CN110748353A - Shield excavation and soil body settlement monitoring simulation test platform and simulation test method - Google Patents

Shield excavation and soil body settlement monitoring simulation test platform and simulation test method Download PDF

Info

Publication number
CN110748353A
CN110748353A CN201911223309.6A CN201911223309A CN110748353A CN 110748353 A CN110748353 A CN 110748353A CN 201911223309 A CN201911223309 A CN 201911223309A CN 110748353 A CN110748353 A CN 110748353A
Authority
CN
China
Prior art keywords
excavation
soil
point displacement
shield
built
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201911223309.6A
Other languages
Chinese (zh)
Inventor
江华
程晋国
李宏亮
江玉生
李继东
王高敏
戈玮
赵亮
唐飞鹏
冯一帆
李加恒
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Urban Construction Rail Transit Construction Engineering Co ltd
China University of Mining and Technology Beijing CUMTB
Original Assignee
Beijing Urban Construction Rail Transit Construction Engineering Co ltd
China University of Mining and Technology Beijing CUMTB
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Urban Construction Rail Transit Construction Engineering Co ltd, China University of Mining and Technology Beijing CUMTB filed Critical Beijing Urban Construction Rail Transit Construction Engineering Co ltd
Priority to CN201911223309.6A priority Critical patent/CN110748353A/en
Publication of CN110748353A publication Critical patent/CN110748353A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/06Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
    • E21D11/105Transport or application of concrete specially adapted for the lining of tunnels or galleries ; Backfilling the space between main building element and the surrounding rock, e.g. with concrete
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/06Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining
    • E21D9/0607Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining the shield being provided with devices for lining the tunnel, e.g. shuttering
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01CMEASURING DISTANCES, LEVELS OR BEARINGS; SURVEYING; NAVIGATION; GYROSCOPIC INSTRUMENTS; PHOTOGRAMMETRY OR VIDEOGRAMMETRY
    • G01C5/00Measuring height; Measuring distances transverse to line of sight; Levelling between separated points; Surveyors' levels
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N33/00Investigating or analysing materials by specific methods not covered by groups G01N1/00 - G01N31/00
    • G01N33/24Earth materials

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geology (AREA)
  • Structural Engineering (AREA)
  • Environmental & Geological Engineering (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Architecture (AREA)
  • General Physics & Mathematics (AREA)
  • Physics & Mathematics (AREA)
  • Remote Sensing (AREA)
  • Health & Medical Sciences (AREA)
  • Chemical & Material Sciences (AREA)
  • Biochemistry (AREA)
  • Immunology (AREA)
  • Pathology (AREA)
  • Food Science & Technology (AREA)
  • General Health & Medical Sciences (AREA)
  • Civil Engineering (AREA)
  • Medicinal Chemistry (AREA)
  • Analytical Chemistry (AREA)
  • Radar, Positioning & Navigation (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

The invention relates to a shield excavation and soil body settlement monitoring simulation test platform and a simulation test method, wherein the simulation test platform comprises a box body, an excavation simulation system and a soil body settlement monitoring system, the excavation simulation system is arranged in the box body and comprises a built-in steel cylinder, a plurality of annular partition plates concentric with the built-in steel cylinder are uniformly arranged at the periphery of the built-in steel cylinder at intervals, and an outer annular water layer and an inner annular water layer concentric with the built-in steel cylinder are arranged between the adjacent annular partition plates; the soil body settlement monitoring system comprises at least one row of single-point displacement meters. The method can simulate the control effect of the shield construction excavation gap and the shield tail gap filling condition on the stratum settlement at least, further study the settlement rule of the soil body caused by shield excavation, correct the soil body settlement monitoring result and study the correction rule. The platform is convenient to manufacture and assemble and can be disassembled and reused.

Description

Shield excavation and soil body settlement monitoring simulation test platform and simulation test method
Technical Field
The invention relates to the technical field of shield construction, in particular to a shield excavation and soil body settlement monitoring simulation test platform and a simulation test method.
Background
One of the important measures for controlling the settlement when the shield method is adopted in the subway tunnel construction is grouting filling, shield tail gap filling is adopted in almost most of the projects at present, the excavation gap filling is rarely considered, and the stratum settlement effect caused by the excavation gap cannot be ignored in projects with high settlement requirements. High-precision and automatic monitoring of stratum displacement caused by shield construction is an important guarantee for realizing micro-disturbance and micro-settlement control when a shield passes through a major risk source, and stratum deep-layer displacement monitoring is increasingly carried out in actual engineering at present. At present, magnetic ring type displacement meters, multipoint displacement meters and single-point displacement meters are adopted for deep level displacement monitoring, and no matter which monitoring equipment is adopted, the equipment needs to be punched and buried in the stratum and backfilled with sand for monitoring. The on-site drilling is ultra-deep, namely the drilling depth exceeds the design depth, the backfill sand of the ultra-deep part is greatly different from the original soil, and the displacement meter actually monitors the sedimentation value of the backfill sand layer in the deep hole sleeve instead of the actual sedimentation of the original stratum at the position.
In order to find out the control effect of the filling degree of the shield excavation gap and the shield tail gap on the stratum settlement, eliminate the settlement difference between the backfill sand and the surrounding stratum or establish the comparison relation between the filling degree and the elastic modulus of the filling material in numerical simulation, it is important to design a similar simulation experiment platform which can simulate the shield excavation, grouting and filling and can also carry out deep soil settlement monitoring and correction.
Disclosure of Invention
The invention aims to overcome the defects of the prior art and provides a shield excavation and soil body settlement monitoring simulation test platform and a simulation test method, which can at least simulate the control effect of the shield construction excavation gap and the shield tail gap filling condition on the stratum settlement, further study the soil body settlement rule caused by the shield excavation, correct the soil body settlement monitoring result and study the correction rule. The platform is convenient to manufacture and assemble and can be disassembled and reused.
The invention provides a shield excavation and soil body settlement monitoring simulation test platform, which comprises a box body, an excavation simulation system and a soil body settlement monitoring system, wherein:
undisturbed soil is filled in the box body;
the excavation simulation system is arranged in the box body and comprises a built-in steel cylinder, the built-in steel cylinder is used as a bearing foundation of the excavation simulation system, a plurality of annular partition plates concentric with the built-in steel cylinder are uniformly arranged at intervals on the periphery of the built-in steel cylinder, an outer annular water layer and an inner annular water layer concentric with the built-in steel cylinder are arranged between the adjacent annular partition plates, the outer annular water layer is provided with a water injection hole and a grouting hole communicated with the inner part of the outer annular water layer, and the inner annular water layer is;
the soil body settlement monitoring system comprises at least one row of single-point displacement meters, and the single-point displacement meters are buried in the undisturbed soil body.
As an improvement, the box body is a three-dimensional steel plate soil box with an open upper part, and the left side plate and the right side plate of the soil box are respectively provided with a vertical sliding groove for placing two ends of the built-in steel cylinder, so that the built-in steel cylinder can slide up and down in the vertical sliding grooves, and the arrangement height of the excavation simulation system is adjusted.
As an improvement, the vertical sliding groove is provided with a vertical sliding groove sealing plate for sealing the inner filling soil.
As an improvement, the soil body settlement monitoring system comprises a first row of single-point displacement meters and a second row of single-point displacement meters, the periphery of the first row of single-point displacement meters is backfilled with original soil, and the ultra-deep section of the hole of the second row of single-point displacement meters is backfilled with test soil.
As an improvement, the first row of single-point displacement meters and the second row of single-point displacement meters are respectively fixed on the upper part of the box body by single-point displacement meter fixing rods.
As an improvement, the first row of single-point displacement meters and the second row of single-point displacement meters are respectively provided with a plurality of single-point displacement meters, and the embedding depths of the single-point displacement meters are different.
As an improvement, the spacing distance of the annular partition plates is the width of the simulated duct pieces of the shield tunnel.
As an improvement, two ends of a built-in steel cylinder of the excavation simulation system are fixed at a test height through supporting cross rods.
The invention also provides a simulation test method according to the simulation test platform, which comprises the following steps:
s1: simulating the beginning of shield tunneling;
s2: water is discharged from the water layer of the outer ring of the previous ring to simulate an excavation gap generated by cutter excavation;
s3: after the excavation gap acts for a certain time, water is discharged to the previous annular water layer to simulate the shield tail gap generated by shield tail separation;
s4: after the excavation gap and the shield tail gap act together for a certain time, grouting the water layer of the outer ring of the previous ring, and simulating different filling degrees by designing and controlling the grouting amount;
s5: repeating the steps S2-S4, and carrying out water drainage and grouting filling on the water layer of the next ring which reaches the designed excavation time;
s6: and repeating the step S5, and sequentially carrying out simulated excavation to realize the propulsion of the shield by setting the actual time difference between water discharge and grouting filling of the water-surrounding layers of different rings.
As an improvement, the excavation gap and the shield tail gap are set to be fixed, the settlement data of soil bodies at different depths are collected through the single-point displacement meter, the difference of settlement values of the single-point displacement meter of original state soil and ultra-deep backfill soil in the soil layer at the same depth is compared, and the correction rules of the settlement monitoring values of the single-point displacement meter at different ultra depths are researched.
Has the advantages that: after the technical scheme is adopted, compared with the prior art, the invention has the following technical effects:
(1) the invention simulates the pipe piece through a fixed built-in steel cylinder, simulates the excavation gap through an outer annular water layer, simulates the shield tail gap through an inner annular water layer, and simulates the filling condition through grouting.
(2) And (4) sequentially simulating excavation to realize the moving propulsion of the shield by the actually set time difference of water drainage and grouting filling of the water-circulating layers of different rings.
(3) The single-point displacement meter is used for monitoring soil body settlement in a combined mode, under the conditions that different excavation gaps and shield tail gaps are set, different-depth soil body settlement data are collected through the single-point displacement meter, and the settlement rule of the soil body caused by shield tunnel excavation is researched.
(4) The single-point displacement meter is combined to monitor soil body settlement, the excavation gap and the shield tail gap are set under a certain condition, the single-point displacement meter is used for collecting the soil body settlement data of different depths, the difference of settlement difference values of the original state soil and the ultra-deep backfill soil in the same depth soil layer is compared, and the correction rule of the monitoring settlement values of the drilling single-point displacement meter of different ultra depths is researched.
Drawings
FIG. 1 is a perspective view of one embodiment of a simulation test platform according to the present invention;
FIG. 2 is a schematic diagram of the construction of one embodiment of the excavation simulation system of the present invention;
FIG. 3 is a schematic illustration of the construction gap according to one embodiment of the present invention.
The accompanying drawings, which are included to provide a further understanding of the invention and are incorporated in and constitute a part of this application, illustrate embodiment(s) of the invention and together with the description serve to explain the principles of the invention.
Detailed Description
In order to make the objects, technical solutions and advantages of the embodiments of the present invention more apparent, the embodiments of the present invention are described in further detail below with reference to the embodiments and the accompanying drawings. The exemplary embodiments and descriptions of the present invention are provided to explain the present invention, but not to limit the present invention.
In the description of the present invention, it is to be understood that the terms "upper", "lower", "front", "rear", "left", "right", "top", "bottom", "inner", "outer", and the like, indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience in describing the present invention and simplifying the description, but do not indicate or imply that the device, component, or structure referred to must have a particular orientation, be constructed or operated in a particular orientation, and should not be construed as limiting the present invention.
It will be further understood that the terms "comprises/comprising," "consists of … …," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a product, apparatus, process, or method that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such product, apparatus, process, or method if desired. Without further limitation, an element defined by the phrases "comprising/including … …," "consisting of … …," or "comprising" does not exclude the presence of other like elements in a product, device, process, or method that comprises the element.
The following will further explain the specific implementation method of the present invention with reference to the attached drawings.
In the invention, "left" refers to the left side facing the longitudinal direction of the view roadway, "right" refers to the right side facing the longitudinal direction of the view roadway, "up" refers to the side facing the view and close to the top plate of the roadway, "down" refers to the side facing the view and close to the bottom plate of the roadway, "inner" refers to the side facing the view and close to the underground reservoir, "outer" refers to the side facing the view and close to the roadway, "longitudinal" refers to the direction parallel to the trend of the roadway, and "transverse" refers to the direction perpendicular to the trend of the roadway.
Referring to fig. 1, fig. 1 is a perspective view of a three-dimensional structure of a shield excavation and soil body settlement monitoring simulation test platform provided by the invention, and the three-dimensional structure comprises a box body 100, an excavation simulation system 200 and a soil body settlement monitoring system 300. The simulation test platform provided by the invention can at least simulate the control effect of shield construction excavation gap and shield tail gap filling conditions on stratum settlement.
Referring specifically to fig. 1, as a specific example, according to the principle of similarity simulation, a box 100 is a three-dimensional steel-plate soil box with an open upper portion, and has a base bottom plate 104, and the soil box is filled with undisturbed soil for simulating the characteristics of the shield excavation stratum. The soil box can be made by welding steel plates, and is convenient to manufacture and assemble.
In a specific example, the left side plate and the right side plate of the soil box are respectively provided with a vertical sliding groove 101 for placing two ends of a built-in steel cylinder 201 to be described later, so that the built-in steel cylinder can slide up and down in the vertical sliding grooves, and the arrangement height of the excavation simulation system, namely the arrangement height of the excavation system, is adjusted, and the actual simulation burial depth is controlled.
In one embodiment, the vertical chute 101 is configured with a vertical chute closure plate 102 for enclosing the internal fill. The chute closing plate 102 can be vertically inserted into the vertical chute 101, and can also be installed outside the vertical chute 101, and a fastening device is added.
In a specific example, referring to fig. 2, the excavation simulation system 200 is installed in the box 100, and includes a built-in steel cylinder 201, the built-in steel cylinder is an integral circular steel cylinder, which is a component of the excavation simulation system and also serves as a supporting component as a bearing foundation of the excavation simulation system, and a plurality of annular partition plates 202 concentric with the built-in steel cylinder are uniformly arranged at intervals on the periphery of the built-in steel cylinder. The excavation simulation system must maintain a reasonable distance from the side walls of the soil box in view of the stress concentration near the side walls of the soil box.
An outer annular water layer 203 and an inner annular water layer 204 which are concentric with the built-in steel cylinder are arranged in a concentric circle mode at the position of each annular pipe piece separated by the annular partition plate 202 in a superposed mode, the outer annular water layer is provided with a water injection hole 205 and a grouting hole 206 which are communicated with the inner portion of the outer annular water layer, and the inner annular water layer is provided with a water injection hole 207 which is communicated with the inner portion of the inner annular water.
Wherein the inner annular water layer 204 is used for simulating the outer diameter of the shield machine, and the water is discharged through the water injection hole 207 to control the thickness of the inner annular water layer 204 in the excavation simulation stage so as to simulate the radius change of a front shield, a middle shield and a tail shield of the shield machine through the same annular sheet; the outer ring water layer 203 is used for simulating an excavation gap and the filling control condition thereof in the shield excavation process, water is discharged through the water injection hole 205 of the outer ring water layer 203 to simulate the excavation gap, and the grouting hole 206 is used for simulating the filling of the excavation gap.
Referring again to fig. 1, in one example, the soil settlement monitoring system 300 includes at least one row of single point displacement meters buried within the undisturbed soil.
In a modified example, the soil settlement monitoring system 300 comprises a first row of single point displacement meters 301 and a second row of single point displacement meters 302, wherein the periphery of the first row of single point displacement meters is backfilled with undisturbed soil, and the ultra-deep section of the hole of the second row of single point displacement meters is backfilled with test soil.
In one example, the first row of single point displacement meters and the second row of single point displacement meters are respectively fixed on the upper part of the box body by a single point displacement meter fixing rod 303.
In a modified example, the first row of single-point displacement meters and the second row of single-point displacement meters are respectively provided with a plurality of single-point displacement meters, and the burying depths of the single-point displacement meters are different.
Two rows of single-point displacement meters are arranged on the upper portion of the box body and are fixed through single-point displacement meter fixing rods respectively, the periphery of the first row of single-point displacement meters is backfilled with original state soil, the hole of the second row of single-point displacement meters is backfilled with experimental soil, drilling monitoring experiments under different ultra-deep conditions are simulated and used as contrast experiments, the settlement rule of a soil body caused by shield excavation is researched, the soil body settlement monitoring result is corrected, and the correction rule is researched, and the method is further specifically explained later.
In the invention, an excavation simulation system (taking a three-ring simulation segment as an example in the figure) can be fixed on vertical sliding grooves on two sides of a box body through a built-in steel cylinder, and the test height is adjusted through a supporting cross rod 103.
Continuing to refer to fig. 3, a shield tunneling machine 400 is of trapezoidal cross-section along its length, having a forward end impeller 401 and a rear end shield tail 402, and a segment 403. The diameter of the cutter head of the shield tunneling machine is the largest, the diameter of the shield tail is the smallest, the diameters of the cutter head and the shield tail of the shield tunneling machine are both larger than the diameter of a tunnel segment, wherein the half of the difference value between the diameter of the cutter head of the shield tunneling machine and the diameter of the shield tail is called as an excavation gap 404, namely the height difference between the cutter head and the shield tail, and the half of the difference value between the diameter of the shield tail and the diameter of the segment is called as a shield tail gap 405, namely the height difference between the. Firstly forming an excavation gap in the shield excavation process to cause stratum settlement; when the shield tail is separated along with the advancing of the shield, a shield tail gap appears, and the excavation gap and the shield tail gap cause stratum settlement together.
With reference to fig. 2 and fig. 3, the present invention further provides a simulation test method according to the simulation test platform, which includes the following steps:
s1: simulating the beginning of shield tunneling;
s2: an excavation gap 404 generated by excavation of a simulation cutter head for water drainage of the water layer of the outer ring of the previous ring;
s3: after the excavation gap acts for a certain time, a shield tail gap 405 generated by simulating shield tail separation is generated by draining water on the previous annular water layer;
s4: after the excavation gap and the shield tail gap act together for a certain time, grouting the water layer of the outer ring of the previous ring, and simulating different filling degrees by designing and controlling the grouting amount;
s5: repeating the steps S2-S4, and carrying out water drainage and grouting filling on the water layer of the next ring which reaches the designed excavation time;
s6: and repeating the step S5, and sequentially carrying out simulated excavation to realize the propulsion of the shield by setting the actual time difference between water discharge and grouting filling of the water-surrounding layers of different rings.
The working principle of the invention is as follows:
① geological condition similarity processing, according to the buried depth, tunnel diameter and soil layer condition of the engineering actual investigation, according to the proper similarity ratio K (the ratio of the on-site actual value and the indoor simulation value), determining the parameters of the simulation experiment.
② the working condition of the shield machine is determined by calculating the appropriate grouting pressure through the stratum property simulated by the indoor experiment, and setting the shield excavation gap value and the shield tail gap value by combining the shield construction parameters.
③ device building, single point displacement meter arranging and wiring (one row of undisturbed soil and one row of ultra-deep drilling hole manual backfill soil), and filling operation.
When the single-point displacement meter for simulating ultra-deep backfill is installed, a PVC pipe can be used as a sleeve to directly sleeve the single-point displacement meter inside, backfill is filled inside, original filling soil is filled outside, and finally the sleeve is removed. The cylinder short cylinder can also be used for shielding and filling one section by one section, and then the cylinder short cylinder can be pulled up while filling. And the ultra-deep section of the sleeve is backfilled with soil, and the rest is undisturbed soil, so that different soil layers on site are simulated.
The installation of the single-point displacement meter for simulating undisturbed soil can be realized without a sleeve, and the undisturbed soil is directly filled in a whole box layer by layer.
④ excavation simulation, according to design value, a shield machine is simulated to firstly drain water to the outer ring water layer 203 of different rings which are divided according to set time in sequence to pass through each ring of pipe pieces (shown as 3 rings), and an excavation gap generated by simulating cutter head excavation is simulated, a shield tail gap generated by draining water to the inner ring water layer 204 to simulate cutter head shield tail separation is acted on the excavation gap for a certain time, at the moment, the excavation gap and the shield tail gap act together to cause soil body settlement, grouting is carried out to the outer ring water layer 203 through a grouting hole, and filling with different degrees is simulated through calculated grouting amount.
When the water drainage and grouting filling of the water-circulating layer of the current ring of simulation pipe piece are carried out, the water drainage and grouting filling are carried out on the water-circulating layer of the next ring which reaches the designed excavation time, and the simulated excavation is carried out in sequence to realize the moving propulsion of the shield through the actually set time difference of the water drainage and grouting filling of the water-circulating layers of different rings, namely the movement of the excavation gap, the shield tail gap and the grouting filling is simulated.
⑤ the settlement data of the single point displacement meter in the process of simulating shield excavation is collected.
Because the settlement of the soil body is determined by the excavation gap, the shield tail gap and the filling conditions of the excavation gap, the shield tail gap and the shield tail gap, the invention simulates the tube piece through the fixed built-in steel cylinder, simulates the excavation gap through the outer annular water layer and simulates the shield tail gap through the inner annular water layer, the filling conditions are simulated through grouting, and meanwhile, the single-point displacement meter is used for monitoring the settlement of the soil body to study the law. The simulation test platform can realize the following functions:
under the condition of setting different excavation gaps and shield tail gaps, different-depth soil body settlement data are collected through a single-point displacement meter, and the settlement rule of the soil body caused by shield tunnel excavation is researched.
And secondly, setting the excavation gap and the shield tail gap under a certain condition, acquiring settlement data of soil bodies at different depths through the single-point displacement meter, comparing the settlement difference of the single-point displacement meter of the original state soil and the ultra-deep backfill soil in the soil layer at the same depth, and researching the correction rule of the monitoring settlement value of the single-point displacement meter for drilling at different ultra depths.
Thus, it should be understood by those skilled in the art that while exemplary embodiments of the present invention have been illustrated and described in detail herein, many other variations and modifications can be made, which are consistent with the principles of the invention, from the disclosure herein, without departing from the spirit and scope of the invention. Accordingly, the scope of the invention should be understood and interpreted to cover all such other variations or modifications.

Claims (10)

1. The utility model provides a shield constructs excavation and soil body settlement monitoring analogue test platform which characterized in that includes box, excavation analog system and soil body settlement monitoring system, wherein:
undisturbed soil is filled in the box body;
the excavation simulation system is arranged in the box body and comprises a built-in steel cylinder, the built-in steel cylinder is used as a bearing foundation of the excavation simulation system, a plurality of annular partition plates concentric with the built-in steel cylinder are uniformly arranged at intervals on the periphery of the built-in steel cylinder, an outer annular water layer and an inner annular water layer concentric with the built-in steel cylinder are arranged between the adjacent annular partition plates, the outer annular water layer is provided with a water injection hole and a grouting hole communicated with the inner part of the outer annular water layer, and the inner annular water layer is;
the soil body settlement monitoring system comprises at least one row of single-point displacement meters, and the single-point displacement meters are buried in the undisturbed soil body.
2. The simulation test platform according to claim 1, wherein the box body is a three-dimensional steel plate soil box with an open upper portion, and the left and right side plates of the soil box are respectively provided with a vertical sliding groove for placing two ends of the built-in steel cylinder, so that the built-in steel cylinder can slide up and down in the vertical sliding grooves, and the arrangement height of the excavation simulation system is adjusted.
3. The simulation test platform of claim 2, wherein the vertical chute is configured with a vertical chute closure plate for enclosing the interior fill.
4. The simulation test platform of claim 1, wherein the soil settlement monitoring system comprises a first row of single point displacement meters and a second row of single point displacement meters, the periphery of the first row of single point displacement meters is backfilled with undisturbed soil, and the ultra-deep section of the hole of the second row of single point displacement meters is backfilled with test soil.
5. The simulation test platform of claim 4, wherein the first row of single point displacement meters and the second row of single point displacement meters are respectively fixed on the upper part of the box body by single point displacement meter fixing rods.
6. The simulation test platform of claim 4, wherein the first row of single point displacement meters and the second row of single point displacement meters are respectively provided with a plurality of single point displacement meters, and the burying depths of the single point displacement meters are different.
7. The simulation test platform of claim 1, wherein the annular baffles are spaced apart by the width of the shield tunnel simulation segment.
8. The simulation test platform of claim 1, wherein the built-in steel cylinder of the excavation simulation system is fixed at a test height at both ends by support rails.
9. A method of simulation testing of a simulation testing platform according to any of the claims 1-8, characterized in that it comprises the steps of:
s1: simulating the beginning of shield tunneling;
s2: water is discharged from the water layer of the outer ring of the previous ring to simulate an excavation gap generated by cutter excavation;
s3: after the excavation gap acts for a certain time, water is discharged to the previous annular water layer to simulate the shield tail gap generated by shield tail separation;
s4: after the excavation gap and the shield tail gap act together for a certain time, grouting the water layer of the outer ring of the previous ring, and simulating different filling degrees by designing and controlling the grouting amount;
s5: repeating the steps S2-S4, and carrying out water drainage and grouting filling on the water layer of the next ring which reaches the designed excavation time;
s6: and repeating the step S5, and sequentially carrying out simulated excavation to realize the propulsion of the shield by setting the actual time difference between water discharge and grouting filling of the water-surrounding layers of different rings.
10. The simulation test method according to claim 9, wherein the excavation gap and the shield tail gap are fixed, the single-point displacement meter is used for acquiring the settlement data of soil bodies at different depths, and the correction rules of the settlement monitoring values of the single-point displacement meter at different ultra depths are researched by comparing the settlement value difference of the undisturbed soil and the ultra-deep backfill soil in the soil layer at the same depth.
CN201911223309.6A 2019-12-03 2019-12-03 Shield excavation and soil body settlement monitoring simulation test platform and simulation test method Pending CN110748353A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201911223309.6A CN110748353A (en) 2019-12-03 2019-12-03 Shield excavation and soil body settlement monitoring simulation test platform and simulation test method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201911223309.6A CN110748353A (en) 2019-12-03 2019-12-03 Shield excavation and soil body settlement monitoring simulation test platform and simulation test method

Publications (1)

Publication Number Publication Date
CN110748353A true CN110748353A (en) 2020-02-04

Family

ID=69285515

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201911223309.6A Pending CN110748353A (en) 2019-12-03 2019-12-03 Shield excavation and soil body settlement monitoring simulation test platform and simulation test method

Country Status (1)

Country Link
CN (1) CN110748353A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113009112A (en) * 2021-03-08 2021-06-22 天津大学 Extrusion drainage type shield excavation simulation test device and method
CN113281179A (en) * 2021-05-21 2021-08-20 中铁第一勘察设计院集团有限公司 Shield tunnel excavation model test box
CN113671150A (en) * 2021-07-16 2021-11-19 长安大学 Combined loess stratum shield tunnel construction full-stage test device capable of uniformly humidifying
CN114136970A (en) * 2021-12-02 2022-03-04 内蒙古科技大学 Experimental method for researching back soil effect caused by rectangular pipe jacking tunneling
CN114439492A (en) * 2022-01-25 2022-05-06 西南交通大学 Device for simulating shield synchronous grouting test stratum restraint and test method
CN114673512A (en) * 2022-04-01 2022-06-28 中国科学院武汉岩土力学研究所 Shield tunnel excavation synchronous grouting test equipment with controllable degree of freedom and application thereof

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113009112A (en) * 2021-03-08 2021-06-22 天津大学 Extrusion drainage type shield excavation simulation test device and method
CN113009112B (en) * 2021-03-08 2023-01-31 天津大学 Extrusion drainage type shield excavation simulation test device and method
CN113281179A (en) * 2021-05-21 2021-08-20 中铁第一勘察设计院集团有限公司 Shield tunnel excavation model test box
CN113281179B (en) * 2021-05-21 2023-03-17 中铁第一勘察设计院集团有限公司 Shield tunnel excavation model test box
CN113671150A (en) * 2021-07-16 2021-11-19 长安大学 Combined loess stratum shield tunnel construction full-stage test device capable of uniformly humidifying
CN113671150B (en) * 2021-07-16 2023-06-20 长安大学 Combined loess stratum shield tunnel construction full-stage test device capable of uniformly humidifying
CN114136970A (en) * 2021-12-02 2022-03-04 内蒙古科技大学 Experimental method for researching back soil effect caused by rectangular pipe jacking tunneling
CN114136970B (en) * 2021-12-02 2024-01-26 内蒙古科技大学 Experimental method for researching back soil effect caused by rectangular pipe-jacking tunneling
CN114439492A (en) * 2022-01-25 2022-05-06 西南交通大学 Device for simulating shield synchronous grouting test stratum restraint and test method
CN114673512A (en) * 2022-04-01 2022-06-28 中国科学院武汉岩土力学研究所 Shield tunnel excavation synchronous grouting test equipment with controllable degree of freedom and application thereof
CN114673512B (en) * 2022-04-01 2023-02-28 中国科学院武汉岩土力学研究所 Shield tunnel excavation synchronous grouting test equipment with controllable degree of freedom and application thereof

Similar Documents

Publication Publication Date Title
CN110748353A (en) Shield excavation and soil body settlement monitoring simulation test platform and simulation test method
CN103996348B (en) The cross-over tunnel construction indoor model test device on operation tunnel impact up and down
CN103117020B (en) Experimental facility for simulating shield tunnel dynamically boring causing ground loss and surface subsidence
CN103837360B (en) Tunnel pipe shed construction method simulated excavation device and implementation method thereof
CN106950070B (en) Experimental rig for rectangular top pipe jacking construction Whole Process Simulation
CN106017407B (en) The formation displacement measuring equipment and method for measurement of a kind of apparent and internal measurement of combination
CN109917108A (en) A kind of three-dimensional similar material model experiment device and method for simulating seam mining
CN102995615B (en) A kind of method of real-time for underground deep layer land movement
CN102434166A (en) Device and method for testing influence of tunnel excavation on existing close-distance parallel tunnels
CN110284530B (en) Multifunctional combined assembled model test box device combining foundation pit and tunnel and application
CN109781773A (en) A kind of frost heave device and its detection method being layered telescopic detection soil
CN104035142A (en) Early warning method for sudden gushing water danger of undersea tunnel
CN108709977A (en) A kind of ground preloading influences the indoor model test device and test method of existing subway tunnel
CN112229981A (en) Device for simulating comprehensive influence of foundation pit excavation and multi-gradient precipitation on tunnel
CN112195927B (en) Deep foundation pit pile anchor support construction method adopting foundation pit deformation monitoring
CN210919057U (en) Shield excavation and soil body settlement monitoring simulation test platform
CN111206932A (en) Simulation device and method for site disturbance of shield construction
CN105257318B (en) A kind of lining cutting localized seepage causes the method for security protection that tunnel structure is deformed
Xu et al. Field pumping experiments and numerical simulations of shield tunnel dewatering under the Yangtze River
CN116956420A (en) Tunnel structure integrated analysis method based on three-dimensional geological model
CN108205055B (en) Shallow undercut tunnel stratum deformation test system that buries under operation highway
CN113281079B (en) Model test device for cooperative construction of open-cut highway tunnel and adjacent double-line tunnel
CN104793262A (en) Stratum hierarchical displacement monitoring method
CN111709065B (en) Method for determining hole distance of ultra-front deep hole grouting drilling under complex surrounding environment
CN108333332B (en) Large scale tunnel model test excavating device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination