CN212562594U - Foldable and recyclable orifice protection device for bridge bored pile - Google Patents

Foldable and recyclable orifice protection device for bridge bored pile Download PDF

Info

Publication number
CN212562594U
CN212562594U CN202020914043.1U CN202020914043U CN212562594U CN 212562594 U CN212562594 U CN 212562594U CN 202020914043 U CN202020914043 U CN 202020914043U CN 212562594 U CN212562594 U CN 212562594U
Authority
CN
China
Prior art keywords
iron chain
guardrail
chain
thick bamboo
bored pile
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202020914043.1U
Other languages
Chinese (zh)
Inventor
赵银超
李贤桂
黄文君
余根钦
许平华
肖明伟
李维
王仙伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Southeast Coast Railway Fujian Co ltd
China Railway 11th Bureau Group Co Ltd
First Engineering Co Ltd of China Railway 11th Bureau Group Co Ltd
Original Assignee
Southeast Coast Railway Fujian Co ltd
China Railway 11th Bureau Group Co Ltd
First Engineering Co Ltd of China Railway 11th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Southeast Coast Railway Fujian Co ltd, China Railway 11th Bureau Group Co Ltd, First Engineering Co Ltd of China Railway 11th Bureau Group Co Ltd filed Critical Southeast Coast Railway Fujian Co ltd
Priority to CN202020914043.1U priority Critical patent/CN212562594U/en
Application granted granted Critical
Publication of CN212562594U publication Critical patent/CN212562594U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

The utility model provides a collapsible used cyclically drill way protector of bridge bored pile, including the section of thick bamboo that protects that is located the drill way, protect a set of guardrail stand along protecting a section of thick bamboo circumference evenly distributed's upper portion and install, the cylinder of guardrail stand is equipped with a set of iron chain hole from top to bottom, protects a section of thick bamboo top and is equipped with a set of iron chain from top to bottom, and the head end of every iron chain passes the iron chain hole that lies in same horizontal position department on the adjacent guardrail stand in proper order, forms closed annular protection chain with the chain ring swing joint of this iron chain. The utility model provides a pair of collapsible used cyclically's of bridge bored pile drill way protector to folding detachable guardrail replaces fixed guardrail, through the combination form and the mounting means that change the rail guard, has solved fixed guardrail turnover yielding and commonality shortcoming such as not strong, the utilization ratio is not high, has improved protecting effect and work efficiency by a wide margin.

Description

Foldable and recyclable orifice protection device for bridge bored pile
Technical Field
The utility model relates to a collapsible used in circulation's of bridge bored pile drill way protector belongs to bridge construction appurtenance technical field.
Background
With the vigorous development of high-speed railway construction, various bridges are increasingly constructed, and pile foundation construction is more and more concerned by broad builders as one of the most important key links of bridge construction. The method of drilling the pile is mostly adopted in the pile foundation construction, and the hole opening protection in the construction is taken as the maximum safety measure and is directly related to the safety of the whole pile foundation construction process.
The conventional orifice protective barriers comprise two types, one type is a fixed type guardrail, the fixed type guardrail is processed into sizes and shapes with different specifications according to the diameter of a pile foundation protective cylinder and is used for protecting the orifice of the pile foundation, equipment such as a crane and the like is needed in the turnover process of the guardrail, deformation is easily caused to influence subsequent use, the construction cost is relatively high, and meanwhile, due to the fixed type protection, the fixed type guardrail has low universality and low utilization rate on pile foundations with different pile diameters; the other type is a net-sheet type guard rail which covers the orifice, the guard rail is not suitable for protection when a rotary drilling rig drills, and is also not beneficial to installation of a mud pipe in impact drilling construction, and the hammer head needs to be taken down when lifted, so that inconvenience in use is caused, and hidden danger is caused for orifice protection safety.
Disclosure of Invention
In order to solve the turnover yielding, the construction cost that current drill hole rail guard exists, the utilization ratio is not high, awkward problem, the utility model provides a collapsible used cyclically drill hole protector of bridge bored pile to folding detachable guardrail replaces fixed guardrail, through the combination form and the mounting means who changes the rail guard, has solved fixed guardrail turnover yielding and commonality weak, the utilization ratio shortcoming such as not high, has improved protecting effect and work efficiency by a wide margin.
The utility model discloses a solve the technical scheme that its technical problem adopted and be: the utility model provides a collapsible used drill way protector that recycles of bridge bored pile, including the fender section of thick bamboo that is located the drill way, the upper portion of protecting a section of thick bamboo is installed a set of guardrail stand along protecting a section of thick bamboo circumference evenly distributed, and the cylinder of guardrail stand is equipped with a set of iron chain hole from top to bottom, protects a section of thick bamboo top and is equipped with a set of iron chain from top to bottom, and the head end of every iron chain passes the iron chain hole that lies in same horizontal position department on the adjacent guardrail stand in proper order, forms closed annular protection chain with the chain ring swing joint of this iron chain.
The upper portion of protecting a section of thick bamboo and the lower part of guardrail stand are equipped with corresponding bolt hole respectively, and the guardrail stand is connected with protecting a section of thick bamboo through the fixing bolt with bolt hole complex.
The bolt holes at the lower part of the guardrail upright post are arranged in a matrix form.
The perimeter of each iron chain is larger than that of the protective cylinder.
The head end of the iron chain is provided with an iron chain hook, and the head end of the iron chain is movably connected with the chain ring through the iron chain hook.
The distance between two adjacent iron chains is not less than 40 cm.
The pile foundation steel pile casing is adopted as the casing.
The utility model discloses based on the beneficial effect that its technical scheme had lies in:
(1) the utility model provides a foldable and recyclable orifice protection device for a bridge bored pile, which changes the phenomena of easy deformation in turnover, high construction cost and the like of the traditional fixed guardrail and provides the foldable and recyclable orifice protection device for the bridge bored pile;
(2) the utility model provides a pair of methods such as orifice of a hole protector of collapsible recycling of bridge bored pile has changed combination form, mounting means of traditional rail guard to folding shrink detachable guardrail replaces fixed guardrail, has solved shortcomings such as traditional guardrail commonality is not strong, the utilization ratio is not high, has improved protecting effect and work efficiency by a wide margin.
Drawings
Fig. 1 is the utility model provides a collapsible used drill way protector's of recycling of bridge bored concrete pile spatial structure sketch map.
Fig. 2 is a schematic top view of the orifice protection device for foldable recycling of the bridge bored pile provided by the present invention.
Fig. 3 is a schematic front view of a guardrail post.
Fig. 4 is a side view of a guardrail post.
Fig. 5 is a schematic view of the connection between a guardrail column and a pile foundation steel casing.
In the figure: 1-guardrail column, 1 a-column upper iron chain hole, 1 b-column middle iron chain hole, 1 c-column lower iron chain hole, 1 d-column upper layer bolt hole, 1 e-column lower layer bolt hole, 2-iron chain, 3-iron chain hook, 4-fixing bolt and 5-pile foundation steel casing.
Detailed Description
The present invention will be further explained with reference to the drawings and examples.
Referring to fig. 1 to 5, the utility model provides a collapsible used cyclically drill way protector of bridge bored pile, including the section of thick bamboo that protects that is located the drill way, protect the upper portion of a section of thick bamboo and install a set of guardrail stand 1 that protects a section of thick bamboo circumference evenly distributed, the cylinder of guardrail stand is equipped with a set of iron chain hole from top to bottom, protects a section of thick bamboo top and is equipped with a set of iron chain 2 from top to bottom, and the head end of every iron chain passes the iron chain hole that is located same horizontal position department on the adjacent guardrail stand in proper order, forms closed annular protection chain with the chain ring swing joint of this iron chain.
The upper portion of protecting a section of thick bamboo and the lower part of guardrail stand are equipped with corresponding bolt hole respectively, and the guardrail stand is connected with protecting a section of thick bamboo through fixing bolt 4 with bolt hole complex. The bolt holes at the lower part of the guardrail upright post are arranged in a matrix form.
In the embodiment, the pile foundation steel casing 5 is adopted as the casing, four guardrail upright posts 1 with the same structure are arranged, and the guardrail upright posts 1 are made of 14I-shaped steel and are 1.2m long; an upper iron chain hole 1a of the upright post, a middle iron chain hole 1b of the upright post and a lower iron chain hole 1c of the upright post are respectively formed in the central position of the I-steel web plate of the guardrail 1, which is 5cm, 45cm and 85cm away from the top end, and the diameter of the iron chain hole is 3 cm. At distance 1 bottom 5cm and 25cm of guardrail stand, open stand upper bolt hole 1d and stand lower floor bolt hole 1e at the I-steel flange plate respectively, upper and lower floor respectively establishes two, and the bolt hole size 18mm, at pile foundation steel protects 5 circumference quartering punishment department, utilizes 4 fixing bolt 4 to protect every guardrail stand 1 and pile foundation steel to protect a section of thick bamboo 5 and be connected the locking, and fixing bolt 4's specification adopts M16 x 40mm and supporting nut.
The perimeter of each iron chain is larger than that of the protective cylinder. The head end of the iron chain is provided with an iron chain hook 3, and the head end of the iron chain is movably connected with the chain ring through the iron chain hook. In the embodiment, the protection of the iron chain 2 with the same three-layer structure is arranged according to the positions of the three-layer iron chain holes on the guardrail upright post 1. The length of iron chain 2 is greater than the girth that pile foundation steel protected 5, and the one end of iron chain 2 sets up iron chain couple 3, loops through iron chain hole 1a on the stand on four guardrail stands 1 along pile foundation steel protected 5 circumferencial direction with the one end that iron chain 2 did not have the couple, then will have the one end of iron chain couple 3 to catch on and do not have couple one end and form closed circular protection iron chain 2. And repeating the steps, and sequentially installing the middle-layer iron chain and the lower-layer iron chain 2 to form a three-layer closed iron chain protection structure.
After the pile foundation construction was accomplished, demolish fixing bolt 4 on the guardrail stand 1 one by one, protect a section of thick bamboo 5 separation with guardrail stand 1 and pile foundation steel, fold the shrink of iron chain 2 simultaneously, circulate to the drill way protection of next pile foundation construction in, through changing 2 lengths of iron chain, form various shapes and the closed type protective structure of size, be applicable to various sizes and the pile foundation steel of size and protect in the section of thick bamboo protection 5, form the protective structure of pile foundation construction overall process.
The guard rail is firmly installed due to the connection mode of the fixing bolts, and meanwhile, the guard rail is convenient to detach and beneficial to recycling.
The utility model provides a pair of collapsible used cyclically's of bridge bored pile drill way protector to folding detachable guardrail replaces fixed guardrail, through the combination form and the mounting means that change the rail guard, has solved fixed guardrail turnover yielding and commonality shortcoming such as not strong, the utilization ratio is not high, has improved protecting effect and work efficiency by a wide margin.
Modifications and variations of the present invention will be apparent to those skilled in the art in light of the foregoing description, and all such modifications and variations are intended to be included within the scope of the present invention as defined in the appended claims.

Claims (7)

1. The utility model provides a collapsible used orifice of a hole protector that recycles of bridge bored pile, is including the pile casing that is located the orifice of a hole, its characterized in that: the upper portion of protecting a section of thick bamboo is installed a set of guardrail stand along protecting a section of thick bamboo circumference evenly distributed, and the cylinder of guardrail stand is equipped with a set of iron chain hole from top to bottom, protects a section of thick bamboo top and is equipped with a set of iron chain from top to bottom, and the head end of every iron chain passes the iron chain hole that lies in same horizontal position department on the adjacent guardrail stand in proper order, forms closed annular protection chain with the chain ring swing joint of this iron chain.
2. The foldable recycled orifice protector of a bridge bored pile according to claim 1, characterized in that: the upper portion of protecting a section of thick bamboo and the lower part of guardrail stand are equipped with corresponding bolt hole respectively, and the guardrail stand is connected with protecting a section of thick bamboo through the fixing bolt with bolt hole complex.
3. The foldable recycled orifice protector of a bridge bored pile according to claim 2, characterized in that: the bolt holes at the lower part of the guardrail upright post are arranged in a matrix form.
4. The foldable recycled orifice protector of a bridge bored pile according to claim 1, characterized in that: the perimeter of each iron chain is larger than that of the protective cylinder.
5. The foldable recycled orifice protector of a bridge bored pile according to claim 1, characterized in that: the head end of the iron chain is provided with an iron chain hook, and the head end of the iron chain is movably connected with the chain ring through the iron chain hook.
6. The foldable recycled orifice protector of a bridge bored pile according to claim 1, characterized in that: the distance between two adjacent iron chains is not less than 40 cm.
7. The foldable recycled orifice protector of a bridge bored pile according to claim 1, characterized in that: the pile foundation steel pile casing is adopted as the casing.
CN202020914043.1U 2020-05-27 2020-05-27 Foldable and recyclable orifice protection device for bridge bored pile Active CN212562594U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020914043.1U CN212562594U (en) 2020-05-27 2020-05-27 Foldable and recyclable orifice protection device for bridge bored pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020914043.1U CN212562594U (en) 2020-05-27 2020-05-27 Foldable and recyclable orifice protection device for bridge bored pile

Publications (1)

Publication Number Publication Date
CN212562594U true CN212562594U (en) 2021-02-19

Family

ID=74633617

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020914043.1U Active CN212562594U (en) 2020-05-27 2020-05-27 Foldable and recyclable orifice protection device for bridge bored pile

Country Status (1)

Country Link
CN (1) CN212562594U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114960652A (en) * 2022-05-29 2022-08-30 五冶集团上海有限公司 Be used for digging into hole bored concrete pile drill way regularization protector soon

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114960652A (en) * 2022-05-29 2022-08-30 五冶集团上海有限公司 Be used for digging into hole bored concrete pile drill way regularization protector soon

Similar Documents

Publication Publication Date Title
CN212562594U (en) Foldable and recyclable orifice protection device for bridge bored pile
CN109252445A (en) Cast-in-situ Beam assembled Large Diameter Pipeline steel pipe support structure and its construction method
CN105672759A (en) Portable safety protective fence
CN214220847U (en) Retractable frame type isolation fence
CN210827475U (en) Safety protection net frame for pile foundation hole
CN213143929U (en) Guardrail bar is prevented in construction in room
CN201158792Y (en) Covering plate
CN211547365U (en) Recyclable orifice protection device for bridge percussion drill
CN114808973A (en) Foundation pit construction method for improving centering property of reinforcement cage based on foundation pit cover piece
CN215488411U (en) Base support of electric concrete core drilling machine for pavement engineering
CN214091318U (en) Movable type regularization protection guardrail
CN210239201U (en) Cart type elevator wellhead and hoistway protection device
CN208293437U (en) Cast-in-situ Beam assembled Large Diameter Pipeline steel pipe support structure
CN203497900U (en) Rail type elevator shaft protecting door
CN206512642U (en) A kind of easy-to-dismount municipal road isolating device
CN219951910U (en) Operation platform suitable for bored concrete pile well head detects operation
CN217538167U (en) Easy-to-mount-and-dismount foundation pit edge protective railing
CN213896748U (en) Highway guardrail decoration construction is with hanging basket
CN215518526U (en) Road protective fence assembled by waste tires
CN201268390Y (en) Chunk cover plate type hanging point
CN221029804U (en) Road both sides protector
CN214145345U (en) Simple and convenient formula ladder car suitable for subway construction
CN210032889U (en) Interim guardrail device of bridge construction
CN220598281U (en) Movable anti-collision concrete guardrail
CN215107551U (en) Interim protection machanism of stair

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant