CN110474271A - The construction method of fixing concrete shear wall distribution box body - Google Patents
The construction method of fixing concrete shear wall distribution box body Download PDFInfo
- Publication number
- CN110474271A CN110474271A CN201910775204.5A CN201910775204A CN110474271A CN 110474271 A CN110474271 A CN 110474271A CN 201910775204 A CN201910775204 A CN 201910775204A CN 110474271 A CN110474271 A CN 110474271A
- Authority
- CN
- China
- Prior art keywords
- distribution box
- box body
- shear wall
- support portion
- construction method
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02G—INSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
- H02G3/00—Installations of electric cables or lines or protective tubing therefor in or on buildings, equivalent structures or vehicles
- H02G3/02—Details
- H02G3/08—Distribution boxes; Connection or junction boxes
- H02G3/12—Distribution boxes; Connection or junction boxes for flush mounting
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Connection Or Junction Boxes (AREA)
Abstract
The present invention provides a kind of construction methods of fixing concrete shear wall distribution box body, are related to distribution box mounting technique field, comprising the following steps: saddle card is fixedly mounted on the surface of distribution box body;Threading hole is opened up on distribution box body;It is provided with support portion, in distribution box body to improve the non-deformability of distribution box body;Shoulder pole reinforcing bar and saddle card are connected and fixed;By shoulder pole reinforcement welding on the vertical reinforcement in shear wall.By the way that saddle card is fixedly mounted on the surface of distribution box body, utilize the inner wall of support portion support distribution box body, it effectively prevent distribution box body to deform, by shoulder pole reinforcing bar pass through saddle card be connected and fixed, after shoulder pole reinforcing bar is fixed in the vertical reinforcement in shear wall, complete the installation of distribution box, it is complicated to alleviate traditional distribution box installation method existing in the prior art, a large amount of manpower and material resources are needed to install distribution box, and installation effectiveness is low, the high technical problem of installation cost.
Description
Technical field
The present invention relates to distribution box mounting technique fields, more particularly, to a kind of fixing concrete shear wall distribution box body
Construction method.
Background technique
With the continuous development of China's economy, it is able to secretly burying the pre-buried construction method of distribution box body in shear wall structure
It promotes, the difficult point of the pre-buried distribution box of shear wall is to the more demanding of qualification rate, once it goes wrong, it is virtually impossible to it adjusts,
It is of the same trade in recent years many also occur about distribution box body way pre-buried in shear wall, it installs and obtains employment as Architectural Equipment
For person, how in shear wall simpler and more direct firm pre-buried distribution box body, it is ensured that one-pass molding qualification rate certainly will become one
A critical issue.
Traditional shear wall distribution box body installation method mainly has, and production welding distribution box support, welding distribution box are fixed
The methods of position muscle, there are many disadvantages in installation process.Distribution box support is welded, labour cost and processing one certainly will be additionally increased
A bracket time is long, distributing box priming paint of easily burning when welding, secondary touch-up paint antirust treatment is needed, after antinose-dive leg welding is cooling
It can carry out box mouth and nozzle blocks, other work posts are waiting for a long time, and more people, which cooperate, to complete.
Summary of the invention
The purpose of the present invention is to provide a kind of construction methods of fixing concrete shear wall distribution box body, to alleviate
Traditional distribution box installation method existing in the prior art is complicated, needs a large amount of manpower and material resources to install distribution box, installs
Inefficiency, the high technical problem of installation cost.
The construction method of fixing concrete shear wall distribution box body provided by the invention, comprising the following steps:
Saddle card is fixedly mounted on the surface of distribution box body;
Threading hole is opened up on distribution box body;
It is provided with support portion, in distribution box body to improve the non-deformability of distribution box body;
Shoulder pole reinforcing bar and saddle card are connected and fixed;
By shoulder pole reinforcement welding on the vertical reinforcement in shear wall.
Further, it is described saddle card is fixedly mounted on it is further comprising the steps of on the surface of distribution box body:
Determine the installation center point that saddle is stuck on the surface of distribution box body;
By the position mark of saddle card bolt hole on the surface of distribution box body;
Through-hole is opened up at the position mark on distribution box body surface;
Bolt hole on saddle card is corresponding with the lead to the hole site, by bolt passing through bolt hole and the through-hole;
Tightening nuts are set in distribution box body, utilize the fixed bolt of tightening nuts.
It is further, described that threading hole is opened up on distribution box body is further comprising the steps of:
Determine pipe diameter size, quantity and the specific location of penetration pipe;
The specific location of penetration pipe is marked on distribution box body, and opens up threading hole in marked locations.
Further, described that support portion is provided in distribution box body, to improve the non-deformability of distribution box body
It is further comprising the steps of:
Nut is fixed on support portion;
Band steel is fixed on the inner wall of distribution box body;
By the relative position of nut adjustment support portion, so that support portion withstands band steel.
Further, it is described shoulder pole reinforcing bar is connected and fixed with saddle card it is further comprising the steps of:
The installation positioning workpiece on shear wall, to form the installation region of distribution box body;
Distribution box body is put into installation region;
Shoulder pole reinforcing bar is sequentially passed through into multiple saddle cards on distribution box body surface, so that shoulder pole reinforcing bar and saddle card connect
Connect fixation.
Further, warning device is provided in the distribution box body;
The warning device includes temperature detector and alarm, and the temperature detector and the alarm are all set in
In the distribution box body, the temperature detector is electrically connected with the alarm, and the temperature detector is described for detecting
Temperature in distribution box body, and the temperature information that will test is transferred in the alarm, is preset in the alarm
Temperature threshold, the corresponding jingle bell for controlling the alarm.
Further, corner support portion is set in the distribution box body;
The corner support portion is connect with the inner wall of the distribution box body, and the corner support portion is located at the distribution
On the quadrangle of box body.
Further, the support portion includes horizontal support bar and vertical supporting bar;
The both ends of the horizontal support bar are connect with the inner wall of the distribution box body respectively, and the two of the vertical supporting bar
End is connect with the inner wall of the distribution box body respectively;
The vertical supporting bar is provided with multiple, and multiple vertical supporting bars are equal along the inner wall of the distribution box body
Even setting.
Further, it is provided on the inner wall of the distribution box body for improving the distribution box body surface strength
Reinforcing rib.
Further, it is provided with demarcation plate on the inner wall of the distribution box body, the adjacent band steel is separated.
The construction method of fixing concrete shear wall distribution box body provided by the invention, comprising the following steps: by saddle
Card is fixedly mounted on the surface of distribution box body;Threading hole is opened up on distribution box body;It is provided in distribution box body
Support portion, to improve the non-deformability of distribution box body;Shoulder pole reinforcing bar and saddle card are connected and fixed;By shoulder pole reinforcement welding
On vertical reinforcement in shear wall.By the way that saddle card is fixedly mounted on the surface of distribution box body, and in distribution box case
Setting support portion in vivo improves the surface strength of distribution box body using the inner wall of support portion support distribution box body, effectively anti-
Only distribution box body deforms, and shoulder pole reinforcing bar is passed through saddle card and is connected and fixed, after shoulder pole reinforcing bar is fixed on it is perpendicular in shear wall
Into reinforcing bar, the installation of distribution box is completed, traditional distribution box installation method complexity existing in the prior art is alleviated, needs
A large amount of manpower and material resources install distribution box, and installation effectiveness is low, and the high technical problem of installation cost realizes distribution quickly
Case is mounted in shear wall, the technical effect effectively to use manpower and material resources sparingly.
Detailed description of the invention
It, below will be to specific in order to illustrate more clearly of the specific embodiment of the invention or technical solution in the prior art
Embodiment or attached drawing needed to be used in the description of the prior art be briefly described, it should be apparent that, it is described below
Attached drawing is some embodiments of the present invention, for those of ordinary skill in the art, before not making the creative labor
It puts, is also possible to obtain other drawings based on these drawings.
Fig. 1 is the flow chart of the construction method of fixing concrete shear wall distribution box body provided in an embodiment of the present invention;
Fig. 2 is the distribution box in the construction method of fixing concrete shear wall distribution box body provided in an embodiment of the present invention
The structural schematic diagram of cabinet;
Fig. 3 is the support portion in the construction method of fixing concrete shear wall distribution box body provided in an embodiment of the present invention
Structural schematic diagram;
Fig. 4 is the construction method of fixing concrete shear wall distribution box body provided in an embodiment of the present invention with alarm dress
The structural schematic diagram set;
Fig. 5 is that the construction method of fixing concrete shear wall distribution box body provided in an embodiment of the present invention has corner branch
The structural schematic diagram of support part.
Icon: 100- distribution box body;110- threading hole;200- saddle card;300- support portion;310- horizontal support bar;
320- vertical supporting bar;330- band steel;400- shoulder pole reinforcing bar;500- reinforcing rib;600- positions workpiece;700- warning device;
710- temperature detector;720- alarm;800- corner support portion.
Specific embodiment
In order to make the object, technical scheme and advantages of the embodiment of the invention clearer, below in conjunction with the embodiment of the present invention
In attached drawing, technical scheme in the embodiment of the invention is clearly and completely described, it is clear that described embodiment is
A part of the embodiment of the present invention, instead of all the embodiments.The present invention being usually described and illustrated herein in the accompanying drawings is implemented
The component of example can be arranged and be designed with a variety of different configurations.
Therefore, the detailed description of the embodiment of the present invention provided in the accompanying drawings is not intended to limit below claimed
The scope of the present invention, but be merely representative of selected embodiment of the invention.Based on the embodiments of the present invention, this field is common
Technical staff's every other embodiment obtained without creative efforts belongs to the model that the present invention protects
It encloses.
It should also be noted that similar label and letter indicate similar terms in following attached drawing, therefore, once a certain Xiang Yi
It is defined in a attached drawing, does not then need that it is further defined and explained in subsequent attached drawing.
In the description of the present invention, it should be noted that term " center ", "upper", "lower", "left", "right", "vertical",
The orientation or positional relationship of the instructions such as "horizontal", "inner", "outside" is to be based on the orientation or positional relationship shown in the drawings, or be somebody's turn to do
Invention product using when the orientation or positional relationship usually put, be merely for convenience of description of the present invention and simplification of the description, without
It is that the device of indication or suggestion meaning or element must have a particular orientation, be constructed and operated in a specific orientation, therefore not
It can be interpreted as limitation of the present invention.In addition, term " first ", " second ", " third " etc. are only used for distinguishing description, and cannot manage
Solution is indication or suggestion relative importance.
In addition, the terms such as term "horizontal", "vertical", " pendency " are not offered as requiring component abswolute level or pendency, and
It is that can be slightly tilted.It is not to indicate the structure if "horizontal" only refers to that its direction is more horizontal with respect to for "vertical"
It has to fully horizontally, but can be slightly tilted.
In the description of the present invention, it is also necessary to which explanation is unless specifically defined or limited otherwise, term " setting ",
" installation ", " connected ", " connection " shall be understood in a broad sense, for example, it may be fixedly connected, may be a detachable connection or one
Connect to body;It can be mechanical connection, be also possible to be electrically connected;It can be directly connected, it can also be indirect by intermediary
It is connected, can be the connection inside two elements.For the ordinary skill in the art, on being understood with concrete condition
State the concrete meaning of term in the present invention.
With reference to the accompanying drawing, it elaborates to some embodiments of the present invention.In the absence of conflict, following
Feature in embodiment and embodiment can be combined with each other.
Fig. 1 is the flow chart of the construction method of fixing concrete shear wall distribution box body provided in this embodiment;
Fig. 2 is the distribution box body in the construction method of fixing concrete shear wall distribution box body provided in this embodiment
Structural schematic diagram;
Fig. 3 is the knot of the support portion in the construction method of fixing concrete shear wall distribution box body provided in this embodiment
Structure schematic diagram.
As shown in Figure 1-3, the construction method of fixing concrete shear wall distribution box body provided in this embodiment, including with
Lower step: saddle card 200 is fixedly mounted on the surface of distribution box body 100;Threading hole is opened up on distribution box body 100
110;It is provided with support portion 300, in distribution box body 100 to improve the non-deformability of distribution box body 100;By shoulder pole steel
Muscle 400 is connected and fixed with saddle card 200;Shoulder pole reinforcing bar 400 is welded on the vertical reinforcement in shear wall.
Specifically, first saddle card 200 is fixed on the outer surface of distribution box body 100, after saddle card 200 is connected and fixed
Support portion 300 is mounted in distribution box body 100, the surface non-deformability of distribution box body 100 is effectively improved, utilization is flat
Carry on a shoulder pole reinforcing bar 400 pass through saddle card 200, be connected and fixed shoulder pole reinforcing bar 400 with saddle card 200, after shoulder pole reinforcing bar 400 is fixed on
On vertical reinforcement in shear wall, the installation of distribution box body 100 is completed.
The construction method of fixing concrete shear wall distribution box body provided in this embodiment, comprising the following steps: by horse
Saddle card 200 is fixedly mounted on the surface of distribution box body 100;Threading hole 110 is opened up on distribution box body 100;In distribution
Support portion 300 is provided in box body 100, to improve the non-deformability of distribution box body 100;By shoulder pole reinforcing bar 400 and horse
Saddle card 200 is connected and fixed;Shoulder pole reinforcing bar 400 is welded on the vertical reinforcement in shear wall.Pacified by fixing saddle card 200
On the surface of distribution box body 100, and support portion 300 is set in distribution box body 100, is supported using support portion 300
The inner wall of distribution box body 100 improves the surface strength of distribution box body 100, and distribution box body 100 is effectively prevent to deform, will
Shoulder pole reinforcing bar 400 pass through saddle card 200 be connected and fixed, after shoulder pole reinforcing bar 400 is fixed in the vertical reinforcement in shear wall, it is complete
At the installation of distribution box, traditional distribution box installation method complexity existing in the prior art is alleviated, a large amount of manpower is needed
Material resources install distribution box, and installation effectiveness is low, the high technical problem of installation cost is realized quickly to be mounted on distribution box and be cut
In power wall, the technical effect that effectively uses manpower and material resources sparingly.
On the basis of the above embodiments, further, fixing concrete shear wall distribution box case provided in this embodiment
Saddle card 200 is fixedly mounted in the construction method of body further comprising the steps of on the surface of distribution box body 100: determining horse
Installation center point of the saddle card 200 on the surface of distribution box body 100;By the position mark of 200 bolt hole of saddle card in distribution
The surface of box body 100;Through-hole is opened up at the position mark on 100 surface of distribution box body;By the bolt on saddle card 200
Hole is corresponding with lead to the hole site, by bolt passing through bolt hole and through-hole;Tightening nuts are set in distribution box body 100, using twist
Tight nut fixing bolt.
Specifically, determining the installation center point of saddle card 200 before the installation of saddle card 200, pushed up in distribution box body 100
It is 200 installation center point of saddle card that face and bottom surface exterior measuring, which measure 25mm distance, saddle card 200 is overlapped with the sideline 25mm, with note
Number pen indicates 200 bolt hole position of saddle card, repeats this step, completes other all 200 bolt hole location marks of saddle card, uses
Spiral bit indicates aperture at bolt hole on 100 surface of distribution box body, by 200 bolt hole of saddle card and distribution box body
100, which newly open bolt hole, corresponds to, and penetrates bolt and tightening nuts, and the nut for paying special attention to bolt should repeat this on the inside of distribution box
Step completes the installation of other saddle cards 200.
The particular number of saddle card 200 can select according to the actual situation, can be arranged two at the top of distribution box body 100
Two saddle cards 200 are arranged in the bottom of distribution box body 100 in saddle card 200.
Further, it is further comprising the steps of that threading hole 110 is opened up on distribution box body 100: determining the pipe of penetration pipe
Diameter size, quantity and specific location;The specific location of penetration pipe is marked on distribution box body 100, and is opened in marked locations
If threading hole 110.
Specifically, opening up threading hole 110, threading hole 110 on distribution box body 100 after saddle card 200 is installed
Specific location and aperture depending on the specific pipe diameter size of penetration pipe, quantity and position.
Connecting wire is provided in penetration pipe, connecting wire is connected with the component in distribution box body 100, and threads
Pipe is corresponded with the threading hole 110 on distribution box body 100, guarantees a Guan Yikong.
Further, it is provided with support portion 300, in distribution box body 100 to improve the resistance to deformation of distribution box body 100
Ability is further comprising the steps of: nut is fixed on support portion 300;Band steel 330 is fixed on to the inner wall of distribution box body 100
On;By the relative position of nut adjustment support portion 300, so that support portion 300 withstands band steel 330.
Specifically, nut is packed into support portion 300, nut is rotated at the nut of support portion 300;By support portion
300 are put into distribution box body 100, and band steel 330 is put on the inside of distribution box body 100, turns nut, make support portion 300
Hold out against band steel 330.
It should be noted that nut must not make support portion 300 by box deformation after tightening.
Further, shoulder pole reinforcing bar 400 is connected and fixed further comprising the steps of with saddle card 200: is pacified on shear wall
A workpiece 600 is set, to form the installation region of distribution box body 100;Distribution box body 100 is put into installation region;
Shoulder pole reinforcing bar 400 is sequentially passed through into multiple saddle cards 200 on 100 surface of distribution box body, so that shoulder pole reinforcing bar 400 and saddle
Card 200 is connected and fixed.
Specifically, the installation positioning workpiece 600 in shear wall, positioning workpiece 600 are specifically configured to locating rod, multiple positioning
Bar forms the installation region of distribution box body 100, and multiple locating rods are mounted in shear wall in matrix, after by distribution box body
100 are put into installation region, and shoulder pole reinforcing bar 400 is passed through multiple saddle cards 200 on distribution box body 100, completes distribution
The fixation of box body 100.
Further, the distance between 400 end of shoulder pole reinforcing bar and 100 side wall of distribution box body are greater than 500mm.
Specifically, shoulder pole reinforcing bar 400 to be penetrated to the saddle card 200 having been fixed on distribution box body 100, it is ensured that shoulder pole steel
Muscle 400 exceeds tank ends 500mm, to ensure that shoulder pole reinforcing bar 400 and distribution box body 100 are fixed.
Further, shoulder pole reinforcing bar 400 is welded on further comprising the steps of on the vertical reinforcement in shear wall: by shoulder pole
Reinforcing bar 400 is banded in the vertical reinforcement in shear wall.
Specifically, determining 100 installed height mark of on-the-spot distribution box cabinet according to drawing installed height mark, shear wall vertical steel is utilized
Muscle is welded and fixed with shoulder pole reinforcing bar 400, completes the installation of shear wall distribution box.
The construction method of fixing concrete shear wall distribution box body provided in this embodiment, by pacifying saddle card 200
On distribution box body 100, saddle card 200 is passed through by shoulder pole reinforcing bar 400 and distribution box body 100 using shoulder pole reinforcing bar 400
Connection, after shoulder pole reinforcing bar 400 and the Vertical bar connection in shear wall are fixed, completion distribution box body 100 installation fix.
On the basis of the above embodiments, further, fixing concrete shear wall distribution box case provided in this embodiment
Support portion 300 in the construction method of body includes horizontal support bar 310 and vertical supporting bar 320;The both ends of horizontal support bar 310
It is connect respectively with the inner wall of distribution box body 100, the both ends of vertical supporting bar 320 connect with the inner wall of distribution box body 100 respectively
It connects;Vertical supporting bar 320 is provided with multiple, and multiple vertical supporting bars 320 are uniformly arranged along the inner wall of distribution box body 100.
Specifically, horizontal support bar 310 and vertical supporting bar 320, horizontal support bar are arranged in distribution box body 100
310 both ends are abutted with the band steel 330 in 100 inner wall of distribution box body, the both ends of vertical supporting bar 320 and distribution box body
Band steel 330 in 100 inner walls abuts, and horizontal support bar 310 and vertical supporting bar 320 are specifically configured to coating steel pipe, level branch
The particular number of strut 310 and vertical supporting bar 320 according to the actual situation depending on, effectively improve the surface of distribution box body 100
Intensity prevents distribution box body 100 from deforming.
It should be noted that vertical supporting bar 320 and horizontal support bar 310 cannot be such that the surface of distribution box body 100 sends out
Raw deformation.
Further, it is provided on the inner wall of distribution box body 100 for improving adding for 100 surface strength of distribution box body
Strengthening tendons 500.
Specifically, reinforcing rib 500 is arranged on the inner wall of distribution box body 100, the quantity of reinforcing rib 500 may be configured as more
A, multiple reinforcing ribs 500 are set to the cooperation of support portion 300, further increase the non-deformability of distribution box body 100.
Further, it is provided with demarcation plate on the inner wall of distribution box body 100, adjacent band steel 330 is separated.
Specifically, be provided with demarcation plate between band steel 330 and band steel 330, using demarcation plate by two adjacent band steels 330
Separation, the corresponding vertical supporting bar 320 of each band steel 330 or a horizontal support bar 310.
The construction method of fixing concrete shear wall distribution box body provided in this embodiment, passes through horizontal support bar 310
Distribution box body 100 is withstood in setting with vertical supporting bar 320, effectively improves the non-deformability of distribution box body 100;It is logical
It crosses demarcation plate to separate two adjacent band steels 330, guarantees the corresponding vertical supporting bar 320 of each band steel 330 and a water
Flat support rod 310.
On the basis of the above embodiments, further, as shown in figure 4, fixing concrete provided in this embodiment shears
Warning device 700 is provided in distribution box body 100 in the construction method of wall distribution box body 100;Warning device 700 includes
Temperature detector 710 and alarm 720, temperature detector 710 and alarm 720 are all set in distribution box body 100, temperature
Detector 710 is electrically connected with alarm 720, and temperature detector 710 is used to detect the temperature in distribution box body 100, and will inspection
The temperature information measured is transferred in alarm 720, and temperature threshold is preset in alarm 720, corresponding control alarm 720
Jingle bell.
Specifically, temperature detector 710 and alarm 720 are arranged in distribution box body 100, temperature detector 710 has
Body is set as electronic thermometer, and alarm 720 is specifically configured to buzzer, and temperature detector 710 detects in distribution box body 100
Temperature, controller is provided in alarm 720, is provided with temperature threshold in controller, when temperature detector 710 detects
Environment temperature be higher than setting temperature threshold when, alarm 720 alarm, issue jingle bell, remind surrounding people's distribution box body
Temperature is excessively high in 100, Yi Fasheng danger of combustion.
Further, as shown in figure 5, corner support portion 800 is arranged in distribution box body 100;Corner support portion 800 with match
The inner wall of electronic box cabinet 100 connects, and corner support portion 800 is located on the quadrangle of distribution box body 100.
Specifically, corner support portion 800 is set on the quadrangle of distribution box body 100, corner support portion 800 is set as propping up
Fagging, support plate support the corner of distribution box body 100, prevent distribution box body 100 from deforming.
The construction method of fixing concrete shear wall distribution box body 100 provided in this embodiment, passes through warning device 700
Setting, the inside of real-time detection distribution box body 100, when occur in abnormal conditions distribution box body 100 when the temperature is excessively high, report
Alarm device 700 issues the sound, and abnormal conditions occurs in warning surrounding people's distribution box.
Finally, it should be noted that the above embodiments are only used to illustrate the technical solution of the present invention., rather than its limitations;To the greatest extent
Pipe present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that: its according to
So be possible to modify the technical solutions described in the foregoing embodiments, or to some or all of the technical features into
Row equivalent replacement;And these are modified or replaceed, various embodiments of the present invention technology that it does not separate the essence of the corresponding technical solution
The range of scheme.
Claims (10)
1. a kind of construction method of fixing concrete shear wall distribution box body, which comprises the following steps:
Saddle card is fixedly mounted on the surface of distribution box body;
Threading hole is opened up on distribution box body;
It is provided with support portion, in distribution box body to improve the non-deformability of distribution box body;
Shoulder pole reinforcing bar and saddle card are connected and fixed;
By shoulder pole reinforcement welding on the vertical reinforcement in shear wall.
2. the construction method of fixing concrete shear wall distribution box body according to claim 1, which is characterized in that described
Saddle card is fixedly mounted on further comprising the steps of on the surface of distribution box body:
Determine the installation center point that saddle is stuck on the surface of distribution box body;
By the position mark of saddle card bolt hole on the surface of distribution box body;
Through-hole is opened up at the position mark on distribution box body surface;
Bolt hole on saddle card is corresponding with the lead to the hole site, by bolt passing through bolt hole and the through-hole;
Tightening nuts are set in distribution box body, utilize the fixed bolt of tightening nuts.
3. the construction method of fixing concrete shear wall distribution box body according to claim 2, which is characterized in that described
It is further comprising the steps of that threading hole is opened up on distribution box body:
Determine pipe diameter size, quantity and the specific location of penetration pipe;
The specific location of penetration pipe is marked on distribution box body, and opens up threading hole in marked locations.
4. the construction method of fixing concrete shear wall distribution box body according to claim 3, which is characterized in that described
Support portion is provided in distribution box body, further comprising the steps of with the non-deformability for improving distribution box body:
Nut is fixed on support portion;
Band steel is fixed on the inner wall of distribution box body;
By the relative position of nut adjustment support portion, so that support portion withstands band steel.
5. the construction method of fixing concrete shear wall distribution box body according to claim 4, which is characterized in that described
Shoulder pole reinforcing bar is connected and fixed with saddle card further comprising the steps of:
The installation positioning workpiece on shear wall, to form the installation region of distribution box body;
Distribution box body is put into installation region;
Shoulder pole reinforcing bar is sequentially passed through into multiple saddle cards on distribution box body surface, so that shoulder pole reinforcing bar is connect admittedly with saddle card
It is fixed.
6. the construction method of fixing concrete shear wall distribution box body according to claim 1, which is characterized in that described
Warning device is provided in distribution box body;
The warning device includes temperature detector and alarm, and the temperature detector and the alarm are all set in described
In distribution box body, the temperature detector is electrically connected with the alarm, and the temperature detector is for detecting the distribution
Temperature in box body, and the temperature information that will test is transferred in the alarm, is preset with temperature in the alarm
Threshold value, the corresponding jingle bell for controlling the alarm.
7. the construction method of fixing concrete shear wall distribution box body according to claim 6, which is characterized in that described
Corner support portion is set in distribution box body;
The corner support portion is connect with the inner wall of the distribution box body, and the corner support portion is located at the distribution box case
On the quadrangle of body.
8. the construction method of fixing concrete shear wall distribution box body according to claim 1, which is characterized in that described
Support portion includes horizontal support bar and vertical supporting bar;
The both ends of the horizontal support bar are connect with the inner wall of the distribution box body respectively, the both ends point of the vertical supporting bar
It is not connect with the inner wall of the distribution box body;
The vertical supporting bar is provided with multiple, and multiple vertical supporting bars are uniformly set along the inner wall of the distribution box body
It sets.
9. the construction method of fixing concrete shear wall distribution box body according to claim 1, which is characterized in that described
The reinforcing rib for improving the distribution box body surface strength is provided on the inner wall of distribution box body.
10. the construction method of fixing concrete shear wall distribution box body according to claim 4, which is characterized in that institute
It states and is provided with demarcation plate on the inner wall of distribution box body, the adjacent band steel is separated.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910775204.5A CN110474271A (en) | 2019-08-21 | 2019-08-21 | The construction method of fixing concrete shear wall distribution box body |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910775204.5A CN110474271A (en) | 2019-08-21 | 2019-08-21 | The construction method of fixing concrete shear wall distribution box body |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110474271A true CN110474271A (en) | 2019-11-19 |
Family
ID=68513356
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910775204.5A Pending CN110474271A (en) | 2019-08-21 | 2019-08-21 | The construction method of fixing concrete shear wall distribution box body |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110474271A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111779268A (en) * | 2020-06-19 | 2020-10-16 | 中建四局安装工程有限公司 | Construction method for synchronously pre-embedding and molding finished electric box along with main body structure |
CN113279577A (en) * | 2021-06-17 | 2021-08-20 | 张家港保税区金运通市政建筑工程有限公司 | Embedded positioning rib wire box structure and construction method thereof |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2012053999A2 (en) * | 2010-10-18 | 2012-04-26 | Mebosa Makine Kimya Sanayi Ve Ticaret Limited Sirketi | Electric distribution box mounting embodiment in tunnel formwork constructions |
CN205724744U (en) * | 2016-06-22 | 2016-11-23 | 山西二建集团有限公司 | Adjustable type wears muscle distribution box |
CN106911110A (en) * | 2017-02-14 | 2017-06-30 | 山西省工业设备安装有限公司 | A kind of distribution box support component and the utilization direct pre-embedded construction method of the component |
CN206850368U (en) * | 2017-06-26 | 2018-01-05 | 荣华建设集团有限公司 | A kind of wall of aerated concrete block distribution box installing mechanism |
CN109208777A (en) * | 2018-09-21 | 2019-01-15 | 南通通博设备安装工程有限公司 | A kind of method of the interior installation distribution box of shear wall |
CN208539499U (en) * | 2018-08-13 | 2019-02-22 | 中建八局第二建设有限公司 | Portable pre-buried electronic box support frame |
-
2019
- 2019-08-21 CN CN201910775204.5A patent/CN110474271A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2012053999A2 (en) * | 2010-10-18 | 2012-04-26 | Mebosa Makine Kimya Sanayi Ve Ticaret Limited Sirketi | Electric distribution box mounting embodiment in tunnel formwork constructions |
CN205724744U (en) * | 2016-06-22 | 2016-11-23 | 山西二建集团有限公司 | Adjustable type wears muscle distribution box |
CN106911110A (en) * | 2017-02-14 | 2017-06-30 | 山西省工业设备安装有限公司 | A kind of distribution box support component and the utilization direct pre-embedded construction method of the component |
CN206850368U (en) * | 2017-06-26 | 2018-01-05 | 荣华建设集团有限公司 | A kind of wall of aerated concrete block distribution box installing mechanism |
CN208539499U (en) * | 2018-08-13 | 2019-02-22 | 中建八局第二建设有限公司 | Portable pre-buried electronic box support frame |
CN109208777A (en) * | 2018-09-21 | 2019-01-15 | 南通通博设备安装工程有限公司 | A kind of method of the interior installation distribution box of shear wall |
Non-Patent Citations (1)
Title |
---|
张松峰: "谈配电箱壳体与暗配管同时预埋施工", 《山西建筑》 * |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111779268A (en) * | 2020-06-19 | 2020-10-16 | 中建四局安装工程有限公司 | Construction method for synchronously pre-embedding and molding finished electric box along with main body structure |
CN111779268B (en) * | 2020-06-19 | 2021-09-17 | 中建四局安装工程有限公司 | Construction method for synchronously pre-embedding and molding finished electric box along with main body structure |
CN113279577A (en) * | 2021-06-17 | 2021-08-20 | 张家港保税区金运通市政建筑工程有限公司 | Embedded positioning rib wire box structure and construction method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110474271A (en) | The construction method of fixing concrete shear wall distribution box body | |
CN204919996U (en) | Pre -buried connection structure of secondary structure reinforcing bar sleeve | |
CN106639336A (en) | Prefabricated concrete wall panel installation and emplacement orientation adjustment device and construction method thereof | |
CN106437767A (en) | Tunnel pre-burying conduit installation structure and tunnel pre-burying conduit installation method | |
CN109853610A (en) | Steel pipe column concrete foundation pre-embedded anchoring bolts precise positioning mechanism and localization method | |
CN212535033U (en) | A pre-buried fixed frame of climbing attaches wall support device for building of passive room | |
CN206071050U (en) | Mould is hung in a kind of pipeline pipe root closure | |
CN206299188U (en) | A kind of bracket supports component of silo sliding formwork platform | |
CN205990774U (en) | A kind of fixing device of cast-in-place concrete side wall embedded part | |
CN205742554U (en) | A kind of steel column and the Mixed Architecture of beams of concrete | |
CN208534073U (en) | A kind of device positioned for controlling pre-buried horizontal case | |
CN204876561U (en) | Device is reserved at entrance to a cave | |
CN209226415U (en) | A kind of Novel sling component | |
CN205775672U (en) | A kind of mirror lever apparatus measuring railroad rail central point | |
CN207194436U (en) | A kind of disk button steel pipe support cross bar connection deadhead of optimization | |
CN206957261U (en) | Pin-connected panel edge protection railing | |
CN206034929U (en) | Hoisting frame of dress behind concrete square column capital | |
CN205314367U (en) | Prestress wire anchor | |
CN207021929U (en) | Photovoltaic bracket | |
CN208072970U (en) | The template system of concrete type seam construction | |
CN209585026U (en) | A kind of pile for prestressed pipe plugging device | |
CN208579972U (en) | A kind of oblique scissor test part production tooling in conjunction old and new concret face | |
CN110592311A (en) | Converter slag stopping device | |
CN205014882U (en) | Coiled condenser strutting arrangement | |
CN213902375U (en) | Detachable deformation monitoring device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20191119 |
|
RJ01 | Rejection of invention patent application after publication |