CN112448350A - 一种防跳线风偏的钻越塔 - Google Patents
一种防跳线风偏的钻越塔 Download PDFInfo
- Publication number
- CN112448350A CN112448350A CN202011330683.9A CN202011330683A CN112448350A CN 112448350 A CN112448350 A CN 112448350A CN 202011330683 A CN202011330683 A CN 202011330683A CN 112448350 A CN112448350 A CN 112448350A
- Authority
- CN
- China
- Prior art keywords
- tower
- jumper
- cross arm
- head
- wire
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Classifications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02G—INSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
- H02G7/00—Overhead installations of electric lines or cables
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02G—INSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
- H02G7/00—Overhead installations of electric lines or cables
- H02G7/05—Suspension arrangements or devices for electric cables or lines
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02G—INSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
- H02G7/00—Overhead installations of electric lines or cables
- H02G7/14—Arrangements or devices for damping mechanical oscillations of lines, e.g. for reducing production of sound
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02G—INSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
- H02G7/00—Overhead installations of electric lines or cables
- H02G7/20—Spatial arrangements or dispositions of lines or cables on poles, posts or towers
Landscapes
- Electric Cable Installation (AREA)
Abstract
本发明公开了一种防跳线风偏的钻越塔,包括塔身和塔头,所述塔头位于所述塔身的上方;沿所述塔头至所述塔身的方向分别水平布置有地线横担、第一横担和第二横担,在所述第二横担的两侧设置有跳线架,在所述跳线架上设置有多个倾斜设置的绝缘子串和多个水平设置的重锤,所述绝缘子串的两端分别与所述跳线架的顶部和底部固定,在所述跳线架的底部固定有多个水平并列设置的重锤。在提高跳线防风偏的同时还多重降低了整体的塔高,减少了成本,而且单片的重锤在工作人员上塔拆卸重锤时提供了便捷,降低了安全隐患。
Description
技术领域
本发明涉及高压架空输电线路的固定式重锤结构技术领域,尤其涉及一种防跳线风偏的钻越塔。
背景技术
海拔高度越高,空气密度及绝对湿度就越小,从而使得输电线路的悬垂绝缘子串和空气间隙的放电电压降低。为保证高海拔地区架空输电线路的安全运行,必须保证悬垂绝缘子串摇摆角在允许值内。对于重冰区线路设计来说,设计中往往会采用增加铁塔高度等办法来尽量避免使用重锤来限制悬垂绝缘子串摇摆角过大,但是有些线路受地形限制,采用增加铁塔高度等办法不尽理想且投资较大,转而考虑采用重锤。CN204243690U公开了一种高压架空输电线路的固定式重锤结构,将多片重锤片紧固在联板上,安装在悬垂绝缘子串和悬垂线夹之间的高压架空输电线路上。CN111725762A公开了叠加组合式重锤片及其制造方法,但是层叠的重锤片还是会增加钻越塔的总高度,而且防跳线风偏效果有限。
发明内容
为克服上述缺陷,本发明的目的在于提供一种防跳线风偏的钻越塔,以降低塔体总高以及减少跳线风偏。
为实现上述目的,本发明采用如下技术方案:
一种防跳线风偏的钻越塔,包括塔身和塔头,所述塔头位于所述塔身的上方;沿所述塔头至所述塔身的方向分别水平布置有地线横担、第一横担和第二横担,在所述第二横担的两侧设置有跳线架,在所述跳线架上设置有多个倾斜设置的绝缘子串和多个水平设置的重锤,所述绝缘子串的两端分别与所述跳线架的顶部和底部固定,在所述跳线架的底部固定有多个水平并列设置的重锤。
可选的,所述跳线架包括塔头跳线架和硬跳线架,所述塔头跳线架位于所述硬跳线架的上方,所述绝缘子串的一端与所述塔头跳线架连接,另一端与所述硬跳线架连接;所述重锤与所述硬跳线架通过螺栓连接,且位于所述硬跳线架的底部。
可选的,所述重锤的形状为长方体平板,采用铸铁材料,规格为400mm*600mm*30mm。
可选的,所述重锤的数量为四片。
可选的,相邻绝缘子串之间的夹角在30°至50°之间。
在所辖及新建输电线路上,广泛应用了合成绝缘子,但是由于绝缘子串重量轻,为了防止发生导线、跳线在大风、覆冰和各种应力作用下的大幅度舞动、摇摆,而导致绝缘子串上拔脱落、导线接地、短路、断线的危险情况发生,就需要在部分耐张、直线杆塔上安装悬重锤装置,通过其自重负载的下坠力,来平衡和消除导线受到的各种外力影响,保证导线对杆塔、拉线、跨越物、临相导地线之间等的安全距离。所以需要在耐张、转角、双回、分支、换相杆塔的跳线,垂度较大、绕跳或处在转角的外角侧及处在风区风口的直线杆塔承载平行导线的悬垂串上,均需要安装悬吊串及悬重锤装置,以防止绝缘子串上拔、抑制导线摇摆角过大的作用。但是由于悬重锤自身结构和联接方式不合理的问题,会造成重锤厚度过大,会保证导电体之间的距离,则需增加塔高;操作过程复杂、工作效率低、用时长;人员危险性和体力消耗大:在杆塔上转移位置频繁、手抱肩扛悬重锤装置进行安装;装置存在运行安全隐患;防风偏效果有限。
本发明的积极有益效果:
将绝缘子串倾斜设置,在固定绝缘子串的跳线架底部固定有水平设置的多片重锤,降低了绝缘子串的高度和重锤高度,以增加重量,降低风阻,减少竖直横截面积,降低风阻,在提高跳线防风偏的同时还多重降低了整体的塔高,减少了成本,而且单片的重锤在工作人员上塔拆卸重锤时提供了便捷,降低了安全隐患。
附图说明
图1是本发明实施例1提供的一种防跳线风偏的钻越塔的正视结构示意图;
图2是本发明实施例1提供的一种示例性重锤的结构示意图;
图3是本发明实施例1提供的图1的B向侧视结构示意图。
具体实施方式
下面结合一些具体实施方式,对本发明做进一步说明。
实施例1
如图1至图3所示,本发明公开了一种防跳线风偏的钻越塔,包括塔身和塔头,所述塔头位于所述塔身的上方;沿所述塔头至所述塔身的方向分别水平布置有地线横担10、第一横担20和第二横担30,在所述第二横担30的两侧设置有跳线架40,在所述跳线架40上设置有多个倾斜设置的绝缘子串50和多个水平设置的重锤60,所述绝缘子串50的两端分别与所述跳线架40的顶部和底部固定,在所述跳线架40的底部固定有多个水平并列设置的重锤60。
参考图2,为示例性的层叠重锤60结构示意图,跳线串长度一般为2.5m,重锤60片层叠的放置于重锤60座上,并用平行挂板悬挂在扁担下方,这样就无形的增长了带电体,由于带电体要保持一定距离,相应的就会增加钻越塔的高度,增加成本,而且这种设置的重锤60竖直横截面较大,风阻相应的也会增大,防跳线风偏效果有限。本发明将绝缘子串50倾斜设置,在固定绝缘子串50的跳线架40底部固定有水平设置的多片重锤60,以增加重量,降低风阻,在提高跳线防风偏的同时还多重降低了整体的塔高,减少了成本,而且单片的重锤60在工作人员上塔拆卸重锤60时提供了便捷。
具体的,参考图3,所述跳线架40包括塔头跳线架41和硬跳线架42,所述塔头跳线架41位于所述硬跳线架42的上方,所述绝缘子串50的一端与所述塔头跳线架41连接,另一端与所述硬跳线架42连接;所述重锤60与所述硬跳线架42通过螺栓连接,且位于所述硬跳线架42的底部。地线横担10设置有地线悬挂点,第一横担20和第二横担30分别设置有多个导线悬挂点。绝缘子采用耐张绝缘子,通过跳线串与塔杆两侧导线连接起来。相邻跳线绝缘子串50之间的夹角在30°至50°之间。所述重锤60的数量为四片,形状为长方体平板,采用铸铁材料,规格为400mm*600mm*30mm,可以根据需要选用不同规格的重锤60。相比图2所示中的跳线串的高度要减小300mm,底部水平单层设置的重锤60能减少150mm的高度,也就是一共降低了450mm。有效控制钻越塔总高度,减小跳线风偏。
最后说明的是,以上实施例仅用以说明本发明的技术方案而非限制,本领域普通技术人员对本发明的技术方案所做的其他修改或者等同替换,只要不脱离本发明技术方案的精神和范围,均应涵盖在本发明的权利要求范围当中。
Claims (5)
1.一种防跳线风偏的钻越塔,其特征在于,包括塔身和塔头,所述塔头位于所述塔身的上方;沿所述塔头至所述塔身的方向分别水平布置有地线横担、第一横担和第二横担,在所述第二横担的两侧设置有跳线架,在所述跳线架上设置有多个倾斜设置的绝缘子串和多个水平设置的重锤,所述绝缘子串的两端分别与所述跳线架的顶部和底部固定,在所述跳线架的底部固定有多个水平并列设置的重锤。
2.如权利要求1所述的一种防跳线风偏的钻越塔,其特征在于,所述跳线架包括塔头跳线架和硬跳线架,所述塔头跳线架位于所述硬跳线架的上方,所述绝缘子串的一端与所述塔头跳线架连接,另一端与所述硬跳线架连接;所述重锤与所述硬跳线架通过螺栓连接,且位于所述硬跳线架的底部。
3.如权利要求2所述的一种防跳线风偏的钻越塔,其特征在于,所述重锤的形状为长方体平板,采用铸铁材料,规格为400mm*600mm*30mm。
4.如权利要求1所述的一种防跳线风偏的钻越塔,其特征在于,所述重锤的数量为四片。
5.如权利要求1所述的一种防跳线风偏的钻越塔,其特征在于,相邻绝缘子串之间的夹角在30°至50°之间。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202011330683.9A CN112448350B (zh) | 2020-11-24 | 2020-11-24 | 一种防跳线风偏的钻越塔 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202011330683.9A CN112448350B (zh) | 2020-11-24 | 2020-11-24 | 一种防跳线风偏的钻越塔 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN112448350A true CN112448350A (zh) | 2021-03-05 |
CN112448350B CN112448350B (zh) | 2023-02-03 |
Family
ID=74737635
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202011330683.9A Active CN112448350B (zh) | 2020-11-24 | 2020-11-24 | 一种防跳线风偏的钻越塔 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN112448350B (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113914697A (zh) * | 2021-10-28 | 2022-01-11 | 华能通辽风力发电有限公司 | 一种输电塔 |
Citations (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH07176233A (ja) * | 1993-12-20 | 1995-07-14 | Asahi Tec Corp | ジャンパ線v吊懸垂装置 |
JPH1066237A (ja) * | 1996-08-23 | 1998-03-06 | Furukawa Electric Co Ltd:The | ジャンパ装置 |
JP2000032639A (ja) * | 1998-07-08 | 2000-01-28 | Furukawa Electric Co Ltd:The | 鳥害防止型ジャンパー装置 |
CN201369532Y (zh) * | 2008-12-24 | 2009-12-23 | 中国电力科学研究院 | 刚性跳线装置的悬吊装置 |
CN202474755U (zh) * | 2011-12-08 | 2012-10-03 | 中国电力工程顾问集团公司 | 一种特高压直流线路720/50导线跳线结构 |
CN202651735U (zh) * | 2012-07-19 | 2013-01-02 | 安徽华电工程咨询设计有限公司 | 非对称w型跳线串双回路钻越塔 |
CN202711874U (zh) * | 2012-07-10 | 2013-01-30 | 中国南方电网有限责任公司超高压输电公司 | ±500kV同塔双回线路用悬垂硬跳线绝缘子串 |
CN103259234A (zh) * | 2011-08-26 | 2013-08-21 | 安徽省电力设计院 | 输电线路刚性跳线非对称v型绝缘子串布置结构 |
CN203607796U (zh) * | 2013-12-10 | 2014-05-21 | 国家电网公司 | 一种耐张塔的跳线*** |
CN204089125U (zh) * | 2014-08-26 | 2015-01-07 | 国网安徽省电力公司电力科学研究院 | 一种杆塔单挂点跳串加支撑管形式跳线装置 |
CN208797539U (zh) * | 2018-10-22 | 2019-04-26 | 国网江苏省电力有限公司宿迁供电分公司 | 可防止风偏的跳线固定装置 |
CN211369746U (zh) * | 2019-10-23 | 2020-08-28 | 中国能源建设集团浙江省电力设计院有限公司 | 一种500kV跳线上绕式双回路钻越塔 |
-
2020
- 2020-11-24 CN CN202011330683.9A patent/CN112448350B/zh active Active
Patent Citations (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH07176233A (ja) * | 1993-12-20 | 1995-07-14 | Asahi Tec Corp | ジャンパ線v吊懸垂装置 |
JPH1066237A (ja) * | 1996-08-23 | 1998-03-06 | Furukawa Electric Co Ltd:The | ジャンパ装置 |
JP2000032639A (ja) * | 1998-07-08 | 2000-01-28 | Furukawa Electric Co Ltd:The | 鳥害防止型ジャンパー装置 |
CN201369532Y (zh) * | 2008-12-24 | 2009-12-23 | 中国电力科学研究院 | 刚性跳线装置的悬吊装置 |
CN103259234A (zh) * | 2011-08-26 | 2013-08-21 | 安徽省电力设计院 | 输电线路刚性跳线非对称v型绝缘子串布置结构 |
CN202474755U (zh) * | 2011-12-08 | 2012-10-03 | 中国电力工程顾问集团公司 | 一种特高压直流线路720/50导线跳线结构 |
CN202711874U (zh) * | 2012-07-10 | 2013-01-30 | 中国南方电网有限责任公司超高压输电公司 | ±500kV同塔双回线路用悬垂硬跳线绝缘子串 |
CN202651735U (zh) * | 2012-07-19 | 2013-01-02 | 安徽华电工程咨询设计有限公司 | 非对称w型跳线串双回路钻越塔 |
CN203607796U (zh) * | 2013-12-10 | 2014-05-21 | 国家电网公司 | 一种耐张塔的跳线*** |
CN204089125U (zh) * | 2014-08-26 | 2015-01-07 | 国网安徽省电力公司电力科学研究院 | 一种杆塔单挂点跳串加支撑管形式跳线装置 |
CN208797539U (zh) * | 2018-10-22 | 2019-04-26 | 国网江苏省电力有限公司宿迁供电分公司 | 可防止风偏的跳线固定装置 |
CN211369746U (zh) * | 2019-10-23 | 2020-08-28 | 中国能源建设集团浙江省电力设计院有限公司 | 一种500kV跳线上绕式双回路钻越塔 |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113914697A (zh) * | 2021-10-28 | 2022-01-11 | 华能通辽风力发电有限公司 | 一种输电塔 |
Also Published As
Publication number | Publication date |
---|---|
CN112448350B (zh) | 2023-02-03 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN112448350B (zh) | 一种防跳线风偏的钻越塔 | |
CN105186378A (zh) | 一种输电线路通道跨越保护机构 | |
CN203850795U (zh) | 一种用于输电线路的防风偏柔性控制装置 | |
CN200985238Y (zh) | 单柱式单双笼人货两用升降机 | |
CN203520573U (zh) | 高压输电线航空警示球 | |
CN106229890B (zh) | 跨越障碍物架线施工保护结构 | |
CN202111445U (zh) | 耐张绝缘子串防雪板 | |
CN103915807A (zh) | 一种用于输电线路的防风偏柔性控制装置 | |
CN105337236A (zh) | 高压输电线路防风拉线装置 | |
CN202449759U (zh) | 一种可防雷的集装箱门式起重机 | |
CN205024700U (zh) | 一种改进型的柔性被动防护网 | |
CN108360907B (zh) | 一种10kV线路双电源手拉手联络结构及其安装和使用方法 | |
CN110768194B (zh) | 一种防风偏的悬垂绝缘子串及安装方法 | |
CN103259234B (zh) | 输电线路刚性跳线非对称v型绝缘子串布置结构 | |
CN104386576B (zh) | 一种缆索起重机万向旋转吊钩结构 | |
CN204590741U (zh) | 异形单回路换位塔 | |
CN113969547A (zh) | 一种大型桥梁桥塔用u型载人挂篮式检修平台 | |
CN107237535A (zh) | 一种输电线路用单侧横担耐张塔 | |
CN204609420U (zh) | 一种高电压等级快速抢修塔 | |
CN202012226U (zh) | 一种窄基铁塔 | |
CN106329389B (zh) | 一种大吨位带电导线的提升装置 | |
CN201435593Y (zh) | 一种输电铁塔的地线支架 | |
CN216699341U (zh) | 一种进出多***导线电场的辅助装置 | |
CN104895390A (zh) | 一种直线塔 | |
CN202322074U (zh) | 一种龙门架 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |