CN206420870U - A kind of Geotechnical Engineering multifunction test slot device - Google Patents
A kind of Geotechnical Engineering multifunction test slot device Download PDFInfo
- Publication number
- CN206420870U CN206420870U CN201621367515.6U CN201621367515U CN206420870U CN 206420870 U CN206420870 U CN 206420870U CN 201621367515 U CN201621367515 U CN 201621367515U CN 206420870 U CN206420870 U CN 206420870U
- Authority
- CN
- China
- Prior art keywords
- test
- geotechnical engineering
- wall
- slot device
- interior panel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Investigating Strength Of Materials By Application Of Mechanical Stress (AREA)
Abstract
The utility model discloses a kind of Geotechnical Engineering multifunction test slot device, including test flume and vertical demarcation strip;Wherein, multiple necks are provided with the test flume, the vertical demarcation strip can be placed in the neck.The beneficial effects of the utility model are:The test flume can enclose multiple test spaces, can form multiple function scheme, realize the efficient utilization of experimental rig, and Multitest project can be carried out simultaneously, greatly save the Geotechnical Engineering pilot project cycle;According to different experimental study targets, pass through two and three dimensions test space needed for various combination formation experiment.
Description
Technical field
The utility model is related to Geotechnical Engineering multifunction test systems technology field, and in particular to a kind of many work(of Geotechnical Engineering
The experiment slot device of energy pilot system.
Background technology
Geotechnical Engineering multifunction test system is to be applied to the experiment in the fields such as Geotechnical Engineering, underground engineering, mineral engineering
Research device, is the infrastructure and device systems of experimental study.Geotechnical Engineering multifunction test slot device is that Geotechnical Engineering is more
A part for functional breadboard system.
Rock And Soil is the product of nature, and its forming process, material composition and engineering characteristic are extremely complex, and
With stress, stress history, loading speed and drainage condition etc. difference and become more complicated.So, it is all kinds of in progress
Before project design and construction, it is necessary to carry out soil test and in-situ test to the Rock And Soil in place where engineering project,
To be fully understood by and grasp the physical and mechanical properties of Rock And Soil, so that provide must for the correct evaluation of place Geotechnical Engineering condition
The foundation wanted.With developing rapidly for China's modernization construction cause, new, higher want is proposed to Geotechnical Engineering measuring technology
Ask.Such as heavy_weight factory, high level, high-rise building, large-scale hydropower complex, railway, highway bridge and tunnel and civil building
Construction it is whether economical, rationally, largely depend on the engineering properties of ground.A geotechnical engineering problems are solved well,
It must be reconnoitred and be tested first, be tested with analyzing, and using the theory and method of soil mechanics, engineering geology etc., to each
Class civil engineering carries out systematic Study.Therefore, soil test is the previous work of Geotechnical Engineering planning and designing, be also ground with
Indispensable key link in basic engineering work.All engineering construction projects, including skyscraper, highway, machine
The construction in field, railway, tunnel etc., all has close relationship with their rely Rock And Soils of presence, largely depends on
Enough bearing capacities can be provided in Rock And Soil, be unlikely to depending on engineering structure by the settlement of foundation and difference more than permission
Deformation etc., and the parameter during foundation bearing capacity and foundation deformation are calculated is mainly what is determined by soil test, therefore, geotechnique
Experiment is indispensable for all kinds of Engineering Project Constructions.
Geotechnical Engineering multifunction test system is to study the important means of large-scale geotechnical engineering problems, has at home and abroad been obtained
Extensive use, and played important function in engineering scientific research, design and demonstration.In the world as the U.S., Britain, Germany, meaning are big
The developed countries such as profit, Japan, Norway have all successively carried out the Test And Research Work of Geotechnical Engineering multifunction test system, for stake
Native collective effect, the rock for accepting stable mechanism, efficiency of pile groups, large-scale mine roof rock, dam and the dam foundation of various stakes
The engineering problems such as body stabilization, huge underground cavity adjoining rock stability and supporting, have carried out fruitful research work, and have developed corresponding
Testing equipment;The country is such as Ground based studies institute of Chinese Research Institute for Building Sciences, Wuhan rock-soil mechanics research institute, Headquarters of the General Staff engineer section
Grind institute, Tsing-Hua University, University of Science & Technology, Beijing, Hohai University, Railway Institutes Of Shijiazhuang, Beijing Inst. of Civil Engineering & Arch, Tongji University,
The units such as Shandong University, have all successively carried out the research work of this respect, have developed scale and do not wait multifunction test system.
It is as follows the characteristics of test flume in all kinds multifunction test system:
1. big-and-middle-sized test flume typically uses reinforced concrete structure, entity steel construction;Small type groove be generally simply test pits,
Fiberglass steel-frame structure.
2. test flume is using embedding two kinds of forms above and below the ground.Reduced size test flume is typically directly made model casing and put
In ground;Larger test flume typically uses reinforced concrete structure, and bottom land absolute altitude is located at less than ± 0.000, the examination of underground buried
Check of foundation subsoil is easy to soil test to operate.The big-and-middle test flume of ground is placed in, there are two kinds of forms of reinforced concrete structure and steel construction, it is right
The rigidity of structure, intensity requirement are higher;The test flume major defect for being placed in ground is detrimental to soil test operation.
3. test flume planar dimension has rectangle and square two kinds, encloses two-dimensional space (such as:1.4m × 3m) or it is three-dimensional
Space is (such as:4.0m×5.0m;1.6m × 1.3m etc.).
4. test flume is generally single test groove, is only capable of carrying out a pilot project.
5. most of test flume (or experimental rig) size is fixed, and test space can not be adjusted.Large-scale experiment groove does smaller
During experiment, demarcation strip earth-retaining is typically used at random according to test requirements document, the test space required for being formed.Demarcation strip is generally entirety
Demarcation strip, is made using steel plate or poly (methyl methacrylate) plate.
6. the box-type rack installation of the development such as Shandong University Zhang Qiangyong realizes size adjustable, all cast steel boxlike structures of stand
Part is assembled, but cost is larger, and size adjusting needs to re-assembly stand.
7. mode is tamped in the transport of experiment earth material and layering:It is generally directly to be operated in test flume, layering is banketed
It is more difficult with test operation.The concrete test groove that Hohai University's Liu Hanlong is developed reserves door opening in side wall, is filled out in experiment
When native, the reinforced concrete gate of door opening piecemeal is closed;The box-type rack installation of the developments such as Shandong University Zhang Qiangyong can be reserved
One side wall, by the way of layering assembled box type component, to facilitate, earth material is transported and layering is tamped, but assembled box type component
Workload is larger.
8. experimental observation mode:The small-scale test groove for doing building enclosure using lucite can be observed directly, large-scale coagulation
Soil box or steel construction groove can not be realized to be observed in side, and the large-sized concrete groove of Liu Hanlong development is used to be set in wall diverse location
Put fixed emissive plastic glazing and solve this problem.But its structure is excessively complicated.
Utility model content
To solve Geotechnical Engineering multifunction test slot device of the prior art existing hypogee can not be made full use of empty
Between, be not easy to soil test operation, experiment slot space it is non-adjustable, can not be while carrying out the defect of Multitest, the utility model
A kind of Geotechnical Engineering multifunction test slot device is provided, the test flume is the reinforced concrete structure groove for being placed in below ground,
The existed building underground space is made full use of, is easy to soil test to operate;Multiple experiment slot spaces can be enclosed, and according to difference
Experimental study target, the two dimension formed needed for experiment by different combining forms or three dimensional taest space;Realize test flume
Spatial scalability, flexible operating space is provided for the experimental study of various size forms;The purpose efficiently utilized can be realized,
And Multitest project can be carried out simultaneously.
To achieve the above object, the technical solution adopted in the utility model is:
A kind of Geotechnical Engineering multifunction test slot device, including test flume and vertical demarcation strip;Wherein,
Multiple necks are provided with the test flume, the vertical demarcation strip can be placed in the neck.
It is preferred that, the test flume is the reinforced concrete structure groove for being placed in below ground.
The test flume of the Geotechnical Engineering multifunction test slot device is the reinforced concrete structure groove for being placed in below ground,
The existed building underground space is made full use of, is easy to soil test to operate;Multiple experiment slot spaces can be enclosed, and according to difference
Experimental study target, the two dimension formed needed for experiment by different combining forms or three dimensional taest space;Realize test flume
Spatial scalability, flexible operating space is provided for the experimental study of various size forms;The purpose efficiently utilized can be realized,
And Multitest project can be carried out simultaneously.
It is preferred that, the test flume is rectangular channel, and it includes two long abutment walls and two short side walls;Wherein,
Described two short side walls are respectively the first short side wall and the second short side wall.
It is preferred that, one end of the close first short side wall is arranged with many on the two long abutment wall cell wall of the test flume
Root is used for the vertical channel-section steel for forming the neck.
It is preferred that, symmetrically set in one end close to the second short side wall at the top of the two long abutment wall cell wall of the test flume
There are two one steel rails.
It is preferred that, the rigidity that the Geotechnical Engineering multifunction test slot device also includes being installed in the test flume is pushed away
The position corresponding with the rail is provided with roller bearing in plate, the rigid push pedal.
It is preferred that, the second short side wall chase wall is provided with sleeper, is used as counter force wall.
It is preferred that, along two long abutment walls provided with two symmetrical T-shaped chutes at the top of the groove of the test flume.
It is preferred that, the vertical demarcation strip includes at least one piece baffle plate;Wherein,
The baffle plate includes metallic framework and the first wall interior panel, and first wall interior panel is fixed in the metallic framework one
Side.
It is preferred that, the first wall interior panel bottom offers multiple permeable holes;On first wall interior panel with it is described permeable
The corresponding position in hole is provided with the second wall interior panel, and first wall interior panel and the second wall interior panel detachable connection;
First wall interior panel and second wall interior panel are poly (methyl methacrylate) plate.
The equal scale of construction of every piece of baffle plate of the vertical demarcation strip is appropriate, easy for installation;The vertical demarcation strip can realize piecemeal
Layering is installed, and is easy to test operation;The vertical demarcation strip has perspectivity, is easy to observation experiment phenomenon.
The beneficial effects of the utility model are:
Test flume:The test flume can enclose multiple test spaces, can form multiple function scheme, realize experiment dress
The efficient utilization put, Multitest project can be carried out simultaneously, greatly save the Geotechnical Engineering pilot project cycle;According to different examinations
Goal in research is tested, passes through two and three dimensions test space needed for various combination formation experiment.
Vertical demarcation strip:The vertical demarcation strip includes polylith baffle plate, can realize that tile and hierarchy is installed, meet geotechnological examination
The characteristics of testing hierarchical operations, often completes the soil body compacting and the embedding work of experimental rig of 0.4m height, you can under installation during experiment
One piece of baffle plate, the work of next layer of progress, test operation is very convenient;Every piece of baffle plate scale of construction is smaller, easy for installation, baffle plate and gear
It is accurate to be docked between plate;Baffle plate uses poly (methyl methacrylate) plate, with perspectivity, is easy to viewing test process;Every piece of baffle plate is installed
Flexibly, baffle plate is mountable in the vertical channel-section steel that reinforced concrete structure groove both sides are provided with for position, and installing particular location can basis
Different experimental designs is determined.
Rigid push pedal:The rigid push pedal integral rigidity is big, can fix and can realize moving horizontally at an arbitrary position;Institute
Stating rigid push pedal can be used in vertical load test as common dividing plate, and rigid push pedal simulation is used as in horizontal addload experiment
Soil compaction effect, rigid push pedal, which is withdrawn, can simulate rigid retaining wall displacement, widen experimental study field.
Brief description of the drawings
Fig. 1 is the structural representation of the Geotechnical Engineering multifunction test slot device of the utility model embodiment;
Fig. 2 is the structural representation of the vertical demarcation strip of the utility model embodiment;
Fig. 3 is the structure diagram of the rigid push pedal of the utility model embodiment (roller bearing is not shown);
Fig. 4 to Fig. 9 is test flume, vertical demarcation strip and the rigidity of a variety of test combinations schemes of the utility model embodiment
The structure diagram of the top view of push pedal (rail is not shown).
In figure,
1- test flumes;11- necks;12- the first short side walls;13- the second short side walls;14- rail;15- sleeper;16-T types are slided
Groove;The long abutment walls of 17-;The vertical demarcation strips of 2-;21- baffle plates;211- metallic frameworks;The wall interior panels of 212- first;2121- permeable holes;
The wall interior panels of 213- second;3- rigidity push pedals;31- roller bearings;32- suspension hooks.
Embodiment
Explanation is explained in detail to structure of the present utility model below in conjunction with the accompanying drawings.
As shown in Figure 1 to Figure 3, a kind of Geotechnical Engineering multifunction test slot device that the utility model embodiment is provided, institute
The design for stating test flume 1 meets that various equipment are installed and experiment loading is required, with adjustability it is strong, it is easy to operate the characteristics of, energy
Enough utilize the existing house underground space.
A kind of Geotechnical Engineering multifunction test slot device that the utility model embodiment is provided, the test flume 1 is designed as
It is placed in the reinforced concrete structure groove of below ground.Dead size 4.6m*2.0m* in structure overall size 5.4m*3.4m*2.0m, groove
1.6m, bottom land absolute altitude -1.6m.The size design of test flume 1 had both considered test space requirement, it is contemplated that existing building structure is empty
Between restrictive condition.
A kind of Geotechnical Engineering multifunction test slot device that the utility model embodiment is provided, the test flume 1 is rectangle
Groove, it includes two long abutment wall 17 and two short side walls;Wherein, described two short side walls are respectively the first short side wall 12 and second
Short side wall 13.
The two long cell wall of abutment wall 17 of the test flume 1 is in distance the first short side wall 121m, 1.5m, 2m, 2.5m position
The symmetrical pre-buried eight vertical channel-section steels in place, are used as the neck 11 for installing experiment baffle plate 21.By installing baffle plate 21, shape in diverse location
Into different test spaces.
Along the two long symmetrical T-shaped chute 16 of abutment wall 17 pre-buried two at the top of the groove of the test flume 1.
A kind of Geotechnical Engineering multifunction test slot device that the utility model embodiment is provided, described two long grooves of abutment wall 17
Risen at the top of wall in the 700mm positions of the second short side of distance wall 13, symmetrical pre-buried two 1m gapless lines 14, for installing the rigidity
Push pedal 3, the rigid push pedal 3 can be fixed at an arbitrary position, and the rigid push pedal 3 also can be by the roller bearing 31 along the rail
14 realizations are moved horizontally.
A kind of Geotechnical Engineering multifunction test slot device that the utility model embodiment is provided, the groove of the second short side wall 13
Wall is provided with sleeper 15, with concrete walls collective effect, is used as counter force wall.The design of reinforced concrete structure groove cell wall is main to be considered
Intensity and detailing requiments.The longitudinal wall thickness of test flume 1 designs the detailing requiments for considering pre-buried rail 14 first.Intensity is according to two
The design of the method for kind.Method 1, calculates bending resistance shearing strength according to cantilever member as computing unit so that 1m is wide, calculates arrangement of reinforcement;Side
Method 2, every block of wallboard fixes one side cantilever slab according to three sides and calculates wallboard span centre and bearing bending strength, calculates arrangement of reinforcement.By method 1
Integrated with the result of calculation of method 2, the long abutment wall 17 of design experiment groove 1 and the ectonexine reinforcing bar and top rebars of short side wall.
A kind of Geotechnical Engineering multifunction test slot device that the utility model embodiment is provided, the rigid push pedal 3 is used
30mm thickness Q235 steel makes, and structure space size is 2m*1.6m, reserves alignment error size, and the horizontal thrust that can be born reaches
To 60T.Roller bearing 31 is installed in the rigid push pedal 3, the rigid push pedal 3 is slided along the rail 14 of the test flume 1.
The top of rigid push pedal 3 is additionally provided with two suspension hooks 32, is installed in order to the lifting of the rigid push pedal 3.
A kind of Geotechnical Engineering multifunction test slot device that the utility model embodiment is provided, the vertical demarcation strip 2 is wrapped
Four pieces of transparent baffle plates 21 are included, every piece of length of baffle plate 21 is 2m, is highly 0.4m, the size of vertical demarcation strip 2 formed after combination
For 2m*1.6m.Lattice steel skeleton is designed as the metallic framework 211 of stress, one side is installed poly (methyl methacrylate) plate and enclosed as first
Backplate 212.
A kind of Geotechnical Engineering multifunction test slot device that the utility model embodiment is provided, the baffle plate 21 can piecemeal peace
Loaded in the symmetrical pre-buried vertical channel-section steel of test flume 1, required position is arranged on according to test space requirement.Wherein two pieces baffle plates 21
It is designed as the baffle plate 21 of porous.Arranging that two rows are permeable at the first wall interior panel 212 the lower edge 105mm and 155mmm
Hole 2121, the spacing of permeable hole 2121 is 50mm, a diameter of 10mm of permeable hole 2121.It is being provided with the first wall interior panel of permeable hole 2121
212 outsides, are provided with the second wall interior panel 213, and second wall interior panel 213 is also poly (methyl methacrylate) plate, is screwed in described
On first wall interior panel, the experiment for not needing draining.
As shown in Fig. 4 to Fig. 9, a kind of Geotechnical Engineering multifunction test slot device that the utility model embodiment is provided, institute
State two-dimentional test space finger to finger test space plane size:Length/width >=2;The three dimensional taest space finger to finger test space plane size:
Length/width<2.In 6 groups of function schemes as shown in Fig. 4 to Fig. 9, groove a, groove H-shaped form three-dimensional examination into two-dimentional test space, groove b-g
Testing space, (into Fig. 9, a, b, c, d, e, f, g, h represent groove a, groove b, groove c, groove d, groove e, groove f, groove g, groove h) to Fig. 4 respectively.
Preferred embodiment of the present utility model is these are only, it is all in this practicality not to limit the utility model
Any modification, equivalent substitution and simple modifications for being made in new substantive content etc., should be included in protection of the present utility model
Within the scope of.
Claims (10)
1. a kind of Geotechnical Engineering multifunction test slot device, it is characterised in that including test flume (1) and vertical demarcation strip (2);Its
In,
Multiple necks (11) are provided with the test flume (1), the vertical demarcation strip (2) can be placed in the neck (11).
2. Geotechnical Engineering multifunction test slot device according to claim 1, it is characterised in that the test flume (1) is
It is placed in the reinforced concrete structure groove of below ground.
3. Geotechnical Engineering multifunction test slot device according to claim 1, it is characterised in that the test flume (1) is
Rectangular channel, it includes two long abutment wall (17) and two short side walls;Wherein,
Described two short side walls are respectively the first short side wall (12) and the second short side wall (13).
4. Geotechnical Engineering multifunction test slot device according to claim 3, it is characterised in that the test flume (1)
Being arranged with many close to one end of the first short side wall (12) on two long abutment wall (17) cell wall is used to form the neck
(11) vertical channel-section steel.
5. Geotechnical Engineering multifunction test slot device according to claim 3, it is characterised in that the test flume (1)
At the top of two long abutment wall (17) cell wall two one steel rails (14) are arranged with one end close to the second short side wall (13).
6. Geotechnical Engineering multifunction test slot device according to claim 5, it is characterised in that many work(of Geotechnical Engineering
Can test slot device also include being installed on rigid push pedal (3) in the test flume (1), the rigid push pedal (3) with it is described
The corresponding position of rail (14) is provided with roller bearing (31).
7. Geotechnical Engineering multifunction test slot device according to claim 3, it is characterised in that the second short side wall
(13) cell wall is provided with sleeper (15).
8. Geotechnical Engineering multifunction test slot device according to claim 3, it is characterised in that the test flume (1)
Along two long abutment wall (17) provided with two symmetrical T-shaped chutes (16) at the top of groove.
9. Geotechnical Engineering multifunction test slot device according to claim 1, it is characterised in that the vertical demarcation strip
(2) at least one piece baffle plate (21) is included;Wherein,
The baffle plate (21) includes metallic framework (211) and the first wall interior panel (212), and first wall interior panel (212) is fixed in
Metallic framework (211) side.
10. Geotechnical Engineering multifunction test slot device according to claim 9, it is characterised in that first wall interior panel
(212) bottom offers multiple permeable holes (2121);It is corresponding with the permeable hole (2121) on first wall interior panel (212)
Position the second wall interior panel (213) is installed, and first wall interior panel (212) and second wall interior panel (213) are detachable
Formula is connected;First wall interior panel (212) and second wall interior panel (213) are poly (methyl methacrylate) plate.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621367515.6U CN206420870U (en) | 2016-12-13 | 2016-12-13 | A kind of Geotechnical Engineering multifunction test slot device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621367515.6U CN206420870U (en) | 2016-12-13 | 2016-12-13 | A kind of Geotechnical Engineering multifunction test slot device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206420870U true CN206420870U (en) | 2017-08-18 |
Family
ID=59575852
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201621367515.6U Expired - Fee Related CN206420870U (en) | 2016-12-13 | 2016-12-13 | A kind of Geotechnical Engineering multifunction test slot device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206420870U (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106526134A (en) * | 2016-12-13 | 2017-03-22 | 华北科技学院 | Multifunctional testing tank device for geotechnical engineering |
CN110780039A (en) * | 2019-10-28 | 2020-02-11 | 西安科技大学 | Coal mining ecological damage mechanism simulation test system |
CN112098628A (en) * | 2020-09-16 | 2020-12-18 | 哈尔滨工业大学 | Multifunctional soil tank for comprehensive test of lunar soil performance |
CN112213464A (en) * | 2020-09-17 | 2021-01-12 | 中煤科工集团北京土地整治与生态修复科技研究院有限公司 | Similar material simulation experiment device and experiment method thereof |
-
2016
- 2016-12-13 CN CN201621367515.6U patent/CN206420870U/en not_active Expired - Fee Related
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106526134A (en) * | 2016-12-13 | 2017-03-22 | 华北科技学院 | Multifunctional testing tank device for geotechnical engineering |
CN110780039A (en) * | 2019-10-28 | 2020-02-11 | 西安科技大学 | Coal mining ecological damage mechanism simulation test system |
CN112098628A (en) * | 2020-09-16 | 2020-12-18 | 哈尔滨工业大学 | Multifunctional soil tank for comprehensive test of lunar soil performance |
CN112213464A (en) * | 2020-09-17 | 2021-01-12 | 中煤科工集团北京土地整治与生态修复科技研究院有限公司 | Similar material simulation experiment device and experiment method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206420870U (en) | A kind of Geotechnical Engineering multifunction test slot device | |
CN103452144B (en) | Large-scale three-dimensional comprehensive simulation test bench for geotechnical engineering | |
Fan et al. | Tunnel deformation and stress response under the bilateral foundation pit construction: A case study | |
Chen et al. | Shaking table test of utility tunnel under non-uniform earthquake wave excitation | |
Shi et al. | Interaction between a large-scale triangular excavation and adjacent structures in Shanghai soft clay | |
CN106769404A (en) | A kind of Geotechnical Engineering multifunction test system | |
CN107179396A (en) | Multifunctional built-up formula Geotechnical Engineering physics similar test system | |
CN102175533A (en) | Ultra-large type geotechnical engineering three-dimensional model test system | |
El Sawwaf et al. | The effect of deep excavation-induced lateral soil movements on the behavior of strip footing supported on reinforced sand | |
CN107119731A (en) | Foundation ditch group excavates the model test apparatus to close to buildings deformation effect | |
CN201983987U (en) | Extra-large geotechnical engineering three-dimensional model test system | |
Korusiewicz et al. | Behaviour of the steel box-type culvert during backfilling | |
CN208685680U (en) | A kind of geosynthetic reinforced pile supported embankments on soft soil model test apparatus | |
CN206430975U (en) | A kind of Geotechnical Engineering multifunction test system | |
Zhou et al. | Deformation characteristics and failure evolution process of the existing metro station under unilateral deep excavation | |
CN102828531B (en) | System and construction method for realizing digging and measuring of diaphragm wall trench in geotechnical centrifugal model test | |
CN201266124Y (en) | Self-balancing type true three-dimensional loading model testing bench frame with sliding wall | |
CN106526134A (en) | Multifunctional testing tank device for geotechnical engineering | |
CN209841545U (en) | Geotechnical model test box for simulating multiple working conditions | |
Chen et al. | Model test and numerical simulation on rigid load shedding culvert backfilled with sand | |
Xu et al. | Centrifuge study of reinforced soil walls with different backfill compaction densities | |
CN208902713U (en) | Ground preloading influences the indoor model test device of existing subway tunnel | |
Liu et al. | Experimental analysis on the interaction between underground structures and sand layer under groundwater level change | |
CN206430974U (en) | A kind of Geotechnical Engineering multifunction test system and its horizontal addload system | |
CN206220137U (en) | A kind of experimental provision for measuring and analyzing banket steel-pipe pile sedimentation and emergent property |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170818 Termination date: 20201213 |