脚手架搭设用穿墙螺栓预埋孔形成装置
CN114214919A (zh) 水域斜拉桥超大零号块支架的反力预压施工方法及***
CN208502273U (zh) 一种用于无支承大型空间钢桁架梁的提升架
CN212388964U (zh) 一种用于连续高大结构空间处爬架提升的附加支座
CN112575785B (zh) 一种大型固定式布料机的整体移动装置及方法
CN219862922U (zh) 一种以脚墩为支撑的预埋式塔吊基础
CN214169115U (zh) 一种用于钢围堰千斤顶精轧螺纹钢下放的转接装置
CN212154243U (zh) 一种托梁拔柱的托换装置
CN111571206B (zh) 挤压机前横梁和后横梁的安装方法
CN116356719A (zh) 一种超宽高架桥现浇箱梁施工塔吊的安装方法
CN219731699U (zh) 一种下承式支架单元整体拆除装置

Legal Events

Date Code Title Description
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C06 Publication
PB01 Publication
C01 Deemed withdrawal of patent application (patent law 1993)
WD01 Invention patent application deemed withdrawn after publication