CN111705668B - 一种公路桥梁桥墩支座检修围栏与桥墩的固连方法 - Google Patents

一种公路桥梁桥墩支座检修围栏与桥墩的固连方法 Download PDF

Info

Publication number
CN111705668B
CN111705668B CN202010566200.9A CN202010566200A CN111705668B CN 111705668 B CN111705668 B CN 111705668B CN 202010566200 A CN202010566200 A CN 202010566200A CN 111705668 B CN111705668 B CN 111705668B
Authority
CN
China
Prior art keywords
fence
pier
steel plate
embedded steel
bridge pier
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202010566200.9A
Other languages
English (en)
Other versions
CN111705668A (zh
Inventor
王宏伟
赵对家
季建东
王宁
张晋媛
王彬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanxi Traffic Planning Survey Design Institute Co Ltd
Original Assignee
Shanxi Traffic Planning Survey Design Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanxi Traffic Planning Survey Design Institute Co Ltd filed Critical Shanxi Traffic Planning Survey Design Institute Co Ltd
Priority to CN202010566200.9A priority Critical patent/CN111705668B/zh
Publication of CN111705668A publication Critical patent/CN111705668A/zh
Application granted granted Critical
Publication of CN111705668B publication Critical patent/CN111705668B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

本发明具体是一种公路桥梁桥墩支座检修围栏与桥墩的固连方法,解决了现有检修围栏的固连方式存在预埋件精准定位困难、易发生移位的问题。一种公路桥梁桥墩支座检修围栏与桥墩的固连方法,所述方法包括以下步骤:S1:现浇混凝土筑成桥墩下部结构;S2:绑扎桥墩上部结构钢筋;S3:以预埋钢板为侧向模板,在桥墩下部结构上支模;S4:在预埋钢板的侧壁上垂直贯穿安装若干根栓钉;S5:现浇混凝土筑成桥墩上部结构;S6:将检修围栏焊接于预埋钢板的外侧壁上部;S7:在检修围栏上安装护栏。本发明方便实施,省去了模板采购费用及拆卸模板的工序,降低了施工成本,所安装的检修围栏定位准确,有效提高了检修围栏的稳定性、安全性与耐久性。

Description

一种公路桥梁桥墩支座检修围栏与桥墩的固连方法
技术领域
本发明涉及桥梁工程用施工方法,具体是一种公路桥梁桥墩支座检修围栏与桥墩的固连方法。
背景技术
在桥梁工程中,桥梁在建成之后,都需要对桥梁支座、垫石等结构进行检查及更换等日常维护工作,检修围栏是一种安全有效的检修设施,为作业人员及检修设备提供支撑及安全防护作用,以保证检修作业的顺利进行。目前,检修围栏与桥墩的固连多采用焊接于预埋件的方式。
然而实践表明,现有检修围栏的固连方式存在以下问题:浇筑混凝土时预埋件易发生移位,预埋件的精准定位较难,导致检修围栏安装位置偏移,影响检修围栏的稳定性,带来一定的安全隐患。
发明内容
本发明为了解决现有检修围栏的固连方式存在预埋件精准定位困难、易发生移位的问题,提供了一种公路桥梁桥墩支座检修围栏与桥墩的固连方法。
本发明是采用如下技术方案实现的:
一种公路桥梁桥墩支座检修围栏与桥墩的固连方法,所述方法包括以下步骤:
S1:现浇混凝土筑成桥墩下部结构;
S2:绑扎桥墩上部结构钢筋;
S3:以预埋钢板为侧向模板,在桥墩下部结构上支模;
S4:在预埋钢板的侧壁上垂直贯穿安装若干根栓钉;
S5:现浇混凝土筑成桥墩上部结构;
S6:将检修围栏焊接于预埋钢板的外侧壁上部;
S7:在检修围栏上安装护栏。
所述预埋钢板为一体成型的钢板。
所述检修围栏由若干首尾连接的围栏单元组成。
所述栓钉排列成若干个上下等间距分布的栓钉组,每个栓钉组内的栓钉均沿周向等间距分布。
预埋钢板拐角处的形状与桥墩拐角处的设计形状相一致。
所述预埋钢板与检修围栏均由不锈钢制成。
所述预埋钢板与检修围栏均由耐候钢制成。
本发明将预埋钢板360°包裹于桥墩外侧,与桥墩混凝土浇筑成一体,解决了预埋件移位的问题;同时将多根栓钉锚固于桥墩混凝土内,加固了预埋钢板与桥墩之间的连接作用。
本发明设计了一种全新的检修围栏的固连方法,方便实施,以预埋钢板作为侧向模板,省去了模板采购费用及拆卸模板的工序,降低了施工成本,所安装的检修围栏定位准确,进而确保了检修围栏的强度,有效提高了检修围栏的稳定性、安全性与耐久性,同时使检修围栏的形式更加简洁、明快,提高了检修围栏的观感。
附图说明
图1是本发明中检修围栏安装完成后的结构示意图;
图2是图1的侧视示意图;
图3是检修围栏的俯视示意图。
图中,1-桥墩,2-预埋钢板,3-栓钉,4-检修围栏,5-护栏,6-0号块。
具体实施方式
一种公路桥梁桥墩支座检修围栏与桥墩的固连方法,所述方法包括以下步骤:
S1:现浇混凝土筑成桥墩1下部结构;
S2:绑扎桥墩1上部结构钢筋;
S3:以预埋钢板2为侧向模板,在桥墩1下部结构上支模;
S4:在预埋钢板2的侧壁上垂直贯穿安装若干根栓钉3;
S5:现浇混凝土筑成桥墩1上部结构;
S6:将检修围栏4焊接于预埋钢板2的外侧壁上部;
S7:在检修围栏4上安装护栏5。
所述预埋钢板为一体成型的钢板。
所述检修围栏4由若干首尾连接的围栏单元组成。
所述栓钉3排列成若干个上下等间距分布的栓钉组,每个栓钉组内的栓钉3均沿周向等间距分布。
预埋钢板2拐角处的形状与桥墩1拐角处的设计形状相一致。
所述预埋钢板2与检修围栏4均由不锈钢制成。
所述预埋钢板2与检修围栏4均由耐候钢制成。

Claims (5)

1.一种公路桥梁桥墩支座检修围栏与桥墩的固连方法,其特征在于:所述方法包括以下步骤:
S1:现浇混凝土筑成桥墩(1)下部结构;
S2:绑扎桥墩(1)上部结构钢筋;
S3:以预埋钢板(2)为侧向模板,在桥墩(1)下部结构上支模;支模时将预埋钢板(2)360°包裹于桥墩(1)外侧,使其与桥墩混凝土浇筑成一体,所述预埋钢板(2)为一体成型的钢板;预埋钢板(2)拐角处的形状与桥墩(1)拐角处的设计形状相一致;
S4:在预埋钢板(2)的侧壁上垂直贯穿安装若干根栓钉(3);
S5:现浇混凝土筑成桥墩(1)上部结构;
S6:将检修围栏(4)焊接于预埋钢板(2)的外侧壁上部;
S7:在检修围栏(4)上安装护栏(5)。
2.根据权利要求1所述的一种公路桥梁桥墩支座检修围栏与桥墩的固连方法,其特征在于:所述检修围栏(4)由若干首尾连接的围栏单元组成。
3.根据权利要求1所述的一种公路桥梁桥墩支座检修围栏与桥墩的固连方法,其特征在于:所述栓钉(3)排列成若干个上下等间距分布的栓钉组,每个栓钉组内的栓钉(3)均沿周向等间距分布。
4.根据权利要求1所述的一种公路桥梁桥墩支座检修围栏与桥墩的固连方法,其特征在于:所述预埋钢板(2)与检修围栏(4)均由不锈钢制成。
5.根据权利要求1所述的一种公路桥梁桥墩支座检修围栏与桥墩的固连方法,其特征在于:所述预埋钢板(2)与检修围栏(4)均由耐候钢制成。
CN202010566200.9A 2020-06-19 2020-06-19 一种公路桥梁桥墩支座检修围栏与桥墩的固连方法 Active CN111705668B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010566200.9A CN111705668B (zh) 2020-06-19 2020-06-19 一种公路桥梁桥墩支座检修围栏与桥墩的固连方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010566200.9A CN111705668B (zh) 2020-06-19 2020-06-19 一种公路桥梁桥墩支座检修围栏与桥墩的固连方法

Publications (2)

Publication Number Publication Date
CN111705668A CN111705668A (zh) 2020-09-25
CN111705668B true CN111705668B (zh) 2021-11-23

Family

ID=72541206

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010566200.9A Active CN111705668B (zh) 2020-06-19 2020-06-19 一种公路桥梁桥墩支座检修围栏与桥墩的固连方法

Country Status (1)

Country Link
CN (1) CN111705668B (zh)

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102251481A (zh) * 2011-05-06 2011-11-23 中铁七局集团第一工程有限公司 铁路桥墩分层施工方法及施工装置

Family Cites Families (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE8308465U1 (de) * 1983-03-22 1983-09-08 Maier, Josef, 7611 Steinach Arbeitsbuehne
KR100373077B1 (ko) * 2000-10-24 2003-02-25 주식회사 한진중공업 일체형 콘크리트 날개식 교량점검대 제조방법
JP2006291463A (ja) * 2005-04-06 2006-10-26 Sumitomo Heavy Ind Ltd 鋼製橋脚と鋼製桁との剛結合構造
CN101240566A (zh) * 2008-03-13 2008-08-13 上海交通大学 方钢管混凝土柱与工字钢梁节点连接结构
KR101166052B1 (ko) * 2011-12-02 2012-07-19 주식회사 대호하이테크 교량 점검용 걸이식 점검대 및 그 조립방법
CN102995758B (zh) * 2012-12-14 2014-09-24 金天德 组合型钢管混凝土柱与钢梁的刚接节点
CN203625873U (zh) * 2013-12-02 2014-06-04 国家电网公司 一种建于水塘中的爬梯式电力检修平台
DE202015102148U1 (de) * 2015-04-29 2015-07-02 Hubert Schmid Bauunternehmen Gmbh Wartungssteg
CN205062679U (zh) * 2015-09-11 2016-03-02 安徽省交通规划设计研究总院股份有限公司 一种预制装配式桥梁标准检修装置
CN205804199U (zh) * 2016-06-30 2016-12-14 中铁第四勘察设计院集团有限公司 高速铁路连续梁中墩的检查通道
CN206736717U (zh) * 2017-04-28 2017-12-12 安徽省交通规划设计研究总院股份有限公司 一种装配式桥梁通用养护平台
CN208430425U (zh) * 2018-05-24 2019-01-25 中铁十局集团青岛工程有限公司 一种便于拆卸安装的高速铁路墩顶防护装置
CN109235286A (zh) * 2018-09-26 2019-01-18 中铁二院工程集团有限责任公司 一种免维护快速拼装桥墩吊篮
CN109339229B (zh) * 2018-10-22 2020-09-29 中国十七冶集团有限公司 一种穿孔浆锚预制装配式钢管混凝土框架结构
CN209722772U (zh) * 2019-01-24 2019-12-03 洛阳科博思新材料科技有限公司 一种复合材料桥墩检修平台
CN110685233A (zh) * 2019-09-27 2020-01-14 中宥(平原)科技有限公司 一种高架桥连接部维护栏

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102251481A (zh) * 2011-05-06 2011-11-23 中铁七局集团第一工程有限公司 铁路桥墩分层施工方法及施工装置

Also Published As

Publication number Publication date
CN111705668A (zh) 2020-09-25

Similar Documents

Publication Publication Date Title
CN109267493B (zh) 一种安装横跨河道钢盖梁的施工方法
KR20100003791A (ko) 교량의 프리케스트 합성형 프리스트레스트 박스 거더교시공방법
CN212688680U (zh) 一种混凝土门式墩结构
CN111705668B (zh) 一种公路桥梁桥墩支座检修围栏与桥墩的固连方法
KR20090027052A (ko) 스틸 플레이트를 이용한 프리캐스트 교량 바닥판과 그 시공방법 및 구조
JP2016160686A (ja) 橋脚の交換方法
CN112144412A (zh) 预制装配式柱间系梁的施工方法
KR20080099061A (ko) Psc 교량의 psc 빔 연결용 강가로보
JP4477467B2 (ja) 橋梁の構造およびその架け替え方法
CN113216281B (zh) 超大吨位基桩压锚静载试验***的施工方法
CN211762299U (zh) 一种用于t梁预制的模板和***
CN213682477U (zh) 一种应用于轨道运营线的上盖结构体系
CN210127028U (zh) 龙门吊端头井轨道梁及龙门吊端头井轨道的安装组件
KR200343468Y1 (ko) 프리스트레스트 합성보를 라멘 교량의 슬래브의 중앙부에설치하고 기둥의 상부에 설치된 강재와 연결하여 설치된합성형 라멘 교량
CN112095780A (zh) 一种应用于轨道运营线的上盖结构体系及其实施方法
CN111455817A (zh) 一种斜拉桥整体式钢锚梁及其施工方法
CN113293793A (zh) 一种用于地铁车辆基地盖下预制短柱与基础连接的组件及施工方法
CN221441302U (zh) 一种横跨既有线的门式墩帽梁装配式模板
CN215857280U (zh) 一种高墩跨河大桥穿杠悬挑支撑体系
CN219260729U (zh) 一种不破坏桥墩的对拉支架
CN220266579U (zh) 组装式换撑格构柱及风亭施工支撑***
CN219793662U (zh) 一种钢混组合梁的跨高速施工防护棚
KR102604117B1 (ko) 교량의 거더 지지부에서의 응력흐름을 보강한 거더 지지부 보강부재
CN219908599U (zh) 一种整体式施工平台
CN212404861U (zh) 盖梁施工支模结构

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant