CN110924673A - Construction method of aluminum alloy building template - Google Patents

Construction method of aluminum alloy building template Download PDF

Info

Publication number
CN110924673A
CN110924673A CN201911032753.XA CN201911032753A CN110924673A CN 110924673 A CN110924673 A CN 110924673A CN 201911032753 A CN201911032753 A CN 201911032753A CN 110924673 A CN110924673 A CN 110924673A
Authority
CN
China
Prior art keywords
aluminum alloy
alloy building
installation
building template
model
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201911032753.XA
Other languages
Chinese (zh)
Inventor
方伟
龚辉
韩丽萍
刘群林
郭凡
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China National Chemical Engineering Sixth Construction Co Ltd
Original Assignee
China National Chemical Engineering Sixth Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China National Chemical Engineering Sixth Construction Co Ltd filed Critical China National Chemical Engineering Sixth Construction Co Ltd
Priority to CN201911032753.XA priority Critical patent/CN110924673A/en
Publication of CN110924673A publication Critical patent/CN110924673A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G9/00Forming or shuttering elements for general use
    • E04G9/02Forming boards or similar elements
    • E04G9/06Forming boards or similar elements the form surface being of metal
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G19/00Auxiliary treatment of forms, e.g. dismantling; Cleaning devices

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a construction method of an aluminum alloy building template, which comprises the following steps: designing and processing an aluminum alloy building template, and sticking a two-dimensional code; step two, establishing a virtual installation model in the control center; thirdly, acquiring material receiving information, forming an expected installation model by the control center according to the installation information, and comparing the expected installation model with the corresponding part of the virtual installation model; scanning the two-dimensional code by using a handheld terminal, and installing the aluminum alloy building template at a designed position; identifying the two-dimensional codes in the installation image by the control center, correspondingly combining the two-dimensional codes according to installation information contained in the two-dimensional codes to form an installed part model, and comparing the installed part model with a corresponding part of the virtual installation model; and step six, repeating the step three to the step five until the installation of the designed aluminum alloy building template is completed. The invention controls the construction quality by being taken out of the warehouse and partially installed on the aluminum alloy building template, thereby improving the construction quality and efficiency.

Description

Construction method of aluminum alloy building template
Technical Field
The invention relates to the technical field of building construction. More specifically, the invention relates to a construction method of an aluminum alloy building template.
Background
The aluminum alloy building template is gradually widely applied due to the advantages of convenience in disassembly and assembly, repeated use, environmental protection and the like. However, the construction quality of the existing aluminum alloy building template still needs to depend on the care and experience of constructors, the construction quality is unstable, and the construction efficiency is low. Therefore, it is desirable to design a construction method that can overcome the above-mentioned drawbacks to some extent.
Disclosure of Invention
The invention aims to provide a construction method of aluminum alloy building templates, which is characterized in that a unique two-dimensional code is arranged for each aluminum alloy building template, the aluminum alloy building templates are taken out of a warehouse and partially installed to control the construction quality, and the construction quality and efficiency are improved.
To achieve these objects and other advantages in accordance with the purpose of the invention, there is provided an aluminum alloy building panel construction method including:
designing and processing an aluminum alloy building template according to an engineering building construction drawing and a structure construction drawing, pasting a two-dimensional code on the surface of the obtained aluminum alloy building template, and warehousing, wherein the two-dimensional code comprises installation information of the corresponding aluminum alloy building template;
step two, establishing a virtual installation model of the aluminum alloy building template in a control center;
acquiring material receiving information submitted by constructors, acquiring installation information of the corresponding aluminum alloy building template according to the material receiving information, sending the installation information to a control center, forming an expected installation model by the control center according to the installation information, comparing the expected installation model with the corresponding part of the virtual installation model, if the expected installation model is not matched with the corresponding part of the virtual installation model, enabling the corresponding aluminum alloy building template not to be taken out of the warehouse, and if the expected installation model is matched with the virtual installation model, enabling the corresponding aluminum alloy building template to be taken out of the warehouse;
fourthly, the constructor conveys the aluminum alloy building template which is delivered out of the warehouse to a construction site, uses a handheld terminal to scan the two-dimensional code on the surface of the aluminum alloy building template which is delivered out of the warehouse, and installs the aluminum alloy building template at a design position according to the obtained installation information;
fifthly, the constructor acquires an installation image of the installed part by using the handheld terminal and sends the installation image to the control center, the control center identifies the two-dimensional code in the installation image, the control center correspondingly combines the installation information contained in the two-dimensional code to form an installed part model, the installed part model is compared with the corresponding part of the virtual installation model, if the two-dimensional code is not matched with the corresponding part of the virtual installation model, an alarm signal is sent to the handheld terminal, and if the two-dimensional code is matched with the installation information contained in the virtual installation model, a mark is displayed on the;
and step six, repeating the step three to the step five until the installation of the designed aluminum alloy building template is completed.
Preferably, the construction method of the aluminum alloy building template further comprises the following steps:
and seventhly, pouring concrete, and dismantling the aluminum alloy building template when the strength of the concrete reaches a preset value.
Preferably, in the aluminum alloy building template construction method, the installation information includes size information and installation position information of the corresponding aluminum alloy building template and information of the connected aluminum alloy building templates.
Preferably, in the construction method of the aluminum alloy building template, the material acceptance information includes the number and the type of the aluminum alloy building templates.
Preferably, in the construction method of the aluminum alloy building template, when a constructor removes the aluminum alloy building template, the two-dimensional code on the surface of the aluminum alloy building template is scanned by using the handheld terminal, and the control center deletes the installation information corresponding to the two-dimensional code.
Preferably, in the construction method of the aluminum alloy building template, the virtual installation model is composed of virtual aluminum alloy building templates and corresponds to the designed aluminum alloy building templates one by one.
Preferably, the aluminum alloy building template construction method is matched in the way that the installation position of the aluminum alloy building template corresponds to the virtual installation model.
The invention at least comprises the following beneficial effects:
the method comprises the steps of establishing a virtual installation model, setting a unique two-dimensional code for each aluminum alloy building template, forming an expected installation model by using the two-dimensional code of the aluminum alloy building template to be delivered in a delivery stage, comparing the expected installation model with the virtual installation model, controlling the delivery quality of materials, and forming an installed part model by using the two-dimensional code of the installed aluminum alloy building template in the installation stage to control the installation quality. Through the quality control of two stages and the indicating information carried by the two-dimensional code, the construction quality and efficiency can be improved to a certain extent.
Additional advantages, objects, and features of the invention will be set forth in part in the description which follows and in part will become apparent to those having ordinary skill in the art upon examination of the following or may be learned from practice of the invention.
Drawings
FIG. 1 is a flow chart of the present invention.
Detailed Description
The present invention is further described in detail below with reference to the attached drawings so that those skilled in the art can implement the invention by referring to the description text.
It will be understood that terms such as "having," "including," and "comprising," as used herein, do not preclude the presence or addition of one or more other elements or groups thereof.
In one embodiment, as shown in fig. 1, a method for constructing an aluminum alloy building form includes:
designing and processing an aluminum alloy building template according to an engineering building construction drawing and a structure construction drawing, pasting a two-dimensional code on the surface of the obtained aluminum alloy building template, and warehousing, wherein the two-dimensional code comprises installation information of the corresponding aluminum alloy building template;
step two, establishing a virtual installation model of the aluminum alloy building template in a control center;
acquiring material receiving information submitted by constructors, acquiring installation information of the corresponding aluminum alloy building template according to the material receiving information, sending the installation information to a control center, forming an expected installation model by the control center according to the installation information, comparing the expected installation model with the corresponding part of the virtual installation model, if the expected installation model is not matched with the corresponding part of the virtual installation model, enabling the corresponding aluminum alloy building template not to be taken out of the warehouse, and if the expected installation model is matched with the virtual installation model, enabling the corresponding aluminum alloy building template to be taken out of the warehouse;
fourthly, the constructor conveys the aluminum alloy building template which is delivered out of the warehouse to a construction site, uses a handheld terminal to scan the two-dimensional code on the surface of the aluminum alloy building template which is delivered out of the warehouse, and installs the aluminum alloy building template at a design position according to the obtained installation information;
fifthly, the constructor acquires an installation image of the installed part by using the handheld terminal and sends the installation image to the control center, the control center identifies the two-dimensional code in the installation image, the control center correspondingly combines the installation information contained in the two-dimensional code to form an installed part model, the installed part model is compared with the corresponding part of the virtual installation model, if the two-dimensional code is not matched with the corresponding part of the virtual installation model, an alarm signal is sent to the handheld terminal, and if the two-dimensional code is matched with the installation information contained in the virtual installation model, a mark is displayed on the;
and step six, repeating the step three to the step five until the installation of the designed aluminum alloy building template is completed.
In the technical scheme, the aluminum alloy building template is designed and processed according to the structure of the building, the unique two-dimensional code is set for the aluminum alloy building template, and the two-dimensional code contains information which can enable the aluminum alloy building template to be accurately installed. The control center is a server and is in communication connection with the handheld terminal, and a virtual installation model matched with the real object is established in the control center. The warehouse acquires material receiving information submitted by constructors, acquires corresponding aluminum alloy building templates according to the material receiving information, acquires installation information through two-dimensional codes on the aluminum alloy building templates, and forms expected installation models according to the installation information, namely possible installation structures are combined according to receiving materials. The expected installation model is compared with the virtual installation model, if the expected installation model and the virtual installation model can be matched, the aluminum alloy building template contained in the material is taken out of the warehouse, if the expected installation model and the virtual installation model can be matched, the aluminum alloy building template is not taken out of the warehouse, and through the control in the material ex-warehouse stage, the supervising constructor accurately takes the material according to the requirement, so that the constructor can more accurately understand the aluminum alloy building template, and the construction error is reduced. And the constructor transports the received materials to a construction site, and installs the materials according to the acquired installation information by scanning the two-dimensional codes on the aluminum alloy building template. After the part is installed, constructors acquire an installation image of the installed part, recognize two-dimensional codes in the installation image through a control center, and form an installed part model according to the two-dimensional codes. And comparing the installed part model with the virtual installation model, judging the installed part model to be qualified if the installed part model can be matched with the virtual installation model, prompting the constructor to continue installation, and giving a warning to the constructor to prompt reinstallation if the installed part model and the virtual installation model cannot be matched with each other. And repeating the material receiving and installation operations until the construction is completed. According to the technical scheme, the virtual installation model is established, the only two-dimension code is set for each aluminum alloy building template, the expected installation model is formed by the two-dimension code of the aluminum alloy building template to be delivered from the warehouse in the warehouse-out stage and is compared with the virtual installation model to control the delivery quality of the material, and the installed part model is formed by the two-dimension code of the installed aluminum alloy building template in the installation stage to control the installation quality. Through the quality control of two stages and the indicating information carried by the two-dimensional code, the construction quality and efficiency can be improved to a certain extent.
In another technical scheme, the construction method of the aluminum alloy building template further comprises the following steps:
and seventhly, pouring concrete, and dismantling the aluminum alloy building template when the strength of the concrete reaches a preset value. The subsequent steps after the installation are provided here, the preset value preferably being 1.2 Mpa.
In another technical scheme, in the aluminum alloy building template construction method, the installation information includes size information and installation position information of the corresponding aluminum alloy building templates and information of the connected aluminum alloy building templates. The preferable content of the installation information is provided, and the installation is convenient for constructors.
In another technical scheme, in the construction method of the aluminum alloy building template, the material acceptance information comprises the number and the type of the aluminum alloy building templates. The preferred content of the material receiving information is provided, and the control center can control the delivery conveniently.
In another technical scheme, in the construction method of the aluminum alloy building template, when a constructor removes the aluminum alloy building template, the constructor uses the handheld terminal to scan the two-dimensional code on the surface of the aluminum alloy building template, and the control center deletes the installation information corresponding to the two-dimensional code. The aluminum alloy building template can be used for multiple times, and information is deleted after the construction is finished and the aluminum alloy building template is dismantled, so that the interference on the next use is avoided.
In another technical scheme, in the construction method of the aluminum alloy building template, the virtual installation model consists of virtual aluminum alloy building templates and corresponds to the designed aluminum alloy building templates one by one. A preferred configuration of the virtual installation model is provided herein to facilitate comparison with the expected installation model and the installed part model, and to determine whether there is a match.
In another technical scheme, the aluminum alloy building template construction method is matched in the way that the installation position of the aluminum alloy building template corresponds to the virtual installation model. Here, each aluminum alloy building template has a unique two-dimensional code, each virtual aluminum alloy building template also uniquely corresponds to the two-dimensional code, and the relative position of each aluminum alloy building template is uniquely determined and uniquely corresponds to the virtual aluminum alloy building template. And when the positions of the actually installed aluminum alloy building templates and the virtual aluminum alloy building templates in the virtual installation model do not correspond, judging that the aluminum alloy building templates and the virtual aluminum alloy building templates are not matched.
The number of apparatuses and the scale of the process described herein are intended to simplify the description of the present invention. Applications, modifications and variations of the aluminum alloy building panel construction method of the present invention will be apparent to those skilled in the art.
While embodiments of the invention have been described above, it is not limited to the applications set forth in the description and the embodiments, which are fully applicable in various fields of endeavor to which the invention pertains, and further modifications may readily be made by those skilled in the art, it being understood that the invention is not limited to the details shown and described herein without departing from the general concept defined by the appended claims and their equivalents.

Claims (7)

1. The construction method of the aluminum alloy building template is characterized by comprising the following steps:
designing and processing an aluminum alloy building template according to an engineering building construction drawing and a structure construction drawing, pasting a two-dimensional code on the surface of the obtained aluminum alloy building template, and warehousing, wherein the two-dimensional code comprises installation information of the corresponding aluminum alloy building template;
step two, establishing a virtual installation model of the aluminum alloy building template in a control center;
acquiring material receiving information submitted by constructors, acquiring installation information of the corresponding aluminum alloy building template according to the material receiving information, sending the installation information to a control center, forming an expected installation model by the control center according to the installation information, comparing the expected installation model with the corresponding part of the virtual installation model, if the expected installation model is not matched with the corresponding part of the virtual installation model, enabling the corresponding aluminum alloy building template not to be taken out of the warehouse, and if the expected installation model is matched with the virtual installation model, enabling the corresponding aluminum alloy building template to be taken out of the warehouse;
fourthly, the constructor conveys the aluminum alloy building template which is delivered out of the warehouse to a construction site, uses a handheld terminal to scan the two-dimensional code on the surface of the aluminum alloy building template which is delivered out of the warehouse, and installs the aluminum alloy building template at a design position according to the obtained installation information;
fifthly, the constructor acquires an installation image of the installed part by using the handheld terminal and sends the installation image to the control center, the control center identifies the two-dimensional code in the installation image, the control center correspondingly combines the installation information contained in the two-dimensional code to form an installed part model, the installed part model is compared with the corresponding part of the virtual installation model, if the two-dimensional code is not matched with the corresponding part of the virtual installation model, an alarm signal is sent to the handheld terminal, and if the two-dimensional code is matched with the installation information contained in the virtual installation model, a mark is displayed on the;
and step six, repeating the step three to the step five until the installation of the designed aluminum alloy building template is completed.
2. The aluminum alloy building panel construction method of claim 1, further comprising:
and seventhly, pouring concrete, and dismantling the aluminum alloy building template when the strength of the concrete reaches a preset value.
3. The aluminum alloy building panel construction method of claim 1, wherein the installation information includes size information of the corresponding aluminum alloy building panel, installation position information, and information of the connected aluminum alloy building panels.
4. The aluminum alloy building panel construction method of claim 1, wherein the material acceptance information includes the number and kind of aluminum alloy building panels.
5. The aluminum alloy building template construction method of claim 2, wherein when a constructor removes the aluminum alloy building template, the constructor uses a handheld terminal to scan the two-dimensional code on the surface of the aluminum alloy building template, and the control center deletes the installation information corresponding to the two-dimensional code.
6. The aluminum alloy building panel construction method of claim 1, wherein the virtual installation model is composed of virtual aluminum alloy building panels and corresponds to the designed aluminum alloy building panels one to one.
7. The aluminum alloy building template construction method of claim 6, wherein the matching means that the installation position of the aluminum alloy building template corresponds to the virtual installation model.
CN201911032753.XA 2019-10-28 2019-10-28 Construction method of aluminum alloy building template Pending CN110924673A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201911032753.XA CN110924673A (en) 2019-10-28 2019-10-28 Construction method of aluminum alloy building template

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201911032753.XA CN110924673A (en) 2019-10-28 2019-10-28 Construction method of aluminum alloy building template

Publications (1)

Publication Number Publication Date
CN110924673A true CN110924673A (en) 2020-03-27

Family

ID=69849696

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201911032753.XA Pending CN110924673A (en) 2019-10-28 2019-10-28 Construction method of aluminum alloy building template

Country Status (1)

Country Link
CN (1) CN110924673A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112613695A (en) * 2020-11-27 2021-04-06 中建三局第一建设工程有限责任公司 Plastic formwork and full-period construction method thereof

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4606603B2 (en) * 2001-01-15 2011-01-05 ▲隆▼ 齊藤 Method for constructing formwork for concrete wall and steel formwork used therefor
CN104268708A (en) * 2014-10-09 2015-01-07 湖南普云智能科技有限公司 Building template intelligent managing system and method based on cloud intelligence technology
CN106351439A (en) * 2016-08-29 2017-01-25 中国建筑第七工程局有限公司 Aluminum alloy template construction technology and method
CN106988525A (en) * 2017-04-25 2017-07-28 中国水利水电第十工程局有限公司 A kind of skyscraper aluminum alloy mould plate construction method
CN108491631A (en) * 2018-03-23 2018-09-04 中国十七冶集团有限公司 A kind of aluminum alloy mould plate construction method based on BIM technology
CN109680924A (en) * 2018-12-31 2019-04-26 宁波二十冶建设有限公司 A kind of aluminum alloy mould plate and construction method with planar bar code technology

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4606603B2 (en) * 2001-01-15 2011-01-05 ▲隆▼ 齊藤 Method for constructing formwork for concrete wall and steel formwork used therefor
CN104268708A (en) * 2014-10-09 2015-01-07 湖南普云智能科技有限公司 Building template intelligent managing system and method based on cloud intelligence technology
CN106351439A (en) * 2016-08-29 2017-01-25 中国建筑第七工程局有限公司 Aluminum alloy template construction technology and method
CN106988525A (en) * 2017-04-25 2017-07-28 中国水利水电第十工程局有限公司 A kind of skyscraper aluminum alloy mould plate construction method
CN108491631A (en) * 2018-03-23 2018-09-04 中国十七冶集团有限公司 A kind of aluminum alloy mould plate construction method based on BIM technology
CN109680924A (en) * 2018-12-31 2019-04-26 宁波二十冶建设有限公司 A kind of aluminum alloy mould plate and construction method with planar bar code technology

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112613695A (en) * 2020-11-27 2021-04-06 中建三局第一建设工程有限责任公司 Plastic formwork and full-period construction method thereof

Similar Documents

Publication Publication Date Title
CN111400812B (en) BIM-based fabricated structural shear wall machining diagram design method
CN111627099B (en) Steel structure non-contact actual measurement real quantity method and system based on three-dimensional scanning technology
CN101287574B (en) Trading method for constructing three-dimensional objects
CN105888248A (en) Construction method of guiding informationization prefabricated member based on BIM (Building Information Modeling)) technology
CN106533476A (en) Method and system for binding vehicle and vehicle-mounted terminal
CN110924673A (en) Construction method of aluminum alloy building template
CN106203812A (en) The industrialized data processing method of building decoration, Apparatus and system
CN214796310U (en) Immersive virtual reality interactive teaching system for building assembly
CN108734443A (en) A kind of project installation and assembly method, device, system and technological process method
CN109558629B (en) Method and device for generating reinforcement arrangement scheme
CN202230490U (en) Bar code scanning contrasting error proof system
CN110780625B (en) Automatic control method, device and equipment for pre-assembly line and storage medium
CN105681284A (en) Method for automatically creating account and server
EP3543878A1 (en) Systems and methods for lean ortho correction for computer models of structures
US10282491B2 (en) System and method for engineering and detailing steel joints in a steel structure
CN110306809A (en) Steel construction curtain wall location and installation method for correcting error based on BIM 3 D laser scanning
KR102588818B1 (en) method and system for outputs design drawings as 3D images using IoT image processing devices at the construction site
CN110427648A (en) Structure attribute acquisition methods and Related product
CN115600277A (en) Method for binding reinforcing steel bars in bridge cable tower anchoring area based on software secondary development technology
CN114541773A (en) Curved surface metal curtain wall installation and appearance monitoring method based on BIM technology
KR101702181B1 (en) Road Facilities Construction Method
CN211499761U (en) Aluminum alloy template with two-dimensional code technology
CN108111480B (en) Data processing method
CN111191758A (en) Equipment binding code and binding method and binding system thereof
CN116229498B (en) Automatic recognition method for column reinforcement information

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20200327