CN215925958U - PHC prestressed pipe pile soil-retaining cover plate - Google Patents

PHC prestressed pipe pile soil-retaining cover plate Download PDF

Info

Publication number
CN215925958U
CN215925958U CN202122247651.9U CN202122247651U CN215925958U CN 215925958 U CN215925958 U CN 215925958U CN 202122247651 U CN202122247651 U CN 202122247651U CN 215925958 U CN215925958 U CN 215925958U
Authority
CN
China
Prior art keywords
cover plate
pipe pile
prestressed pipe
retaining cover
phc
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202122247651.9U
Other languages
Chinese (zh)
Inventor
韩健丰
武念铎
陈新喜
王子安
李赟
刘建南
余少乐
洪伟健
许诺
何超
万展君
沈坚
罗欢
吴利利
潘钧俊
霍涛
杨钦
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Eighth Engineering Division Co Ltd
Original Assignee
China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Eighth Engineering Division Co Ltd filed Critical China Construction Eighth Engineering Division Co Ltd
Priority to CN202122247651.9U priority Critical patent/CN215925958U/en
Application granted granted Critical
Publication of CN215925958U publication Critical patent/CN215925958U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model discloses a PHC prestressed pipe pile soil-retaining cover plate, which comprises: a apron for locating in the tubular pile, this apron bottom surface central symmetry is fixed with a plurality of stabilizer blades, has seted up screw thread form spout in this tubular pile, a plurality of these stabilizer blade tip and this spout adaptation, and a plurality of these stabilizer blades slide to be located in this spout. The pipe pile sealing structure solves the technical problem that soil is easy to fall into the pipe pile in the prior art by clamping the cover plate and the sealing diagram inside the pipe pile. Through the device, seal the tubular pile, effectively prevent soil cement to get into inside, save a large amount of manual works, cost and time limit for a project, and can prevent that the operation personnel from stepping on the incident that the stake hole leads to by mistake, protection workman life safety.

Description

PHC prestressed pipe pile soil-retaining cover plate
Technical Field
The utility model relates to the field of building construction, in particular to a PHC prestressed pipe pile soil retaining cover plate.
Background
In the prior art, in the pile feeding construction process of the PHC tubular pile, because the pile top is positioned in the soil body, due to poor cohesiveness of the soil body, or due to the fact that the soil body forms flowing plastic soil by rainwater and underground water, or due to the fact that the soil body is reinforced at the bottom of a deep foundation pit, a large amount of soil or hardened cement soil still exists in the last PHC tubular pile after the subsequent earthwork excavation is finished, core filling operation of the tubular pile is affected, and large amount of labor, time and cost are needed for cleaning up the cement soil at a deeper part in the tubular pile, and core filling of the tubular pile is a key step of basic construction, so that core picking is very important, if core picking construction is not met, the PHC tubular pile is used as an engineering pile, and original advantages are lost.
At present, the method for cleaning soil in a tubular pile is to use a high-pressure water gun for washing, but because a pile hole is completely filled with hardened cement, water and soil and is compacted, if the pile hole is directly washed by the high-pressure water gun, mud can flow, pollute and invade a foundation or a cushion layer, therefore, a Luoyang shovel is required to firstly clean the soil with the height range of 500mm of the pile top, and then the high-pressure water gun is used for washing and replacing the mud. And after the sludge and the slurry in the pipe are completely discharged, performing reinforced concrete core-filling construction. This method has several significant disadvantages:
the water used for replacing all the slurry is large, for example, the water needed for a 50m PHC-B500(100) pipe pile is about 3m3The cost is increased inevitably;
secondly, the construction period is influenced. More labor and time are wasted in cleaning the cement soil in the PHC tubular pile;
in part of foundation pit engineering with the supporting beams, the core drawing work is influenced by the net height of the supporting beams and cannot be effectively operated;
and fourthly, in the construction process of the foundation engineering, due to the operation of soil quality and other on-site mechanical equipment, a large amount of sludge is generated to submerge the height of the top of the tubular pile, is not easy to be found by workers during operation, is easy to step into a pile hole, is easy to fall and hurt if the height is small, and can cause serious safety accidents if the height is large.
SUMMERY OF THE UTILITY MODEL
The utility model provides a PHC prestressed pipe pile soil retaining cover plate, which solves the technical problem that soil is easy to fall into a pipe pile in the prior art.
In a first aspect, the utility model discloses a PHC prestressed pipe pile soil retaining cover plate, which comprises: a apron for locating in the tubular pile, this apron bottom surface central symmetry is fixed with a plurality of stabilizer blades, has seted up screw thread form spout in this tubular pile, a plurality of these stabilizer blade tip and this spout adaptation, and a plurality of these stabilizer blades slide to be located in this spout.
The PHC prestressed pipe pile soil retaining cover plate is further improved in that the upper ends of a plurality of the support legs are fixed on a fixing plate, the fixing plate is fixed on the bottom surface of the cover plate, the lower end of each support leg is provided with a vertical sliding plate, and the width of the sliding plate is suitable for the width of the sliding chute.
The PHC prestressed pipe pile soil retaining cover plate is further improved in that the sliding chute comprises a plurality of vertical sections with the upper parts the same as the number of the support legs, and a threaded section with the lower part communicated with the vertical sections.
The PHC prestressed pipe pile soil retaining cover plate is further improved in that the sliding groove is arranged at the upper part of the pipe pile.
The PHC prestressed pipe pile soil retaining cover plate is further improved in that the number of the support legs is three, and the three support legs are arranged at an angle of 120 degrees.
The PHC prestressed pipe pile soil retaining cover plate is further improved in that a sealing ring is fixed on the periphery of the cover plate.
The PHC prestressed pipe pile soil retaining cover plate is further improved in that the sealing ring is a rubber water stop belt.
The PHC prestressed pipe pile soil retaining cover plate is further improved in that a pull ring is fixed on the top surface of the cover plate.
In a second aspect, the utility model further provides a construction method of the PHC prestressed pipe pile soil retaining cover plate, which comprises the following steps:
aligning a plurality of support legs to the sliding grooves respectively;
and sliding the support legs into the sliding groove, and rotating the cover plate along the extending direction of the sliding groove to enable the support legs to slide along the sliding groove until the cover plate is positioned below the top surface of the tubular pile.
The construction method of the PHC prestressed pipe pile soil retaining cover plate is further improved in that the sliding chute comprises a plurality of vertical sections the upper parts of which are the same as the number of the support legs, and a threaded section the lower part of which is communicated with the vertical sections;
when the support legs are slid into the sliding groove, the support legs are slid downwards along the vertical section until reaching the threaded section.
Compared with the prior art, the utility model has positive and obvious effect. The pipe pile sealing structure solves the technical problem that soil is easy to fall into the pipe pile in the prior art by clamping the cover plate and the sealing diagram inside the pipe pile. Through the device, seal the tubular pile, effectively prevent soil cement to get into inside, save a large amount of manual works, cost and time limit for a project, and can prevent that the operation personnel from stepping on the incident that the stake hole leads to by mistake, protection workman life safety.
Drawings
Fig. 1 is a plan view of a PHC prestressed pipe pile retaining cover plate of the present invention.
Fig. 2 is a cross-sectional view taken along line a-a in fig. 1.
Fig. 3 is a plan view of the PHC prestressed pipe pile retaining cover plate pile of the present invention.
Fig. 4 is a cross-sectional view taken along line B-B of fig. 3.
Fig. 5 is a top view of the PHC prestressed pipe pile retaining cover plate of the present invention mounted to the pipe pile.
Fig. 6 is a cross-sectional view taken at C-C in fig. 5.
Detailed Description
The utility model is further described below with reference to the figures and examples.
As shown in fig. 1, 2, 3 and 4, the PHC prestressed pipe pile soil retaining cover plate of the present invention comprises: a apron 1 for locating in tubular pile 5, 1 bottom surface central symmetry of this apron is fixed with a plurality of stabilizer blades 2, has seted up screw thread form spout 6 in this tubular pile 5, a plurality of 2 tip of these stabilizer blades and the 6 adaptations of this spout, and a plurality of these stabilizer blades 2 slide and locate in this spout 6.
In the embodiment, the cover plate 1 is made of steel plates, the strength is high, and the accident of falling injury cannot occur even if a pile hole is stepped by mistake in construction. Need carry out preprocessing to tubular pile 5 before the construction of tubular pile 5, set up spout 6 at the inner wall of tubular pile 5, the upper portion region of spout 6 in this embodiment is vertical setting, and the lower part will set up for the screw thread, and 6 quantity of vertical spout equal with the quantity of stabilizer blade 2. As shown in fig. 5 and 6, when in use, the supporting legs 2 are directly slid into the sliding grooves 6, and then the cover plate 1 is rotated until the supporting legs 2 abut against the tail ends of the sliding grooves 6, so that the installation is completed. The cover plate 1 and the tubular pile 5 of the device are processed and manufactured in advance, field workers only need to install the device manually, holes do not need to be cleaned in the later period, and the construction period is greatly shortened.
Preferably, the upper ends of a plurality of the supporting legs 2 are fixed on a fixing plate fixed on the bottom surface of the cover plate 1, and the lower end of each supporting leg 2 is formed with a vertical sliding plate having a width suitable for the width of the sliding chute 6.
The supporting legs 2 and the fixing plate form a certain angle. This fixed plate is fixed in the central point of apron 1, connects into a whole through the fixed plate with a plurality of stabilizer blades 2, improves the support intensity of stabilizer blade 2, prevents when the workman steps on apron 1 that a plurality of stabilizer blades 2 can not scatter the frame and support upper portion weight jointly. Vertical slide more the laminating locate the spout 6 on 5 inner walls of tubular pile to the area of contact of increase stabilizer blade 2 and 5 inner walls of tubular pile, reinforcing supporting effect.
Preferably, the sliding groove 6 comprises a plurality of vertical sections, the upper part of which is the same as the number of the support legs 2, and a threaded section, the lower part of which is communicated with the plurality of vertical sections, of the sliding groove 6.
When the device installation is accomplished, make apron 1 be located the vertical section in upper portion, upper portion is less because 6 areas of spout to make the gap between apron 1 and the 5 inner walls of tubular pile still less, improve apron 1's sealed effect.
Preferably, as shown in fig. 4, the slide groove 6 is provided at an upper portion of the tube pile 5.
The cover plate 1 is only required to be covered on the upper part of the tubular pile 5, so that the cover plate can be taken out in time when core filling construction is required, the sliding groove 6 is arranged on the upper part, and the cover plate 1 can be taken out through the way of a worker without the help of other tools.
Preferably, as shown in fig. 1 and 5, the number of the legs 2 is three, and three legs 2 are arranged at 120 degrees to each other.
Be triangle-shaped's arrangement stabilizer blade 2, can improve apron 1's stability effectively, for apron 1 provides the support of high strength, also can not take place to sink sunken when the workman mistake steps on to tubular pile 5 in, improve site operation's security.
Preferably, a seal ring 4 is fixed to the outer periphery of the cover plate 1.
The sealing ring 4 improves the sealing performance between the cover plate 1 and the inner wall of the tubular pile 5.
Preferably, the sealing ring 4 is a rubber water stop.
The side face of the cover plate 1 is sealed by a rubber water stop belt, so that cement soil can be effectively prevented from entering the tubular pile 5, the tubular wall cannot be damaged when the cover plate slides up and down, and the strength of the tubular pile 5 is ensured.
Preferably, as shown in fig. 2 and 6, a tab 3 is fixed to the top surface of the cap plate 1.
When tubular pile 5 need irritate the core construction, twist out apron 1 rotation through pull ring 3, can carry out the reutilization, more economy, the tubular pile 5 of different specifications corresponds the apron 1 of the different specifications of preparation, takes out after the use and washes clean and can carry out next use, can save engineering construction cost greatly.
The utility model also provides a construction method of the PHC prestressed pipe pile 5 soil retaining cover plate 1, which comprises the following steps:
aligning the plurality of support legs 2 with the chutes 6 respectively;
the supporting legs 2 are slid into the sliding grooves 6, and the cover plate 1 is rotated along the extending direction of the sliding grooves 6, so that the supporting legs 2 slide along the sliding grooves 6 until the cover plate 1 is located below the top surface of the tubular pile 5.
The device is convenient to use, can be manufactured in factories, can be directly installed on site, can be operated on the way, does not need to borrow other tools, and greatly improves the construction efficiency.
Preferably, the sliding groove 6 comprises a plurality of vertical sections with the upper parts being the same as the number of the support legs 2, and a threaded section with the lower part of the sliding groove 6 being communicated with the plurality of vertical sections;
when sliding the legs 2 into the runner 6, the legs 2 are slid down the vertical section to the threaded section.
The vertical section sliding groove 6 enables the supporting leg 2 to be aligned and slide downwards more easily, the vertical section is communicated with the threaded section, extra adjustment is not needed at the joint of the vertical section and the threaded section, and the sliding block can be slid into the threaded section by directly rotating the cover plate 1.
The pipe pile sealing structure solves the technical problem that soil is easy to fall into the pipe pile in the prior art by clamping the cover plate and the sealing diagram inside the pipe pile. Through the device, seal the tubular pile, effectively prevent soil cement to get into inside, save a large amount of manual works, cost and time limit for a project, and can prevent that the operation personnel from stepping on the incident that the stake hole leads to by mistake, protection workman life safety.
Although the present invention has been described with reference to a preferred embodiment, it should be understood that various changes, substitutions and alterations can be made herein without departing from the spirit and scope of the utility model as defined by the appended claims.

Claims (8)

1. The utility model provides a PHC prestressed pipe pile keeps off native apron which characterized in that includes: a apron for the card is located in the tubular pile, apron bottom surface central symmetry is fixed with a plurality of stabilizer blades, threaded spout has been seted up in the tubular pile, and is a plurality of stabilizer blade tip with spout adaptation, it is a plurality of the stabilizer blade slides and locates in the spout.
2. The PHC prestressed pipe pile soil retaining cover plate according to claim 1, wherein the upper ends of the plurality of legs are fixed to a fixing plate fixed to the bottom surface of the cover plate, and a vertical sliding plate is formed at the lower end of each leg, and the width of the sliding plate is adapted to the width of the sliding groove.
3. The PHC prestressed pipe pile retaining cover plate according to claim 1, wherein the chute comprises a plurality of vertical sections having the same number of upper portions as the number of the legs, and a threaded section having a lower portion of the chute communicating with the plurality of vertical sections.
4. The PHC prestressed pipe pile soil retaining cover plate according to claim 1, wherein the slide groove is provided at the upper portion of the pipe pile.
5. The PHC prestressed pipe pile retaining cover plate according to claim 1, wherein the number of the legs is three, three of the legs being arranged at 120 degrees from each other.
6. The PHC prestressed pipe pile soil retaining cover plate according to claim 1, wherein a sealing ring is fixed to the periphery of the cover plate.
7. The PHC prestressed pipe pile soil retaining cover plate according to claim 6, wherein the sealing ring is a rubber water stop.
8. The PHC prestressed pipe pile soil retaining cover plate according to claim 1, wherein a pull ring is fixed to the top surface of the cover plate.
CN202122247651.9U 2021-09-16 2021-09-16 PHC prestressed pipe pile soil-retaining cover plate Active CN215925958U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202122247651.9U CN215925958U (en) 2021-09-16 2021-09-16 PHC prestressed pipe pile soil-retaining cover plate

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202122247651.9U CN215925958U (en) 2021-09-16 2021-09-16 PHC prestressed pipe pile soil-retaining cover plate

Publications (1)

Publication Number Publication Date
CN215925958U true CN215925958U (en) 2022-03-01

Family

ID=80416963

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202122247651.9U Active CN215925958U (en) 2021-09-16 2021-09-16 PHC prestressed pipe pile soil-retaining cover plate

Country Status (1)

Country Link
CN (1) CN215925958U (en)

Similar Documents

Publication Publication Date Title
CN113445498A (en) Construction process of karst hole pile foundation in complex geology
CN112502139A (en) Construction method for excavation of deep pit by three-axis stirring pile curtain water stop and rotary digging cast-in-place pile support
CN111395322A (en) Construction method for rotary digging cast-in-place pile under karst landform
CN113684824A (en) PHC prestressed pipe pile soil-retaining cover plate and construction method thereof
CN114164823B (en) Pile foundation construction method in high-fill foundation
CN215925958U (en) PHC prestressed pipe pile soil-retaining cover plate
CN113550335A (en) Construction method for high slope concrete slope protection engineering
CN113404042A (en) Bridge pile position construction method
CN113074003A (en) Method for inhibiting deformation of small-clear-distance tunnel in argillaceous sandstone stratum
CN109371961B (en) Steel pipe column for subway station and construction process thereof
CN218322863U (en) Well body reinforcing system for inspection well
CN110331736B (en) Slurry circulation device for construction of underwater pile foundation and corresponding construction method
CN211080280U (en) Large-diameter pile foundation enclosure miniature pile group
CN111691426A (en) Comprehensive construction method for non-occluded water stop pile of deep foundation pit drilling support structure
CN113339003A (en) Construction method of tunnel integrated arch sheathing trolley
CN216974851U (en) Section tunnel entrance to a cave reinforced structure
CN210562185U (en) Recyclable pile cap mold
CN214940189U (en) Large-span foundation pit inner supporting structure
CN210975866U (en) Novel bearing platform type tower shore mark foundation structure
CN115217108B (en) Anti-floating anchor rod with cage core bag and construction process thereof
CN219793944U (en) Structure is handled to foundation ditch lateral wall crack
CN110241819B (en) Manual hole digging and pouring construction method for subsurface flow special geological ultra-deep pile
CN218437022U (en) Post-anchor rod construction structure
CN221320926U (en) Reinforcing steel bar protection device for breaking pile head of bored pile
CN113846695B (en) Reverse construction method basement construction method

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant