CN105335905A - Building engineering computation and evaluation system and method - Google Patents
Building engineering computation and evaluation system and method Download PDFInfo
- Publication number
- CN105335905A CN105335905A CN201510828302.2A CN201510828302A CN105335905A CN 105335905 A CN105335905 A CN 105335905A CN 201510828302 A CN201510828302 A CN 201510828302A CN 105335905 A CN105335905 A CN 105335905A
- Authority
- CN
- China
- Prior art keywords
- quantities
- appraisal
- building system
- module
- construction work
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Landscapes
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention relates to a building engineering computation and evaluation system and method. The system comprises an associating module, a parameter reading module, an analysis module and a computation and evaluation module, wherein the associating module is used for identifying a building information model object from a building information document and associating a corresponding building system project in a master database with the building information model object; the parameter reading module is used for acquiring the structural parameters of the building information model object according to the structural item corresponding to the building system project and generating a parameter list file of the acquired structural parameters; the analysis module is used for analyzing the parameter list file and determining the definitions of the structural parameters according to the building system project; and the computation and evaluation module is used for estimating the engineering quantity according to the definitions of the structural parameters, evaluating the price of required building resources by querying a unit price catalogue database, and further generating an engineering quantity and evaluation list by combining the engineering quantity and the evaluated result. According to the invention, the efficiency and accuracy of engineering computation and evaluation are greatly increased.
Description
Technical field
The present invention relates to construction work system regions, be specifically related to a kind of construction work calculation amount and appraisal system, simultaneously also correspondingly relate to a kind of construction work calculation amount and valuation methods.
Background technology
Quantities and cost estimate be bidding of construction engineering or formal start before the big event that needed.In prior art, main some special construction calculation volume softwares that use calculate quantities, then bill of quantities is generated, construction costs estimation is carried out again afterwards by quantity surveyor, this scheme is consuming time comparatively of a specified duration, and efficiency is low, and depends on the experience of quantity surveyor, make mistakes than being easier to, when demand has change, need to find corresponding bill of quantities and appraisal entry to carry out manual modification, efficiency is lower.Also predefine inventory list can be used in some construction calculation volume softwares, by user manual typing quantities and cost in predefine inventory list, although this scheme can alleviate the problem of quantity surveyor's part workload, but compare its experience of dependence, still need manually to go operation increase and decrease adjustment bill of quantities and appraisal entry when demand has change time, efficiency is lower equally.
In addition, construction calculation volume softwares a lot of in prior art can not carry out dynamic order according to the entry in bill of quantities and gather the new final inventory institutional framework of generation, and thus dirigibility is not enough.
Summary of the invention
First object of the present invention is, proposes a kind of construction work calculation amount and appraisal system, to improve high efficiency and the accuracy of construction calculation volume and appraisal.
A kind of construction work calculation amount that the present invention proposes and appraisal system, it comprises relating module, parameter read module, parsing module, calculation amount and valuation module; Wherein,
Relating module, identifies BIM object from architecture information document, and by building system project corresponding in master data base and described BIM object association; Described master data base stores each building system project in construction work;
Parameter read module, the structure item corresponding according to described building system project obtains every structural parameters of described BIM object, and the every structural parameters obtained are generated parameter list file;
Parsing module, resolves described parameter list file, and determines the definition of described every structural parameters according to described building system project;
Calculation amount and valuation module, according to the definition estimation quantities of described every structural parameters, and in cargo tracer valency catalog data base, the price of required buildings and resources is evaluated, and incorporation engineering amount and rating result generate quantities and appraisal inventory; Described unit price catalog data base stores the price of various buildings and resources in construction work.
In present invention further optimization scheme, construction work calculation amount and appraisal system also comprise sequence summarizing module, described sequence summarizing module is carried out sequence according to the level in quantities and appraisal inventory belonging to each entry and is gathered, and generates final quantities and appraisal inventory.
Second object of the present invention is, corresponding proposition a kind of construction work calculation amount and valuation methods, and it comprises the following steps:
A1, from architecture information document, identify BIM object, and by building system project corresponding in master data base and described BIM object association;
A2, the structure item corresponding according to described building system project obtain every structural parameters of described BIM object;
A3, the every structural parameters generation parameter list file that will obtain;
A4, described parameter list file to be resolved, and determine the calculation process that described building system project is corresponding;
A5, according to analysis result and described calculation process estimation quantities, and in cargo tracer valency catalog data base, the price of required buildings and resources is evaluated, and incorporation engineering amount and rating result generate quantities and appraisal inventory.
In present invention further optimization scheme, described steps A 1 specifically comprises: automatically identified the BIM object in architecture information document by Object Selection collection formula, and by the coding of building system project corresponding in master data base and described BIM object association.
In present invention further optimization scheme, described steps A 2 is specially: according to the computing formula of counter structure item in building system project, automatically reads every structural parameters of described BIM object.
In present invention further optimization scheme, be specially in described steps A 2: based on question and answer mode typing, read every structural parameters of user's counter structure item typing in building system project.
In present invention further optimization scheme, in described steps A 3, parameter list file transmits so that XML data is streamed, and described steps A 4 is specifically resolved this XML data stream.
In present invention further optimization scheme, further comprising the steps of:
A6, carry out sequence according to the level in quantities and appraisal inventory belonging to each entry and gather, generate final quantities and appraisal inventory.
In present invention further optimization scheme, described steps A 6 is carried out sequence based on the item code of entry and is gathered, and it comprises:
A61, to carry out by analytic hierarchy process according to the item code scope of each entry in bill of quantities and appraisal inventory;
A62, to distribute each entry according to analysis result to corresponding level.
In present invention further optimization scheme, described steps A 6 is carried out sequence based on catalogue subitem and is gathered, and it comprises by User Defined split catalog, distributes each entry in quantities and appraisal inventory and itemizes to each catalogue.
The present invention at least possesses following beneficial effect:
1, directly BIM object can be identified from architecture information document, and the building system item association corresponding with master data base, every structural parameters according to the structure item automatic acquisition BIM object corresponding to building system project of association carry out estimation of approximate quantities, relative to manual typing quantities, high efficiency and accuracy improve all greatly.
2, the price of required buildings and resources can evaluate in cargo tracer valency catalog data base, and be no longer dependent on the experience of quantity surveyor, improve efficiency and the accuracy of appraisal.
3, in further preferred version, can efficiently, neatly quantities and appraisal inventory be carried out sequence and gathered, solve the quick Generating Problems of different inventory structure, the needs of different client can be met when bid.
Accompanying drawing explanation
Fig. 1 is a kind of construction work calculation amount of embodiment one proposition and the modular construction schematic diagram of appraisal system.
Fig. 2 is a kind of construction work calculation amount of embodiment two proposition and the schematic flow sheet of valuation methods.
Embodiment
For the ease of it will be appreciated by those skilled in the art that the present invention is described further below in conjunction with accompanying drawing and embodiment.
As an example, embodiments of the invention can realize based on a building system, this building system is provided with the database such as master data base, unit price catalog data base in advance, also comprises the series of computation serviced component (being referred to as calculation services) etc. for the estimation of performance of work amount and appraisal.Wherein, each building system project in construction work is stored in master data base, such as " walling " is one of them building system project, each building system project is an XML format file, file internal comprises a series of definition of this building system project, such as calculation process, computing formula, structure item (for " walling ", its structure item comprises the length of wall) etc., each building system project is to there being a unique coding.To store in construction work the price of required buildings and resources, capacity data (productionvalue) and bill of quantities data in unit price catalog data base, buildings and resources is brick, cement and artificial etc. such as.
The embodiment of the present invention mainly realizes in conjunction with BIM (BIM, BuildingInformationModeling), is introduced below to each embodiment.
Embodiment one
A kind of construction work calculation amount that the present embodiment proposes and appraisal system, can be considered as the part of functions system of above-mentioned building system, refer to Fig. 1, it mainly comprises relating module 10, parameter read module 20, parsing module 30, calculation amount and valuation module 40; Wherein, each functions of modules is as follows:
Relating module 10, identifies BIM object from architecture information document, and by building system project corresponding in master data base and described BIM object association.As mentioned above, master data base stores each building system project in construction work.
Parameter read module 20, the structure item corresponding according to described building system project obtains every structural parameters of described BIM object, and the every structural parameters obtained are generated parameter list file.For " walling ", structure item comprises the length of wall, and structural parameters then correspond to length, width, highly.
Parsing module 30, resolves described parameter list file, and determines the definition of described every structural parameters according to described building system project.
Calculation amount and valuation module 40, according to the definition estimation quantities of described every structural parameters, and in cargo tracer valency catalog data base, the price of required buildings and resources is evaluated, and incorporation engineering amount and rating result generate quantities and appraisal inventory.As mentioned above.Unit price catalog data base stores the price of various buildings and resources in construction work.
In addition, the present embodiment also preferably comprises sequence summarizing module 50 further, and described sequence summarizing module 50 is carried out sequence according to the level in quantities and appraisal inventory belonging to each entry and gathered, and generates final quantities and appraisal inventory.
The concrete implementation of embodiment one does corresponding detailed introduction in following examples two.
Embodiment two
Corresponding with above-described embodiment one, the present embodiment proposes a kind of construction work calculation amount and valuation methods, and refer to Fig. 2, it mainly comprises the following steps:
S100, from architecture information document, identify BIM object, and by building system project corresponding in master data base and described BIM object association.
Be preferably in step S100: automatically identified the BIM object in architecture information document by Object Selection collection formula, and by the coding of building system project corresponding in master data base and described BIM object association.Be exemplified below:
Object Selection collection formula can be configured in advance in master data base, the sample of formula literary style is as Object (cpiComponentType==" wall "), when user selects association, the BIM object in architecture information document can be automatically identified and automatically distribute association building system project for it, if this BIM is to liking wall (i.e. wall), then by the coding of the building system project of correspondence and this BIM object association, such as being distributed to by coding 01.187 is all BIM objects of wall (i.e. wall).
In addition, the mode such as manually can also be adopted to realize association, such as on system software window, the building system project chosen directly " is dragged " on the window of BIM object (such as supposing that this window shows the figure of a width wall) by user, then the coding assignment of this building system project associates to this BIM object by system automatically.
S200, the structure item corresponding according to described building system project obtain every structural parameters of described BIM object.
Specifically according to the computing formula of counter structure item in building system project, every structural parameters of described BIM object can be automatically read in step S200.
Same for " walling ", the structure item of its correspondence comprises length, and the computing formula at this moment by correspondence reads or calculates every structural parameters from BIM.Such as use computing formula Var_Obj (" length ", m, cpivar) that the length information of wall will be returned.
Other modes also can be adopted in step 200 to obtain every structural parameters, such as, on system software window, based on question and answer mode typing, read every structural parameters of user's counter structure item typing in building system project.
For " walling ", namely on software window with field and fill in the mode that frame combines and carry out " question and answer ", user inputs counter structure parameter in corresponding the filling in frame of (field) length.
S300, the every structural parameters generation parameter list file that will obtain.
In step S00, the every structural parameters obtained are generated parameter list file, so that the calculation services of master data base (being equivalent to the parsing module 30 in embodiment one here) is done estimation and is prepared, it is streamed that this parameter list file can be packaged into XML data, be packaged into service call parameter, transfer to calculation services.
S400, described parameter list file to be resolved, and determine the calculation process that described building system project is corresponding.
In step S400, the calculation services of master data base is resolved XML data stream, can obtain the coding of building system project and determine corresponding calculation process.
S500, according to analysis result and described calculation process estimation quantities, and in cargo tracer valency catalog data base, the price of required buildings and resources is evaluated, and incorporation engineering amount and rating result generate quantities and appraisal inventory.
In step S500, as foregoing description, building system project definition has calculation process, parse the coding of building system project in calculation services after, just may correspond to and read its calculation process, and carry out calculation quantities calculation amount and appraisal in conjunction with every structural parameters, unit price catalog data base, then generate quantities and appraisal inventory, in this inventory, include multiple listing entries.Be exemplified below:
Suppose that a building system project is defined as follows:
Parameter: length (Length), width (Width), highly (Height), volume (Volume)
Formula: volume (F1)=Length*Width*Height
It is high that dimension: D1{1 represents the wide * of long *, and other expressions directly read Volume}
Specification: S1 use what brick 1, common brick; 2, cement brick; 3, blue bricks }
List: T1{ is associated with 2230.011 engineering entries }
T11, reading dimension D1, if 1, so just representative is calculated by length, just goes to read this formula of F1 and the length obtained in the parameter list file parsed, calculates volume.
The bill of quantities entry item code 2230.011 of the definition in T12, reading list T1, generates bill of quantities entry in conjunction with the volume calculated.
T13, reading specification S1, detect it is use common brick, so cargo tracer valency catalog data base, obtain common brick resource entries, associate with the listing entries of harsh one-tenth.
Arrive this, simple quantities calculation amount, cost estimate just complete.If the words of more complicated operation are corresponding have more complicated definition.Multiple list can be defined inside a building system project, also can other building system projects nested.
In the present embodiment, in order to adapt to further needs, further comprises and quantities and appraisal inventory are sorted the step gathered.This is because, the data of the quantities generated in step S500 and appraisal inventory are flattenings store (being different from tree-like storage), but usually when building trade or bid, need to carry out collating sort according to different structures.Such as user wants to remove classification and ordination cost information according to floor, so preferably gather sequence together what all belong to Stall, obtain the structure of Stall, price and inventory.
Particularly, the present embodiment comprises step S600 further:
S600, carry out sequence according to the level in quantities and appraisal inventory belonging to each entry and gather, generate final quantities and appraisal inventory.
The sequence of step S600 gathers can be carried out sequence based on inventory discal patch object item code and gather, and also can adopt to carry out sequence based on catalogue subitem and gather.Sequence based on catalogue subitem gathers namely by User Defined split catalog, distributes each entry in quantities and appraisal inventory and itemizes to each catalogue.
1, comprise the following steps based on the item code of the entry scheme gathered of carrying out sorting:
S610, to carry out by analytic hierarchy process according to the item code scope of each entry in bill of quantities and appraisal inventory.
S620, to distribute each entry according to analysis result to corresponding level.
The present embodiment adopts tree-shaped three-decker catalogue, and be division (branch) respectively, major (mainly), minor (secondary), be below illustrated:
The definition reference table 1 of division:
Table 1
Division | Description |
0 | Notes |
1 | General requirements |
2 | Sitework |
The definition reference table 2 of Majoritemgroup:
Table 2
Major item group | MinValue | Description |
2299.999 | 2200 | Site preparation |
The definition of Minoritemgroup is with reference to 3:
Table 3
Minor Item Group | MinValue | Description |
1309.999 | 1300 | Administrative requirements |
2209.999 | 2200 | Site preparation |
2239.999 | 2230 | Site clearing |
Such as, the distribution table of comparisons of the item code of allocation project amount inventory in systems in which, as shown in table 4:
Table 4
Gather for the sequence of item code 02200.132:
Inquire about in the table of the first level division, before two be that " 02 " so it has just matched " 2Sitework ", then just with the coding of this division, describe as the ground floor element in new hierarchical structure:
Table 5
Division | Description |
2 | Sitework |
Next, item code " 02200.132 " is inquiry in second layer Major shows, and " major is main " entry that so it matches is " 2299.999 ", because it drops among the scope of minimum value 2200 and maximal value 2299.999:
Table 6
Major item group | MinValue | Description |
2299.999 | 2200 | Site preparation |
The definition entries in like manner matched in third layer " minor is secondary " table is " 2209.999 ":
Table 7
Minor Item Group | MinValue | Description |
2209.999 | 2200 | Site preparation |
So these three layers of tree structure catalogues of stack up are just out:
Table 8
Ground floor directory node | 2 | Sitework(Division) |
Second layer directory node | 2299.999 | Site preparation(Major) |
Third layer directory node | 2209.999 | Site preparation(Minor) |
Leaf node | 02200.132 | Silt fence w/plastic roll and stakes |
2, as follows based on catalogue subitem carrying out the sorting scheme that gathers:
Such as, the distribution table of comparisons of the catalogue subitem of allocation project amount inventory in systems in which, as shown in table 9:
Table 9
Meanwhile, suppose that catalogue subitem SF1, SF2, SF3 configuration is as follows:
(1) hierarchical structure of catalogue subitem SF1:
Table 10
Level | Code | Description |
Ground floor | G3 | Site preparation |
The second layer | G300000 | Site Preparation step 1 |
(2) hierarchical structure of catalogue subitem SF2:
Table 11
Level | Code | Description |
Ground floor | 03 | Phase03 |
The second layer | 330000 | Phase03001 |
The second layer | 331219 | Phase03002 |
(3) hierarchical structure of catalogue subitem SF3:
Table 12
Level | Code | Description |
Ground floor | 1 | Floor |
The second layer | 001 | 1st Floor |
The second layer | 002 | 2nd Floor |
The second layer | 003 | 3th Floor |
Gather for the sequence of listing entries 02200.132 equally, according to the configuration that above catalogue is itemized, 02200.132 matches second layer G300000 in SF1, matches the second layer 330000 in SF2, in SF3, match the second layer 001, finally can obtain with following table 13 result:
Table 13
Ground floor directory node | G300000 | Site Preparation step 1 |
Second layer directory node | 330000 | Phase03001 |
Third layer directory node | 001 | 1st Floor |
Leaf node | 02200.132 | Silt fence w/plastic roll and stakes |
In sum, the embodiment of the present invention directly can identify BIM object from architecture information document, and the building system item association corresponding with master data base, every structural parameters according to the structure item automatic acquisition BIM object corresponding to building system project of association carry out estimation of approximate quantities, relative to manual typing quantities, high efficiency and accuracy improve all greatly; Evaluated by the price of buildings and resources required in cargo tracer valency catalog data base, and be no longer dependent on the experience of quantity surveyor, improve efficiency and the accuracy of appraisal; Can efficiently, neatly quantities and appraisal inventory be carried out sequence and gathered in addition, solve the quick Generating Problems of different inventory structure, the needs of different client can be met when bid.
The above embodiment only have expressed several embodiment of the present invention, and it describes comparatively concrete and detailed, but therefore can not be interpreted as the restriction to the scope of the claims of the present invention.It should be pointed out that for the person of ordinary skill of the art, without departing from the inventive concept of the premise, can also make some distortion and improvement, these all belong to protection scope of the present invention.Therefore, the protection domain of patent of the present invention should be as the criterion with claims.
Claims (10)
1. construction work calculation amount and an appraisal system, is characterized in that, comprises relating module, parameter read module, parsing module, calculation amount and valuation module; Wherein,
Relating module, identifies BIM object from architecture information document, and by building system project corresponding in master data base and described BIM object association; Described master data base stores each building system project in construction work;
Parameter read module, the structure item corresponding according to described building system project obtains every structural parameters of described BIM object, and the every structural parameters obtained are generated parameter list file;
Parsing module, resolves described parameter list file, and determines the definition of described every structural parameters according to described building system project;
Calculation amount and valuation module, according to the definition estimation quantities of described every structural parameters, and in cargo tracer valency catalog data base, the price of required buildings and resources is evaluated, and incorporation engineering amount and rating result generate quantities and appraisal inventory; Described unit price catalog data base stores the price of various buildings and resources in construction work.
2. according to the construction work calculation amount shown in claim 1 and appraisal system, it is characterized in that, also comprise sequence summarizing module, described sequence summarizing module is carried out sequence according to the level in quantities and appraisal inventory belonging to each entry and is gathered, and generates final quantities and appraisal inventory.
3. construction work calculation amount and a valuation methods, is characterized in that, comprises the following steps:
A1, from architecture information document, identify BIM object, and by building system project corresponding in master data base and described BIM object association;
A2, the structure item corresponding according to described building system project obtain every structural parameters of described BIM object;
A3, the every structural parameters generation parameter list file that will obtain;
A4, described parameter list file to be resolved, and determine the calculation process that described building system project is corresponding;
A5, according to analysis result and described calculation process estimation quantities, and in cargo tracer valency catalog data base, the price of required buildings and resources is evaluated, and incorporation engineering amount and rating result generate quantities and appraisal inventory.
4. construction work calculation amount according to claim 3 and valuation methods, it is characterized in that, described steps A 1 specifically comprises: automatically identified the BIM object in architecture information document by Object Selection collection formula, and by the coding of building system project corresponding in master data base and described BIM object association.
5. construction work calculation amount according to claim 3 and valuation methods, is characterized in that, described steps A 2 is specially: according to the computing formula of counter structure item in building system project, automatically reads every structural parameters of described BIM object.
6. construction work calculation amount according to claim 3 and valuation methods, is characterized in that, is specially: based on question and answer mode typing in described steps A 2, reads every structural parameters of user's counter structure item typing in building system project.
7. construction work calculation amount according to claim 3 and valuation methods, is characterized in that, in described steps A 3, parameter list file transmits so that XML data is streamed, and described steps A 4 is specifically resolved this XML data stream.
8. construction work calculation amount according to claim 3 and valuation methods, is characterized in that, further comprising the steps of:
A6, carry out sequence according to the level in quantities and appraisal inventory belonging to each entry and gather, generate final quantities and appraisal inventory.
9. construction work calculation amount according to claim 8 and valuation methods, is characterized in that, described steps A 6 is carried out sequence based on the item code of entry and gathered, and it comprises:
A61, to carry out by analytic hierarchy process according to the item code scope of each entry in bill of quantities and appraisal inventory;
A62, to distribute each entry according to analysis result to corresponding level.
10. construction work calculation amount according to claim 8 and valuation methods, it is characterized in that, described steps A 6 is carried out sequence based on catalogue subitem and is gathered, and it comprises by User Defined split catalog, distributes each entry in quantities and appraisal inventory and itemizes to each catalogue.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510828302.2A CN105335905B (en) | 2015-11-24 | 2015-11-24 | Building engineering calculation and evaluation system and method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510828302.2A CN105335905B (en) | 2015-11-24 | 2015-11-24 | Building engineering calculation and evaluation system and method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105335905A true CN105335905A (en) | 2016-02-17 |
CN105335905B CN105335905B (en) | 2020-01-21 |
Family
ID=55286416
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510828302.2A Active CN105335905B (en) | 2015-11-24 | 2015-11-24 | Building engineering calculation and evaluation system and method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105335905B (en) |
Cited By (32)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105844016A (en) * | 2016-03-23 | 2016-08-10 | 中国航空规划设计研究总院有限公司 | Planned building engineering quantity acquisition method based on building model cutting |
CN105956762A (en) * | 2016-04-28 | 2016-09-21 | 上海宝冶集团有限公司 | Engineering budgeting price combination method based on BIM and cloud platform |
CN106295077A (en) * | 2016-08-31 | 2017-01-04 | 江苏国泰新点软件有限公司 | Method for computing work amount and device |
CN106295019A (en) * | 2016-08-15 | 2017-01-04 | 上海宝冶集团有限公司 | Heating ventilation air-conditioning system installation method based on BIM |
CN106373036A (en) * | 2016-09-21 | 2017-02-01 | 广东中建普联科技股份有限公司 | Construction project data automatic recognition and analysis method and system |
CN106845925A (en) * | 2016-12-26 | 2017-06-13 | 钟炜 | Engineering based on the BIM amount of calculating quickly and project high in the clouds collaborative platform soon is to amount method |
CN106875108A (en) * | 2017-01-25 | 2017-06-20 | 北京数码大方科技股份有限公司 | CAD diagram paper resource consumption analysis method and device |
CN107194089A (en) * | 2017-05-27 | 2017-09-22 | 联合建管(北京)国际工程科技有限责任公司 | The cost measurement of model element lists method and device in BIM |
CN107229791A (en) * | 2017-05-27 | 2017-10-03 | 联合建管(北京)国际工程科技有限责任公司 | Cost of construction metering method and device |
CN107273484A (en) * | 2017-06-13 | 2017-10-20 | 广东中建普联科技股份有限公司 | Construction industry engineering project XML file purpose data classifying method and system |
CN107301527A (en) * | 2017-04-17 | 2017-10-27 | 昆明理工大学 | A kind of engineering project subitem method that quickly can precisely evaluate again |
CN107766587A (en) * | 2016-08-16 | 2018-03-06 | ***际物业管理顾问有限公司 | To check the method for building equipment cost |
CN107958043A (en) * | 2017-11-24 | 2018-04-24 | 中科院合肥技术创新工程院 | A kind of electricity power engineering budget inventory automatic generation method |
CN108550000A (en) * | 2018-05-31 | 2018-09-18 | 新奥泛能网络科技有限公司 | It is laid with the cost estimate method and device of direct-buried pipe |
CN108846639A (en) * | 2018-06-12 | 2018-11-20 | 湖南建工集团有限公司 | One kind is based on BIM technology design and construction valuation management system and method |
CN109785018A (en) * | 2019-03-21 | 2019-05-21 | 广州翔实工程咨询有限公司 | Automatic budget and balance method and system based on BIM |
CN109918401A (en) * | 2019-01-25 | 2019-06-21 | 北京海数宝科技有限公司 | Bill of quantities data processing method, device, storage medium and computer equipment |
CN109978502A (en) * | 2019-03-21 | 2019-07-05 | 广州翔实工程咨询有限公司 | Automatic budget method, system and computer storage medium are changed in engineering design |
CN110009302A (en) * | 2019-03-21 | 2019-07-12 | 广州翔实工程咨询有限公司 | Automatic cross rate method, system and storage medium based on BIM and database |
CN110189175A (en) * | 2019-05-29 | 2019-08-30 | 广东粤能工程管理有限公司 | A kind of project cost consulting system and method |
CN110188454A (en) * | 2019-05-27 | 2019-08-30 | 北京建筑大学 | Architectural Equipment and Building Information Model matching process and device |
CN110442903A (en) * | 2019-06-28 | 2019-11-12 | 万翼科技有限公司 | The method and Related product of operation cost calculation amount |
CN110533389A (en) * | 2019-08-27 | 2019-12-03 | 中交水运规划设计院有限公司 | The determination method and device of Project Cost |
CN111553558A (en) * | 2020-03-30 | 2020-08-18 | 宁波市城展建设工程有限公司 | Building cost budgeting method, device and storage medium thereof |
CN111680071A (en) * | 2020-06-12 | 2020-09-18 | 中国雄安集团有限公司 | Method, device, system and medium for generating engineering quantity list |
CN111695833A (en) * | 2020-06-22 | 2020-09-22 | 陕西国防工业职业技术学院 | Engineering cost risk prediction and assessment method |
CN111882206A (en) * | 2020-07-25 | 2020-11-03 | 广州城市职业学院 | Application value evaluation method for building information model adopted in building engineering |
CN112000724A (en) * | 2020-08-27 | 2020-11-27 | 四川公路桥梁建设集团有限公司 | Highway engineering collaborative computation amount information management system based on custom formula |
CN112395680A (en) * | 2020-11-24 | 2021-02-23 | 筑友智造科技投资有限公司 | Method and system for measuring and calculating engineering quantity of prefabrication scheme |
CN112669081A (en) * | 2020-12-31 | 2021-04-16 | 大为国际工程咨询有限公司 | Rapid building cost estimation method and system |
CN112861500A (en) * | 2021-01-14 | 2021-05-28 | 佛山轨道交通设计研究院有限公司 | Engineering pricing table generation method and device based on engineering quantity list |
CN116739632A (en) * | 2023-06-09 | 2023-09-12 | 内蒙古科安数图科技有限公司 | New-built substation engineering estimation system |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1731404A (en) * | 2005-06-06 | 2006-02-08 | 施兆洲 | Method and system for calculating engineering quantity by using computer |
CN101504741A (en) * | 2009-02-18 | 2009-08-12 | 路桥集团国际建设股份有限公司 | Intelligent metering management system and method for construction engineering |
CN101814163A (en) * | 2009-02-20 | 2010-08-25 | 天宝导航有限公司 | The method and system that is used for adaptive construction sequencing |
WO2011099826A2 (en) * | 2010-02-12 | 2011-08-18 | Lee Ki Sang | Method and system for processing information on construction costs containing information on detailed spaces or parts |
CN102722784A (en) * | 2012-05-23 | 2012-10-10 | 成都鹏业软件股份有限公司 | Method for setting list or quota rapidly |
CN103136595A (en) * | 2011-11-29 | 2013-06-05 | 北京建龙重工集团有限公司 | On-line management method for project budget generation by material and labor cost analysis |
KR20130082731A (en) * | 2011-12-15 | 2013-07-22 | 현대중공업 주식회사 | Management system of budget using bill of quantities |
CN103366284A (en) * | 2013-07-18 | 2013-10-23 | 北京今达标正软件开发有限公司 | Tender offer and expense control system |
CN104732034A (en) * | 2015-04-01 | 2015-06-24 | 中铁隆工程集团有限公司 | Constructional engineering budgeting system and working mechanism thereof |
-
2015
- 2015-11-24 CN CN201510828302.2A patent/CN105335905B/en active Active
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1731404A (en) * | 2005-06-06 | 2006-02-08 | 施兆洲 | Method and system for calculating engineering quantity by using computer |
CN101504741A (en) * | 2009-02-18 | 2009-08-12 | 路桥集团国际建设股份有限公司 | Intelligent metering management system and method for construction engineering |
CN101814163A (en) * | 2009-02-20 | 2010-08-25 | 天宝导航有限公司 | The method and system that is used for adaptive construction sequencing |
WO2011099826A2 (en) * | 2010-02-12 | 2011-08-18 | Lee Ki Sang | Method and system for processing information on construction costs containing information on detailed spaces or parts |
CN103136595A (en) * | 2011-11-29 | 2013-06-05 | 北京建龙重工集团有限公司 | On-line management method for project budget generation by material and labor cost analysis |
KR20130082731A (en) * | 2011-12-15 | 2013-07-22 | 현대중공업 주식회사 | Management system of budget using bill of quantities |
CN102722784A (en) * | 2012-05-23 | 2012-10-10 | 成都鹏业软件股份有限公司 | Method for setting list or quota rapidly |
CN103366284A (en) * | 2013-07-18 | 2013-10-23 | 北京今达标正软件开发有限公司 | Tender offer and expense control system |
CN104732034A (en) * | 2015-04-01 | 2015-06-24 | 中铁隆工程集团有限公司 | Constructional engineering budgeting system and working mechanism thereof |
Non-Patent Citations (2)
Title |
---|
戴国红 等: "安装工程量计算特点在算量软件中的应用", 《中国工程咨询》 * |
王兴吉 等: ""阅图式"图形算量计算方法探索", 《计算机工程与设计》 * |
Cited By (39)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105844016A (en) * | 2016-03-23 | 2016-08-10 | 中国航空规划设计研究总院有限公司 | Planned building engineering quantity acquisition method based on building model cutting |
CN105844016B (en) * | 2016-03-23 | 2019-06-07 | 中国航空规划设计研究总院有限公司 | A method of the proposed building quantity of acquisition based on buildings model cutting |
CN105956762A (en) * | 2016-04-28 | 2016-09-21 | 上海宝冶集团有限公司 | Engineering budgeting price combination method based on BIM and cloud platform |
CN106295019A (en) * | 2016-08-15 | 2017-01-04 | 上海宝冶集团有限公司 | Heating ventilation air-conditioning system installation method based on BIM |
CN107766587A (en) * | 2016-08-16 | 2018-03-06 | ***际物业管理顾问有限公司 | To check the method for building equipment cost |
CN106295077A (en) * | 2016-08-31 | 2017-01-04 | 江苏国泰新点软件有限公司 | Method for computing work amount and device |
CN106295077B (en) * | 2016-08-31 | 2019-08-20 | 江苏国泰新点软件有限公司 | Method for computing work amount and device |
CN106373036A (en) * | 2016-09-21 | 2017-02-01 | 广东中建普联科技股份有限公司 | Construction project data automatic recognition and analysis method and system |
CN106845925A (en) * | 2016-12-26 | 2017-06-13 | 钟炜 | Engineering based on the BIM amount of calculating quickly and project high in the clouds collaborative platform soon is to amount method |
CN106875108A (en) * | 2017-01-25 | 2017-06-20 | 北京数码大方科技股份有限公司 | CAD diagram paper resource consumption analysis method and device |
CN107301527A (en) * | 2017-04-17 | 2017-10-27 | 昆明理工大学 | A kind of engineering project subitem method that quickly can precisely evaluate again |
CN107301527B (en) * | 2017-04-17 | 2021-01-05 | 昆明理工大学 | Project evaluation method based on items |
CN107229791A (en) * | 2017-05-27 | 2017-10-03 | 联合建管(北京)国际工程科技有限责任公司 | Cost of construction metering method and device |
CN107194089A (en) * | 2017-05-27 | 2017-09-22 | 联合建管(北京)国际工程科技有限责任公司 | The cost measurement of model element lists method and device in BIM |
CN107273484A (en) * | 2017-06-13 | 2017-10-20 | 广东中建普联科技股份有限公司 | Construction industry engineering project XML file purpose data classifying method and system |
CN107958043A (en) * | 2017-11-24 | 2018-04-24 | 中科院合肥技术创新工程院 | A kind of electricity power engineering budget inventory automatic generation method |
CN107958043B (en) * | 2017-11-24 | 2021-04-27 | 合肥中科加点智能科技有限公司 | Automatic generation method for power grid engineering budget list |
CN108550000A (en) * | 2018-05-31 | 2018-09-18 | 新奥泛能网络科技有限公司 | It is laid with the cost estimate method and device of direct-buried pipe |
CN108846639A (en) * | 2018-06-12 | 2018-11-20 | 湖南建工集团有限公司 | One kind is based on BIM technology design and construction valuation management system and method |
CN108846639B (en) * | 2018-06-12 | 2022-04-15 | 湖南建工集团有限公司 | BIM technology-based design construction pricing management method |
CN109918401A (en) * | 2019-01-25 | 2019-06-21 | 北京海数宝科技有限公司 | Bill of quantities data processing method, device, storage medium and computer equipment |
CN109918401B (en) * | 2019-01-25 | 2021-10-19 | 北京海数宝科技有限公司 | Building engineering list data processing method and device, storage medium and computer equipment |
CN109978502A (en) * | 2019-03-21 | 2019-07-05 | 广州翔实工程咨询有限公司 | Automatic budget method, system and computer storage medium are changed in engineering design |
CN109785018A (en) * | 2019-03-21 | 2019-05-21 | 广州翔实工程咨询有限公司 | Automatic budget and balance method and system based on BIM |
CN110009302A (en) * | 2019-03-21 | 2019-07-12 | 广州翔实工程咨询有限公司 | Automatic cross rate method, system and storage medium based on BIM and database |
CN110188454A (en) * | 2019-05-27 | 2019-08-30 | 北京建筑大学 | Architectural Equipment and Building Information Model matching process and device |
CN110189175A (en) * | 2019-05-29 | 2019-08-30 | 广东粤能工程管理有限公司 | A kind of project cost consulting system and method |
CN110442903A (en) * | 2019-06-28 | 2019-11-12 | 万翼科技有限公司 | The method and Related product of operation cost calculation amount |
CN110533389A (en) * | 2019-08-27 | 2019-12-03 | 中交水运规划设计院有限公司 | The determination method and device of Project Cost |
CN111553558A (en) * | 2020-03-30 | 2020-08-18 | 宁波市城展建设工程有限公司 | Building cost budgeting method, device and storage medium thereof |
CN111680071A (en) * | 2020-06-12 | 2020-09-18 | 中国雄安集团有限公司 | Method, device, system and medium for generating engineering quantity list |
CN111695833A (en) * | 2020-06-22 | 2020-09-22 | 陕西国防工业职业技术学院 | Engineering cost risk prediction and assessment method |
CN111882206A (en) * | 2020-07-25 | 2020-11-03 | 广州城市职业学院 | Application value evaluation method for building information model adopted in building engineering |
CN111882206B (en) * | 2020-07-25 | 2023-11-07 | 广州城市职业学院 | Application value evaluation method for building information model used in building engineering |
CN112000724A (en) * | 2020-08-27 | 2020-11-27 | 四川公路桥梁建设集团有限公司 | Highway engineering collaborative computation amount information management system based on custom formula |
CN112395680A (en) * | 2020-11-24 | 2021-02-23 | 筑友智造科技投资有限公司 | Method and system for measuring and calculating engineering quantity of prefabrication scheme |
CN112669081A (en) * | 2020-12-31 | 2021-04-16 | 大为国际工程咨询有限公司 | Rapid building cost estimation method and system |
CN112861500A (en) * | 2021-01-14 | 2021-05-28 | 佛山轨道交通设计研究院有限公司 | Engineering pricing table generation method and device based on engineering quantity list |
CN116739632A (en) * | 2023-06-09 | 2023-09-12 | 内蒙古科安数图科技有限公司 | New-built substation engineering estimation system |
Also Published As
Publication number | Publication date |
---|---|
CN105335905B (en) | 2020-01-21 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105335905A (en) | Building engineering computation and evaluation system and method | |
CN103279542B (en) | Data import processing method and data processing equipment | |
CN104915456A (en) | Mass power utilization data mining method on the basis of data analysis system | |
CN101572629A (en) | Method and device for processing IP data | |
CN110443499A (en) | A kind of inventory project amount automatic generation method and system | |
CN105260913A (en) | CTR estimation method and system, and DSP server used for Internet advertisement putting | |
CN108256724A (en) | A kind of power distribution network based on dynamic industry coefficient can open method for planning capacity | |
CN105590239A (en) | Real estate price calculating method and system | |
CN102331948A (en) | Resource state-based virtual machine structure adjustment method and adjustment system | |
Hidiroglou et al. | Stratification of skewed populations: a comparison of optimisation‐based versus approximate methods | |
CN112330077A (en) | Power load prediction method, power load prediction device, computer equipment and storage medium | |
Koo et al. | A cost-plus estimating framework for BIM related design and engineering services | |
CN104796467A (en) | Method for calculating limitation range of QoS (quality of service) optimal combined services with QoS correlations | |
CN112419124B (en) | Method and device for quickly identifying low-efficiency industrial land and storage medium thereof | |
CN109544386A (en) | A kind of building concentration earthquake insurance rating method based on Building Information Model | |
CN106126739A (en) | A kind of device processing business association data | |
CN106202347A (en) | A kind of device excavated with useful data for data quality management | |
CN104246812A (en) | Best-deal list generation | |
CN113743791A (en) | Business evaluation method and device for business work order, electronic equipment and medium | |
CN115170196A (en) | Popularization method based on big data intelligent writing | |
CN115358705A (en) | BIPV building-based implementation scheme generation method and information management device | |
CN114971187A (en) | Power supply and utilization contract generation method and system based on robot process automation | |
CN112184350A (en) | User order processing method and device, storage medium and server | |
CN101609532A (en) | Allocation criterion collocation method and system in the application system | |
Rosenberger et al. | Site correspondence effects in benefit transfers: A meta-analysis transfer function |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |