CN115211324A - Vegetation slope protection method for highway side slope - Google Patents

Vegetation slope protection method for highway side slope Download PDF

Info

Publication number
CN115211324A
CN115211324A CN202210787201.5A CN202210787201A CN115211324A CN 115211324 A CN115211324 A CN 115211324A CN 202210787201 A CN202210787201 A CN 202210787201A CN 115211324 A CN115211324 A CN 115211324A
Authority
CN
China
Prior art keywords
slope
vegetation net
dimensional vegetation
dimensional
soil
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202210787201.5A
Other languages
Chinese (zh)
Other versions
CN115211324B (en
Inventor
罗爱忠
方娟
王鸿
韩六平
李密
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guizhou University of Engineering Science
Original Assignee
Guizhou University of Engineering Science
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guizhou University of Engineering Science filed Critical Guizhou University of Engineering Science
Priority to CN202210787201.5A priority Critical patent/CN115211324B/en
Publication of CN115211324A publication Critical patent/CN115211324A/en
Application granted granted Critical
Publication of CN115211324B publication Critical patent/CN115211324B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01GHORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
    • A01G20/00Cultivation of turf, lawn or the like; Apparatus or methods therefor
    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01GHORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
    • A01G13/00Protecting plants
    • A01G13/02Protective coverings for plants; Coverings for the ground; Devices for laying-out or removing coverings
    • A01G13/0256Ground coverings
    • A01G13/0268Mats or sheets, e.g. nets or fabrics
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/20Securing of slopes or inclines

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Environmental Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • General Health & Medical Sciences (AREA)
  • Toxicology (AREA)
  • Health & Medical Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Cultivation Of Plants (AREA)

Abstract

The invention discloses a vegetation slope protection method for a highway side slope, which comprises the following steps: cleaning a slope surface, covering soil with the thickness of five to seven centimeters on the surface of a highway side slope through an operation machine, spraying a medicament for inhibiting the growth of weeds on the surface of the side slope, and digging a buried pressing ditch on the top surface of the slope surface; and secondly, laying the three-dimensional vegetation net along the slope surface from top to bottom, wherein two sides of the upper end of the three-dimensional vegetation net are inserted into the buried pressure ditch at the top of the slope through fixing pieces for positioning and fixing. According to the method, the specific support structure is arranged, so that the site construction of the three-dimensional vegetation net can be assisted, the stability of the arrangement of the three-dimensional vegetation net is ensured, the three-dimensional vegetation net is fully expanded to the revetment, and the working quality of the follow-up spray-seeding grass planting and the overall construction quality of the revetment are improved.

Description

Vegetation slope protection method for highway side slope
Technical Field
The invention relates to the technical field of highway side slope protection facilities, in particular to a vegetation slope protection method for a highway side slope.
Background
Because the highway is completely in the natural environment, the side slope of the highway is easily damaged by rain, snow and running water, and the vegetation can protect the slope, green the environment and improve the landscape effect of the highway. To the structure, the soil property, the state of different side slopes, can adopt skeleton grass planting bank protection, each room grass planting bank protection of geotechnique, hydraulic pressure spray seeding's grass bank protection, high steep side slope grass planting bank protection and TBS grass planting bank protection technology respectively, make the side slope so that the road bed keeps permanent good state, wherein the destruction of highway side slope mainly has two kinds of forms: firstly, the side slope is not stable enough and deforms slowly to cause final instability, namely integral or local landslide; and secondly, the side slope soil loss is caused by infiltration and erosion of rain, snow and running water on the side slope. At present, most highway subgrade side slopes adopt a grass planting protection method in a large quantity, and a good protection effect and an environmental landscape effect are achieved.
The three-dimensional vegetation net slope protection is developed on the basis of the defects that turf slope protection is easy to suffer from strong rainfall or slope runoff all year round forms gully, the instability and the slumping of the surface layer of the slope are caused, and the like, and has the following characteristics: and (1) the soil-fixing performance is excellent. The net bag with wavy surface has excellent fixing effect on soil, grass, etc. covered on the net and can reduce erosion of rain. And (2) the energy dissipation effect is obvious. The mesh covering layer buffers the impact energy of raindrops, weakens the splash erosion of the raindrops, enables wind, water flow and the like to generate countless small vortexes on the surface layer of the mesh surface, and slows down the wind erosion and the water erosion. And (3) the network reinforcement effect is outstanding. The transverse and vertical lines between the basic layer of the three-dimensional vegetation net and the net wrapping layer grids are woven and bonded in a staggered mode, so that the three-dimensional vegetation net has a reinforcement effect on backfilled foreign soil, and the erosion resistance of the surface layer of the side slope is improved along with the growth of grass root systems. And (4) the heat preservation function promotes vegetation growth. The temperature of the vegetation root can be 3-5 OC lower than the external environment temperature in summer and 3-5 OC higher in winter, so that the three-dimensional vegetation net prolongs the construction time of the roadbed tree-planted revetment to a certain extent and promotes the survival rate and uniform growth of vegetation.
In the actual three-dimensional vegetation net work progress, the pre-fixing of three-dimensional vegetation net is stable inadequately, and it is also comparatively difficult to the expansion of the three-dimensional vegetation net of large tracts of land, does not expand completely and arrange unstable three-dimensional vegetation net, can influence subsequent spray-seeding grass planting work's quality, also can lead to the phenomenon of partial region range upon range of extrusion simultaneously, influences the life and the maintenance cost of bank protection.
Disclosure of Invention
The invention aims to provide a vegetation slope protection method for a highway side slope, which can assist the site construction of a three-dimensional vegetation net by arranging a specific support structure, ensure the stability of the arrangement of the three-dimensional vegetation net, fully expand the three-dimensional vegetation net to the slope protection and further improve the working quality of the subsequent spray-seeding grass planting and the overall construction quality of the slope protection.
In order to achieve the purpose, the technical scheme adopted by the invention is as follows:
a vegetation slope protection method for a highway slope comprises the following steps:
cleaning a slope surface, covering soil with the thickness of five to seven centimeters on the surface of a highway side slope through an operation machine, spraying a medicament for inhibiting the growth of weeds on the surface of the side slope, and digging a buried pressing ditch on the top surface of the slope surface;
step two, laying the three-dimensional vegetation net along the slope from top to bottom, wherein two sides of the upper end of the three-dimensional vegetation net are inserted into a buried pressure ditch of the top of the slope through fixing pieces for positioning and fixing, a plurality of U-shaped nails are nailed into the middle area of the upper end of the three-dimensional vegetation net to enable the three-dimensional vegetation net to be tightly attached to the slope, two sides of the lower end of the three-dimensional vegetation net at the position of a slope foot are tensioned through tensioning pieces, the middle parts of two adjacent left and right three-dimensional vegetation nets are overlapped by ten to fifteen centimeters, a curled edge of five to ten centimeters is reserved on the periphery of each three-dimensional vegetation net, and the curled edge is pressed by the U-shaped nails;
step three, after the three-dimensional vegetation net is laid in a laminated mode, filling soil and waste materials from the top of a slope downwards in three steps, namely, backfilling dry soil with a mesh screen and compacting, spraying water for sedimentation, and backfilling slurry in the third step;
uniformly spraying a mixture mixed with seeds, a fertilizer, a soil modifier, a water-retaining agent and water on the slope by using a hydraulic spray-seeding machine, and spraying a little soil according to the situation after spray-seeding to cover the three-dimensional vegetation net;
covering non-woven fabrics above the three-dimensional vegetation net without exposing edge openings, operating gently and keeping the integrity of the cloth cover;
and step six, maintaining the grass planting in the front, middle and later stages, mainly spraying water in the early sixty days, frequently keeping the soil moist to promote the germination of the seeds, maintaining by natural rainwater in the middle stage, spraying water once or twice per month in drought seasons, spraying water twice per month in the later-stage maintenance, applying additional fertilizer to promote seedling turning to green, and spraying a proper amount of pesticide to prevent diseases and insect pests.
Further, the mounting include the inserted bar, inserted bar upper end be equipped with the handle just the inserted bar with three-dimensional vegetation net upper end both sides region impress inside the buried pressure ditch, inserted bar body the first half be equipped with the spirit level just inserted bar body the latter half be equipped with the lantern ring, the lantern ring outside rotate downwards through the pivot and be connected with the adjustment inserted bar, inserted bar and adjustment inserted bar all insert inside the top of a slope soil.
Further, tensioning piece include domatic location stalk, domatic location stalk body the latter half cover be equipped with from the top down a plurality of and rotate the cover, wherein every rotates a spring pull rod of the equal fixedly connected with in cover outside, spring pull rod outer end be fixed with the drag hook, the drag hook three-dimensional vegetation net lower extreme both sides region.
Compared with the prior art, the invention has the following beneficial effects:
according to the invention, by arranging the fixing part and the tensioning part structure, the stability of arrangement of the three-dimensional vegetation net can be ensured in the construction process of the three-dimensional vegetation net, so that the three-dimensional vegetation net is fully expanded to the slope protection, and the working quality of the follow-up spray-seeding grass planting and the overall construction quality of the slope protection are improved.
Drawings
FIG. 1 is a schematic view of the arrangement of the fixing member and the tensioning member of the present invention;
FIG. 2 is a schematic view of the fastener of the present invention;
figure 3 is a schematic view of the tension member of the present invention;
in the figure: 1. slope protection; 2. a fixing member; 3. a tensioning member; 4. inserting a rod; 5. a handle; 6. a level gauge; 7. adjusting the inserted link; 8. slope positioning rods; 9. a spring pull rod; 10. and (4) pulling a hook.
Detailed Description
In order to make the technical means, the creation characteristics, the achievement purposes and the effects of the invention easy to understand, the invention is further explained by combining the specific drawings.
During actual construction, as shown in fig. 1, each position department of upper and lower ends at bank protection 1 arranges mounting 2 and tensioning piece 3 respectively, at first the staff takes up inserted bar 4 through handle 5, press into the top both sides of a three-dimensional vegetation net respectively and bury the pressure ditch inside, through changing the position of adjustment inserted bar 7, the 6 readings of spirit level are observed in the cooperation, guarantee that inserted bar 4 is vertical to be inserted inside burying the pressure ditch, improve the fixed stability of three-dimensional vegetation net upper end, the below both sides region of three-dimensional vegetation net all hooks different angular position departments through drag hook 10, cooperate the pulling force of spring pull rod 9 and insert domatic fixed domatic location stalk 8, the whole three-dimensional vegetation net of tensioning, wherein spring pull rod 9 and drag hook 10 can set up reasonable quantity and crisscross different angles according to three-dimensional vegetation net size, the convenient tight three-dimensional vegetation net of a plurality of different positions department hook in below of following.
The concrete construction steps are as follows: cleaning a slope surface, covering soil with the thickness of five to seven centimeters on the surface of a highway side slope through an operation machine, spraying a medicament for inhibiting the growth of weeds on the surface of the side slope, and digging a buried pressing ditch on the top surface of the slope surface; step two, laying the three-dimensional vegetation net along the slope from top to bottom, wherein two sides of the upper end of the three-dimensional vegetation net are inserted into a buried pressure ditch of the top of the slope through fixing pieces 2 for positioning and fixing, a plurality of U-shaped nails are nailed into the middle area of the upper end of the three-dimensional vegetation net to enable the three-dimensional vegetation net to be tightly attached to the slope, two sides of the lower end of the three-dimensional vegetation net at the position of a slope foot are tensioned through tensioning pieces 3, the middle parts of two adjacent left and right three-dimensional vegetation nets are overlapped by ten to fifteen centimeters, a curled edge of five to ten centimeters is reserved on the periphery of each three-dimensional vegetation net, and the curled edge is pressed by the U-shaped nails; step three, after the three-dimensional vegetation net is laid in a laminated mode, filling soil and waste materials from the top of a slope downwards in three steps, namely, backfilling dry soil with a mesh screen and compacting, spraying water for sedimentation, and backfilling slurry in the third step; uniformly spraying a mixture mixed with seeds, a fertilizer, a soil modifier, a water-retaining agent and water on the slope by using a hydraulic spray-seeding machine, and spraying a little soil according to the situation after spray-seeding to cover the three-dimensional vegetation net; covering non-woven fabrics above the three-dimensional vegetation net without exposing edges, and performing soft operation to keep the integrity of the cloth cover; and step six, maintaining the grass planting in the front, middle and later stages, mainly spraying water in the early sixty days, frequently keeping the soil moist to promote the germination of the seeds, maintaining by natural rainwater in the middle stage, spraying water once or twice per month in drought seasons, spraying water twice per month in the later-stage maintenance, applying additional fertilizer to promote seedling turning to green, and spraying a proper amount of pesticide to prevent diseases and insect pests.
The foregoing shows and describes the general principles and features of the present invention, together with the advantages thereof. It will be understood by those skilled in the art that the present invention is not limited to the embodiments described above, which are described in the specification and illustrated only to illustrate the principle of the present invention, but that various changes and modifications may be made therein without departing from the spirit and scope of the present invention, which fall within the scope of the invention as claimed. The scope of the invention is defined by the appended claims and equivalents thereof.

Claims (3)

1. A vegetation slope protection method for a highway side slope is characterized by comprising the following steps: the method comprises the following steps:
cleaning a slope surface, covering soil with a thickness of five to seven centimeters on the surface of a highway side slope through operation machinery, spraying a medicament for inhibiting the growth of weeds on the surface of the side slope, and digging and arranging a burying ditch on the top surface of the slope surface;
step two, laying the three-dimensional vegetation net along the slope from top to bottom, wherein two sides of the upper end of the three-dimensional vegetation net are inserted into a buried pressure ditch of the top of the slope through fixing pieces for positioning and fixing, a plurality of U-shaped nails are nailed into the middle area of the upper end of the three-dimensional vegetation net to enable the three-dimensional vegetation net to be tightly attached to the slope, two sides of the lower end of the three-dimensional vegetation net at the position of a slope foot are tensioned through tensioning pieces, the middle parts of two adjacent left and right three-dimensional vegetation nets are overlapped by ten to fifteen centimeters, a curled edge of five to ten centimeters is reserved on the periphery of each three-dimensional vegetation net, and the curled edge is pressed by the U-shaped nails;
step three, after the three-dimensional vegetation net is laid in a laminated mode, filling soil and waste materials from the top of a slope downwards in three steps, namely, backfilling dry soil with a mesh screen and compacting, spraying water for sedimentation, and backfilling slurry in the third step;
uniformly spraying a mixture mixed with seeds, a fertilizer, a soil modifier, a water-retaining agent and water on the slope by using a hydraulic spray-seeding machine, and spraying a little soil according to the situation after spray-seeding to cover the three-dimensional vegetation net;
covering non-woven fabrics above the three-dimensional vegetation net without exposing edges, and performing soft operation to keep the integrity of the cloth cover;
and step six, maintaining the grass planting in the front, middle and later stages, mainly spraying water in the early sixty days, frequently keeping the soil moist to promote the germination of the seeds, maintaining by natural rainwater in the middle stage, spraying water once or twice per month in drought seasons, spraying water twice per month in the later-stage maintenance, applying additional fertilizer to promote seedling turning to green, and spraying a proper amount of pesticide to prevent diseases and insect pests.
2. The vegetation slope protection method for the expressway slope according to claim 1, wherein: the mounting include the inserted bar, inserted bar upper end be equipped with the handle just the inserted bar with three-dimensional vegetation net upper end both sides region impress inside the buried pressure ditch, inserted bar pole body the first half be equipped with the spirit level just inserted bar pole body the latter half be equipped with the lantern ring, the lantern ring outside rotate downwards through the pivot and be connected with the adjustment inserted bar, inserted bar and adjustment inserted bar all insert inside the hillside top soil.
3. The vegetation slope protection method for the expressway slope according to claim 1, wherein: tensioning piece include domatic location stalk, domatic location stalk body the latter half cover be equipped with from the top down a plurality of and rotate the cover, wherein every rotates a spring pull rod of the equal fixedly connected with in cover outside, spring pull rod outer end be fixed with the drag hook, the drag hook three-dimensional vegetation net lower end both sides region.
CN202210787201.5A 2022-07-04 2022-07-04 Vegetation slope protection method for expressway slope Active CN115211324B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202210787201.5A CN115211324B (en) 2022-07-04 2022-07-04 Vegetation slope protection method for expressway slope

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202210787201.5A CN115211324B (en) 2022-07-04 2022-07-04 Vegetation slope protection method for expressway slope

Publications (2)

Publication Number Publication Date
CN115211324A true CN115211324A (en) 2022-10-21
CN115211324B CN115211324B (en) 2023-05-05

Family

ID=83609459

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202210787201.5A Active CN115211324B (en) 2022-07-04 2022-07-04 Vegetation slope protection method for expressway slope

Country Status (1)

Country Link
CN (1) CN115211324B (en)

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004108066A (en) * 2002-09-19 2004-04-08 Makkusuton Kk Lining block unit
WO2009075595A2 (en) * 2007-12-12 2009-06-18 Neil Evans Limited Fencing arrangements
CN203101208U (en) * 2013-02-21 2013-07-31 江苏丘陵地区镇江农业科学研究所 Device for rapidly measuring compactness of cabbage head of common head cabbage
CN205742301U (en) * 2016-06-16 2016-11-30 中建八局第一建设有限公司 A kind of Construction of Civil Engineering base pricker
WO2017068797A1 (en) * 2015-10-23 2017-04-27 近畿測量株式会社 Slope stake installation apparatus and slope stake installation method
CN110616703A (en) * 2019-10-18 2019-12-27 中冶建工集团有限公司 Drill rod detection device
KR20200123700A (en) * 2019-04-22 2020-10-30 복기찬 Incision Protecting the surface Fixed anchor of vegetation mat
CN212270829U (en) * 2020-04-16 2021-01-01 江西信恒建设工程有限公司 Side slope support device suitable for water conservancy building

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004108066A (en) * 2002-09-19 2004-04-08 Makkusuton Kk Lining block unit
WO2009075595A2 (en) * 2007-12-12 2009-06-18 Neil Evans Limited Fencing arrangements
CN203101208U (en) * 2013-02-21 2013-07-31 江苏丘陵地区镇江农业科学研究所 Device for rapidly measuring compactness of cabbage head of common head cabbage
WO2017068797A1 (en) * 2015-10-23 2017-04-27 近畿測量株式会社 Slope stake installation apparatus and slope stake installation method
CN205742301U (en) * 2016-06-16 2016-11-30 中建八局第一建设有限公司 A kind of Construction of Civil Engineering base pricker
KR20200123700A (en) * 2019-04-22 2020-10-30 복기찬 Incision Protecting the surface Fixed anchor of vegetation mat
CN110616703A (en) * 2019-10-18 2019-12-27 中冶建工集团有限公司 Drill rod detection device
CN212270829U (en) * 2020-04-16 2021-01-01 江西信恒建设工程有限公司 Side slope support device suitable for water conservancy building

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
刘爱兰: "三维植被网喷播植草技术的应用" *
熊欢;文家刚;胡励耘;: "浅谈TRD工法在基坑支护工程中的应用" *

Also Published As

Publication number Publication date
CN115211324B (en) 2023-05-05

Similar Documents

Publication Publication Date Title
CN101818499B (en) Revegetation system on steep rocky slopes and implementing method thereof
CN101761086B (en) Three-dimensional net greening technique for roadbed side slope
CN109122191A (en) Big specification metasequoia complete crown transplants construction method
CN208266847U (en) Quickly repair structure in Gullied suitable for Canal in Loess Area
CN110714469A (en) Red sandstone hard slope ecological greening system and construction method thereof
CN103362135B (en) Fang Beng hilllock, protect water and soil net grass bank protection
WO2008026855A1 (en) A seed line net for greening
CN210031857U (en) Ecological embankment side slope structure
WO2009111995A1 (en) Vegetation roof, especially pitched, and method of its production
CN108934581A (en) A kind of structure and method of modular slope greening
CN104396691A (en) Sacsaoul irrigation-free vegetative cover afforestation method for draughty gravel desert region
KR20060011929A (en) Plantation works with plantation mat for earth slope
KR200412817Y1 (en) The Greening mat for an ecosystem
CN106609510A (en) A flexible slope protection device
CN115211324A (en) Vegetation slope protection method for highway side slope
CN212896409U (en) Three-dimensional geotechnique's net pad grass planting slope protection structure
CN208191519U (en) The structure of modular slope greening
KR20120034970A (en) Gabion block and method of manufacturing the gabion block
CN220598332U (en) Flexible ecological revetment
CN212896141U (en) Ecological bank protection in river course
JP5699291B2 (en) Vegetation method
KR100949915B1 (en) A plant bag for afforestation and its manufacturing process
RU2423033C1 (en) Method to reinforce slopes by sowing seeds of woody plants
JP3701429B2 (en) Concrete green revetment block
CN211973359U (en) Structure for protecting soil and storing water in flat-land type spoil area

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant