CN114737809B CN202210185041.7A CN202210185041A CN114737809B CN 114737809 B CN114737809 B CN 114737809B CN 202210185041 A CN202210185041 A CN 202210185041A CN 114737809 B CN114737809 B CN 114737809B
Authority
CN
China
Prior art keywords
plastic concrete
pool
post
concrete post
wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202210185041.7A
Other languages
Chinese (zh)
Other versions
CN114737809A (en
Inventor
王静峰
郑瑞琪
郑九德
胡子明
刘学迅
闫凤涛
钟卓延
顾客
查甫生
沈奇罕
刘用
丁兆东
李国强
程安乐
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou Environmental Investment Conghua Environmental Protection Energy Co ltd
Hefei University of Technology
China Energy Construction Group Co Ltd
Original Assignee
China Energy Engineering Group Anhui No1 Electric Power Construction Co ltd
Guangzhou Environmental Investment Conghua Environmental Protection Energy Co ltd
Hefei University of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Energy Engineering Group Anhui No1 Electric Power Construction Co ltd, Guangzhou Environmental Investment Conghua Environmental Protection Energy Co ltd, Hefei University of Technology filed Critical China Energy Engineering Group Anhui No1 Electric Power Construction Co ltd
Priority to CN202210185041.7A priority Critical patent/CN114737809B/en
Publication of CN114737809A publication Critical patent/CN114737809A/en
Application granted granted Critical
Publication of CN114737809B publication Critical patent/CN114737809B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H7/00Construction or assembling of bulk storage containers employing civil engineering techniques in situ or off the site
    • E04H7/22Containers for fluent solids, e.g. silos, bunkers; Supports therefor
    • E04H7/24Constructions, with or without perforated walls, depending on the use of specified materials
    • E04H7/26Constructions, with or without perforated walls, depending on the use of specified materials mainly of concrete, e.g. reinforced concrete or other stone-like materials
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65FGATHERING OR REMOVAL OF DOMESTIC OR LIKE REFUSE
    • B65F1/00Refuse receptacles; Accessories therefor
    • B65F1/14Other constructional features; Accessories
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/66Sealings
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/66Sealings
    • E04B1/68Sealings of joints, e.g. expansion joints
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/66Sealings
    • E04B1/68Sealings of joints, e.g. expansion joints
    • E04B1/6801Fillings therefor
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02WCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO WASTEWATER TREATMENT OR WASTE MANAGEMENT
    • Y02W30/00Technologies for solid waste management
    • Y02W30/30Landfill technologies aiming to mitigate methane emissions

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
  • Sewage (AREA)

Abstract

The invention relates to the technical field of garbage pools, in particular to a large plastic concrete garbage pool. The invention comprises a tank body, wherein the tank bottom is divided into more than two sections of tank bottom reinforced concrete areas, and the adjacent tank bottom reinforced concrete areas are connected with each other through a tank bottom plastic concrete post-pouring belt; two ends of the pool bottom plastic concrete post-pouring belt are provided with pool wall plastic concrete post-pouring belts, the pool wall reinforced concrete areas are correspondingly arranged at the pool bottom reinforced concrete areas, and the pool wall reinforced concrete areas and the pool wall plastic concrete post-pouring belts are matched to form the pool wall; the upper surface department of bottom of pool plastic concrete post-cast strip concave is equipped with the holding tank, and the extension of cantilever form that the relative cell wall department of holding tank faced each other has the scale, all has the gap between two adjacent scale that cooperate each other and between the cantilever end of scale and the corresponding cell wall of holding tank. The invention not only concentrates sedimentation deformation and leakage phenomena by establishing the vulnerable section, but also can realize on-line monitoring of the vulnerable section timely and efficiently.

Description

Large plastic concrete combined garbage pool
Technical Field
The invention relates to the technical field of garbage pools, in particular to a large plastic concrete garbage pool.
Background
The construction of the large garbage pool is included in the construction of the garbage incineration plant, garbage in the garbage pool contains a large amount of heavy metals, and once the pool body leaks, serious pollution can be generated to the soil. The garbage pool has the characteristics of large volume and wide occupied area, in actual engineering, foundation conditions in the range of the pool body are complex, cast-in-situ work load is large, and concrete hydration heat influence is large, so that temperature deformation and uneven settlement deformation conditions are easy to generate in the service life of the pool body, cracks are generated along with the deformation conditions, and leakage problems occur. Because the soil body is located below the garbage pool and covered by the garbage pool, the problem of leakage of the garbage pool is difficult to find, and once the problem is found, the situation is very bad, so that the repair difficulty is high, and the problem needs to be solved.
Disclosure of Invention
The invention aims to overcome the defects of the prior art, provides a large plastic concrete combined garbage pool, not only concentrates sedimentation deformation and leakage phenomena by establishing a vulnerable section, but also can timely and efficiently realize on-line monitoring of the vulnerable section, and even can remedy the vulnerable section at the beginning of sedimentation deformation, and has the advantages of simple maintenance and repair.
In order to achieve the above purpose, the present invention adopts the following technical scheme:
the utility model provides a large-scale plastic concrete combination rubbish pond, includes the cell body, and the cell body includes bottom of the pool and pool wall, its characterized in that: the pool bottom is divided into more than two sections of pool bottom reinforced concrete areas, and the adjacent pool bottom reinforced concrete areas are connected with each other through a pool bottom plastic concrete post-pouring belt; two ends of the pool bottom plastic concrete post-pouring belt are provided with pool wall plastic concrete post-pouring belts, the pool wall reinforced concrete areas are correspondingly arranged at the pool bottom reinforced concrete areas, and the pool wall reinforced concrete areas and the pool wall plastic concrete post-pouring belts are matched to form the pool wall;
the upper surface of the pool bottom plastic concrete post-pouring belt is concavely provided with a containing groove with the length direction parallel to the length direction of the pool bottom plastic concrete post-pouring belt, cantilever-shaped extending scales are opposite to each other at the opposite groove walls of the containing groove, and the scales are parallel to each other and are arranged on the same plane; each scale at the same side groove wall of the accommodating groove is distributed in a comb tooth shape, scales at the groove walls of two opposite sides extend in opposite directions to form tooth surface meshed distribution, and gaps are reserved between two adjacent scales matched with each other and between the cantilever ends of the scales and the corresponding groove walls of the accommodating groove.
Preferably, scales for observing whether relative frustration occurs on two adjacent scales are arranged on the scales.
Preferably, the holding groove is covered with a layer of protective fence with a bearing function, and the protective fence is provided with an observation hole or a transparent observation window for observing the scales.
Preferably, the shape of the pool body is square box body shape, the pool bottom plastic concrete post-cast strip comprises a vertical plastic concrete post-cast strip extending along the length direction of the pool bottom and a transverse plastic concrete post-cast strip extending along the width direction of the pool bottom, the two groups of plastic concrete post-cast strips are mutually perpendicular to form a cross-shaped layout, and the transverse plastic concrete post-cast strip blocks the vertical plastic concrete post-cast strip, so that the vertical plastic concrete post-cast section is divided into more than two sections of post-cast units; the length direction of the scale on the transverse plastic concrete post-pouring belt is parallel to the length direction of the vertical plastic concrete post-pouring belt, and the length direction of the scale on the vertical plastic concrete post-pouring belt is parallel to the length direction of the transverse plastic concrete post-pouring belt.
Preferably, an extension rod is extended outwardly from the outer wall of the receiving groove, and the extension rod and the mesh reinforcement in the matched reinforced concrete area are fixed to each other.
Preferably, the scale extends in the length direction through the wall of the receiving groove and out of the outer wall of the receiving groove, the extension forming an extension rod which extends into the cooperating reinforced concrete area.
Preferably, the lowest part of the pool bottom is positioned at the post-pouring zone of the pool bottom plastic concrete; the holding tank constitutes simultaneously and is used for getting rid of the flowing back canal of leachate, and leachate is drained to outside liquid collecting device through the both ends notch of flowing back canal with leachate.
Preferably, the leachate guiding pipes are arranged at the position of the pool bottom plastic concrete post-pouring belt below the accommodating groove, the leachate guiding pipes are uniformly distributed in sequence along the length direction of the pool bottom plastic concrete post-pouring belt, and the liquid outlet ends of the leachate guiding pipes are communicated with external alarm equipment.
Preferably, haunching is uniformly distributed between the pool bottom plastic concrete post-pouring belt and the pool wall plastic concrete post-pouring belt and between the pool bottom reinforced concrete area and the pool wall reinforced concrete area.
The invention has the beneficial effects that:
1) The plastic concrete material has the advantages of small elastic modulus, good crack resistance and impermeability, good fluidity and cohesiveness, etc., and the elastic modulus can be as low as several tenths of that of common concrete. Plastic concrete has a limited application range, although it has a good deformability. Based on the above, the invention provides a plastic concrete combined garbage pool to solve the existing problems. The invention not only can concentrate sedimentation deformation and leakage phenomena by establishing the vulnerable section, but also can timely and efficiently realize on-line monitoring of the vulnerable section, and can remedy the vulnerable section even at the beginning of sedimentation deformation occurrence, and has the advantages of simple maintenance and repair.
2) Compared with the existing large garbage pool, the large garbage pool is artificially divided into a plurality of areas, and each area is uniformly connected by the relatively flexible plastic concrete post-pouring belt, so that the deformation coordination capacity of the whole structure is improved, and the capacity of resisting sedimentation and temperature deformation of the whole structure is increased.
3) The plastic concrete post-pouring belt is reasonably utilized, and matched with the scale with scales, so that the plastic concrete post-pouring belt has additional functions and is simpler in construction.
4) The strength of the plastic concrete post-pouring belt is lower than that of common concrete so as to form a vulnerable section. When the plastic concrete post-cast strip is subjected to large uneven deformation, the plastic concrete post-cast strip can crack at first, which is equivalent to providing protection for other areas, becomes a fuse of a structure, and ensures the integrity of other areas. Because the scales are arranged on the post-pouring zone of the plastic concrete at the bottom of the pool, if the pool body is required to crack, the contusion and the structural deformation are caused to occur firstly, and at the moment, the scales which are parallel to each other and positioned on the post-pouring zone of the plastic concrete at the bottom of the pool are displayed through the deviation of the scales, so that the invention has the advantages of early discovery and early solution.
5) The armpit is arranged in a large number in each area, so that the integrity of the area is ensured, the strength of the area is increased, and the fuse function of the plastic concrete post-cast strip is ensured. Meanwhile, due to the good integrity, the structural stability can be ensured under the condition that the plastic concrete post-cast strip needs to be dismantled and re-laid.
6) The scale forms a similar fence structure, and a protective fence can be arranged above the scale at the same time to protect the scale. Meanwhile, the containing groove arranged on the plastic concrete post-pouring belt also forms a liquid draining channel, so that the function of continuously collecting the leachate can be normally realized before seepage occurs, the relative dryness of garbage in the garbage pool is ensured, and the erosion effect of the leachate on the pool body is reduced. The accommodating groove can be integrally formed on the pool bottom plastic concrete post-pouring belt, or can be made of angle steel stainless steel independently and erected on the upper surface of the pool bottom plastic concrete post-pouring belt; the invention can be considered to adopt independent components, so that the containing groove can normally guide the leachate, and the self strength of the plastic concrete post-pouring belt is not increased, thereby achieving multiple purposes.
7) Even in the routine decontamination inspection process, the inspection of the staff gauge is omitted; once the leachate flows out of the leachate guide pipe, the crack of the plastic concrete post-cast strip serving as a fuse can be immediately judged, and the structural seepage is easy to find and repair in time.
8) The garbage pool provided by the invention has the advantages that the integrity and the strength of other areas, namely the reinforced concrete area, are high except the plastic concrete post-pouring area, and the plastic concrete post-pouring area needs to be repaired in the maintenance stage; the post-cast area formed by the plastic concrete post-cast strip has low strength and is easy to dismantle and re-arrange, thereby being beneficial to maintenance and repair.
Drawings
FIG. 1 is a schematic perspective view of the present invention;
FIG. 2 is a schematic view of the structure of the present invention during construction;
3-5 are mating state diagrams of the plastic concrete post-cast strip and the middle zone;
FIG. 6 is a diagram of the arrangement of a marker post;
FIG. 7 is a schematic view of the structure of the corner region;
fig. 8 is a schematic structural view of the middle region.
The actual correspondence between each label and the component name of the invention is as follows:
a-corner region b-middle region
11-reinforced concrete area at bottom of pool 12-reinforced concrete area at wall of pool
21-pool bottom plastic concrete post-cast strip 21 a-vertical plastic concrete post-cast strip
21 b-transverse plastic concrete post-cast strip 22-pool wall plastic concrete post-cast strip
31-receiving groove 32-scale 32 a-scale 33-extension rod
40-haunch
Detailed Description
For ease of understanding, the specific structure and operation of the present invention will be further described herein with reference to FIGS. 1-8:
in the embodiment shown in fig. 1-8, the present invention includes four corner regions a, several middle regions b, and five plastic concrete post-cast strips. Two plastic concrete post-cast strips form two groups of transverse plastic concrete post-cast strips 21b, and post-cast units represented by the other three plastic concrete post-cast strips are matched together to form a group of vertical plastic concrete post-cast strips 21a. The plastic concrete post-cast strips are positioned on each other, thereby playing the roles of connecting the corner area a and the middle area b and coordinating the deformation. The corner area a and the middle area b are formed by traditional reinforced concrete areas, so that the cell body has the required integrity and use strength.
As shown in fig. 1-2 and fig. 7, corner areas a are positioned at four corners of the tank body, and each corner area a consists of a reinforced concrete area 12 of two side tank walls and a reinforced concrete area 11 of one side tank bottom, and is formed by pouring commercially available impermeable concrete and reinforced concrete. During construction, the reinforced concrete areas 12 of the tank wall stand above the reinforced concrete areas 11 of the tank bottom and are connected with each other, and armors 40 are respectively arranged at the joint positions.
The middle area b is positioned in the middle section of the tank body, and consists of a reinforced concrete area 12 on one side of the tank wall and a reinforced concrete area 11 on the two sides of the tank bottom, and is formed by pouring commercially available impermeable concrete and reinforced steel bars. During construction, the reinforced concrete areas 12 of the tank wall stand above the reinforced concrete areas 11 of the tank bottom and are connected with each other, and armors 40 are respectively arranged at the joint positions.
The plastic concrete component comprises cement, expansive soil, clay, silica fume, fly ash, polyvinyl alcohol fiber, water reducing agent, stone, sand and the like. The pool bottom plastic concrete post-cast strips 21 and the pool bottom areas of the middle area b and the corner area a are flush with each other, and the pool wall plastic concrete post-cast strips 22 and the pool wall areas of the middle area b and the corner area a are flush with each other, so that the pool body shown in fig. 1-2 is finally formed.
For the plastic concrete post-cast strip, the wall part of the tank body is formed by casting a conventional reinforcing mesh and plastic concrete, and after the main body is formed by casting the reinforcing mesh and the plastic concrete, the tank bottom part is integrally or independently provided with a containing groove 31 as shown in fig. 2-6 at the upper surface of the tank bottom plastic concrete post-cast strip 21. The receiving groove 31 may be formed in an integral structure with the protective fence, but the protective fence may be installed at a later stage. The two opposite groove walls of the accommodating groove 31 form a tooth staggered matching structure through the scale 32 with the scale 32a in fig. 6, so that whether the whole structure is frustrated or not and the structure deformation condition can be judged through the deformation of the scale 32.
For the scaleplates 32, while the same plastic concrete post-cast strip is guaranteed to be parallel to each other, on one hand, the scaleplates 32 on the same plastic concrete post-cast strip need to be perpendicular to the length direction of the plastic concrete post-cast strip; on the other hand, each scale 32 may be directly cantilever-mounted at the side wall of the receiving groove 31, as shown in fig. 3 to 5, or may directly penetrate the receiving groove 31 and extend to the reinforced concrete area through the extension rod 33, as shown in fig. 6, so that the sensing range of the scale 32 can be further increased by sensing the stress variation of the reinforced concrete area. When the scale 32 is simply mounted on the receiving groove 31, the so-called extension rod 33 at the outer wall of the receiving groove 31 is actually a part of the reinforcing mesh of the reinforced concrete area, and the extension rod 33 is only fixed on the receiving groove 31, so that the effect of affecting the scale 32 can be achieved by the deformation of the reinforcing mesh, and the practical construction is easier.
It will be understood by those skilled in the art that the present invention is not limited to the details of the foregoing exemplary embodiments, but includes other specific forms of the same or similar structures that may be embodied without departing from the spirit or essential characteristics thereof. The present embodiments are, therefore, to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.
Furthermore, it should be understood that although the present disclosure describes embodiments, not every embodiment is provided with a separate embodiment, and that this description is provided for clarity only, and that the disclosure is not limited to the embodiments described in detail below, and that the embodiments described in the examples may be combined as appropriate to form other embodiments that will be apparent to those skilled in the art.
The technology, shape, and construction parts of the present invention, which are not described in detail, are known in the art.

Claims (7)

1. The utility model provides a large-scale plastic concrete combination rubbish pond, includes the cell body, and the cell body includes bottom of the pool and pool wall, its characterized in that: the pool bottom is divided into more than two sections of pool bottom reinforced concrete areas (11), and each two adjacent pool bottom reinforced concrete areas (11) are connected with each other through a pool bottom plastic concrete post-pouring belt (21); two ends of the pool bottom plastic concrete post-pouring belt (21) are provided with pool wall plastic concrete post-pouring belts (22), the pool bottom reinforced concrete areas (11) are correspondingly provided with pool wall reinforced concrete areas (12), and the pool wall reinforced concrete areas (12) and the pool wall plastic concrete post-pouring belts (22) are matched to form the pool wall;
the upper surface of the pool bottom plastic concrete post-pouring belt (21) is concavely provided with a containing groove (31) with the length direction parallel to the length direction of the pool bottom plastic concrete post-pouring belt (21), cantilever-shaped extending rulers (32) which are opposite to each other are arranged at the opposite groove walls of the containing groove (31), and all the rulers (32) are parallel to each other and are arranged on the same plane; each scale (32) positioned on the same side groove wall of the accommodating groove (31) is distributed in a comb tooth shape, the scales (32) positioned on the groove walls on two opposite sides extend in opposite directions to form tooth surface meshed distribution, and gaps are reserved between two adjacent scales (32) matched with each other and between the cantilever ends of the scales (32) and the corresponding groove walls of the accommodating groove (31);
a scale (32 a) for observing whether the two adjacent scales (32) are relatively frustrated is arranged on the scales (32);
the pool body is square box-shaped, the pool bottom plastic concrete post-cast strip (21) comprises a vertical plastic concrete post-cast strip (21 a) which is arranged along the length direction of the pool bottom and a transverse plastic concrete post-cast strip (21 b) which is arranged along the width direction of the pool bottom, the two groups of plastic concrete post-cast strips are perpendicular to each other so as to form a cross-shaped layout, and the transverse plastic concrete post-cast strip (21 b) blocks and cuts off the vertical plastic concrete post-cast strip (21 a), so that the vertical plastic concrete post-cast section is divided into more than two sections of post-cast units; the length direction of the scale (32) on the transverse plastic concrete post-pouring belt (21 b) is parallel to the length direction of the vertical plastic concrete post-pouring belt (21 a), and the length direction of the scale (32) on the vertical plastic concrete post-pouring belt (21 a) is parallel to the length direction of the transverse plastic concrete post-pouring belt (21 b);
a leachate guiding pipe is arranged at the position of the pool bottom plastic concrete post-pouring belt (21) below the accommodating groove (31).
2. The large plastic concrete composite refuse receptacle of claim 1, further comprising: the upper cover of the accommodating groove (31) is covered with a layer of protective fence which has a bearing function, and an observation hole or a transparent observation window for observing the scale (32 a) is simultaneously formed at the protective fence.
3. The large plastic concrete composite refuse receptacle of claim 1, further comprising: an extension rod (33) is outwardly extended from the outer wall of the accommodating groove (31), and the extension rod (33) and the reinforcing mesh in the matched reinforced concrete area are fixed with each other.
4. The large plastic concrete composite refuse receptacle of claim 1, further comprising: the scale (32) penetrates the wall of the accommodating groove (31) along the length direction and extends out of the outer wall of the accommodating groove (31), the extending part forms an extension rod (33), and the extension rod (33) extends into the matched reinforced concrete area.
5. A large plastic concrete composite refuse receptacle according to claim 1 or 2, characterized in that: the lowest part of the pool bottom is positioned at a post-pouring zone (21) of plastic concrete at the pool bottom; the accommodating groove (31) simultaneously forms a liquid draining channel for draining the leachate, and the leachate is drained to an external liquid collecting device through the notch at the two ends of the liquid draining channel.
6. A large plastic concrete composite refuse receptacle according to claim 1 or 2, characterized in that: the leachate guiding pipes are sequentially and uniformly distributed along the length direction of the pool bottom plastic concrete post-pouring belt (21), and the liquid outlet ends of the leachate guiding pipes are communicated with external alarm equipment.
7. A large plastic concrete composite refuse receptacle according to claim 1 or 2, characterized in that: haunched (40) are uniformly distributed between the pool bottom plastic concrete post-pouring belt (21) and the pool wall plastic concrete post-pouring belt (22) and between the pool bottom reinforced concrete area (11) and the pool wall reinforced concrete area (12).
CN202210185041.7A 2022-02-28 2022-02-28 Large plastic concrete combined garbage pool Active CN114737809B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202210185041.7A CN114737809B (en) 2022-02-28 2022-02-28 Large plastic concrete combined garbage pool

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202210185041.7A CN114737809B (en) 2022-02-28 2022-02-28 Large plastic concrete combined garbage pool

Publications (2)

Publication Number Publication Date
CN114737809A CN114737809A (en) 2022-07-12
CN114737809B true CN114737809B (en) 2023-09-15

Family

ID=82274882

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202210185041.7A Active CN114737809B (en) 2022-02-28 2022-02-28 Large plastic concrete combined garbage pool

Country Status (1)

Country Link
CN (1) CN114737809B (en)

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE4335877A1 (en) * 1993-10-18 1995-04-20 Betonwerk Rethwisch Gmbh Ballast-less superstructure with concrete sleepers
KR20030017901A (en) * 2001-08-25 2003-03-04 이현주 Construction Method of Clay Liner of Waste Land-fill Site
CN101220713A (en) * 2008-01-23 2008-07-16 浙江中成建工集团有限公司 No-leakage structure of steel reinforced concrete pool and well, and leakage preventing method
CN107298557A (en) * 2017-06-07 2017-10-27 重庆聚融建设(集团)股份有限公司 The concrete production method of building waste and waste water
CN111350268A (en) * 2018-12-23 2020-06-30 哈密西部建设有限责任公司 Construction method of concrete structure self-waterproof system in sewage treatment engineering
CN212105092U (en) * 2020-03-20 2020-12-08 广东万晖建设工程有限公司 Concrete pouring steel formwork for highway bridge
CN112663774A (en) * 2021-01-18 2021-04-16 中铁八局集团有限公司 Construction method of unbonded prestressed large-diameter reinforced concrete thin-wall circular water tank
CN113588877A (en) * 2021-07-16 2021-11-02 中国能源建设集团安徽电力建设第一工程有限公司 Concrete garbage tank body seepage and corrosion monitoring early warning system

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE4335877A1 (en) * 1993-10-18 1995-04-20 Betonwerk Rethwisch Gmbh Ballast-less superstructure with concrete sleepers
KR20030017901A (en) * 2001-08-25 2003-03-04 이현주 Construction Method of Clay Liner of Waste Land-fill Site
CN101220713A (en) * 2008-01-23 2008-07-16 浙江中成建工集团有限公司 No-leakage structure of steel reinforced concrete pool and well, and leakage preventing method
CN107298557A (en) * 2017-06-07 2017-10-27 重庆聚融建设(集团)股份有限公司 The concrete production method of building waste and waste water
CN111350268A (en) * 2018-12-23 2020-06-30 哈密西部建设有限责任公司 Construction method of concrete structure self-waterproof system in sewage treatment engineering
CN212105092U (en) * 2020-03-20 2020-12-08 广东万晖建设工程有限公司 Concrete pouring steel formwork for highway bridge
CN112663774A (en) * 2021-01-18 2021-04-16 中铁八局集团有限公司 Construction method of unbonded prestressed large-diameter reinforced concrete thin-wall circular water tank
CN113588877A (en) * 2021-07-16 2021-11-02 中国能源建设集团安徽电力建设第一工程有限公司 Concrete garbage tank body seepage and corrosion monitoring early warning system

Also Published As

Publication number Publication date
CN114737809A (en) 2022-07-12

Similar Documents

Publication Publication Date Title
CN105297630A (en) Construction method for double-component steel tubes of main arch arcs
CN109537468A (en) Cast-in-place support construction method in a kind of ultrahigh water
CN108914963A (en) Assembled arcading barricade
CN114737809B (en) Large plastic concrete combined garbage pool
CN206420870U (en) A kind of Geotechnical Engineering multifunction test slot device
CN209652936U (en) A kind of artificial push pipe inspection shaft steel plate box pattern foundation pit supporting structure
CN109406759A (en) A kind of multi-functional geotechnical engineering test model case of assembled
Sereshkeh et al. Induced settlement reduction of adjacent masonry building in residential constructions
CN108225432A (en) Refuse landfill cut-pff wall model measurement device and preparation method thereof
CN209231334U (en) A kind of multi-functional geotechnical engineering test model case of assembled
CN208009473U (en) The integrated concrete pipe gallery in braced wall corridor
CN110258630A (en) A kind of underground pipe gallery float Structure and its antifloating computation method
CN110565549A (en) New bridge dismantling process for urban viaduct
CN212612442U (en) Concrete anticorrosion device
CN114527022B (en) Red mud-based cementing material road environment evaluation simulation system and method
CN211346660U (en) Tripod for quickly measuring V-shaped groove
CN211061207U (en) Rectangular large-section pipe curtain underground excavation method simulation device
CN216839039U (en) Multi-span crossover continuous beam combined support
CN114197476B (en) Construction method for deep foundation pit-mouth-shaped support of transfer section of urban railway underground station
Wu et al. Application research of prestressed high strength concrete pipe pile in construction
CN217782295U (en) Simple and easy apron is contained
Lourenço et al. Strengthening of masonry arch bridges: research and applications
CN216749007U (en) Nondestructive testing training base
CN219364545U (en) A operation platform for construction of large-scale pile foundation cushion cap on water
CN118257304A (en) Method for reinforcing uneven settlement of existing main building and auxiliary building of integral raft foundation

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address

Address after: No. 193, Tunxi Road, Hefei City, Anhui Province

Patentee after: Hefei University of Technology

Patentee after: China Energy Construction Group Co.,Ltd.

Patentee after: Guangzhou environmental investment Conghua environmental protection energy Co.,Ltd.

Address before: Tunxi road in Baohe District of Hefei city of Anhui Province, No. 193 230009

Patentee before: Hefei University of Technology

Patentee before: China Energy Engineering Group Anhui No.1 Electric Power Construction Co.,Ltd.

Patentee before: Guangzhou environmental investment Conghua environmental protection energy Co.,Ltd.