CN114482618A - Construction method for static force demolition of reinforced concrete structure - Google Patents

Construction method for static force demolition of reinforced concrete structure Download PDF

Info

Publication number
CN114482618A
CN114482618A CN202210008981.9A CN202210008981A CN114482618A CN 114482618 A CN114482618 A CN 114482618A CN 202210008981 A CN202210008981 A CN 202210008981A CN 114482618 A CN114482618 A CN 114482618A
Authority
CN
China
Prior art keywords
reinforced concrete
cut
cutting
concrete structure
hoisting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202210008981.9A
Other languages
Chinese (zh)
Inventor
张喜滨
肖勇
王闯
孙玲萍
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CNNC Huachen Construction Engineering Co Ltd
Original Assignee
CNNC Huachen Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CNNC Huachen Construction Engineering Co Ltd filed Critical CNNC Huachen Construction Engineering Co Ltd
Priority to CN202210008981.9A priority Critical patent/CN114482618A/en
Publication of CN114482618A publication Critical patent/CN114482618A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00Working measures on existing buildings
    • E04G23/08Wrecking of buildings

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Chemical & Material Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Electrochemistry (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Working Measures On Existing Buildindgs (AREA)

Abstract

The invention discloses a construction method for dismantling a static force of a reinforced concrete structure, which is characterized by constructing a working site aiming at the reinforced concrete structure to be cut and measuring the size of the reinforced concrete structure to be cut; determining the block division of the cutting part; determining a cutting sequence based on the division of the cutting part, and hoisting the part to be cut of the partitioned reinforced concrete structure by using hoisting equipment; fixing the wire saw in place based on the cutting position; starting the wire saw to cut the cutting part; hoisting the cut reinforced concrete part by hoisting equipment and placing the cut reinforced concrete part outside a cutting workplace in a centralized manner; and transferring a plurality of reinforced concrete cutting parts outside the working site to a reasonable site for crushing treatment, and finishing the whole static force dismantling construction at the moment. The invention can realize the static separation of the reinforced concrete structure, has high cutting efficiency in the separation and cutting process, is safe and reliable, and is beneficial to popularization and application.

Description

Construction method for static force demolition of reinforced concrete structure
Technical Field
The invention relates to the technical field, in particular to a construction method for dismantling a static force of a reinforced concrete structure.
Background
At present, the concrete structure is dismantled mainly by breaking the concrete structure with a pneumatic pick breaking hammer and the like, and then cutting off the steel bars with steel bar cutting equipment to complete the dismantling of the reinforced concrete structure. The method mainly achieves the purpose of destroying the concrete structure by carrying out integral vibration crushing on the concrete structure through a tool, has larger integral vibration on the concrete structure, causes the concrete to present damage in a range, and can cause an uncontrollable structural destruction surface for reinforced concrete members except for the position needing to be removed. Therefore, a construction method for dismantling the static force of the reinforced concrete structure is provided.
Disclosure of Invention
The invention aims to solve the defects in the prior art and provides a static force dismantling construction method for a reinforced concrete structure.
In order to achieve the purpose, the invention adopts the following technical scheme:
a construction method for dismantling a static force of a reinforced concrete structure comprises the following steps:
s1: building a working site for the reinforced concrete structure to be cut, and measuring the size of the reinforced concrete structure to be cut;
s2: carrying out block ink fountain snapping line division on a reinforced concrete structure to be cut based on the hoisting tonnage of hoisting equipment, and determining block division of a cutting part;
s3: determining a cutting sequence based on the division of the cutting part, hoisting the part to be cut of the partitioned reinforced concrete structure by using hoisting equipment, and ensuring that a hoisting rope is in a stressed state;
s4: fixing the wire saw in place based on the cutting position;
s5: threading a fine steel wire saw between the cutting part and the wire saw machine, and starting the wire saw machine to cut the cutting part;
s6: after cutting, hoisting the cut reinforced concrete parts by using hoisting equipment, intensively placing the cut reinforced concrete parts outside a cutting working site, and sequentially cutting the subsequent parts to be cut based on the cutting sequence determined by correcting S3;
s7: after the sequential cutting is finished, transferring a plurality of reinforced concrete cutting parts placed outside a working field to a reasonable field for crushing treatment, and finishing the whole static force dismantling construction.
Preferably, in the step S1, the construction site is based on a site environment where the reinforced concrete structure to be cut is located, for example, scaffolds need to be built around the reinforced concrete structure to be cut, and a protective cover needs to be built for an auxiliary facility below the reinforced concrete structure to be cut.
Preferably, in step S3, the determined cutting order is determined by:
h1: a floor slab connected to the reinforced concrete structure which does not need to be cut;
h2: a frame beam connected to the reinforced concrete structure which does not need to be cut;
h3: a shear wall connected to the reinforced concrete structure which does not require cutting;
h4: based on the steps H1, H2 and H3, the rope sawing machine is used for completing the complete segmentation of the reinforced concrete structure to be cut and the part which does not need to be cut among the reinforced concrete structures;
h5, determining the cutting sequence according to the sequence of the reinforced concrete slab → the reinforced concrete beam → the reinforced concrete wall → the reinforced concrete column.
Preferably, in the case that the reinforced concrete structure to be cut is not connected with a reinforced concrete structure not to be cut, the cutting sequence is determined as follows: and determining the cutting sequence according to the sequence of the reinforced concrete slab → the reinforced concrete beam → the reinforced concrete wall → the reinforced concrete column.
Preferably, in step S5, based on the fact that the site to be cut cannot be cut by the diamond wire saw, the site to be cut is drilled by a water drill with a diameter of 50mm, and then the diamond wire saw is inserted after the drilling.
The construction method for dismantling the static force of the reinforced concrete structure has the following beneficial effects: in the application process of the technical scheme, the cutting of the reinforced concrete structure can be realized, the cutting efficiency in the cutting process is high, the labor cost is low, and the cutting method is safe and reliable; the vibration and noise in the cutting process are very small, and the cut body can be statically separated under the stable condition, so that the great influence on the surrounding environment of the reinforced concrete structure is avoided; the shape and size of the cut object can be limited, and the cut object can be cut in any direction, such as a diagonal direction, a vertical direction, a transverse direction and the like; further, under the condition that the reinforced concrete to be cut is connected with the reinforced concrete structure which does not need to be cut, the influence of vibration and the like on the reinforced concrete structure which does not need to be cut can be avoided, the stability and the reliability of the reserved reinforced concrete structure part which does not need to be cut and the integrity of a cutting surface are ensured, and the popularization and the application are facilitated.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to embodiments 1-2 of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all embodiments.
Example 1, in the case where a reinforced concrete structure requiring cutting is connected with a reinforced concrete structure not requiring cutting: a construction method for dismantling a static force of a reinforced concrete structure comprises the following steps:
s1: a working site is built for the reinforced concrete structure to be cut, and the size of the reinforced concrete structure to be cut is measured;
s2: carrying out block ink fountain snapping line division on a reinforced concrete structure to be cut based on the hoisting tonnage of hoisting equipment, and determining block division of a cutting part;
s3: determining a cutting sequence based on the division of the cutting part, hoisting the part to be cut of the partitioned reinforced concrete structure by using hoisting equipment, and ensuring that a hoisting rope is in a stressed state;
s4: fixing the wire saw in place based on the cutting position;
s5: threading a fine steel wire saw between the cutting part and the wire saw machine, and starting the wire saw machine to cut the cutting part;
s6: after cutting, hoisting the cut reinforced concrete parts by using hoisting equipment, intensively placing the cut reinforced concrete parts outside a cutting working site, and sequentially cutting the subsequent parts to be cut based on the cutting sequence determined by correcting S3;
s7: after the sequential cutting is finished, transferring a plurality of reinforced concrete cutting parts placed outside a working field to a reasonable field for crushing treatment, and finishing the whole static force dismantling construction.
In step S1, a site environment where the work site is located based on the reinforced concrete structure to be cut is established, for example, scaffolds need to be established around the reinforced concrete structure to be cut, and a protective cover needs to be established for an auxiliary facility below the reinforced concrete structure.
In step S3, the determined cutting order is determined by:
h1: a floor slab connected to a reinforced concrete structure which does not require cutting;
h2: a frame beam connected to the reinforced concrete structure which does not need to be cut;
h3: a shear wall connected to the reinforced concrete structure which does not require cutting;
h4: based on the steps H1, H2 and H3, the rope sawing machine is used for completing the complete segmentation of the reinforced concrete structure to be cut and the part which does not need to be cut among the reinforced concrete structures;
h5, determining the cutting sequence according to the sequence of the reinforced concrete slab → the reinforced concrete beam → the reinforced concrete wall → the reinforced concrete column.
In step S5, based on the situation that the site to be cut cannot be cut by the diamond wire saw, the site to be cut is drilled by a water drill with a diameter of 50mm, and then the diamond wire saw is inserted into the drilled hole.
Example 2, in the case where the reinforced concrete structure requiring cutting is not connected with a reinforced concrete structure not requiring cutting: a construction method for dismantling a static force of a reinforced concrete structure comprises the following steps:
s1: a working site is built for the reinforced concrete structure to be cut, and the size of the reinforced concrete structure to be cut is measured;
s2: carrying out block ink fountain snapping line division on a reinforced concrete structure to be cut based on the hoisting tonnage of hoisting equipment, and determining block division of a cutting part;
s3: determining a cutting sequence based on the division of the cutting part, hoisting the part to be cut of the partitioned reinforced concrete structure by using hoisting equipment, and ensuring that a hoisting rope is in a stressed state;
s4: fixing the wire saw in place based on the cutting position;
s5: threading a fine steel wire saw between the cutting part and the wire saw machine, and starting the wire saw machine to cut the cutting part;
s6: after cutting, hoisting the cut reinforced concrete cutting parts by hoisting equipment, intensively placing the cut reinforced concrete cutting parts outside a cutting working site, and sequentially cutting the subsequent parts to be cut based on the cutting sequence determined by correcting S3;
s7: after the sequential cutting is finished, transferring a plurality of reinforced concrete cutting parts placed outside a working field to a reasonable field for crushing treatment, and finishing the whole static force dismantling construction.
In step S1, a site environment where the work site is located based on the reinforced concrete structure to be cut is established, for example, scaffolds need to be established around the reinforced concrete structure to be cut, and a protective cover needs to be established for an auxiliary facility below the reinforced concrete structure.
In step S3, the determined cutting order is determined by:
and determining the cutting sequence according to the sequence of the reinforced concrete slab → the reinforced concrete beam → the reinforced concrete wall → the reinforced concrete column.
In step S5, based on the situation that the site to be cut cannot be cut by the diamond wire saw, the site to be cut is drilled by a water drill with a diameter of 50mm, and then the diamond wire saw is inserted into the drilled hole.
The above description is only for the preferred embodiment of the present invention, but the scope of the present invention is not limited thereto, and any person skilled in the art should be considered to be within the technical scope of the present invention, and the technical solutions and the inventive concepts thereof according to the present invention should be equivalent or changed within the scope of the present invention.

Claims (5)

1. A construction method for dismantling a static force of a reinforced concrete structure is characterized by comprising the following steps:
s1: building a working site for the reinforced concrete structure to be cut, and measuring the size of the reinforced concrete structure to be cut;
s2: carrying out block ink fountain snapping line partitioning on a reinforced concrete structure to be cut based on the hoisting tonnage of hoisting equipment, and determining block partitioning of a cutting part;
s3: determining a cutting sequence based on the division of the cutting part, hoisting the part to be cut of the partitioned reinforced concrete structure by using hoisting equipment, and ensuring that a hoisting rope is in a stressed state;
s4: fixing the wire saw in place based on the cutting position;
s5: threading a fine steel wire saw between the cutting part and the wire saw machine, and starting the wire saw machine to cut the cutting part;
s6: after cutting, hoisting the cut reinforced concrete parts by using hoisting equipment, intensively placing the cut reinforced concrete parts outside a cutting working site, and sequentially cutting the subsequent parts to be cut based on the cutting sequence determined by correcting S3;
s7: after the cutting is completed in sequence, a plurality of reinforced concrete cutting parts placed outside a working field are transferred to a reasonable field for crushing treatment, and at the moment, the whole static force dismantling construction is completed.
2. A static demolition construction method for a reinforced concrete structure according to claim 1, wherein in the step S1, a construction site is built based on a site environment where the reinforced concrete structure to be cut is located, such as scaffolds to be built around the reinforced concrete structure to be cut and a protective cover to be built for an auxiliary facility below the reinforced concrete structure to be cut.
3. A static demolition construction method of a reinforced concrete structure according to claim 1 wherein in step S3, the determination method of the determined cutting sequence is:
h1: a floor slab connected to the reinforced concrete structure which does not need to be cut;
h2: a frame beam connected to the reinforced concrete structure which does not need to be cut;
h3: a shear wall connected to the reinforced concrete structure which does not require cutting;
h4: based on the steps H1, H2 and H3, the rope sawing machine is used for completing the complete segmentation of the reinforced concrete structure to be cut and the part which does not need to be cut among the reinforced concrete structures;
h5, determining the cutting sequence according to the sequence of the reinforced concrete slab → the reinforced concrete beam → the reinforced concrete wall → the reinforced concrete column.
4. A method for static demolition construction of a reinforced concrete structure according to claim 3, wherein in case that the reinforced concrete structure to be cut is not connected with a reinforced concrete structure that does not need to be cut, the determination of the cutting sequence is: and determining the cutting sequence according to the sequence of the reinforced concrete slab → the reinforced concrete beam → the reinforced concrete wall → the reinforced concrete column.
5. A static force demolition construction method for a reinforced concrete structure according to claim 1, wherein in step S5, based on the situation that the site to be cut cannot be cut by the diamond wire saw, a hole is made in the site to be cut by using a water drill with a diameter of 50mm, and then the diamond wire saw is inserted after the hole is made.
CN202210008981.9A 2022-01-05 2022-01-05 Construction method for static force demolition of reinforced concrete structure Pending CN114482618A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202210008981.9A CN114482618A (en) 2022-01-05 2022-01-05 Construction method for static force demolition of reinforced concrete structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202210008981.9A CN114482618A (en) 2022-01-05 2022-01-05 Construction method for static force demolition of reinforced concrete structure

Publications (1)

Publication Number Publication Date
CN114482618A true CN114482618A (en) 2022-05-13

Family

ID=81509092

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202210008981.9A Pending CN114482618A (en) 2022-01-05 2022-01-05 Construction method for static force demolition of reinforced concrete structure

Country Status (1)

Country Link
CN (1) CN114482618A (en)

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101985858A (en) * 2010-09-30 2011-03-16 中国华西企业有限公司 Hydraulic fracturing stripping unbonded prestressed reinforcement surface concrete construction method
CN103291085A (en) * 2013-06-07 2013-09-11 陈春来 Concrete static force cutting dismantling construction method
CN104594655A (en) * 2014-12-05 2015-05-06 杭州固力建筑工程有限公司 Application method for dismantling temporary supports in brick-concrete structure wall
CN105569376A (en) * 2015-12-17 2016-05-11 上海建工一建集团有限公司 Demolition construction method for building wall
CN108166500A (en) * 2017-12-12 2018-06-15 武汉科技大学 A kind of cutting disassembling of deep foundation ditch concrete near a river and recovery method
CN108518083A (en) * 2018-03-27 2018-09-11 五冶集团上海有限公司 The Demolition Construction method of main sintering building
CN111335672A (en) * 2020-03-30 2020-06-26 中铁二十二局集团第五工程有限公司 Diamond wire saw cutting construction method
CN111877798A (en) * 2020-08-07 2020-11-03 中电建十一局工程有限公司 Static force dismantling construction process for concrete structure of continuous construction project
CN212507545U (en) * 2020-06-09 2021-02-09 贵州远博建设工程有限公司 Diamond rope static cutting device

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101985858A (en) * 2010-09-30 2011-03-16 中国华西企业有限公司 Hydraulic fracturing stripping unbonded prestressed reinforcement surface concrete construction method
CN103291085A (en) * 2013-06-07 2013-09-11 陈春来 Concrete static force cutting dismantling construction method
CN104594655A (en) * 2014-12-05 2015-05-06 杭州固力建筑工程有限公司 Application method for dismantling temporary supports in brick-concrete structure wall
CN105569376A (en) * 2015-12-17 2016-05-11 上海建工一建集团有限公司 Demolition construction method for building wall
CN108166500A (en) * 2017-12-12 2018-06-15 武汉科技大学 A kind of cutting disassembling of deep foundation ditch concrete near a river and recovery method
CN108518083A (en) * 2018-03-27 2018-09-11 五冶集团上海有限公司 The Demolition Construction method of main sintering building
CN111335672A (en) * 2020-03-30 2020-06-26 中铁二十二局集团第五工程有限公司 Diamond wire saw cutting construction method
CN212507545U (en) * 2020-06-09 2021-02-09 贵州远博建设工程有限公司 Diamond rope static cutting device
CN111877798A (en) * 2020-08-07 2020-11-03 中电建十一局工程有限公司 Static force dismantling construction process for concrete structure of continuous construction project

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
中国建材工业出版社编: "《建筑业10项新技术 2017版》", 北京:中国建材工业出版社, pages: 172 - 173 *

Similar Documents

Publication Publication Date Title
US6082058A (en) Lifting method of building construction from top to bottom
CN102808526A (en) Nondestructive demolition construction method of reinforced concrete frame beam
CN107419918B (en) A kind of Historical Buildings periphery single-layer frame retains method for dismounting
CN113235467A (en) Construction method for dismantling large-span prestressed cast-in-place box girder
CN109183783B (en) Breaking-free separated pile head of concrete filling pile
CN208965714U (en) A kind of prefabricated piping lane main frame structure of assembly concrete
CN108999394B (en) Construction process of floor type scaffold rotary cantilever type scaffold
CN111335672A (en) Diamond wire saw cutting construction method
CN113774822B (en) Dismantling method of old reinforced concrete bridge
CN114293813A (en) Floor slab cutting and reinforcing structure and construction method
CN114033154A (en) Clamp type operation hanging basket suspension device and use method thereof
CN105862897A (en) Original-groove casting construction method for shallow foundation of sandy mudstone foundation
CN109307108A (en) A kind of concrete delivery pump pipe angle turning tool formula fixed structure and its construction method
CN113668529A (en) Construction method for breaking and removing pile head with template based on steel wedge-shaped gap
CN114482618A (en) Construction method for static force demolition of reinforced concrete structure
CN116356801A (en) Ground continuous wall stay column dismantling mode
CN116201392A (en) Construction method for pre-stressing of large-span structure underpinning pre-stressing conversion beam
CN114277790B (en) Repairing and processing method for defect filling pile
CN105888595B (en) Rotary drilling rig fishes for drill bit special purpose device and method in the case of bit freezing
CN112227814B (en) Method for dismantling straight-barrel type concrete tower body
CN102720353A (en) Post-construction one-side shear wall formwork for settlement joint of tower and construction method
CN111270872A (en) Wood structure jacking method and jacking device
CN114233046B (en) Method for dismantling wall body between main body structure and auxiliary structure of subway station
CN109208936B (en) Existing building elevator shaft structure additional construction structure and construction method thereof
JP2014001518A (en) Dismantlement method for structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20220513

RJ01 Rejection of invention patent application after publication