CN206850368U CN201720746816.8U CN201720746816U CN206850368U CN 206850368 U CN206850368 U CN 206850368U CN 201720746816 U CN201720746816 U CN 201720746816U CN 206850368 U CN206850368 U CN 206850368U
Authority
CN
China
Prior art keywords
installation
wall
location
mobile side
bar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720746816.8U
Other languages
Chinese (zh)
Inventor
赵成福
张行良
于亿卓
黄永波
朱磊
李玉波
何飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ronghua Construction Group Co Ltd
Original Assignee
Ronghua Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ronghua Construction Group Co Ltd filed Critical Ronghua Construction Group Co Ltd
Priority to CN201720746816.8U priority Critical patent/CN206850368U/en
Application granted granted Critical
Publication of CN206850368U publication Critical patent/CN206850368U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Distribution Board (AREA)

Abstract

It the utility model is related to wall distribution box installing area,Specially a kind of wall of aerated concrete block distribution box installing mechanism,Including wall base body,The inside of the wall base body is embedded with location and installation bar,One end of the location and installation bar reaches the outside of wall base body through the side wall of wall base body,The wall of aerated concrete block distribution box installing mechanism,By using the main body of installation base plate and symmetrically arranged four groups of mobile side boards composition installation form component,And connected and fixed by entering line slip with location and installation bar in the outer surface of mobile side board addition movable loop,The installation for being convenient for people to carry out installation form component is fixed,And the main matrix of installation form component is formed by using installation base plate and mobile side board,And rotate projection by adding,Rotation slot,Rotate the mode of slotted eye and rotating bar,Carry out the rotation connection of installation base plate and mobile side board,In order to which people adjust angle according to different power distribution cabinets.

Description

A kind of wall of aerated concrete block distribution box installing mechanism
Technical field
Wall distribution box installing area is the utility model is related to, specially a kind of wall of aerated concrete block distribution box peace Mounting mechanism.
Background technology
With the continuous development of economy, skyscraper is more and more, traditional electric brake component, gradually by more safe ready Power distribution cabinet substitute, and these power distribution cabinets are also gradually installed by external, are changed to the hidden installation inside wall, from And reduce floor space attractive in appearance while, but concealed installation power distribution cabinet, line position is mostly entered before concrete segment is piled up Fixation is put, piling up for building block can be carried out, but now, the more difficult control of installation site of power distribution cabinet, and existing artificial progress The mode of installation is measured, applicability is not high.
Utility model content
A kind of the defects of technical problem that the utility model solves is to overcome prior art, there is provided air-entrained concrete building block Wall distribution box installing mechanism.
To achieve the above object, the utility model provides following technical scheme:
A kind of wall of aerated concrete block distribution box installing mechanism, including wall base body, the inside of the wall base body are pre-buried There is location and installation bar, one end of the location and installation bar reaches the outside of wall base body, the positioning peace through the side wall of wall base body Outside one end that dress bar be located at wall base body is provided with installation form component, and the installation form component includes installation base plate and multiple Mobile side board, the outer surface of the installation base plate are installed with rotation projection, and the two side for rotating projection opens up Have a rotation slotted eye, the mobile side board position corresponding with rotating projection offers rotation slot, the inwall of the rotation slot with Rotate the corresponding position of slotted eye and be installed with rotating bar, the rotating bar rotates the inside for being plugged on and rotating slotted eye, described It is installed with positioning snap ring in the middle part of the inwall of mobile side board, the surface of the installation base plate position corresponding with positioning snap ring Put and be installed with positioning snap ring two, wherein by connecting and fixing part clamping between corresponding positioning snap ring and positioning snap ring two Fixed, wherein the mobile side board corresponding with location and installation bar is installed with movable loop, the location and installation bar, which slides, to be inserted The inside of movable loop is connected on, wherein the mobile side board corresponding with location and installation bar offers Pipe installing through hole.
Preferably, the quantity of the location and installation bar is at least two groups, and in the setting symmetrical above and below of the surface of wall base body.
Preferably, the movable loop and location and installation bar are two-to-one counter structure, and movable loop is in location and installation The surface of bar linear array successively.
Preferably, the installation base plate is rectangular slab, and wherein the quantity of mobile side board is four groups, and respectively with installing base Four side walls of plate are corresponding, and the positioning snap ring and mobile side board are one to one counter structure, and positioning snap ring and movable sleeve Ring is formed in one structure with mobile side board.
Compared with prior art, the beneficial effects of the utility model are:The wall of aerated concrete block distribution box is installed Mechanism, the main body of installation form component is formed by using installation base plate and symmetrically arranged four groups of mobile side boards, and passed through In the outer surface of mobile side board, addition movable loop enters line slip with location and installation bar and connected and fixed, and is convenient for people to carry out installation mould The installation of board component is fixed, and the main matrix of installation form component is formed by using installation base plate and mobile side board, and By way of adding and rotating projection, rotation slot, rotation slotted eye and rotating bar, the rotation for carrying out installation base plate and mobile side board connects Connect, in order to which people adjust angle according to different power distribution cabinets, while by the surface of mobile side board and installation base plate point Not Jia Ru positioning snap ring and positioning snap ring two, and connected and fixed by the U-shaped part that connects and fixes, in order to determine to install Substrate and mobile side board angle, are convenient for people to be installed and used, and open up Pipe installing through hole on the surface of mobile side board, In order to the connection of power distribution cabinet and electrical lead pipeline.
Brief description of the drawings
Fig. 1 is structural representation of the present utility model.
In figure:1 wall base body, 2 location and installation bars, 3 installation form components, 31 installation base plates, 32 mobile side boards, 33 rotations are convex Block, 34 rotation slotted eyes, 35 rotation slots, 36 rotating bars, 4 positioning snap rings, 5 positioning snap rings two, 6 connect and fix part, 7 movable loops.
Embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the embodiment of the utility model is carried out Clearly and completely describing, it is clear that described embodiment is only the utility model part of the embodiment, rather than whole Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are not under the premise of creative work is made The every other embodiment obtained, belong to the scope of the utility model protection.
Referring to Fig. 1, the utility model provides a kind of technical scheme:
A kind of wall of aerated concrete block distribution box installing mechanism, including wall base body 1, the inside of the wall base body 1 are pre- Location and installation bar 2 is embedded with, one end of the location and installation bar 2 reaches the outside of wall base body 1 through the side wall of wall base body 1, described Outside one end that location and installation bar 2 is located at wall base body 1 is provided with installation form component 3, and the installation form component 3 includes installation Substrate 31 and multiple mobile side boards 32, the outer surface of the installation base plate 31, which is installed with, rotates projection 33, described turn The two side of dynamic projection 33, which offers, rotates slotted eye 34, and the mobile side board 32 position corresponding with rotating projection 33 offers Rotation slot 35, the inwall of the rotation slot 35 position corresponding with rotating slotted eye 34 are installed with rotating bar 36, described turn Lever 36 rotates the inside for being plugged on and rotating slotted eye 34, and positioning snap ring is installed with the middle part of the inwall of the mobile side board 32 4, the position that the surface of the installation base plate 31 is corresponding with positioning snap ring 4 is installed with positioning snap ring 25, wherein corresponding Positioning snap ring 4 and positioning snap ring 25 between connected and fixed by connecting and fixing part 6, wherein corresponding with location and installation bar 2 Mobile side board 32 is installed with movable loop 7, the sliding plug of location and installation bar 2 in the inside of movable loop 7, wherein with The corresponding mobile side board 32 of location and installation bar 2 offers Pipe installing through hole.
As a kind of technical optimization scheme of the present utility model, the quantity of the location and installation bar 2 is at least two groups, and The surface setting symmetrical above and below of wall base body 1.
As a kind of technical optimization scheme of the present utility model, the movable loop 7 is two-to-one right with location and installation bar 2 Structure is answered, and movable loop 7 is on the surface of location and installation bar 7 successively linear array.
As a kind of technical optimization scheme of the present utility model, the installation base plate 31 is rectangular slab, wherein active side The quantity of plate 32 is four groups, and corresponding with four side walls of installation base plate 31 respectively, the positioning snap ring 4 and mobile side board 32 For one to one counter structure, and positioning snap ring 4 and movable loop 7 are formed in one structure with mobile side board 32.
Operation principle:When people use the wall of aerated concrete block distribution box installing mechanism, by using installation base The main body of plate 31 and symmetrically arranged four groups of mobile side boards 32 composition installation form component 3, and by mobile side board 32 Outer surface addition movable loop 7 enters line slip with location and installation bar 2 and connected and fixed, and is convenient for people to carry out installation form component 3 Installation is fixed, and forms the main matrix of installation form component 3 by using installation base plate 31 and mobile side board 32, and is passed through Add and rotate projection 33, rotation slot 35, the mode for rotating slotted eye 34 and rotating bar 36, carry out installation base plate 31 and mobile side board 32 Rotation connection, in order to which people adjust angle according to different power distribution cabinet, while by mobile side board 32 and installation base The surface of plate 31 is separately added into positioning snap ring 4 and positioning snap ring 25, and is consolidated by the U-shaped progress clamping of part 6 that connects and fixes It is fixed, in order to determine installation base plate 31 and the angle of mobile side board 32, it is convenient for people to be installed and used, and in mobile side board 32 Surface open up Pipe installing through hole, in order to the connection of power distribution cabinet and electrical lead pipeline.
While there has been shown and described that embodiment of the present utility model, for the ordinary skill in the art, It is appreciated that these embodiments can be carried out with a variety of changes in the case where not departing from principle of the present utility model and spirit, repaiied Change, replace and modification, the scope of the utility model are defined by the appended claims and the equivalents thereof.

Claims (4)

1. a kind of wall of aerated concrete block distribution box installing mechanism, including wall base body(1), it is characterised in that:The wall base Body(1)Inside be embedded with location and installation bar(2), the location and installation bar(2)One end pass through wall base body(1)Side wall reach Wall base body(1)Outside, the location and installation bar(2)Positioned at wall base body(1)Outside one end be provided with installation form component (3), the installation form component(3)Including installation base plate(31)With multiple mobile side boards(32), the installation base plate(31)'s Outer surface is installed with rotation projection(33), the rotation projection(33)Two side offer rotation slotted eye(34), The mobile side board(32)With rotating projection(33)Corresponding position offers rotation slot(35), the rotation slot(35)It is interior Wall is with rotating slotted eye(34)Corresponding position is installed with rotating bar(36), the rotating bar(36)Rotation is plugged on rotation Slotted eye(34)Inside, the mobile side board(32)Inwall in the middle part of be installed with positioning snap ring(4), the installation base plate (31)Surface and positioning snap ring(4)Corresponding position is installed with positioning snap ring two(5), wherein corresponding locator card Ring(4)With positioning snap ring two(5)Between by connecting and fixing part(6)Connect and fix, wherein with location and installation bar(2)Corresponding Mobile side board(32)It is installed with movable loop(7), the location and installation bar(2)Sliding plug is in movable loop(7)It is interior Portion, wherein with location and installation bar(2)Corresponding mobile side board(32)Offer Pipe installing through hole.
A kind of 2. wall of aerated concrete block distribution box installing mechanism according to claim 1, it is characterised in that:It is described Location and installation bar(2)Quantity be at least two groups, and in wall base body(1)Surface setting symmetrical above and below.
A kind of 3. wall of aerated concrete block distribution box installing mechanism according to claim 1, it is characterised in that:It is described Movable loop(7)With location and installation bar(2)For two-to-one counter structure, and movable loop(7)In location and installation bar(2)Surface Linear array successively.
A kind of 4. wall of aerated concrete block distribution box installing mechanism according to claim 1, it is characterised in that:It is described Installation base plate(31)For rectangular slab, wherein mobile side board(32)Quantity be four groups, and respectively with installation base plate(31)Four Individual side wall is corresponding, the positioning snap ring(4)With mobile side board(32)For one to one counter structure, and positioning snap ring(4)And work The dynamic collar(7)And mobile side board(32)Be formed in one structure.
CN201720746816.8U 2017-06-26 2017-06-26 A kind of wall of aerated concrete block distribution box installing mechanism Expired - Fee Related CN206850368U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720746816.8U CN206850368U (en) 2017-06-26 2017-06-26 A kind of wall of aerated concrete block distribution box installing mechanism

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720746816.8U CN206850368U (en) 2017-06-26 2017-06-26 A kind of wall of aerated concrete block distribution box installing mechanism

Publications (1)

Publication Number Publication Date
CN206850368U true CN206850368U (en) 2018-01-05

Family

ID=60802163

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720746816.8U Expired - Fee Related CN206850368U (en) 2017-06-26 2017-06-26 A kind of wall of aerated concrete block distribution box installing mechanism

Country Status (1)

Country Link
CN (1) CN206850368U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110474271A (en) * 2019-08-21 2019-11-19 云南建投第十一建设有限公司 The construction method of fixing concrete shear wall distribution box body
CN110593434A (en) * 2019-08-26 2019-12-20 南通通博设备安装工程有限公司 Mounting structure and construction method for power distribution cabinet of light wall of building

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110474271A (en) * 2019-08-21 2019-11-19 云南建投第十一建设有限公司 The construction method of fixing concrete shear wall distribution box body
CN110593434A (en) * 2019-08-26 2019-12-20 南通通博设备安装工程有限公司 Mounting structure and construction method for power distribution cabinet of light wall of building

Similar Documents

Publication Publication Date Title
CN206850368U (en) A kind of wall of aerated concrete block distribution box installing mechanism
CN109440939B (en) Folding building
CN207409183U (en) Assembly concrete knows figure instructional device
CN206052765U (en) A kind of streetlamp foundation positions instrument
CN207110329U (en) A kind of wallboard fast fixing structure
CN202265928U (en) Seamless suspended ceiling device
CN102409790A (en) Seamless suspended ceiling device and installation method thereof
CN215803121U (en) Multifunctional positioning device for bolt of pull-up type overhanging scaffold
CN205901240U (en) Height -adjustable frame of reducing expenditure for cable pit
CN211037616U (en) Connecting structure of modeling wallboard
CN204741191U (en) Novel strapping table case
CN208838495U (en) A kind of supplementary motion system based on object of mating formation
CN208028541U (en) A kind of expansible street code
CN210917834U (en) Prefabricated assembled wall for indoor decoration
CN209083045U (en) A kind of assembled-type house building structure
CN208078533U (en) Power cable is laid with holder
CN207069535U (en) The cable bearer that a kind of transformer station uses
CN205287564U (en) Magic cube
CN203797279U (en) Anchoring part for universallymounting square tube
CN214169022U (en) Hydraulic construction foundation seepage prevention structure
CN109830163B (en) Experimental device for be used for simulating stack of broken basin structure
CN214752586U (en) Free building structure of house model
CN215008811U (en) Pre-buried construction structures of end box of switch socket line box
CN214624200U (en) House house type transformation scheme generation device
CN215835066U (en) Combined cable bridge

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180105

Termination date: 20210626