CN106988525A - A kind of skyscraper aluminum alloy mould plate construction method - Google Patents

A kind of skyscraper aluminum alloy mould plate construction method Download PDF

Info

Publication number
CN106988525A
CN106988525A CN201710276378.8A CN201710276378A CN106988525A CN 106988525 A CN106988525 A CN 106988525A CN 201710276378 A CN201710276378 A CN 201710276378A CN 106988525 A CN106988525 A CN 106988525A
Authority
CN
China
Prior art keywords
wall column
plate
template
support bar
formwork
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710276378.8A
Other languages
Chinese (zh)
Inventor
王海星
李祝庆
李潇
张举阳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sinohydro Bureau 11 Co Ltd
Sinohydro Bureau 11 Zhengzhou Co Ltd
Original Assignee
Sinohydro Bureau 11 Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sinohydro Bureau 11 Co Ltd filed Critical Sinohydro Bureau 11 Co Ltd
Priority to CN201710276378.8A priority Critical patent/CN106988525A/en
Publication of CN106988525A publication Critical patent/CN106988525A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G11/00Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
    • E04G11/02Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for rooms as a whole by which walls and floors are cast simultaneously, whole storeys, or whole buildings
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G13/00Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills
    • E04G13/02Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills for columns or like pillars; Special tying or clamping means therefor
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G13/00Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills
    • E04G13/04Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills for lintels, beams, or transoms to be encased separately; Special tying or clamping means therefor
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G17/00Connecting or other auxiliary members for forms, falsework structures, or shutterings
    • E04G17/14Bracing or strutting arrangements for formwalls; Devices for aligning forms
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G19/00Auxiliary treatment of forms, e.g. dismantling; Cleaning devices

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The invention belongs to technical field of building construction, it is related to a kind of skyscraper aluminum alloy mould plate construction method.Including, step 1, the surveying setting-out of model sheetinstallat 1.1;1.2 foundation construction;1.3 wall column formworks are installed;1.4 beam forms are installed;1.5 the template die is installed;Formwork reinforcement described in 1.6;The actual measurement actual quantities correction of 1.7 templates;1.7.1 wall column surveys the correction of actual quantities;1.7.2 top plate surveys the correction of actual quantities;1.8 reinforce ending and check and accept;Wall column formwork is removed in step 2 form removable 2.1;2.2 remove backform;2.3 remove support bar;Beneficial effects of the present invention are:Concrete construction quality is significantly improved;Save a large amount of construction periods;Reduce cost.

Description

A kind of skyscraper aluminum alloy mould plate construction method
Technical field
The invention belongs to technical field of building construction, it is related to a kind of skyscraper aluminum alloy mould plate construction method.
Background technology
Form work engineering be one in reinforced concrete building engineering have a large capacity and a wide range, one of vital construction technology, The quality that form work engineering is implemented directly affects the key elements such as progress, cost, quality, safety and the environmental protection of project construction.Mesh There is relatively low technology content, low construction efficiency, waste people in the template systems such as wood plywood template, the steel form that preceding market is present Work, it is seriously polluted the problems such as, the green construction advocated with harmonious society, energy-saving and emission-reduction greatly differ from each other.Traditional plank sheathing construction, is mixed Solidifying soil presentation quality is difficult to ensure that the concrete after shaping various mass defects occurs, such as more:It is honeycomb, pitted skin, spillage, rotten Root, faulting of slab ends, curtain etc., concrete surface flatness, perpendicularity are difficult to reach code requirement after turnover repeatedly.Template industry is urgent Expect the appearance for the template system that service efficiency is high, integrated cost is low.As new generation of green template, aluminum alloy mould plate will draw Lead the developing direction and quality of template industry.In skyscraper, especially for reproducible floor it is more when, aluminum alloy mould plate The number of turnover is more, good economy performance, efficiency of construction are high, especially prominent to the low advantage of mechanical dependency degree.Aluminum alloy mould plate is to build Forth generation template of the building mould after it experienced plank sheathing, steel form, plastic formwork, as new generation of green template, aluminium is closed Golden template will lead template industry development direction.Aluminum alloy mould plate is as a kind of new construction material, with lightweight, dismounting Convenient, rigidity is high, plate face is big, piece is few, stability good, precision is high, smooth bright and clean, the service life length that pours formation of concrete, The number of turnover is more, good economy performance, recovery value high, construction speed is fast, efficiency of construction is high, job site is safe, clean and tidy, construction shape As it is good, low to mechanical degree of dependence, have a wide range of application, environmental protection the features such as, meet China advocate low-carbon, energy-conservation political affairs Plan, is worth promoting the use of a large area in China.
The content of the invention
The purpose of the present invention be in view of the shortcomings of the prior art there is provided a kind of skyscraper aluminum alloy mould plate construction method, Including,
Step 1, model sheetinstallat
1.1 surveying setting-outs, the good wall column line of bullet and wall column control line, wherein hole line, wall column control line distance on floor Wall sideline 200mm;Floor absolute altitude control point is indicated on post longitudinal rib, is marked by sticking two-faced adhesive tape, and with mouth under double faced adhesive tape As absolute altitude control point, absolute altitude control point is that the corner and corner of wall column are respectively provided with control at story height above 500mm Point;
1.2 foundation constructions, including wall column reinforcing bar and wall column Hydroelectric Project Construction are installed, the wall column Hydroelectric Project Construction includes pre-buried water Electronic box box, spool, reserved opening;
1.3 wall column formworks are installed;
1.3.1 the wall column position floor absolute altitude is checked, the wall column position floor absolute altitude is checked according to absolute altitude control point Whether meet the requirements, what is be higher by cuts, timber wedge on low pad controls the floor absolute altitude error within 5mm;
1.3.2 spacer bar is implanted on the wall column root line side, in the cement that same wall thickness is set in the wall column Stay or reinforcing bar inner bracing strip, inner bracing strip two ends prop up template;
1.3.3 template, uniform brushing releasing agent are made an overall screening;
1.3.4 the assembled template, closes before the wall column formwork, inserts the wall column formwork fastening screw and be inserted in Pvc pipe, sleeve pipe and the cheek board face contact position of wall two are smooth;
1.3.5 the head of pin is embedded in the inside lock template when wall column formwork is connected with inside lock template Portion, the selling sheet of the wall column formwork connecting pin will be installed from top to bottom;
1.3.6 good mortar is blocked up within 12 hours before casting concrete;
1.4 beam forms are installed, and good beam bottom board assembled first simultaneously installed support bar, and beam bottom is adjusted with support bar to designing mark Height, beam bottom support bar answers vertical non-loosening, then assembled side template;
Template die described in 1.5 is installed, and first installs the inner corner trim of floorboard, and then keel of assembled floorboard and installing are supported, With support bar adjustable plate bottom to designed elevation, plate bottom support bar answers vertical non-loosening, installs and install floorboard after keel successively On-gauge plate;
Formwork reinforcement described in 1.6, carries out the reinforcing of the wall column formwork after the completion of integral mold plate is assembled;
The actual measurement actual quantities correction of 1.7 templates;
1.7.1 wall column surveys the correction of actual quantities:
After the completion of wall column formwork is reinforced, the relative position in wall column both sides installs bearing diagonal, and bearing diagonal one end is fixed on the back of the body On stupefied, the other end is fixed on flooring with setscrew, and perpendicularity and the journal offset that wall column is checked with steel tape are fallen with line, and It is corrected according to wall column control line, wall column perpendicularity deviation should be controlled in the range of 5mm;
1.7.2 top plate surveys the correction of actual quantities:
According to floor absolute altitude, beam bottom levelness is first checked with infrared ray, regulation Adjustable bracing bar is to beam bottom level, then with red The horizontal extreme difference of outer ray examination top plate, adjusts each support bar of top plate, the same horizontal extreme difference control of span inside ceiling panel is in 5mm In the range of;
1.8 reinforce ending and check and accept;
1.8.1 treat that beam reinforced steel bar colligation is finished, drop plate and reversed beam, caisson are installed, the position of caisson placing is accurate, tight Gu;
Step 2 form removable
2.1 remove wall column formwork
Wall column side form is removed when concrete strength reaches 1.2Mpa, bearing diagonal is first removed, then remove the pin of aluminum dipping form connection Pin piece;
2.2 remove backform
According to the early removing system of aluminum dipping form, intensity reaches that 50% rear of design strength is dismountable after the completion of concreting Backform, backform is removed since the position that beam, plate support bar are connected, removes the coupled company of beam, plate support bar pin selling sheet Fitting, followed by removes the pin selling sheet of beam adjacent thereto, plate, should first tear side template, beam bottom board during form removal open in order Plate, then removes the keel of floorboard, then removes the template of standard;
2.3 remove support bar
The dismounting of support bar should meet《Concrete structure engineering job specfication》GB50666-2011 is removed on bed die Concrete strength requirement.
Further, in step 1.6, the wall column formwork is reinforced by installing back cord on through-wall bolt.
Further, in step 2.1, the wall column side form is removed in concreting after 12 hours.
Further, in step 2.2, concreting removes the backform after 48 hours.
Further, in step 2.3, concreting is torn open after the plate bottom support, 336 hours days are removed after 240 hours Except beam bottom support, the cantilever bottom support is removed after 672 hours.
Beneficial effects of the present invention are:
(1) quality:By using aluminum alloy mould plate, concrete construction quality is significantly improved;
(2) duration:" early removing system " safety and stability of aluminum alloy mould plate, part of encorbelmenting is equipped with 6 sets of support systems, beam Be equipped with 4 sets, 3 sets of board member outfit, under normal service condition, its speed of application can reach every 100 hours or so one layer.Aluminium is closed Golden mould plate technique carries out material transmission using material transfer mouthful, without discharging platform, a large amount of tower crane transhipment times is saved, so as to shorten master The body construction duration;
(3) it is economical:
Project No. 4 plot 8#, 10# building is marked as measuring and calculating object, aluminum alloy pattern plate and plank sheathing using certain shanty town nine of air harbor the 8th (tube clamps containing frame) are included in market price;
1) aluminum alloy pattern plate mode is used
According to aluminum alloy pattern plate, it is only necessary to buy the aluminum alloy pattern plate of 1 index bed, aluminum alloy pattern plate need to be bought by calculating Dan Donglou 2500m2 (i.e. individual layer exhibition Model area), aluminum alloy pattern plate 1050 yuan/m2 of unit price (actual purchase area), Dan Donglou total prices 2500m2* 1050 yuan/m2=2625000 members.Dan Donglou construction complete, aluminum alloy pattern plate typically have 70% standard element can recycling, Therefore during one building of construction, required aluminum alloy pattern plate takes for 2625000* (1-70%)=787500 yuan;
2) plank sheathing mode is used
According to plank sheathing, shuttering supporting scaffold and fastener take 10 yuan/m2 (construction area), 50 yuan/m2 of form cost (exhibitions Model area), generally, a set of template can use 6 layers, and a building needs 6 sets of templates, therefore 10 yuan of Dan Donglou costs/ M2*21847.24m2+50*2500*6=968472 members;
Pass through comparative analysis, it is contemplated that the effective access times of aluminum alloy pattern plate are at least up to 100 times (i.e. three buildings), access times More, construction building number is more, and cost is lower, and economic benefit is higher.And when using plank sheathing construction, required expense is constant, because This is more many than using plank sheathing reduction using the expense of aluminum alloy pattern plate;
(4) experience and social benefit:At present, the construction of the economic comprehensive test region in Zhengzhou air harbor, is the great war in center Slightly dispose, this project will give full play to intrinsic advantage, be bold in innovation as the first stop exploited market, do an engineering, tree one Face flag, opens up a side market, casts a monument.Adhere to the theory item to manage with innovation, with the spiritual management project provided quality goods or brilliant, use The pursuit planned project of green construction is created, with information-based strength equipment Project, group company is established in Zhengzhou air harbor area Image and brand influence.
Brief description of the drawings
Fig. 1 is the flow chart of construction method of the present invention.
Embodiment
With reference to the accompanying drawings and detailed description, the present invention is further illustrated.
Embodiment one
The construction method, as shown in figure 1, including,
(1) the good wall column line of bullet and wall column control line, hole line on floor, wherein wall column control line is apart from wall sideline 200mm, can examine wall body template whether off normal and perpendicularity.Floor absolute altitude control point is indicated on post longitudinal rib, by pasting Double faced adhesive tape is marked, and mouth is as absolute altitude control point using under double faced adhesive tape, and absolute altitude control point is floor+500mm, the corner of wall column and is turned Control point is respectively provided with angle, to check floor face absolute altitude.
(2) installation wall column reinforcing bar and pre-buried water power chamber, spool, reserved opening etc., handle acceptance of concealed work after finishing Formality.
(3) wall column formwork is installed
1) install before wall column formwork, check whether wall column position, floor absolute altitude meet the requirements according to absolute altitude control point, be higher by Cut, timber wedge on low pad, control floor absolute altitude error within 5mm.
2) spacer bar is implanted on the line side of wall column root, prevents the positioning when reinforcing, same wall thickness is set in wall column Cement inner bracing strip or reinforcing bar inner bracing strip, inner bracing strip two ends prop up template.
3) before wall column formwork is installed, it is necessary to template is made an overall screening, on brushing releasing agent.
4) before assembled formwork, closing wall column formwork, wall column formwork fastening screw need to be inserted and pvc pipe is inserted in, simultaneously Ensure that sleeve pipe and the cheek board face contact position of wall two are smooth, so as to which Screw arbor with nut at both-ends can be withdrawn after pouring into a mould.
5) in order to remove conveniently, the head of pin should be as far as possible in inside lock when wall column formwork is connected with inside lock template Inside template, the selling sheet of wall column formwork connecting pin will from top to bottom, in order to avoid being come off in casting concrete, pin spacing must not More than 300mm.
6) to prevent from blocking up good mortar on request in 12 hours before mouth running pulp under wall column formwork, casting concrete, prevent to use cement Mouth under bag or foam blocking, it is to avoid cause bad root phenomenon.
(4) beam forms is installed
Carry out aluminum alloy mould plate assembled, good beam bottom board assembled first has simultaneously installed support bar, with support bar adjust beam bottom to Designed elevation, beam bottom support bar answers vertical non-loosening, then assembled side template.
(5) template die is installed
Install after wall column, beam forms, assembled template die, the inner corner trim of floorboard is installed first, then the dragon of assembled floorboard Bone and installing is supported, and with support bar adjustable plate bottom to designed elevation, plate bottom support bar is answered vertical non-loosening, installed after keel The on-gauge plate of floorboard just can be installed successively.
(6) formwork reinforcement
The reinforcing of wall column formwork is carried out after the completion of integral mold plate is assembled, that is, back cord is installed.Back cord is installed on through-wall bolt And answer two people to be carried out simultaneously in the both sides of wall column.
(7) template actual measurement actual quantities correction
1) wall column surveys the correction of actual quantities:
After the completion of wall column formwork is reinforced, the relative position in wall column both sides installs bearing diagonal, and bearing diagonal one end is fixed on the back of the body On stupefied, the other end is fixed on flooring with setscrew, and perpendicularity and the journal offset that wall column is checked with steel tape are fallen with line, and It is corrected according to wall column control line, wall column perpendicularity will not be offset in casting concrete, wall column perpendicularity deviation should be controlled In the range of 5mm.
2) top plate surveys the correction of actual quantities:
According to floor absolute altitude, first checked with infrared ray beam bottom whether level, regulation Adjustable bracing bar then uses to beam bottom level The horizontal extreme difference of infrared inspection top plate, adjusts each support bar of top plate, until the horizontal extreme difference of top plate meets the requirements, together The one horizontal extreme difference of span inside ceiling panel should be controlled in the range of 5mm.
(8) reinforce ending and check and accept:
Treat that beam reinforced steel bar colligation is finished, drop plate and reversed beam, caisson are installed;To formwork reinforcement and after having corrected, to wall column The sectional dimension of perpendicularity, the flatness of top plate, wall column and beam is checked.
The dismounting of 5.2 templates
(1) concrete strength during form removal has to comply with the requirement of table 1:
Table 1
In aluminum dipping form early removing system, according to aluminum dipping form use requirement, intensity reaches design strength after the completion of concreting It is dismountable backform after 50%, leaves behind support bar.When the dismounting of support bar determines to remove according to the form removal test block of concrete Between.
(2) demolishing process
1) wall column formwork is removed
Wall column side form is removed when concrete strength reaches 1.2Mpa, concreting removes wall column side form after 12 hours.
2) backform is removed
According to the early removing system of aluminum dipping form, intensity reaches that 50% rear of design strength is dismountable after the completion of concreting Backform, backform can be removed after 48 hours.
3) support bar is removed
Support bar is removed, the support of plate bottom is removed after 240 hours, is torn open after the support of beam bottom, 672 hours days are removed after 336 hours Except the support of cantilever bottom, then carry out aluminum dipping form dismounting.
The present invention is not limited to above-mentioned embodiment, in the case of without departing substantially from substantive content of the present invention, art technology Any deformation that personnel are contemplated that, improvement, replace and each fall within protection scope of the present invention.

Claims (5)

1. a kind of skyscraper aluminum alloy mould plate construction method, including,
Step 1, model sheetinstallat
1.1 surveying setting-outs, the good wall column line of bullet and wall column control line, hole line on floor, wherein wall column control line is apart from wall side Line 200mm;Floor absolute altitude control point is indicated on post longitudinal rib, is marked by sticking two-faced adhesive tape, and using under double faced adhesive tape mouth as Absolute altitude control point, absolute altitude control point is that the corner and corner of wall column are respectively provided with control point at story height above 500mm;
1.2 foundation constructions, including wall column reinforcing bar and wall column Hydroelectric Project Construction are installed, the wall column Hydroelectric Project Construction includes pre-buried water power case Box, spool, reserved opening;
1.3 wall column formworks are installed;
1.3.1 the wall column position floor absolute altitude is checked, whether the wall column position floor absolute altitude is checked according to absolute altitude control point Meet the requirements, what is be higher by cuts, timber wedge on low pad controls the floor absolute altitude error within 5mm;
1.3.2 spacer bar is implanted on the wall column root line side, the cement inner bracing strip of same wall thickness is set in the wall column Or reinforcing bar inner bracing strip, inner bracing strip two ends prop up template;
1.3.3 template, uniform brushing releasing agent are made an overall screening;
1.3.4 the assembled template, closes before the wall column formwork, inserts the wall column formwork fastening screw and be inserted in PVC Pipe, sleeve pipe and the cheek board face contact position of wall two are smooth;
1.3.5 the head of pin is embedded in inside the inside lock template when wall column formwork is connected with inside lock template, institute Stating the selling sheet of wall column formwork connecting pin will install from top to bottom;
1.3.6 good mortar is blocked up within 12 hours before casting concrete;
1.4 beam forms are installed, and good beam bottom board assembled first has simultaneously installed support bar, and beam bottom is adjusted to designed elevation with support bar, Beam bottom support bar answers vertical non-loosening, then assembled side template;
Template die described in 1.5 is installed, and first installs the inner corner trim of floorboard, and then keel of assembled floorboard and installing are supported, with branch Strut adjustable plate bottom to designed elevation, plate bottom support bar answers vertical non-loosening, installs the mark for installing floorboard after keel successively Quasi- plate;
Formwork reinforcement described in 1.6, carries out the reinforcing of the wall column formwork after the completion of integral mold plate is assembled;
The actual measurement actual quantities correction of 1.7 templates;
1.7.1 wall column surveys the correction of actual quantities:
After the completion of wall column formwork is reinforced, the relative position in wall column both sides installs bearing diagonal, and bearing diagonal one end is fixed on back cord, The other end is fixed on flooring with setscrew, the perpendicularity with steel tape inspection wall column and journal offset with line pendant, and according to Wall column control line is corrected, and wall column perpendicularity deviation should be controlled in the range of 5mm;
1.7.2 top plate surveys the correction of actual quantities:
According to floor absolute altitude, beam bottom levelness is first checked with infrared ray, regulation Adjustable bracing bar is to beam bottom level, then uses infrared ray The horizontal extreme difference of top plate is checked, each support bar of top plate is adjusted, the same horizontal extreme difference control of span inside ceiling panel is in 5mm scopes It is interior;
1.8 reinforce ending and check and accept;
1.8.1 treat that beam reinforced steel bar colligation is finished, drop plate and reversed beam, caisson are installed, accurate, fastening is wanted in the position of caisson placing;
Step 2 form removable
2.1 remove wall column formwork
Wall column side form is removed when concrete strength reaches 1.2Mpa, bearing diagonal is first removed, then remove the pin pin of aluminum dipping form connection Piece;
2.2 remove backform
According to the early removing system of aluminum dipping form, intensity reaches the dismountable top in 50% rear of design strength after the completion of concreting Mould, backform is removed since the position that beam, plate support bar are connected, removes the coupled connection of beam, plate support bar pin selling sheet Part, followed by removes the pin selling sheet of beam adjacent thereto, plate, should first tear side template, beam bottom mother plate during form removal open in order, Then the keel of floorboard are removed, then remove the template of standard;
2.3 remove support bar
The dismounting of support bar should meet《Concrete structure engineering job specfication》The coagulation that GB50666-2011 is removed on bed die Native intensity requirement.
2. construction method according to claim 1, it is characterised in that in step 1.6, is carried on the back by being installed on through-wall bolt It is stupefied that the wall column formwork is reinforced.
3. construction method according to claim 1, it is characterised in that in step 2.1, concreting is removed after 12 hours The wall column side form.
4. construction method according to claim 1, it is characterised in that in step 2.2, after 48 hours of concreting Remove the backform.
5. construction method according to claim 1, it is characterised in that in step 2.3, concreting is torn open after 240 hours Except plate bottom support, the beam bottom support is removed behind 336 hours days, the cantilever bottom support is removed after 672 hours.
CN201710276378.8A 2017-04-25 2017-04-25 A kind of skyscraper aluminum alloy mould plate construction method Pending CN106988525A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710276378.8A CN106988525A (en) 2017-04-25 2017-04-25 A kind of skyscraper aluminum alloy mould plate construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710276378.8A CN106988525A (en) 2017-04-25 2017-04-25 A kind of skyscraper aluminum alloy mould plate construction method

Publications (1)

Publication Number Publication Date
CN106988525A true CN106988525A (en) 2017-07-28

Family

ID=59418174

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710276378.8A Pending CN106988525A (en) 2017-04-25 2017-04-25 A kind of skyscraper aluminum alloy mould plate construction method

Country Status (1)

Country Link
CN (1) CN106988525A (en)

Cited By (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107859176A (en) * 2017-11-29 2018-03-30 湖北绿溪建筑科技有限公司 A kind of staggered floor construction in assembled architecture, improve the construction method of form cycling rate
CN108755296A (en) * 2018-08-20 2018-11-06 中铁二十局集团第五工程有限公司 A kind of tool and its construction method for concrete slope construction
CN109138407A (en) * 2018-10-19 2019-01-04 青岛建集团有限公司 Skyscraper early tears aluminium alloy inset stencil plate form bracing system construction technology open
CN109404010A (en) * 2018-10-29 2019-03-01 高渭泉 A kind of aluminum tunnel modular system and its operating method
CN109680938A (en) * 2018-12-28 2019-04-26 中天建设集团有限公司 A kind of nonstandard layer aluminum wood steel combination template and its construction method, building
CN109707152A (en) * 2019-01-23 2019-05-03 深圳市润飞建筑劳务有限公司 Aluminum alloy mould plate system and its construction method
CN110499915A (en) * 2018-05-18 2019-11-26 东宏建设股份有限公司 A kind of aluminum alloy pattern plate construction
CN110528871A (en) * 2019-06-05 2019-12-03 江门志特新材料科技有限公司 A kind of fastening member and its construction method for thick wall column pulling-on piece aluminum alloy mould plate system
CN110886487A (en) * 2018-09-11 2020-03-17 中建铝新材料广东有限公司 Aluminum alloy formwork basement single-side formwork erecting construction process
CN110924673A (en) * 2019-10-28 2020-03-27 中国化学工程第六建设有限公司 Construction method of aluminum alloy building template
CN111576856A (en) * 2020-06-05 2020-08-25 中电建路桥集团有限公司 Aluminum alloy template assembling system and assembling method
CN112160617A (en) * 2020-09-21 2021-01-01 安徽墨砂工程修缮技术有限公司 Method for repairing outer wall thermal insulation falling
CN112227521A (en) * 2020-10-21 2021-01-15 北京住总第六开发建设有限公司 Construction method of one-step formed assembly type project
CN112942809A (en) * 2021-01-29 2021-06-11 广东亿德兴工程建设有限公司 Combined template assembling method capable of realizing mechanical construction
CN112942808A (en) * 2021-01-29 2021-06-11 广东亿德兴工程建设有限公司 Combined template construction method combining mechanized construction
CN113266092A (en) * 2021-06-25 2021-08-17 深圳市建工集团股份有限公司 Ultrahigh-floor wall body pouring method
CN113863655A (en) * 2021-09-01 2021-12-31 中兆建工集团有限公司 Construction method of aluminum alloy formwork system
CN114382199A (en) * 2022-01-19 2022-04-22 中国华西企业有限公司 Aluminum construction technology for bottom corner of aluminum alloy template

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103206089A (en) * 2013-04-18 2013-07-17 成军 Fabricated aluminum alloy formwork system construction method
CN106013803A (en) * 2016-07-04 2016-10-12 浙江谊科建筑技术发展有限公司 Installing process of aluminum formwork
CN106320691A (en) * 2016-08-23 2017-01-11 中建八局第二建设有限公司 Aluminum-wood formwork construction method

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103206089A (en) * 2013-04-18 2013-07-17 成军 Fabricated aluminum alloy formwork system construction method
CN106013803A (en) * 2016-07-04 2016-10-12 浙江谊科建筑技术发展有限公司 Installing process of aluminum formwork
CN106320691A (en) * 2016-08-23 2017-01-11 中建八局第二建设有限公司 Aluminum-wood formwork construction method

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
潘志枫等: "铝合金早拆模板体系在孔雀城项目的应用实例", 《施工技术》 *

Cited By (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107859176A (en) * 2017-11-29 2018-03-30 湖北绿溪建筑科技有限公司 A kind of staggered floor construction in assembled architecture, improve the construction method of form cycling rate
CN110499915A (en) * 2018-05-18 2019-11-26 东宏建设股份有限公司 A kind of aluminum alloy pattern plate construction
CN108755296A (en) * 2018-08-20 2018-11-06 中铁二十局集团第五工程有限公司 A kind of tool and its construction method for concrete slope construction
CN110886487A (en) * 2018-09-11 2020-03-17 中建铝新材料广东有限公司 Aluminum alloy formwork basement single-side formwork erecting construction process
CN109138407A (en) * 2018-10-19 2019-01-04 青岛建集团有限公司 Skyscraper early tears aluminium alloy inset stencil plate form bracing system construction technology open
CN109404010A (en) * 2018-10-29 2019-03-01 高渭泉 A kind of aluminum tunnel modular system and its operating method
CN109680938A (en) * 2018-12-28 2019-04-26 中天建设集团有限公司 A kind of nonstandard layer aluminum wood steel combination template and its construction method, building
CN109707152A (en) * 2019-01-23 2019-05-03 深圳市润飞建筑劳务有限公司 Aluminum alloy mould plate system and its construction method
CN109707152B (en) * 2019-01-23 2021-08-06 深圳市润飞建筑劳务有限公司 Aluminum alloy formwork system and construction method thereof
CN110528871A (en) * 2019-06-05 2019-12-03 江门志特新材料科技有限公司 A kind of fastening member and its construction method for thick wall column pulling-on piece aluminum alloy mould plate system
CN110924673A (en) * 2019-10-28 2020-03-27 中国化学工程第六建设有限公司 Construction method of aluminum alloy building template
CN111576856A (en) * 2020-06-05 2020-08-25 中电建路桥集团有限公司 Aluminum alloy template assembling system and assembling method
CN112160617A (en) * 2020-09-21 2021-01-01 安徽墨砂工程修缮技术有限公司 Method for repairing outer wall thermal insulation falling
CN112227521A (en) * 2020-10-21 2021-01-15 北京住总第六开发建设有限公司 Construction method of one-step formed assembly type project
CN112942809A (en) * 2021-01-29 2021-06-11 广东亿德兴工程建设有限公司 Combined template assembling method capable of realizing mechanical construction
CN112942808A (en) * 2021-01-29 2021-06-11 广东亿德兴工程建设有限公司 Combined template construction method combining mechanized construction
CN113266092A (en) * 2021-06-25 2021-08-17 深圳市建工集团股份有限公司 Ultrahigh-floor wall body pouring method
CN113863655A (en) * 2021-09-01 2021-12-31 中兆建工集团有限公司 Construction method of aluminum alloy formwork system
CN114382199A (en) * 2022-01-19 2022-04-22 中国华西企业有限公司 Aluminum construction technology for bottom corner of aluminum alloy template

Similar Documents

Publication Publication Date Title
CN106988525A (en) A kind of skyscraper aluminum alloy mould plate construction method
CN104895318B (en) Aluminum alloy template system and construction method of same
CN106320691B (en) Aluminum wood template construction method
CN109441098B (en) Early-dismantling formwork system and construction method thereof
CN107297810A (en) A kind of making of precast wall body component and installation method
WO2013185277A1 (en) Constructing method for concrete cylinder of construction steel bar of high-rise steel structure
CN105926942A (en) Construction method of combined aluminum/steel frame wood-plastic formwork system
CN112854745A (en) Construction process of assembled building aluminum alloy template
CN103161126A (en) Road bridge variable section hollow high pier slip-form construction method
CN108894488A (en) A kind of construction method of Novel section steel keel steel and wood composite template
CN106351439B (en) Aluminum alloy pattern plate construction technology
CN104196231A (en) Concrete floor aluminum alloy template and construction method thereof
CN209799969U (en) A integrally lift up cantilever formwork device for quick construction shaft lining cutting
CN114109030A (en) Construction method of special-shaped structure of bare concrete diaphragm wall
CN105178604A (en) Construction method of assembly type superimposed floor slab
CN106639306A (en) Material-saving type inclination linking and supporting plate column cap wood formwork and construction method thereof
CN111576856A (en) Aluminum alloy template assembling system and assembling method
CN106120855A (en) A kind of subway open-cut station arch is without rod structure and construction thereof
CN112627497A (en) High-precision aluminum frame wood formwork building method
CN107217840A (en) A kind of regularization template external corner reinforcement system
CN212154120U (en) Aluminum alloy template set for prefabricated building
CN110847598A (en) Thin-wall hollow pier diaphragm plate bottom formwork and construction method
CN111576878A (en) Construction process for quick-release system of aluminum alloy template
CN110439257A (en) A kind of high turnover rate fashioned iron of sectional-film coating plywood light-type template system construction method
CN109235871A (en) Variable section structure aluminum alloy mould plate construction method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20180423

Address after: 450001 No. 59 Lianhua street, hi tech Development Zone, Henan, Zhengzhou

Applicant after: China Hydropower eleventh Engineering Bureau (Zhengzhou) Co., Ltd.

Applicant after: SINOHYDRO Bureau 11 Co., Ltd.

Address before: 472000 No. 147 middle of the Yellow River Road, Sanmenxia, Henan

Applicant before: SINOHYDRO Bureau 11 Co., Ltd.

TA01 Transfer of patent application right
CB02 Change of applicant information

Address after: 450001 No. 59 Lianhua street, hi tech Development Zone, Henan, Zhengzhou

Applicant after: China Power Construction Eleventh Bureau Engineering Co., Ltd.

Applicant after: SINOHYDRO Bureau 11 Co., Ltd.

Address before: 450001 No. 59 Lianhua street, hi tech Development Zone, Henan, Zhengzhou

Applicant before: China Hydropower eleventh Engineering Bureau (Zhengzhou) Co., Ltd.

Applicant before: SINOHYDRO Bureau 11 Co., Ltd.

CB02 Change of applicant information
RJ01 Rejection of invention patent application after publication

Application publication date: 20170728

RJ01 Rejection of invention patent application after publication