CN112000724A - Highway engineering collaborative computation amount information management system based on custom formula - Google Patents
Highway engineering collaborative computation amount information management system based on custom formula Download PDFInfo
- Publication number
- CN112000724A CN112000724A CN202010877554.5A CN202010877554A CN112000724A CN 112000724 A CN112000724 A CN 112000724A CN 202010877554 A CN202010877554 A CN 202010877554A CN 112000724 A CN112000724 A CN 112000724A
- Authority
- CN
- China
- Prior art keywords
- engineering
- data
- project
- calculation
- items
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 claims abstract description 17
- 230000008569 process Effects 0.000 claims abstract description 15
- 230000002452 interceptive effect Effects 0.000 claims abstract description 13
- 230000003993 interaction Effects 0.000 claims description 12
- 230000004048 modification Effects 0.000 claims description 7
- 238000012986 modification Methods 0.000 claims description 7
- 230000004044 response Effects 0.000 claims description 3
- 238000013461 design Methods 0.000 abstract description 5
- 238000004891 communication Methods 0.000 abstract description 4
- 230000008901 benefit Effects 0.000 abstract description 3
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000012938 design process Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000006872 improvement Effects 0.000 description 1
Images
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F16/00—Information retrieval; Database structures therefor; File system structures therefor
- G06F16/20—Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
- G06F16/25—Integrating or interfacing systems involving database management systems
- G06F16/252—Integrating or interfacing systems involving database management systems between a Database Management System and a front-end application
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F40/00—Handling natural language data
- G06F40/10—Text processing
- G06F40/166—Editing, e.g. inserting or deleting
- G06F40/177—Editing, e.g. inserting or deleting of tables; using ruled lines
- G06F40/18—Editing, e.g. inserting or deleting of tables; using ruled lines of spreadsheets
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F40/00—Handling natural language data
- G06F40/10—Text processing
- G06F40/166—Editing, e.g. inserting or deleting
- G06F40/186—Templates
Landscapes
- Engineering & Computer Science (AREA)
- Theoretical Computer Science (AREA)
- Physics & Mathematics (AREA)
- General Engineering & Computer Science (AREA)
- General Physics & Mathematics (AREA)
- Databases & Information Systems (AREA)
- Audiology, Speech & Language Pathology (AREA)
- Computational Linguistics (AREA)
- General Health & Medical Sciences (AREA)
- Health & Medical Sciences (AREA)
- Artificial Intelligence (AREA)
- Data Mining & Analysis (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention discloses a road engineering collaborative computation amount information management system based on a custom formula; the method comprises the following steps: the system comprises a data processing center, a front-end interactive system, an online form editing module and a data interface service. The invention has the following advantages: 1. project managers only need to manage the templates, the related formulas and the numerical terms of the projects, and do not need to communicate and issue related materials to designers repeatedly. 2. The designer only needs to fill in the related numerical values of the subentries and does not need to care about the calculation formulas and calculation results of the subentries. 3. The items are not interfered with each other, and the modified formula and the data items are only effective in the item. 4. And automatically generating a project amount list and the project amount required to be classified by the cost software. This patent liberates project management personnel and project design personnel from a large amount of complicated calculations calculation and communication, has practiced thrift a large amount of time cost and human cost, because the computational process is carried out by the computer simultaneously, has guaranteed the accuracy of computational result, provides reliable guarantee for the result of engineering calculations.
Description
Technical Field
The invention relates to the field related to engineering management, in particular to a road engineering cooperative calculation amount information management system based on a custom formula.
Background
The existing engineering calculation amount can only be calculated by a fixed formula, and meanwhile, the form field is fixed, so that the calculation formulas of different projects and different calculation projects cannot be flexibly changed according to engineering design, the calculation amount process is rigid, once the calculation formulas and the calculation projects are changed, recalculation and summarization are needed, huge workload is generated for related designers, and even if communication is not timely, errors and omissions are generated in the calculation amount of the whole project.
Disclosure of Invention
Therefore, in order to solve the above-mentioned deficiencies, the present invention provides a road engineering collaborative computation amount information management system based on a custom formula; the invention aims to solve the problems that in the engineering calculation process of a design project, if a calculation formula is changed in the design process, the calculation of all engineering drawings needs to be recalculated and summarized again, a great amount of repeated and complicated work is generated for each designer, and in the changing process, calculation errors can occur. Therefore, the invention provides a method for changing the calculation formula, changing the calculation items and automatically calculating the calculation by the building engineering calculation information management system, thereby solving the problem. The system also has the following characteristics that 1, the calculation amount is calculated once without repeated calculation. 2. And the system is in seamless connection with a cost software system.
The invention is realized in such a way that a road engineering collaborative computation information management system based on a self-defined formula is constructed; it is characterized in that;
the system comprises: the system comprises a data processing center, a front-end interactive system, an online form editing module and a data interface service;
the data processing center provides data interaction for a data interaction service, provides data interaction for a front-end interaction system, meets the requirement of database writing and reading, and provides data support for a data interface;
the front-end interactive system is an engineering computation system man-machine interactive system accessed by a user through a browser;
the online form editing module is an online Excel editing module accessed through a browser;
the data interface service is a standard API response service provided by the server side.
The invention relates to a road engineering collaborative computation amount information management system based on a custom formula; it is characterized in that; the system executes the following processes;
1) accessing the engineering calculation system, inputting relevant information of projects, inputting section information (including section pile numbers), and inputting relevant information (including pile number information and later used for calculation) of roads, bridges, tunnels and the like (called sub-items after roads, bridges, tunnels and the like); uploading the standard calculation amount template of the enterprise;
2) entering an engineering computation quantity value management module, automatically generating a project tree by the system, clicking one project, and automatically copying an enterprise standard computation quantity template by the system to generate a project computation quantity template of the project;
3) the system automatically reads the engineering materials, the engineering projects, the related formulas and the related numerical values in the project computation amount template and writes the engineering materials, the engineering projects, the related formulas and the related numerical values into a data center;
4) entering an engineering calculation quantity value filling module, wherein the system automatically generates a directory tree of the project and the sub-items in a recursion manner, clicks one of the sub-items, and reads the engineering material and the project information of the project from the data center to regenerate the data related to the sub-items;
5) filling sub-item calculation amount filling values according to engineering materials and projects;
6) entering an engineering calculation quantity engineering quantity table module, wherein the system automatically generates a directory tree of the item and the sub-items in a recursion manner, clicking one of the sub-items, automatically calculating the data by the data center, writing a calculation result into a copied calculation quantity template of the item, and opening the calculation quantity template on line through an online form editing module so as to facilitate export and copy;
7) entering an engineering calculation amount engineering quantity list module, wherein the system automatically generates a directory tree of the project and the mark segments in a recursion manner, clicking one mark segment, automatically calculating the data by the data center, summarizing according to all sub-items contained in mark segment pile numbers, writing a calculation result into a copied engineering quantity list template of the project, and opening online through an online form editing module to facilitate export and copy;
8) entering an engineering calculation amount engineering amount detailed list module, automatically generating a directory tree of the project and the mark segments by the system in a recursion mode, clicking one mark segment, automatically calculating the data by the data center, summarizing according to all sub-items contained in mark segment pile numbers, writing a calculation result into a copied engineering amount detailed list template of the project, and opening the template on line through an online form editing module to facilitate exporting and copying. And provides a data pushing function, and pushes the data to the cost management system through the data interface service.
The invention relates to a road engineering collaborative computation amount information management system based on a custom formula; it is characterized in that; wherein the execution process of the automatic calculation of the data comprises the following steps:
1) the data center reads the stored project engineering materials, project projects, formulas and reported values;
2) the data center writes the read project engineering materials, project projects, formulas and filling values into a blank Excel table automatically built by the system, rereads the execution result of the Excel formula, and outputs the result to the front-end interactive system;
the invention relates to a road engineering collaborative computation amount information management system based on a custom formula; it is characterized in that; a formula modification data item modification execution process;
1) entering an engineering calculation quantity value management module, clicking one item in the item tree, and modifying and storing the listed formula and data item;
2) the data center writes new formulas and data items, and when automatic calculation of data is performed, calculation is performed according to the new formulas and data items.
The invention has the following advantages: 1. project managers only need to manage the templates, the related formulas and the numerical terms of the projects, and do not need to communicate and issue related materials to designers repeatedly. 2. The designer only needs to fill in the related numerical values of the subentries and does not need to care about the calculation formulas and calculation results of the subentries. 3. The items are not interfered with each other, and the modified formula and the data items are only effective in the item. This patent liberates project management personnel and project design personnel from a large amount of complicated calculations calculation and communication, has practiced thrift a large amount of time cost and human cost, because the computational process is carried out by the computer simultaneously, has guaranteed the accuracy of computational result, provides reliable guarantee for the result of engineering calculations. The system also has the following characteristics that 1, the calculation amount is calculated once without repeated calculation. 2. And the system is in seamless connection with a cost software system.
Drawings
FIG. 1 is a block diagram of the system of the present invention;
fig. 2 is a flow chart of the system of the present invention.
Detailed Description
The present invention will be described in detail with reference to fig. 1-2, and the technical solutions in the embodiments of the present invention will be clearly and completely described, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
The invention provides a road engineering cooperative computation information management system based on a self-defined formula by improvement; as shown in fig. 1, the system includes: the system comprises a data processing center, a front-end interactive system, an online form editing module and a data interface service.
The data processing center provides data interaction for the data interaction service, provides data interaction for the front-end interaction system, meets the requirement of database writing and reading, and provides data support for the data interface.
The front-end interactive system is engineering computation system man-machine interactive software accessed by a user through a browser.
The online form editing module is an online Excel editing module accessed through a browser.
The data interface service is a standard API response service provided by the server side.
The system executes the process:
1) and accessing the engineering calculation system, inputting relevant information of projects, inputting section information (including section pile numbers), and inputting relevant information (including pile number information and later calculation) of roads, bridges, tunnels and the like (called sub-items after roads, bridges, tunnels and the like). And uploading the standard calculation amount template of the enterprise.
2) Entering an engineering calculation quantity value management module, automatically generating a project tree by the system, clicking one project, and automatically copying an enterprise standard calculation quantity template by the system to generate a project calculation quantity template of the project.
3) The system automatically reads the engineering materials, the engineering projects, the related formulas and the related numerical values in the project computation amount template and writes the engineering materials, the engineering projects, the related formulas and the related numerical values into the data center.
4) Entering an engineering calculation quantity value filling module, automatically generating a directory tree of the project and the sub-items by the system in a recursion mode, clicking one of the sub-items, and reading the engineering material and the project information of the project from the data center by the system to regenerate the data related to the sub-items.
5) Filling the sub-item computation amount filling values according to engineering materials and projects.
6) Entering an engineering calculation quantity engineering quantity table module, automatically generating a directory tree of the item and the sub-items by the system through recursion, clicking one of the sub-items, automatically calculating the data by the data center, writing the calculation result into a copied calculation quantity template of the item, and opening the copied calculation quantity template on line through an online form editing module so as to facilitate export and copy.
7) Entering an engineering calculation amount engineering amount list module, automatically generating a directory tree of the project and the mark segments by the system in a recursion mode, clicking one mark segment, automatically calculating the data by the data center, summarizing according to all sub-items contained in mark segment pile numbers, writing a calculation result into a copied engineering amount list template of the project, and opening on line through an online form editing module to facilitate export and copy.
8) Entering an engineering calculation amount engineering amount detailed list module, automatically generating a directory tree of the project and the mark segments by the system in a recursion mode, clicking one mark segment, automatically calculating the data by the data center, summarizing according to all sub-items contained in mark segment pile numbers, writing a calculation result into a copied engineering amount detailed list template of the project, and opening the template on line through an online form editing module to facilitate exporting and copying. And provides a data pushing function, and pushes the data to the cost management system through the data interface service.
Wherein the execution process of the automatic calculation of the data comprises the following steps:
1) the data center reads the stored project engineering materials, project projects, formulas and reported values.
2) And the data center writes the read project engineering materials, project projects, formulas and filling values into a blank Excel table automatically built by the system, rereads the execution result of the Excel formula, and outputs the result to the front-end interactive system.
Formula modification data item modification execution process:
1) entering an engineering calculation quantity value management module, clicking one item in the item tree, and modifying and storing the listed formula and data item.
2) The data center writes new formulas and data items, and when automatic calculation of data is performed, calculation is performed according to the new formulas and data items.
This patent the system have following advantage and beneficial effect:
1. project managers only need to manage the templates, the related formulas and the numerical terms of the projects, and do not need to communicate and issue related materials to designers repeatedly. 2. The designer only needs to fill in the related numerical values of the subentries and does not need to care about the calculation formulas and calculation results of the subentries. 3. The items are not interfered with each other, and the modified formula and the data items are only effective in the item. This patent liberates project management personnel and project design personnel from a large amount of complicated calculations calculation and communication, has practiced thrift a large amount of time cost and human cost, because the computational process is carried out by the computer simultaneously, has guaranteed the accuracy of computational result, provides reliable guarantee for the result of engineering calculations.
The previous description of the disclosed embodiments is provided to enable any person skilled in the art to make or use the present invention. Various modifications to these embodiments will be readily apparent to those skilled in the art, and the generic principles defined herein may be applied to other embodiments without departing from the spirit or scope of the invention. Thus, the present invention is not intended to be limited to the embodiments shown herein but is to be accorded the widest scope consistent with the principles and novel features disclosed herein.
Claims (4)
1. A road engineering cooperative computation information management system based on a custom formula; it is characterized in that;
the system comprises: the system comprises a data processing center, a front-end interactive system, an online form editing module and a data interface service;
the data processing center provides data interaction for a data interaction service, provides data interaction for a front-end interaction system, meets the requirement of database writing and reading, and provides data support for a data interface;
the front-end interactive system is an engineering computation system man-machine interactive system accessed by a user through a browser;
the online form editing module is an online Excel editing module accessed through a browser;
the data interface service is a standard API response service provided by the server side.
2. The road engineering collaborative computation amount information management system based on the custom formula according to claim 1; it is characterized in that; the system executes the following processes;
1) accessing the engineering calculation system, inputting relevant information of projects, inputting section information (including section pile numbers), and inputting relevant information (including pile number information and later used for calculation) of roads, bridges, tunnels and the like (called sub-items after roads, bridges, tunnels and the like); uploading the standard calculation amount template of the enterprise;
2) entering an engineering computation quantity value management module, automatically generating a project tree by the system, clicking one project, and automatically copying an enterprise standard computation quantity template by the system to generate a project computation quantity template of the project;
3) the system automatically reads the engineering materials, the engineering projects, the related formulas and the related numerical values in the project computation amount template and writes the engineering materials, the engineering projects, the related formulas and the related numerical values into a data center;
4) entering an engineering calculation quantity value filling module, wherein the system automatically generates a directory tree of the project and the sub-items in a recursion manner, clicks one of the sub-items, and reads the engineering material and the project information of the project from the data center to regenerate the data related to the sub-items;
5) filling sub-item calculation amount filling values according to engineering materials and projects;
6) entering an engineering calculation quantity engineering quantity table module, wherein the system automatically generates a directory tree of the item and the sub-items in a recursion manner, clicking one of the sub-items, automatically calculating the data by the data center, writing a calculation result into a copied calculation quantity template of the item, and opening the calculation quantity template on line through an online form editing module so as to facilitate export and copy;
7) entering an engineering calculation amount engineering quantity list module, wherein the system automatically generates a directory tree of the project and the mark segments in a recursion manner, clicking one mark segment, automatically calculating the data by the data center, summarizing according to all sub-items contained in mark segment pile numbers, writing a calculation result into a copied engineering quantity list template of the project, and opening online through an online form editing module to facilitate export and copy;
8) entering an engineering calculation amount engineering quantity detailed list module, wherein the system automatically generates a directory tree of the project and the mark segments in a recursion manner, clicking one mark segment, automatically calculating the data by the data center, summarizing according to all sub-items contained in mark segment pile numbers, writing a calculation result into a copied engineering quantity detailed list template of the project, and opening the template on line through an online form editing module so as to facilitate export and copy;
and provides a data pushing function, and pushes the data to the cost management system through the data interface service.
3. The road engineering collaborative computation information management system based on the custom formula according to claim 1; it is characterized in that; wherein the execution process of the automatic calculation of the data comprises the following steps:
1) the data center reads the stored project engineering materials, project projects, formulas and reported values;
2) and the data center writes the read project engineering materials, project projects, formulas and filling values into a blank Excel table automatically built by the system, rereads the execution result of the Excel formula, and outputs the result to the front-end interactive system.
4. The road engineering collaborative computation information management system based on the custom formula according to claim 1; it is characterized in that; a formula modification data item modification execution process;
1) entering an engineering calculation quantity value management module, clicking one item in the item tree, and modifying and storing the listed formula and data item;
2) the data center writes new formulas and data items, and when automatic calculation of data is performed, calculation is performed according to the new formulas and data items.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010877554.5A CN112000724A (en) | 2020-08-27 | 2020-08-27 | Highway engineering collaborative computation amount information management system based on custom formula |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010877554.5A CN112000724A (en) | 2020-08-27 | 2020-08-27 | Highway engineering collaborative computation amount information management system based on custom formula |
Publications (1)
Publication Number | Publication Date |
---|---|
CN112000724A true CN112000724A (en) | 2020-11-27 |
Family
ID=73471945
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202010877554.5A Pending CN112000724A (en) | 2020-08-27 | 2020-08-27 | Highway engineering collaborative computation amount information management system based on custom formula |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN112000724A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113626927A (en) * | 2021-08-23 | 2021-11-09 | 四川公路桥梁建设集团有限公司 | Intelligent reinforcing steel bar laying system based on three-dimensional digitization |
CN114971597A (en) * | 2022-07-29 | 2022-08-30 | 浙江小塔塔峰软件技术有限公司 | Road cost calculation system and method based on BIM calculation amount and metering payment |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102063306A (en) * | 2011-01-06 | 2011-05-18 | 夏春秋 | Technical implementation method for application development through electronic form |
CN102819774A (en) * | 2011-06-09 | 2012-12-12 | 上海市第七建筑有限公司 | Project cost management system and architecture thereof |
CN103136595A (en) * | 2011-11-29 | 2013-06-05 | 北京建龙重工集团有限公司 | On-line management method for project budget generation by material and labor cost analysis |
CN103136626A (en) * | 2011-11-29 | 2013-06-05 | 北京建龙重工集团有限公司 | On-line management method for engineering project |
CN105335905A (en) * | 2015-11-24 | 2016-02-17 | 广州拓欧信息技术有限公司 | Building engineering computation and evaluation system and method |
CN109118123A (en) * | 2018-09-20 | 2019-01-01 | 长江勘测规划设计研究有限责任公司 | Construction for Hydroelectric Project performance rating BIM management method |
CN109165919A (en) * | 2018-08-10 | 2019-01-08 | 深圳云联万企科技有限公司 | A kind of engineering list workout system |
CN109409634A (en) * | 2018-08-23 | 2019-03-01 | 国网天津市电力公司 | A method of the metering of Grid Construction Project project amount is carried out based on project management APP |
CN109784681A (en) * | 2018-12-26 | 2019-05-21 | 中国大唐集团科学技术研究院有限公司 | Power engineering project investment management system |
-
2020
- 2020-08-27 CN CN202010877554.5A patent/CN112000724A/en active Pending
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102063306A (en) * | 2011-01-06 | 2011-05-18 | 夏春秋 | Technical implementation method for application development through electronic form |
CN102819774A (en) * | 2011-06-09 | 2012-12-12 | 上海市第七建筑有限公司 | Project cost management system and architecture thereof |
CN103136595A (en) * | 2011-11-29 | 2013-06-05 | 北京建龙重工集团有限公司 | On-line management method for project budget generation by material and labor cost analysis |
CN103136626A (en) * | 2011-11-29 | 2013-06-05 | 北京建龙重工集团有限公司 | On-line management method for engineering project |
CN105335905A (en) * | 2015-11-24 | 2016-02-17 | 广州拓欧信息技术有限公司 | Building engineering computation and evaluation system and method |
CN109165919A (en) * | 2018-08-10 | 2019-01-08 | 深圳云联万企科技有限公司 | A kind of engineering list workout system |
CN109409634A (en) * | 2018-08-23 | 2019-03-01 | 国网天津市电力公司 | A method of the metering of Grid Construction Project project amount is carried out based on project management APP |
CN109118123A (en) * | 2018-09-20 | 2019-01-01 | 长江勘测规划设计研究有限责任公司 | Construction for Hydroelectric Project performance rating BIM management method |
CN109784681A (en) * | 2018-12-26 | 2019-05-21 | 中国大唐集团科学技术研究院有限公司 | Power engineering project investment management system |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113626927A (en) * | 2021-08-23 | 2021-11-09 | 四川公路桥梁建设集团有限公司 | Intelligent reinforcing steel bar laying system based on three-dimensional digitization |
CN114971597A (en) * | 2022-07-29 | 2022-08-30 | 浙江小塔塔峰软件技术有限公司 | Road cost calculation system and method based on BIM calculation amount and metering payment |
CN114971597B (en) * | 2022-07-29 | 2022-12-06 | 浙江小塔塔峰软件技术有限公司 | BIM-based calculated amount and metering payment road cost calculation system and method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Blacker et al. | CUBIT geometry and mesh generation toolkit 15.1 user documentation | |
Codsi et al. | GEMPACK: General-purpose software for applied general equilibrium and other economic modellers | |
Ardis et al. | Software product lines: a case study | |
US7363578B2 (en) | Method and apparatus for mapping a data model to a user interface model | |
CN106874066A (en) | A kind of virtual machine migration method and device, electronic equipment | |
CN112000724A (en) | Highway engineering collaborative computation amount information management system based on custom formula | |
US20070083543A1 (en) | XML schema template builder | |
EP1618488A2 (en) | System and method in a data table for managing insertion operations in recursive scalable template instances | |
Estublier et al. | Three dimensional versioning | |
US8595610B2 (en) | Method, software and computer system for manipulating aggregated data | |
CN112764743B (en) | Method for automatically generating software based on data model drive | |
CN105653255A (en) | Method arranging report template to automatically generate report files in office frame | |
CN101916267B (en) | Intelligent spatial data object modeling method applied to management of spatial data resource of road system | |
CN110414926A (en) | Account management method, device and computer readable storage medium | |
CN115840567A (en) | Application editing method and related equipment | |
CN106951593B (en) | Method and device for generating configuration file of protection measurement and control device | |
CN103903085A (en) | Method and device for isolating report application scene | |
US20060206497A1 (en) | System and method in a data table for creating recursive scalable template instances | |
CN114895875B (en) | Zero-code visual information system metadata production application method and system | |
CN103345485A (en) | Method and system for automatic generation of mainframe platform dynamic reports | |
CN114896655A (en) | Method, device, equipment and medium for determining component calculated amount in antique building project | |
US20060026522A1 (en) | Method and apparatus for revising data models and maps by example | |
CN113906409A (en) | Row level worksheet security | |
CN106933544A (en) | Declare table generating method and system | |
EP1618490A2 (en) | System and method in a data table for exporting and importing recursive scalable templates |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |