CN110823199A - 竖井超欠挖快速测量结构及其应用方法 - Google Patents
竖井超欠挖快速测量结构及其应用方法 Download PDFInfo
- Publication number
- CN110823199A CN110823199A CN201911119222.4A CN201911119222A CN110823199A CN 110823199 A CN110823199 A CN 110823199A CN 201911119222 A CN201911119222 A CN 201911119222A CN 110823199 A CN110823199 A CN 110823199A
- Authority
- CN
- China
- Prior art keywords
- construction
- vertical shaft
- foot rest
- distancer
- scale
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01C—MEASURING DISTANCES, LEVELS OR BEARINGS; SURVEYING; NAVIGATION; GYROSCOPIC INSTRUMENTS; PHOTOGRAMMETRY OR VIDEOGRAMMETRY
- G01C15/00—Surveying instruments or accessories not provided for in groups G01C1/00 - G01C13/00
Landscapes
- Physics & Mathematics (AREA)
- Engineering & Computer Science (AREA)
- General Physics & Mathematics (AREA)
- Radar, Positioning & Navigation (AREA)
- Remote Sensing (AREA)
- A Measuring Device Byusing Mechanical Method (AREA)
Abstract
本发明公开了竖井超欠挖快速测量结构及其应用方法,包括施工大盘,所述施工大盘侧壁设有可伸缩的支撑杆,施工大盘通过钢绳吊装在施工桁架上,所述施工桁架上设有铅锤线;所述施工大盘上设有脚架,脚架上固定设有刻度盘,刻度盘为一个圆环结构,刻度盘一周设有刻度,所述脚架上设有测距仪,所述测距仪穿过刻度盘的圆环中心与脚架活动连接,将测距仪、铅锤线与刻度盘上0刻度对齐三者对齐,开始测试第一个点的距离,根据设定的角度间隔,仅转动测距仪,测距仪指向刻度盘上的刻度即为角度,依次进行距离测量并记录。本发明操作简单,设站快速,减少工作量与人为误差。
Description
技术领域
本发明涉及工程测量技术领域,具体涉及的是一种竖井超欠挖快速测量结构及其应用方法。
背景技术
竖井开挖顺序为先导井,再扩挖;在扩挖过程中,传统测量一般使用度盘配合皮尺进行量测,速度较缓慢,操作繁琐且工作量大。
发明内容
为解决现有技术中操作繁琐的问题,提供一种简易的竖井超欠挖快速测量结构及其应用方法。
本发明所要解决的技术问题采用以下的技术方案来实现:
竖井超欠挖快速测量结构,包括施工大盘,所述施工大盘侧壁设有可伸缩的支撑杆,施工大盘通过钢绳吊装在施工桁架上,所述施工桁架上设有铅锤线;
所述施工大盘上设有脚架,脚架上固定设有刻度盘,刻度盘为一个圆环结构,刻度盘一周设有刻度,所述脚架上设有测距仪,所述测距仪穿过刻度盘的圆环中心与脚架活动连接。
本发明的进一步技术:
优选的,脚架为三脚架上设有伸缩杆,三脚架底部设有尖锥。
优选的,所述施工桁架为圆形架,钢绳至少设有三根,且均匀分布设在施工大盘上。
优选的,所述施工大盘侧壁设有螺纹孔,可伸缩的支撑杆为螺纹杆,螺纹杆一端螺旋在螺纹孔内,且螺纹杆另一端设有撑板。
优选的,所述铅锤线至少设有三条,三条铅锤线位于设在靠近竖井壁施工桁架的任意三点,通过三点定圆心,将脚架放置在圆心后,其中一条铅锤线与刻度盘上0刻度对齐定方位。
优选的,所述刻度盘设有上盘和下盘,之间设有至少3个螺栓,所述测距仪上设有水平仪,通过观察水平仪调节螺栓,保证测距仪的水平。
本发明还提供一种利用上述测量结构的测量方法:
施工大盘下降至作业面,通过可伸缩支撑杆将大盘进行固定;
三条铅锤线位于设在靠近竖井壁施工桁架的任意三点,通过三点定圆心,将脚架放置在圆心后,其中一条铅锤线与刻度盘上0刻度对齐定方位;
刻度盘设有上盘和下盘,之间设有至少3个螺栓,所述测距仪上设有水平仪,通过观察水平仪调节螺栓,保证测距仪的水平;
架站完成后进行方向校核;
将测距仪、铅锤线与刻度盘上0刻度对齐三者对齐,开始测试第一个点的距离,根据设定的角度间隔,仅转动测距仪,测距仪指向刻度盘上的刻度即为角度,依次进行距离测量并记录。
本发明具有以下技术效果:
操作简单,设站快速,减少工作量与人为误差。
附图说明
为了更清楚地说明本发明实施例中的技术方案,下面将对实施例描述中所需要使用的附图作简单地介绍,显而易见地,下面描述中的附图仅仅是本发明的一些实施例,对于本领域普通技术人员来讲,在不付出创造性劳动的前提下,还可以根据这些附图获得其他的附图;
图1为测量结构剖面示意图;
图2为脚架及测距仪结构放大示意图;
图3为测量结构平面示意图;
图中标号说明:1、施工大盘;2、支撑杆;3、钢绳;4、施工桁架;5、铅锤线;6、脚架;7、刻度盘;8、测距仪;9、螺栓;10、水平仪。
具体实施方式
为使本发明实施例的目的、技术方案和优点更加清楚,下面将结合本发明实施例,对本发明实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例是本发明一部分实施例,而不是全部的实施例。基于本发明中的实施例,本领域普通技术人员在没有作出创造性劳动前提下所获得的所有其他实施例,都属于本发明保护的范围。
如图1-3,竖井超欠挖快速测量结构,包括施工大盘1,所述施工大盘侧壁设有可伸缩的支撑杆2,施工大盘通过钢绳3吊装在施工桁架4上,所述施工桁架4上设有铅锤线5;
所述施工大盘上设有脚架6,脚架上固定设有刻度盘7,刻度盘为一个圆环结构,刻度盘一周设有刻度,所述脚架上设有测距仪8,所述测距仪穿过刻度盘的圆环中心与脚架活动连接。
脚架为三脚架上设有伸缩杆,便于高度的调节,三脚架底部设有尖锥,便于三脚架固定在地面,防止发生滑动。
所述施工桁架为圆形架,钢绳至少设有三根,且均匀分布设在施工大盘上。
所述施工大盘侧壁设有螺纹孔,可伸缩的支撑杆为螺纹杆,螺纹杆一端螺旋在螺纹孔内,且螺纹杆另一端设有撑板。
所述铅锤线至少设有三条,三条铅锤线位于设在靠近竖井壁施工桁架的任意三点,通过三点定圆心,将脚架放置在圆心后,其中一条铅锤线与刻度盘上0刻度对齐定方位。
所述刻度盘设有上盘和下盘,之间设有至少3个螺栓9,所述测距仪上设有水平仪10,通过观察水平仪调节螺栓,保证测距仪的水平。
通过架设施工桁架,吊装施工大盘,螺纹杆支撑,固定大盘,操作简单,设站快速,通过简单的三点定位圆心,一条定位0度角,转动测距仪即可转动测距,胶皮尺精准,快速,减少工作量与人为误差。
本发明还提供一种利用上述测量结构的测量方法:
施工大盘下降至作业面,通过可伸缩支撑杆将大盘进行固定;
三条铅锤线位于设在靠近竖井壁施工桁架的任意三点,通过三点定圆心,将脚架放置在圆心后,其中一条铅锤线与刻度盘上0刻度对齐定方位;
刻度盘设有上盘和下盘,之间设有至少3个螺栓,所述测距仪上设有水平仪,通过观察水平仪调节螺栓,保证测距仪的水平;
架站完成后进行方向校核;
将测距仪、铅锤线与刻度盘上0刻度对齐三者对齐,开始测试第一个点的距离,根据设定的角度间隔,仅转动测距仪,测距仪指向刻度盘上的刻度即为角度,依次进行距离测量并记录。
需要说明的是,在本文中,诸如第一和第二等之类的关系术语仅仅用来将一个实体或者操作与另一个实体或操作区分开来,而不一定要求或者暗示这些实体或操作之间存在任何这种实际的关系或者顺序。而且,术语“包括”、“包含”或者其任何其他变体意在涵盖非排他性的包含,从而使得包括一系列要素的过程、方法、物品或者设备不仅包括那些要素,而且还包括没有明确列出的其他要素,或者是还包括为这种过程、方法、物品或者设备所固有的要素。在没有更多限制的情况下,由语句“包括一个……”限定的要素,并不排除在包括所述要素的过程、方法、物品或者设备中还存在另外的相同要素。
在本发明中,除非有明确的规定和限定,特征之间相互交错,不一定独立存在。以上显示与描述包括本发明的基本原理、主要特征及其优点。从事该专业的技术人员需知,本发明不局限于上述实施例的限制,上述的实施例与说明书仅为本发明的优选例,而不是用来限制本发明,以成为唯一选择。在发明的精神和范围要求下,本发明还可进一步变化并优化,对本发明进行的改进优化都进入要求保护的本发明范围内,本发明要求保护具体范围由所附的权利要求书及其等效物界定。
Claims (7)
1.竖井超欠挖快速测量结构,其特征在于:包括施工大盘,所述施工大盘侧壁设有可伸缩的支撑杆,施工大盘通过钢绳吊装在施工桁架上,所述施工桁架上设有铅锤线;
所述施工大盘上设有脚架,脚架上固定设有刻度盘,刻度盘为一个圆环结构,刻度盘一周设有刻度,所述脚架上设有测距仪,所述测距仪穿过刻度盘的圆环中心与脚架活动连接。
2.根据权利要求1中所述的竖井超欠挖快速测量结构,其特征在于:脚架为三脚架上设有伸缩杆,三脚架底部设有尖锥。
3.根据权利要求1中所述的竖井超欠挖快速测量结构,其特征在于:所述施工桁架为圆形架,钢绳至少设有三根,且均匀分布设在施工大盘上。
4.根据权利要求1中所述的竖井超欠挖快速测量结构,其特征在于:所述施工大盘侧壁设有螺纹孔,可伸缩的支撑杆为螺纹杆,螺纹杆一端螺旋在螺纹孔内,且螺纹杆另一端设有撑板。
5.根据权利要求1中所述的竖井超欠挖快速测量结构,其特征在于:所述铅锤线至少设有三条,三条铅锤线位于设在靠近竖井壁施工桁架的任意三点,通过三点定圆心,将脚架放置在圆心后,其中一条铅锤线与刻度盘上0刻度对齐定方位。
6.根据权利要求1中所述的竖井超欠挖快速测量结构,其特征在于:所述刻度盘设有上盘和下盘,之间设有至少3个螺栓,所述测距仪上设有水平仪,通过观察水平仪调节螺栓,保证测距仪的水平。
7.利用权利要求1-6任意一项所述的竖井超欠挖快速测量结构,其特征在于,竖井超欠挖快速测量方法为:
施工大盘下降至作业面,通过可伸缩支撑杆将大盘进行固定;
三条铅锤线位于设在靠近竖井壁施工桁架的任意三点,通过三点定圆心,将脚架放置在圆心后,其中一条铅锤线与刻度盘上0刻度对齐定方位;
刻度盘设有上盘和下盘,之间设有至少3个螺栓,所述测距仪上设有水平仪,通过观察水平仪调节螺栓,保证测距仪的水平;
架站完成后进行方向校核;
将测距仪、铅锤线与刻度盘上0刻度对齐三者对齐,开始测试第一个点的距离,根据设定的角度间隔,仅转动测距仪,测距仪指向刻度盘上的刻度即为角度,依次进行距离测量并记录。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201911119222.4A CN110823199A (zh) | 2019-11-15 | 2019-11-15 | 竖井超欠挖快速测量结构及其应用方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201911119222.4A CN110823199A (zh) | 2019-11-15 | 2019-11-15 | 竖井超欠挖快速测量结构及其应用方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110823199A true CN110823199A (zh) | 2020-02-21 |
Family
ID=69555718
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201911119222.4A Pending CN110823199A (zh) | 2019-11-15 | 2019-11-15 | 竖井超欠挖快速测量结构及其应用方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110823199A (zh) |
Citations (15)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2012107464A (ja) * | 2010-11-19 | 2012-06-07 | Alpha Civil Engineering:Kk | 掘進機 |
CN203163733U (zh) * | 2013-03-24 | 2013-08-28 | 陆建国 | 一种立井井筒装备锚杆孔激光定位仪 |
US20130294843A1 (en) * | 2012-05-07 | 2013-11-07 | Soilmec S.P.A. | Helical drill bit for an auger of a ground excavation assembly, in particular for building excavated piles, and drilling method that uses such a bit |
CN103821514A (zh) * | 2014-01-25 | 2014-05-28 | 三一重型装备有限公司 | 掘进机截割*** |
CN203640740U (zh) * | 2013-11-22 | 2014-06-11 | 中煤第三建设(集团)有限责任公司 | 导向装置及矿井吊盘 |
CN104613831A (zh) * | 2015-01-19 | 2015-05-13 | 中铁十八局集团有限公司 | 一种在竖井周边眼***增设周边辅助眼的施工方法 |
CN204388845U (zh) * | 2015-01-31 | 2015-06-10 | 长安大学 | 一种隧道快速超欠挖测定激光断面仪 |
CN106123872A (zh) * | 2016-06-20 | 2016-11-16 | 中国葛洲坝集团勘测设计有限公司 | 一种用于竖井开挖施工的坐标传递方法 |
CN106482706A (zh) * | 2015-08-24 | 2017-03-08 | 中国华冶科工集团有限公司 | 一种竖井断面数字测量装置及方法 |
CN107131828A (zh) * | 2017-05-08 | 2017-09-05 | 上海建工集团股份有限公司 | 异型隧道开挖测量方法 |
CN108446473A (zh) * | 2018-03-13 | 2018-08-24 | 中国水利水电第五工程局有限公司 | 一种水电站斜井开挖和超欠挖检查方法 |
CN108706432A (zh) * | 2018-06-05 | 2018-10-26 | 南华大学 | 深井固化桶回收***及其回收方法 |
CN208150862U (zh) * | 2018-03-26 | 2018-11-27 | 中国葛洲坝集团第六工程有限公司 | 一种用于大型深竖井施工的可升降平台 |
CN109115175A (zh) * | 2018-08-08 | 2019-01-01 | 中国十七冶集团有限公司 | 一种隧道扫描断面仪及施工方法 |
CN110030951A (zh) * | 2019-05-14 | 2019-07-19 | 武汉大学 | 一种基于三维激光扫描技术的引水竖井缺陷检测方法 |
-
2019
- 2019-11-15 CN CN201911119222.4A patent/CN110823199A/zh active Pending
Patent Citations (15)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2012107464A (ja) * | 2010-11-19 | 2012-06-07 | Alpha Civil Engineering:Kk | 掘進機 |
US20130294843A1 (en) * | 2012-05-07 | 2013-11-07 | Soilmec S.P.A. | Helical drill bit for an auger of a ground excavation assembly, in particular for building excavated piles, and drilling method that uses such a bit |
CN203163733U (zh) * | 2013-03-24 | 2013-08-28 | 陆建国 | 一种立井井筒装备锚杆孔激光定位仪 |
CN203640740U (zh) * | 2013-11-22 | 2014-06-11 | 中煤第三建设(集团)有限责任公司 | 导向装置及矿井吊盘 |
CN103821514A (zh) * | 2014-01-25 | 2014-05-28 | 三一重型装备有限公司 | 掘进机截割*** |
CN104613831A (zh) * | 2015-01-19 | 2015-05-13 | 中铁十八局集团有限公司 | 一种在竖井周边眼***增设周边辅助眼的施工方法 |
CN204388845U (zh) * | 2015-01-31 | 2015-06-10 | 长安大学 | 一种隧道快速超欠挖测定激光断面仪 |
CN106482706A (zh) * | 2015-08-24 | 2017-03-08 | 中国华冶科工集团有限公司 | 一种竖井断面数字测量装置及方法 |
CN106123872A (zh) * | 2016-06-20 | 2016-11-16 | 中国葛洲坝集团勘测设计有限公司 | 一种用于竖井开挖施工的坐标传递方法 |
CN107131828A (zh) * | 2017-05-08 | 2017-09-05 | 上海建工集团股份有限公司 | 异型隧道开挖测量方法 |
CN108446473A (zh) * | 2018-03-13 | 2018-08-24 | 中国水利水电第五工程局有限公司 | 一种水电站斜井开挖和超欠挖检查方法 |
CN208150862U (zh) * | 2018-03-26 | 2018-11-27 | 中国葛洲坝集团第六工程有限公司 | 一种用于大型深竖井施工的可升降平台 |
CN108706432A (zh) * | 2018-06-05 | 2018-10-26 | 南华大学 | 深井固化桶回收***及其回收方法 |
CN109115175A (zh) * | 2018-08-08 | 2019-01-01 | 中国十七冶集团有限公司 | 一种隧道扫描断面仪及施工方法 |
CN110030951A (zh) * | 2019-05-14 | 2019-07-19 | 武汉大学 | 一种基于三维激光扫描技术的引水竖井缺陷检测方法 |
Non-Patent Citations (3)
Title |
---|
崔库: "《建井测量》", 30 June 1989 * |
张巍: "窄小竖井长暗挖隧道施工测量线型控制研究", 《城市建设理论研究》 * |
陈社杰: "《测量与矿山测量》", 30 November 1990 * |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US5841353A (en) | Relating to the determination of verticality in tall buildings and other structures | |
CN113203368B (zh) | 一种桩基成孔形状及垂直度检测装置的检测方法 | |
CN206512764U (zh) | 一种于桩顶施加垂直荷载的水平静载试验*** | |
CN110219326B (zh) | 逆作法一柱一桩水下调垂施工工艺 | |
CN205718762U (zh) | 一种桩孔测量仪 | |
CN105507325A (zh) | 一种稳桩定位平台 | |
CN210441865U (zh) | 一种城市道路桥梁路基工程测量设备 | |
CN113802565B (zh) | 一种炼钢车间内基坑与构筑物一体化智能监测***及方法 | |
CN206161011U (zh) | 调节式倒垂线组装支架结构 | |
CN208604645U (zh) | 一种竖向圆柱管孔任意点中心测量装置 | |
CN110725348A (zh) | 立柱桩纠偏装置及纠偏施工方法 | |
CN106638535B (zh) | 基坑施工现场监测装置以及监测方法 | |
CN110823199A (zh) | 竖井超欠挖快速测量结构及其应用方法 | |
CN210533641U (zh) | 一种桥梁挠度测量装置 | |
CN201884021U (zh) | 滑动式钻孔测斜仪观测管口辅助装置 | |
CN208269817U (zh) | 支撑结构的收敛监测装置 | |
CN107860317B (zh) | 一种基于激光光斑位移检测构筑物位移或振动幅度的方法 | |
CN206208430U (zh) | 一种拉力测量装置及*** | |
CN109469123A (zh) | 一种双千斤顶的桩基水平加载的自平衡装置及测试方法 | |
CN210288506U (zh) | 一种超厚底板测量放线平台 | |
CN212779195U (zh) | 基坑沉降监测装置 | |
CN210513104U (zh) | 一种支模***监控装置 | |
CN208884590U (zh) | 一种新的桩基自平衡实验位移测试装置 | |
CN113048961A (zh) | 一种用于独立基础定位的测量工具及使用方法 | |
CN111649720A (zh) | 一种大坡度隧道工作基点沉降的监测装置及方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20200221 |