CN114960652A
CN114960652A CN202210595182.6A CN202210595182A CN114960652A CN 114960652 A CN114960652 A CN 114960652A CN 202210595182 A CN202210595182 A CN 202210595182A CN 114960652 A CN114960652 A CN 114960652A
Authority
CN
China
Prior art keywords
reinforcement cage
steel reinforcement
diameter
cast
pile
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202210595182.6A
Other languages
Chinese (zh)
Inventor
蒋吉财
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MCC5 Group Shanghai Corp Ltd
Original Assignee
MCC5 Group Shanghai Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MCC5 Group Shanghai Corp Ltd filed Critical MCC5 Group Shanghai Corp Ltd
Priority to CN202210595182.6A priority Critical patent/CN114960652A/en
Publication of CN114960652A publication Critical patent/CN114960652A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D13/00Accessories for placing or removing piles or bulkheads, e.g. noise attenuating chambers
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/32Safety or protective measures for persons during the construction of buildings
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/32Safety or protective measures for persons during the construction of buildings
    • E04G21/3204Safety or protective measures for persons during the construction of buildings against falling down

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • General Engineering & Computer Science (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The utility model provides a be used for digging into hole bored concrete pile drill way regularization protector soon, includes steel reinforcement cage, a plurality of pi shape steel reinforcement nail, its characterized in that: the steel reinforcement cage is the big steel reinforcement cage support that end opening is little down of suitable for reading, and the upper portion of steel reinforcement cage support is cylindrical steel reinforcement cage, and the bottom of cylindrical steel reinforcement cage is equipped with the foundation ring II shape steel muscle nail is that the diameter is greater than or equal to 10mm, long 300mm reinforcing bar, wherein: the diameter of the circular ring is 200mm larger than the aperture width of the cast-in-place pile, and the diameter of the bottom ring circular ring is 200mm narrow in the aperture of the cast-in-place pile. The protective device for shaping the hole opening of the rotary-excavated cast-in-situ pile has the advantages of simple structure, convenient manufacture, convenient movement, good protective effect, capability of avoiding unsafe accidents, capability of pouring concrete without dismantling the protective device and time and labor conservation.

Description

Be used for digging into hole bored concrete pile drill way regularization protector soon
Technical Field
The invention relates to a protection device, in particular to a hole opening shaping protection device for a rotary-excavated bored concrete pile.
Background
In the traditional project, a bored pile is drilled by rotary excavation, generally, the hole diameter is large, the formed hole is deep, and serious personnel falling potential safety hazards exist in the hole depth inspection, such as hole depth measurement, sediment thickness detection and other processes; if concrete is not poured in time, the site operation personnel have the falling hidden danger, meanwhile, the steel pipe is generally adopted to set up the enclosure for protection in the traditional project, the factors of frequent setting and dismantling, large material transfer amount and the like exist, and the phenomenon of consuming time and labor is caused.
Therefore, the known method for building a steel pipe enclosure at the opening of the cast-in-place pile has various inconveniences and problems.
Disclosure of Invention
The invention aims to provide a safe and reliable protective device for shaping an orifice of a rotary-excavated bored concrete pile.
In order to achieve the purpose, the technical solution of the invention is as follows:
the utility model provides a be used for digging into hole bored concrete pile drill way regularization protector soon, includes steel reinforcement cage, a plurality of pi shape steel reinforcement nail, its characterized in that:
the steel reinforcement cage is a steel reinforcement cage support with a large upper opening and a small lower opening, a cylindrical steel reinforcement cage is arranged at the upper part of the steel reinforcement cage support, a bottom ring circular ring is arranged at the bottom end of the cylindrical steel reinforcement cage, the cylindrical steel reinforcement cage is provided with a plurality of vertical ribs and a plurality of circular rings, the vertical ribs and the circular rings are fixedly welded, and the distance between the circular rings is 200 mm; the height of the vertical rib is more than or equal to 1200 mm;
the n-shaped steel bar nails are steel bars with the diameter of more than or equal to 10mm and the length of 300mm, and nail the steel bar cage into the ground of the hole opening of the cast-in-place pile for fixing;
wherein: the diameter of the circular ring is 200mm larger than the aperture width of the cast-in-place pile, and the diameter of the bottom ring circular ring is 200mm narrow in the aperture of the cast-in-place pile.
The protective device for sizing the hole opening of the rotary-excavated cast-in-place pile can be further realized by adopting the following technical measures.
The above-mentioned forming protection device for the hole mouth of the rotary-excavated cast-in-place pile, wherein the vertical rib is a steel bar with a diameter of not less than 10 mm.
The protective device for the shaping of the hole opening of the rotary-excavated cast-in-place pile is characterized in that the ring is a steel bar with the diameter of more than or equal to 8 mm.
The device for protecting the mouth of the rotary-excavated cast-in-place pile is formed by coating red and white paint on the reinforcement cage.
After the technical scheme is adopted, the device for shaping the orifice of the rotary-excavated cast-in-situ pile has the following advantages:
1. the protective device has simple structure and convenient manufacture;
2. the protection device is convenient and fast to move, has good protection effect, and avoids unsafe accidents;
3. concrete can be poured without dismantling the protection device, so that time and labor are saved.
Drawings
FIG. 1 is a schematic structural diagram of a protection device according to an embodiment of the present invention;
FIG. 2 is a schematic view of a shield apparatus of an embodiment of the present invention disposed in a pile hole;
fig. 3 is a schematic view of the guard according to the embodiment of the present invention in a concrete casting use state.
In the figure: the concrete pile comprises 1 vertical rib, 2 circular rings, 3 oblique ribs, 4 lower openings, 5 upper openings, 6 pile holes, 7 concrete guide pipes and 8 bottom ring circular rings.
Detailed Description
The present invention will be further described with reference to the following examples and the accompanying drawings.
Example 1
The invention discloses a manufacturing method of a hole opening shaping protection device for a rotary-excavated cast-in-place pile, which comprises the following steps:
1. the protective device for shaping the orifice of the rotary-excavated cast-in-place pile is a reinforcement cage welded by steel bars and is used for protecting the orifice of the pile diameter of a rotary-excavated pile hole of 1200 mm.
Referring to fig. 1, fig. 1 is a schematic structural diagram of a protection device according to an embodiment of the present invention. As shown in the figure, the reinforcing cage adopts a phi 8mm reinforcing steel bar to be welded into 7 circular rings with the diameter of 1400mm (the width of each side is 100mm than the hole diameter, the hole diameter is d, and the size of the protective circular ring at the upper part of the protective device is 100+ d + 100).
2. The lower part of the protection device is welded into 1 bottom ring 8 with the diameter of 1000mm by phi 8 (the diameter of each side is 100mm narrower than the hole diameter, the hole diameter is d, and the size of the bottom ring at the lower part of the protection device is d-100 plus 100).
3. 6 reinforcing steel bars with the diameter of 10mm are uniformly distributed in the vertical direction, and a ring 2 with the diameter of 1400mm is welded with the vertical bar 1 according to the diameter @200mm to form a cylindrical structure.
4. And continuously welding the rings with the diameter of 1000mm and the interval of 200mm on the top of the cylindrical structure by using vertical steel bars to extend oblique steel bars.
5. Brushing the protective structure into red and white paint at vertical intervals, and airing the paint for use.
Example 2
The use method of the hole opening sizing protection device for the rotary-excavated cast-in-place pile comprises the following steps:
1. protecting in place: after the pile hole of the rotary pile hole is finished, one end of a welding small ring of the protective device is placed in the hole opening, and the lower part of the welding small ring is 100mm smaller than each side of the hole opening and is welded by the inclined ribs 3 to be clamped in the pile hole.
2. Protection and fixation: at least 3 positions are adopted for fixing each protection, n-shaped steel bars with the length of 10mm and the length of 300mm are fixedly nailed into the ground, and the nailing effective length is not less than 200 mm. Fig. 2 is a schematic view of the installation of the guard in the pile hole according to the embodiment of the present invention.
3. Because this protective structure is open for annular upper portion, during concrete placement construction, can directly insert concrete pipe 7 from protector upper shed 5 center, and pass end opening 4, after concrete placement initial set, retrieve the protector and shift to next stake mouth 6 and use. Fig. 3 is a schematic view of the guard according to the embodiment of the present invention in a concrete casting use state.
The protective device for the mouth sizing of the rotary-excavated cast-in-situ pile has the advantages of being simple in installation and convenient to move, effectively ensuring the safety in the processes of hole depth, sediment detection and the like, pouring concrete under the condition that the protection is not removed, and being convenient to move after the pouring of the concrete is finished. The effects of saving time and labor and ensuring safety are achieved.
The protective device for the hole opening sizing of the rotary-excavated cast-in-situ pile is applied to standardized workshops and supporting projects in Longyan high and new areas, has obvious effect and is fully determined by implementation units, supervision units and construction units.
The above embodiments are provided only for illustrating the present invention and not for limiting the present invention, and those skilled in the art can make various changes or modifications without departing from the spirit and scope of the present invention. Accordingly, all equivalents are intended to fall within the scope of the invention, which is defined in the claims.

Claims (4)

1. The utility model provides a be used for digging into hole bored concrete pile drill way regularization protector soon, includes steel reinforcement cage, a plurality of pi shape steel reinforcement nail, its characterized in that:
the steel reinforcement cage is a steel reinforcement cage support with a large upper opening and a small lower opening, a cylindrical steel reinforcement cage is arranged at the upper part of the steel reinforcement cage support, a bottom ring circular ring is arranged at the bottom end of the cylindrical steel reinforcement cage, the cylindrical steel reinforcement cage is provided with a plurality of vertical ribs and a plurality of circular rings, the vertical ribs and the circular rings are fixedly welded, and the distance between the circular rings is 200 mm; the height of the vertical rib is more than or equal to 1200 mm;
the n-shaped steel bar nails are steel bars with the diameter of more than or equal to 10mm and the length of 300mm, and nail the steel bar cage into the ground of the hole opening of the cast-in-place pile for fixing;
wherein: the diameter of the circular ring is 200mm larger than the aperture width of the cast-in-place pile, and the diameter of the bottom ring circular ring is 200mm narrow in the aperture of the cast-in-place pile.
2. The device for protecting the mouth sizing of the rotary-excavated cast-in-situ pile according to claim 1, wherein the vertical ribs are reinforcing steel bars with a diameter of more than or equal to 10 mm.
3. The device for protecting the mouth of the rotary-excavated cast-in-place pile from the formation of the hole according to claim 1, wherein the circular ring is a steel bar with a diameter of more than or equal to 8 mm.
4. The apparatus according to claim 1, wherein the reinforcement cage is coated with red and white paint.
CN202210595182.6A 2022-05-29 2022-05-29 Be used for digging into hole bored concrete pile drill way regularization protector soon Pending CN114960652A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202210595182.6A CN114960652A (en) 2022-05-29 2022-05-29 Be used for digging into hole bored concrete pile drill way regularization protector soon

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202210595182.6A CN114960652A (en) 2022-05-29 2022-05-29 Be used for digging into hole bored concrete pile drill way regularization protector soon

Publications (1)

Publication Number Publication Date
CN114960652A true CN114960652A (en) 2022-08-30

Family

ID=82957874

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202210595182.6A Pending CN114960652A (en) 2022-05-29 2022-05-29 Be used for digging into hole bored concrete pile drill way regularization protector soon

Country Status (1)

Country Link
CN (1) CN114960652A (en)

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0994038A1 (en) * 1998-09-10 2000-04-19 Don De Cristo Concrete Accessories Inc. Protective cover for a concrete reinforcing bar
CN203129128U (en) * 2013-02-01 2013-08-14 中国十七冶集团有限公司 Pile hole protective cage
CN203129127U (en) * 2013-03-13 2013-08-14 中国十七冶集团有限公司 Falling prevention device of wellhead of manual hole digging pile
CN206722436U (en) * 2017-03-30 2017-12-08 中建五局第三建设有限公司 The light protector in hole stake hole
CN210460038U (en) * 2019-07-05 2020-05-05 云南省建设投资控股集团有限公司 Shaping protection device for hole opening of manual hole digging pile
CN210530384U (en) * 2019-07-04 2020-05-15 中建桥梁有限公司 Pile hole safety protection device for rotary digging pile construction
CN210713897U (en) * 2019-06-21 2020-06-09 中铁建工集团有限公司 Pile foundation hole opening protection device
CN212562594U (en) * 2020-05-27 2021-02-19 中铁十一局集团第一工程有限公司 Foldable and recyclable orifice protection device for bridge bored pile
CN214402836U (en) * 2020-10-30 2021-10-15 中铁一局集团铁路建设有限公司 Split type orifice rail guard of socket joint

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0994038A1 (en) * 1998-09-10 2000-04-19 Don De Cristo Concrete Accessories Inc. Protective cover for a concrete reinforcing bar
CN203129128U (en) * 2013-02-01 2013-08-14 中国十七冶集团有限公司 Pile hole protective cage
CN203129127U (en) * 2013-03-13 2013-08-14 中国十七冶集团有限公司 Falling prevention device of wellhead of manual hole digging pile
CN206722436U (en) * 2017-03-30 2017-12-08 中建五局第三建设有限公司 The light protector in hole stake hole
CN210713897U (en) * 2019-06-21 2020-06-09 中铁建工集团有限公司 Pile foundation hole opening protection device
CN210530384U (en) * 2019-07-04 2020-05-15 中建桥梁有限公司 Pile hole safety protection device for rotary digging pile construction
CN210460038U (en) * 2019-07-05 2020-05-05 云南省建设投资控股集团有限公司 Shaping protection device for hole opening of manual hole digging pile
CN212562594U (en) * 2020-05-27 2021-02-19 中铁十一局集团第一工程有限公司 Foldable and recyclable orifice protection device for bridge bored pile
CN214402836U (en) * 2020-10-30 2021-10-15 中铁一局集团铁路建设有限公司 Split type orifice rail guard of socket joint

Similar Documents

Publication Publication Date Title
CN109403354B (en) Construction method for deep foundation pit support of inverted retaining wall of cyclone well
CN110016938B (en) Positioning and verticality adjusting device for rectangular lattice column of reverse construction method foundation pit
CN211735685U (en) Concrete road surface rain sewage well lid mounting structure
CN100516378C (en) Method for supporting and protecting building foundation pit by employing transverse-diaphragm prestressing concrete pipe pile
CN112343079A (en) Construction method for microporous cast-in-place pile foundation of mountain photovoltaic power station
CN115012425A (en) Positioning construction method for foundation pit support structure upright column pile and lattice column
CN214883687U (en) Foundation pit supporting structure
CN114215096A (en) Tower crane lattice column pile foundation bearing platform
CN114960652A (en) Be used for digging into hole bored concrete pile drill way regularization protector soon
CN211286938U (en) Simple and easy open working well faces limit protective structure
CN215562600U (en) Lattice column bored concrete pile steel column positioner
CN107724419A (en) A kind of equipment prefabricated foundation locator and its application method
CN215759001U (en) Cast-in-place pile casing device capable of avoiding pile cutting head
CN216272644U (en) Pile foundation steel reinforcement cage suspends and positioner in midair
CN215925958U (en) PHC prestressed pipe pile soil-retaining cover plate
CN217460616U (en) Foundation pit side wall reinforcing structure
CN115506372B (en) Combined support method for bored pile and steel pipe pile
CN212801697U (en) Protection device of cast-in-place concrete pile detecting tube
CN214363445U (en) Equipment for accurately positioning height of foundation pile and position of reinforcement cage
CN214940189U (en) Large-span foundation pit inner supporting structure
CN112962616B (en) Construction method of large-span foundation pit inner support structure
CN110258678B (en) Concrete cast-in-place pile deviation rectifying method and raft foundation cast-in-place pile construction method
CN218579424U (en) Bridge steel reinforcement cage hoisting device
CN220888647U (en) Foundation pit steel lattice column perpendicularity control device
CN219862946U (en) Steel pipe column perpendicularity control device for reverse construction method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20220830