CN113445436A - Bridge pier temporary reinforcing structure under condition that does not stop - Google Patents

Bridge pier temporary reinforcing structure under condition that does not stop Download PDF

Info

Publication number
CN113445436A
CN113445436A CN202110761958.2A CN202110761958A CN113445436A CN 113445436 A CN113445436 A CN 113445436A CN 202110761958 A CN202110761958 A CN 202110761958A CN 113445436 A CN113445436 A CN 113445436A
Authority
CN
China
Prior art keywords
bridge
fixedly connected
jacking
reinforcing structure
steel support
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202110761958.2A
Other languages
Chinese (zh)
Inventor
李奇志
黄�俊
张洪庆
陈之
徐达
张鹏
郭淯晟
漆佳欣
宋永良
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Second Engineering Bureau Co Ltd
Original Assignee
China Construction Second Engineering Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Second Engineering Bureau Co Ltd filed Critical China Construction Second Engineering Bureau Co Ltd
Priority to CN202110761958.2A priority Critical patent/CN113445436A/en
Publication of CN113445436A publication Critical patent/CN113445436A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D22/00Methods or apparatus for repairing or strengthening existing bridges ; Methods or apparatus for dismantling bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/02Piers; Abutments ; Protecting same against drifting ice

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The temporary bridge pier reinforcing structure under the condition that the bridge does not stop achieves the purpose of maintaining and reinforcing the bridge piers and simultaneously temporarily supporting the bridge, the bridge pavement can be normally used, traffic is not obstructed, the temporary bridge pier reinforcing structure is stable in structure and strong in bearing and supporting capacity, the bridge can be stably supported, and safety accidents are prevented. Include by last hydraulic jack, jacking longeron, capital spandrel girder and a plurality of support frame that sets gradually under to, be provided with a plurality of bailey roof beams between jacking longeron and the capital spandrel girder, the support frame includes two steel support posts and sets up a plurality of bridging between two steel support posts, the both ends of bridging respectively with two steel support post fixed connection, the upper portion and the equal fixedly connected with in lower part of every bridging link the roof beam, the both ends of linking the roof beam respectively with two steel support post fixed connection, the bottom fixed mounting of two steel support posts is on the ground.

Description

Bridge pier temporary reinforcing structure under condition that does not stop
Technical Field
The invention relates to the technical field of bridge construction, in particular to a temporary bridge pier reinforcing structure under the condition that a bridge does not stop.
Background
At present, when the bridge pier is maintained and reinforced, vehicles need to stop passing through the bridge. However, it is very difficult to stop the vehicle and stop the vehicle on the bridge with complicated road conditions and a large number of moving persons and vehicles. In addition, in the process of maintaining and reinforcing the bridge pier, the bridge structure is easy to be unstable, so that safety accidents are caused.
Disclosure of Invention
In order to overcome the defects of the prior art, the invention aims to provide a temporary pier reinforcing structure under the condition that a bridge does not stop.
The technical scheme adopted by the invention is as follows: a temporary bridge pier reinforcing structure under the condition that a bridge does not stop comprises an oil jack, a jacking longitudinal beam, a column top bearing beam and a plurality of supporting frames which are sequentially arranged from top to bottom, wherein a plurality of Bailey beams are arranged between the jacking longitudinal beam and the column top bearing beam, each supporting frame comprises two steel supporting stand columns and a plurality of cross braces arranged between the two steel supporting stand columns, two ends of each cross brace are respectively and fixedly connected with the two steel supporting stand columns, the upper part and the lower part of each cross brace are respectively and fixedly connected with a connecting beam, two ends of each connecting beam are respectively and fixedly connected with the two steel supporting stand columns, the bottoms of the two steel supporting stand columns are fixedly arranged on a foundation, the tops of the two steel supporting stand columns are fixedly connected with the bottom of the column top bearing beam, the top of the column top bearing beam is fixedly connected with the bottom of the Bailey beam, and the top of the Bailey beam is fixedly connected with the bottom of the jacking longitudinal beam, the top of jacking longeron and hydraulic jack's cylinder body fixed connection, hydraulic jack's telescopic link top is at the bridge, be provided with the support between bridge and the jacking longeron, the top of support is supported on the bridge, the bottom and the jacking longeron fixed connection of support, a plurality of bailey roof beams are total three, and three bailey roof beams set up along jacking longeron length direction interval in proper order, all are provided with a horizontal bracing frame between two adjacent bailey roof beams, and the both ends of horizontal bracing frame respectively with two adjacent bailey roof beam fixed connection.
Furthermore, the jacking longitudinal beam and the column top bearing beam are arranged in parallel.
Furthermore, the steel support upright post and the column top bearing beam are vertically arranged.
Compared with the prior art, the invention has the following beneficial effects: the temporary bridge pier reinforcing structure under the condition that the bridge does not stop achieves the purpose of maintaining and reinforcing the bridge piers and simultaneously temporarily supporting the bridge, the bridge pavement can be normally used, traffic is not obstructed, the temporary bridge pier reinforcing structure is stable in structure and strong in bearing and supporting capacity, the bridge can be stably supported, and safety accidents are prevented.
Drawings
Fig. 1 is a schematic structural view of the present invention.
Detailed Description
The invention is described in detail below with reference to the figures and the specific embodiments.
As shown in fig. 1, a temporary bridge pier reinforcing structure under the condition that a bridge is not stopped comprises an oil jack 1, a jacking longitudinal beam 2, a column top bearing beam 4 and a plurality of support frames which are sequentially arranged from top to bottom, wherein a plurality of bailey beams 3 are arranged between the jacking longitudinal beam 2 and the column top bearing beam 4, each support frame comprises two steel support columns 5 and a plurality of scissors struts 6 arranged between the two steel support columns 5, two ends of each scissors strut 6 are respectively and fixedly connected with the two steel support columns 5, the upper part and the lower part of each scissors strut 6 are respectively and fixedly connected with a connecting beam 7, two ends of each connecting beam 7 are respectively and fixedly connected with the two steel support columns 5, the bottoms of the two steel support columns 5 are fixedly arranged on a foundation 8, the tops of the two steel support columns 5 are fixedly connected with the bottom of the column top bearing beam 4, the top of the column top bearing beam 4 is fixedly connected with the bottom of the bailey beam 3, the top of bailey beam 3 and the bottom of jacking longeron 2 are fixed connection, and the top of jacking longeron 2 and the cylinder body fixed connection of hydraulic jack 1, hydraulic jack 1's telescopic link top is at bridge 9.
A support 10 is arranged between the bridge 9 and the jacking longitudinal beam 2, the top of the support 10 is abutted against the bridge 9, and the bottom of the support 10 is fixedly connected with the jacking longitudinal beam 2.
The plurality of bailey beams 3 are three in total, the three bailey beams 3 are sequentially arranged at intervals along the length direction of the jacking longitudinal beam 2, a transverse inclined strut 11 is arranged between every two adjacent bailey beams 3, and two ends of each transverse inclined strut 11 are fixedly connected with the two adjacent bailey beams 3 respectively.
The jacking longitudinal beam 2 and the column top bearing beam 4 are arranged in parallel.
The steel support upright post 5 and the bearing beam 4 at the top of the post are arranged vertically.
The above embodiments are based on the technical solution of the present invention, and detailed implementation and specific operation processes are given, but the scope of the present invention is not limited to the above embodiments.

Claims (3)

1. The utility model provides a bridge pier temporary reinforcement structure under the circumstances of not stopping which characterized in that: comprises an oil jack (1), a jacking longitudinal beam (2), a column top bearing beam (4) and a plurality of supporting frames which are sequentially arranged from top to bottom, wherein a plurality of Bailey beams (3) are arranged between the jacking longitudinal beam (2) and the column top bearing beam (4), each supporting frame comprises two steel supporting columns (5) and a plurality of cross braces (6) arranged between the two steel supporting columns (5), the two ends of each cross brace (6) are respectively and fixedly connected with the two steel supporting columns (5), the upper part and the lower part of each cross brace (6) are respectively and fixedly connected with a connecting beam (7), the two ends of each connecting beam (7) are respectively and fixedly connected with the two steel supporting columns (5), the bottoms of the two steel supporting columns (5) are fixedly arranged on a foundation (8), the tops of the two steel supporting columns (5) are fixedly connected with the bottom of the column top bearing beam (4), the top of a column top bearing beam (4) is fixedly connected with the bottom of a Bailey beam (3), the top of the Bailey beam (3) is fixedly connected with the bottom of a jacking longitudinal beam (2), the top of the jacking longitudinal beam (2) is fixedly connected with a cylinder body of an oil jack (1), a telescopic rod of the oil jack (1) is propped against a bridge (9), a support (10) is arranged between the bridge (9) and the jacking longitudinal beam (2), the top of the support (10) is abutted against the bridge (9), the bottom of the support (10) is fixedly connected with the jacking longitudinal beam (2), the multi-beam-type multi-beam system is characterized in that the number of the multi-beam-type multi-beam is three, three multi-beam-type multi-beam-type multi-beam-type multi-beam (3) are sequentially arranged at intervals along the length direction of the jacking longitudinal beam (2).
2. The temporary pier reinforcing structure under the condition that the bridge does not stop as claimed in claim 1, wherein: the jacking longitudinal beam (2) and the column top bearing beam (4) are arranged in parallel.
3. The temporary pier reinforcing structure under the condition that the bridge does not stop as claimed in claim 1, wherein: the steel support upright post (5) is vertical to the bearing beam (4) on the top of the post.
CN202110761958.2A 2021-07-06 2021-07-06 Bridge pier temporary reinforcing structure under condition that does not stop Pending CN113445436A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110761958.2A CN113445436A (en) 2021-07-06 2021-07-06 Bridge pier temporary reinforcing structure under condition that does not stop

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110761958.2A CN113445436A (en) 2021-07-06 2021-07-06 Bridge pier temporary reinforcing structure under condition that does not stop

Publications (1)

Publication Number Publication Date
CN113445436A true CN113445436A (en) 2021-09-28

Family

ID=77815156

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110761958.2A Pending CN113445436A (en) 2021-07-06 2021-07-06 Bridge pier temporary reinforcing structure under condition that does not stop

Country Status (1)

Country Link
CN (1) CN113445436A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114395976A (en) * 2022-03-11 2022-04-26 广西航务建设工程有限公司 Stepless-adjustment Bailey sheet support construction method

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103981816A (en) * 2014-04-15 2014-08-13 河南省公路工程局集团有限公司 Construction method for underpinning of overpass framework pier columns
CN203947428U (en) * 2014-07-21 2014-11-19 沈阳铁道勘察设计院有限公司 Bridge adjustable height support top is stretched ruggedized construction
CN205024600U (en) * 2015-10-06 2016-02-10 中交第四公路工程局有限公司 A work platform that is used for bridge aquatic pile foundation to be under construction
CN205474844U (en) * 2015-12-30 2016-08-17 中交第二航务工程局有限公司 Straddle type beiLei beam support
CN107254847A (en) * 2017-06-15 2017-10-17 上海颖川路桥科技有限公司 A kind of city rotary interchange synchronization of jacking up steel support structure
CN107761573A (en) * 2017-11-29 2018-03-06 中铁二十四局集团安徽工程有限公司 Crossing bridge bottom Bailey beam falsework jacking transportation by driving method for dismounting
CN208917702U (en) * 2018-09-29 2019-05-31 中铁二十四局集团安徽工程有限公司 Fish-bellied type concrete box girder cast-in-place construction formwork-support
CN210049116U (en) * 2019-05-27 2020-02-11 贾垂朋 Bridge construction support

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103981816A (en) * 2014-04-15 2014-08-13 河南省公路工程局集团有限公司 Construction method for underpinning of overpass framework pier columns
CN203947428U (en) * 2014-07-21 2014-11-19 沈阳铁道勘察设计院有限公司 Bridge adjustable height support top is stretched ruggedized construction
CN205024600U (en) * 2015-10-06 2016-02-10 中交第四公路工程局有限公司 A work platform that is used for bridge aquatic pile foundation to be under construction
CN205474844U (en) * 2015-12-30 2016-08-17 中交第二航务工程局有限公司 Straddle type beiLei beam support
CN107254847A (en) * 2017-06-15 2017-10-17 上海颖川路桥科技有限公司 A kind of city rotary interchange synchronization of jacking up steel support structure
CN107761573A (en) * 2017-11-29 2018-03-06 中铁二十四局集团安徽工程有限公司 Crossing bridge bottom Bailey beam falsework jacking transportation by driving method for dismounting
CN208917702U (en) * 2018-09-29 2019-05-31 中铁二十四局集团安徽工程有限公司 Fish-bellied type concrete box girder cast-in-place construction formwork-support
CN210049116U (en) * 2019-05-27 2020-02-11 贾垂朋 Bridge construction support

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114395976A (en) * 2022-03-11 2022-04-26 广西航务建设工程有限公司 Stepless-adjustment Bailey sheet support construction method
CN114395976B (en) * 2022-03-11 2023-12-01 广西航务建设工程有限公司 Stepless-adjustment bailey piece support construction method

Similar Documents

Publication Publication Date Title
CN105155414A (en) Floor-type slant-legged steel truss bracket of lower transverse beam of large-span cable tower
CN113445436A (en) Bridge pier temporary reinforcing structure under condition that does not stop
CN214362953U (en) Single-column pier reinforcing structure for improving bridge anti-overturning capacity
CN112267390A (en) Single-column pier reinforcing structure for improving bridge anti-overturning capacity
CN215405658U (en) Bridge pier temporary reinforcing structure under condition that does not stop
CN214301300U (en) Adjustable bracket system for mounting steel box girder
CN112921841B (en) Method for quickly dismantling upper structure of deck through type arch bridge
CN213476666U (en) Limiting device for main pier during integral jacking of main bridge steel box girder
CN112664235A (en) Walking type pipe gallery formwork supporting device
CN211973136U (en) Cast-in-place bridge formwork support frame of large-span
CN218147879U (en) Steel support system structure for bridge pier and bearing platform dismantling and lowering reconstruction
CN111395204A (en) Prestressed cantilever support structure of large cantilever bent cap and construction method
CN215718762U (en) Support structure for synchronous construction of station and shield
CN216238152U (en) Prefabricated beam erection temporary buttress platform of variable width bridge
CN205382428U (en) Whole cast -in -place roof beam formwork support frame of falling triangle in hole
CN215947912U (en) Cast-in-place case roof beam of mountain area topography back-pulls back pressure support
CN214116296U (en) Bailey cast-in-place support dismantling device
CN215210553U (en) Bridge deck support for unloading large cantilever prestress capping beam load
CN220645356U (en) Truss overhead rack bulk auxiliary supporting device
CN213061657U (en) Large-span cable-stayed steel trestle structure
CN215052204U (en) 0# block supporting frame structure of cylindrical pier
CN117418474A (en) No. 0 block installation positioning bracket for lower chord steel diagonal bracing of hollow continuous rigid frame bridge
CN216892039U (en) A bent cap epitaxial operation platform for going up stride railway precast beam and erect
CN215669015U (en) Die carrier device and two bridge integral casting systems of striding for frame bridge construction
CN211665584U (en) Staple bolt installation construction hanging flower basket on column pier

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20210928

RJ01 Rejection of invention patent application after publication