CN114086593A - Method for quickly adjusting elevation of bottom of cup foundation steel column - Google Patents

Method for quickly adjusting elevation of bottom of cup foundation steel column Download PDF

Info

Publication number
CN114086593A
CN114086593A CN202111418273.4A CN202111418273A CN114086593A CN 114086593 A CN114086593 A CN 114086593A CN 202111418273 A CN202111418273 A CN 202111418273A CN 114086593 A CN114086593 A CN 114086593A
Authority
CN
China
Prior art keywords
steel column
limiting plate
cup
foundation
steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202111418273.4A
Other languages
Chinese (zh)
Inventor
楚升升
张明启
胡毅
张开甲
黄辰来
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MCC Shanghai Steel Structure Technology Co Ltd
Original Assignee
MCC Shanghai Steel Structure Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MCC Shanghai Steel Structure Technology Co Ltd filed Critical MCC Shanghai Steel Structure Technology Co Ltd
Priority to CN202111418273.4A priority Critical patent/CN114086593A/en
Publication of CN114086593A publication Critical patent/CN114086593A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/42Foundations for poles, masts or chimneys
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C3/00Structural elongated elements designed for load-supporting
    • E04C3/30Columns; Pillars; Struts
    • E04C3/32Columns; Pillars; Struts of metal

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • General Engineering & Computer Science (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention relates to a method for quickly adjusting elevation of the bottom of a cup foundation steel column; comprises a limiting plate (3) with a 'return' shape in projection is manufactured; placing the limiting plate (3) at the bottom of the cleaned cup mouth foundation (4); elevation of four corners of the limiting plate (3) is calculated through a measuring instrument, the height difference between the elevation and the column bottom of the steel column (1) is calculated, the height of the steel cushion blocks (2) with different plate thicknesses is enabled to reach different height difference values of four corners of the limiting plate (30) through combination and superposition, and then the combined steel cushion blocks (2) are welded and fixed with the four corners of the corresponding steel column (1) before hoisting; and inserting the steel column (1) with the steel cushion block (2) into the cup opening foundation (4), and performing subsequent installation operation of the steel column (1). In the construction process, operators do not need to enter the interior of the cup rim foundation, the construction difficulty is reduced, the installation efficiency is improved, all parts used in the method can be processed by excess materials, the method is green and environment-friendly, and the manufacturing cost of a construction site is reduced.

Description

Method for quickly adjusting elevation of bottom of cup foundation steel column
Technical Field
The invention relates to the technical field of building construction, in particular to a method for quickly adjusting elevation of a bottom of a steel column of a cup foundation.
Background
In the installation process of the cup foundation steel column, because the adjusting interval is designed between the bottom plate of the steel column and the bottom of the cup foundation, and the steel column in the interval is free of any stress support, the elevation of the bottom of the steel column is determined as a big difficulty in installation of the cup foundation steel column. In order to ensure the installation accuracy of the steel column, elevation adjusting measures need to be arranged at the bottom of the cup opening before the steel column is installed. According to the installation operation of the basic steel column of the cup opening in the past, the adjustment interval of the column bottom needs an operator to enter the cup opening and adjust the adjustment interval to the steel column installation elevation position by adopting the section steel or the base plate, but the cross section of the cup opening is often smaller, and an adult cannot enter the internal construction of the foundation, so that the error is larger during measurement, and the labor is wasted.
Disclosure of Invention
The invention aims to overcome the defects and provide a quick adjustment method for the elevation of the bottom of a cup foundation steel column, which is high in efficiency, can solve the problem of uneven elevation of the bottom of a cup opening and improve installation accuracy.
In order to achieve the above object, the present invention is realized by:
a method for quickly adjusting elevation of bottom of cup foundation steel column includes
Step 1, manufacturing a limiting plate (3) with a projection in a shape of a Chinese character 'hui', wherein the overall dimension of the limiting plate (3) is smaller than the bottom of the cup-mouth foundation (4) but larger than the dimension of a bottom plate of the steel column (1);
step 2, placing the limiting plate (3) at the bottom of the cup mouth foundation (4) which is cleaned up, aligning the center of the limiting plate (3) with the center of the bottom of the cup mouth foundation (4) as far as possible, and enabling the limiting plate (3) to be in close contact with the bottom of the cup mouth foundation (4) so as to ensure that numerical value inaccuracy cannot occur due to the influence of concrete in the measuring process;
step 3, the elevation of the four corners of the limiting plate (3) is calculated through a measuring instrument, the height difference between the four corners of the limiting plate (3) and the bottom of the steel column (1) is calculated, the steel cushion blocks (2) with different plate thicknesses are combined and stacked, the height of the steel cushion blocks reaches different height difference values of the four corners of the limiting plate (30), and then the combined steel cushion blocks (2) are welded and fixed with the four corners of the corresponding steel column (1) before hoisting;
and 4, inserting the steel column (1) with the steel cushion block (2) into the cup opening foundation (4), and performing subsequent installation operation of the steel column (1).
By adopting the design, the elevation adjusting device is used for adjusting the elevation of the bottom of the steel column of the cup foundation, and an operator does not need to enter the cup foundation in the construction process, so that the construction difficulty is reduced, and the installation efficiency is improved. In this scheme, adopt the height difference of adjusting that the heightening pad is in the same place, solve the uneven problem in rim of a cup bottom, improve the installation accuracy, measure the equal available clout processing of material and form at this in-process, green reduces job site cost of manufacture.
Drawings
Fig. 1 is a projection view of the stopper plate (3).
Fig. 2 is a first process diagram of the adjustment method.
Fig. 3 is a diagram of the second process of the adjustment method.
Fig. 4 is a third process diagram of the adjustment method.
Fig. 5 is a diagram of the process of the adjustment method.
Detailed Description
The invention is further illustrated by the following specific examples.
As shown in FIGS. 1 to 5, a method for rapidly adjusting elevation of bottom of cup foundation steel column comprises
Step 1, manufacturing a limiting plate (3) with a projection in a shape of a Chinese character 'hui', wherein the overall dimension of the limiting plate (3) is smaller than the bottom of the cup-mouth foundation (4) but larger than the dimension of a bottom plate of the steel column (1);
step 2, placing the limiting plate (3) at the bottom of the cup mouth foundation (4) which is cleaned up, aligning the center of the limiting plate (3) with the center of the bottom of the cup mouth foundation (4) as far as possible, and enabling the limiting plate (3) to be in close contact with the bottom of the cup mouth foundation (4) so as to ensure that numerical value inaccuracy cannot occur due to the influence of concrete in the measuring process;
step 3, the elevation of the four corners of the limiting plate (3) is calculated through a measuring instrument, the height difference between the four corners of the limiting plate (3) and the bottom of the steel column (1) is calculated, the steel cushion blocks (2) with different plate thicknesses are combined and stacked, the height of the steel cushion blocks reaches different height difference values of the four corners of the limiting plate (30), and then the combined steel cushion blocks (2) are welded and fixed with the four corners of the corresponding steel column (1) before hoisting;
and 4, inserting the steel column (1) with the steel cushion block (2) into the cup opening foundation (4), and performing subsequent installation operation of the steel column (1).
By adopting the design, the elevation adjusting device is used for adjusting the elevation of the bottom of the steel column of the cup foundation, and an operator does not need to enter the cup foundation in the construction process, so that the construction difficulty is reduced, and the installation efficiency is improved. In this scheme, adopt the height difference of adjusting that the heightening pad is in the same place, solve the uneven problem in rim of a cup bottom, improve the installation accuracy, measure the equal available clout processing of material and form at this in-process, green reduces job site cost of manufacture.

Claims (1)

1. A method for quickly adjusting elevation of bottom of a cup foundation steel column is characterized by comprising the following steps: comprises that
Step 1, manufacturing a limiting plate (3) with a projection in a shape of a Chinese character 'hui', wherein the overall dimension of the limiting plate (3) is smaller than the bottom of the cup-mouth foundation (4) but larger than the dimension of a bottom plate of the steel column (1);
step 2, placing the limiting plate (3) at the bottom of the cup mouth foundation (4) which is cleaned up, aligning the center of the limiting plate (3) with the center of the bottom of the cup mouth foundation (4) as far as possible, and enabling the limiting plate (3) to be in close contact with the bottom of the cup mouth foundation (4) so as to ensure that numerical value inaccuracy cannot occur due to the influence of concrete in the measuring process;
step 3, the elevation of the four corners of the limiting plate (3) is calculated through a measuring instrument, the height difference between the four corners of the limiting plate (3) and the bottom of the steel column (1) is calculated, the steel cushion blocks (2) with different plate thicknesses are combined and stacked, the height of the steel cushion blocks reaches different height difference values of the four corners of the limiting plate (30), and then the combined steel cushion blocks (2) are welded and fixed with the four corners of the corresponding steel column (1) before hoisting;
and 4, inserting the steel column (1) with the steel cushion block (2) into the cup opening foundation (4), and performing subsequent installation operation of the steel column (1).
CN202111418273.4A 2021-11-26 2021-11-26 Method for quickly adjusting elevation of bottom of cup foundation steel column Pending CN114086593A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202111418273.4A CN114086593A (en) 2021-11-26 2021-11-26 Method for quickly adjusting elevation of bottom of cup foundation steel column

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202111418273.4A CN114086593A (en) 2021-11-26 2021-11-26 Method for quickly adjusting elevation of bottom of cup foundation steel column

Publications (1)

Publication Number Publication Date
CN114086593A true CN114086593A (en) 2022-02-25

Family

ID=80304734

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202111418273.4A Pending CN114086593A (en) 2021-11-26 2021-11-26 Method for quickly adjusting elevation of bottom of cup foundation steel column

Country Status (1)

Country Link
CN (1) CN114086593A (en)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106545028A (en) * 2015-09-16 2017-03-29 上海宝冶集团有限公司 Light Steel-Structure Factory with Steel rim of a cup post method for rapidly mounting
CN212427171U (en) * 2020-02-28 2021-01-29 中国二十二冶集团有限公司 Steel column installation elevation quick adjustment device
CN112647590A (en) * 2020-12-01 2021-04-13 河北建工集团有限责任公司 Construction method for prefabricated assembled reinforced concrete beam column steel node prefabricated combination column

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106545028A (en) * 2015-09-16 2017-03-29 上海宝冶集团有限公司 Light Steel-Structure Factory with Steel rim of a cup post method for rapidly mounting
CN212427171U (en) * 2020-02-28 2021-01-29 中国二十二冶集团有限公司 Steel column installation elevation quick adjustment device
CN112647590A (en) * 2020-12-01 2021-04-13 河北建工集团有限责任公司 Construction method for prefabricated assembled reinforced concrete beam column steel node prefabricated combination column

Similar Documents

Publication Publication Date Title
CN201459755U (en) Bolt sleeve for construction of equipment foundation
CN103161177B (en) Integrated equipment quick centering device and equipment aligning method
CN108643217B (en) Construction method for high-speed railway roadbed contact net stand column foundation
CN107246026B (en) Tower equipment foundation bolt embedding construction mold and embedding method thereof
CN114086593A (en) Method for quickly adjusting elevation of bottom of cup foundation steel column
CN109322323B (en) Installation method of large-angle inclined equipment bottom plate
CN101811252B (en) Feed screw nut pair assembling device
CN107130796A (en) A kind of clean room wafer board flatness control methods
CN104191314B (en) A kind of Gas Turbine Power turbine guide vane sheet datum level positioning and processing method
CN112095787A (en) Embedded box column and installation method
CN204771663U (en) Multi -functional regulation molding die of sealed face processing of triple offset butterfly valve dress
CN114713661B (en) Method for repairing stamping die by referring to workpiece rebound parameters
CN107634614A (en) Rapid installation and centering method for motor
CN113118397B (en) Integral base of vertical continuous casting machine light pressure module and adjusting method thereof
CN214574096U (en) Cup type basis steel column quick mounting structure
CN110315035B (en) Measuring device for mounting sector section base of slab caster and construction method thereof
CN110965791A (en) Accurate positioning method for foundation bolt
CN112627227A (en) Equipment foundation with elastic interlayer leveling piece and manufacturing method thereof
KR20200041529A (en) Method for machining of raw material for mold
CN114413733B (en) Measuring method of sector section foundation frame
CN101607358B (en) Quick manufacturing method for inspection jig
CN215832646U (en) Sand core detection tool
CN212058552U (en) Quick acceptance device for anchor backing plate
CN211785544U (en) Concrete performance detection device
CN105108524A (en) Rapid clamping and aligning device and method for gas turbine valve collar

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20220225