CN208072970U - The template system of concrete type seam construction - Google Patents

The template system of concrete type seam construction Download PDF

Info

Publication number
CN208072970U
CN208072970U CN201820427595.2U CN201820427595U CN208072970U CN 208072970 U CN208072970 U CN 208072970U CN 201820427595 U CN201820427595 U CN 201820427595U CN 208072970 U CN208072970 U CN 208072970U
Authority
CN
China
Prior art keywords
built
fitting
seam construction
template system
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820427595.2U
Other languages
Chinese (zh)
Inventor
刘怀刚
高世强
肖向荣
杨杰
赵升辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Road and Bridge South China Engineering Co Ltd
Original Assignee
Road and Bridge South China Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Road and Bridge South China Engineering Co Ltd filed Critical Road and Bridge South China Engineering Co Ltd
Priority to CN201820427595.2U priority Critical patent/CN208072970U/en
Application granted granted Critical
Publication of CN208072970U publication Critical patent/CN208072970U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The utility model provides a kind of template system of concrete type seam construction, it is erected between the concrete structure for being completed and pouring or is completed between the formed steel construction set up to form seam construction, it includes several panels and support several panels install structure, wherein, the panel is close to be fixed on the completed concrete structure boundary or formed steel construction boundary, the structure that installs includes the built-in fitting being laid in inside the completed concrete structure or formed steel construction, and one end is fixedly connected with the panel, the pull rod that the other end is fixedly connected with the built-in fitting.The template system reasonable stress of the utility model concrete type seam construction, support is firm, can realize the reasonable fixation of concrete type seam construction.

Description

The template system of concrete type seam construction
【Technical field】
The utility model is related to construction engineering technical field more particularly to a kind of template systems of concrete type seam construction System.
【Background technology】
The support of the template system of concrete type seam construction must assure that enough intensity, rigidity, stability, and take If simplicity.In the prior art, the template system of concrete type seam construction mostly uses greatly is arranged laterally branch between template The mode of support.Although set up lateral support can fixed form, reserve enough gaps, but be extremely unfavorable on construction personnel Lower operation.In addition, part concrete type seam construction template system sets up complexity, unbalance stress is unfavorable for keeping seam crossing Fixation.
Therefore, it is necessary to provide a kind of reasonable stress, the template system of firm concrete type seam construction is supported.
【Utility model content】
The purpose of this utility model is to provide a kind of reasonable stress, support the template of firm concrete type seam construction System.
To realize the purpose, the utility model adopts the following technical solution:
A kind of template system of concrete type seam construction, is erected between the concrete structure for being completed and pouring or complete At between the formed steel construction set up forming seam construction, including several panels and support several panels install knot Structure, wherein the panel is close to be fixed on the completed concrete structure boundary or formed steel construction boundary, described to install knot Structure includes that be laid in built-in fitting inside the completed concrete structure or formed steel construction and one end solid with the panel The pull rod that fixed connection, the other end are fixedly connected with the built-in fitting.
Preferably, plane where the built-in fitting is mutually perpendicular to plane where the panel.
Preferably, the panel is fixed on the completed concrete structure boundary or shaped steel by the way that Screw arbor with nut at both-ends is arranged Structure boundary, the Screw arbor with nut at both-ends include screw rod and the connection support component being connect with screw flight, the connection support group Part is fixed on the completed concrete structure outside boundaries or formed steel construction outside boundaries.
Preferably, the Screw arbor with nut at both-ends is from the bottom of seam construction, and interval is laid in the vertical direction;The built-in fitting From the bottom of the seam construction, interval is laid in the horizontal direction, and the screw rod in the Screw arbor with nut at both-ends connects with the pull rod It connects, the pull rod is fixed on the built-in fitting, to realize the connection of the panel and the built-in fitting.
Preferably, the ratio between the distance between the distance between described Screw arbor with nut at both-ends and the built-in fitting are 1:1.5.
The panel for being preferably located at the seam construction bottom is directly welded by screw rod and the built-in fitting.
Preferably, the pull rod is to drawing reinforcing bar or to wire drawing pipe, and the built-in fitting is embedded bar or shaped steel.
Preferably, also it is erected with scaffold between the seam construction.
Preferably, the scaffold bottom is equipped with buttress, and the formed steel construction is erected on the buttress.
Compared with prior art, the utility model has following advantage:
1. the utility model is fixed by the way that panel is arranged in completed concrete structure or formed steel construction boundary, and And setting support the panel install structure, further, by installing structure and being arranged in completed concrete structure Or the built-in fitting connection inside formed steel construction, reasonable stress is ultimately formed, the template of firm concrete type seam construction is supported System.
2. the template system of the utility model concrete type seam construction uses " distributing installs " pattern --- it is described right Draw screw rod from the bottom of seam construction, interval is laid in the vertical direction;The built-in fitting is from the bottom of the seam construction It rises, interval is laid in the horizontal direction;And the ratio between the distance between the distance between described Screw arbor with nut at both-ends and the built-in fitting one It is fixed, and the screw rod in the Screw arbor with nut at both-ends is connect with the pull rod, and the pull rod is fixed on the built-in fitting, to realize The connection for stating panel and the built-in fitting can prevent the template system of concrete type seam construction to having poured with upper type setting Section generates excessive pressure, to ensure to have poured the stability of section.
3. the template system of the utility model concrete type seam construction is provided with scaffold, the installation of panel is facilitated, Greatly improve construction efficiency simultaneously.
4. the template system composition of the utility model concrete type seam construction is simple, simplicity is set up, it is highly practical, it can Applied to various seam constructions.
【Description of the drawings】
Fig. 1 is the structural schematic diagram of the template system of the utility model concrete type seam construction.
【Specific implementation mode】
The utility model is further described with exemplary embodiment below in conjunction with the accompanying drawings, it is wherein identical in attached drawing Label all refers to identical component.In addition, if the detailed description of known technology is for showing the feature of the utility model It is unnecessary, then omits it.
Referring to Fig. 1, a kind of template system 10 of concrete type seam construction is erected at the concrete structure for being completed and pouring Between 20 or it is completed between the formed steel construction 30 set up to form seam construction 40, including several panels 101 and support institute That states several panels 101 installs structure 102, wherein the panel 101 is close to be fixed on the completed concrete structure 20 30 boundary of boundary or formed steel construction, the structure 102 that installs includes being laid in the completed concrete structure 20 or shaped steel Built-in fitting 1021 and one end inside structure 30 are fixedly connected with the panel 101, the other end and the built-in fitting 1021 are solid Surely the pull rod 1022 connected.
Preferably, 1021 place plane of the built-in fitting is mutually perpendicular to 101 place plane of the panel.The panel 101 are fixed on 20 boundary of completed concrete structure or 30 boundary of formed steel construction, institute by the way that Screw arbor with nut at both-ends 1010 is arranged It states Screw arbor with nut at both-ends 1010 and includes screw rod 1011 and the connection support component 1012 being threadedly coupled with screw rod 1011, the connection Support component 1012 is fixed on 20 boundary of completed concrete structure or 30 outside boundaries of formed steel construction.The pull rod 1022 is, to drawing reinforcing bar or to wire drawing pipe, the built-in fitting 1021 are embedded bar or shaped steel.
Preferably, the Screw arbor with nut at both-ends 1010 is from the bottom of seam construction 40, and interval is laid in the vertical direction;Institute is pre- Embedded part 1021 is from the bottom of the seam construction 40, and interval is laid in the horizontal direction;Spiral shell in the Screw arbor with nut at both-ends 1010 Bar 1011 is connect with the pull rod 1022, and the pull rod 1022 is fixed on the built-in fitting 1021, with realize the panel 101 with The connection of built-in fitting 1021.Preferably, the distance between the distance between described Screw arbor with nut at both-ends 1010 and the built-in fitting 1021 The ratio between be 1:1.5, and the pull rod 1022 is uniformly distributed by 40 center outwardly direction of seam construction, and phase between pull rod 1022 It is mutually parallel.
The seam construction 40 of different size is adapted to, the quantity and spacing distance of the panel 101 and built-in fitting 1021 can spirits Adjustment living, by taking the seam construction 40 of 10m × 22m as an example, 20 boundary of concrete structure or 30 boundary of formed steel construction of both sides are the bottom of from Portion rises, and sets gradually 3 Screw arbor with nut at both-ends 1010 straight up, wherein the Screw arbor with nut at both-ends 1010 of bottom is apart from 30 bottom of formed steel construction The height in portion is 3-4m, and 8-10m is set between remaining Screw arbor with nut at both-ends 1010.With the pre- of 40 left side of the seam construction For 1021 laying mode of embedded part, the built-in fitting 1021 is equipped with 3 in the horizontal direction, wherein the built-in fitting of the rightmost side 1021 between 30 boundary 2-3m of 20 boundary of concrete structure or formed steel construction, remaining built-in fitting 1021 between be divided into 12-15m It lays, after welding rod 1022, ensures to be mutually parallel between pull rod 1022, be formed " cable-stayed type pull rod ", to form stress conjunction Reason, supports the template system 10 of firm concrete type seam construction.
The template system of the utility model concrete type seam construction uses " distributing installs " pattern --- described pair of drawing Screw rod 1010 is from the bottom of seam construction 40, and interval is laid in the vertical direction;The built-in fitting 1021 is from the seam knot The bottom of structure 40 is risen, and interval is laid in the horizontal direction;And the distance between described Screw arbor with nut at both-ends 1010 and the built-in fitting The ratio between the distance between 1021 is certain, and the screw rod 1011 in the Screw arbor with nut at both-ends 1010 is connect with the pull rod 1022, institute It states pull rod 1022 to be fixed on the built-in fitting 1021, to realize the connection of the panel 101 and built-in fitting 1021, with upper type Being arranged can prevent the template system of concrete type seam construction from generating excessive pressure to having poured section, to ensure to have poured section Stability.
Further, the template system 10 of the concrete type seam construction further includes being set between seam construction 40, institute The scaffold 103 in casting space defined by panel 101 is stated, the scaffold 103 is made of steel pipe, and scaffold 103 is set The installation for facilitating panel 101 is set, while greatly improving construction efficiency.103 bottom of the scaffold is equipped with buttress 104, described Formed steel construction 30 is erected on the buttress 104, is conducive to the stability for improving the template system 10 of concrete type seam construction.
The template system 10 of the utility model concrete type seam construction forms simply, sets up simplicity, highly practical, can Applied to all kinds of seam constructions in construction engineering technical field.
Although having been illustrated with some exemplary embodiments of the utility model above, those skilled in the art will Understand, in the case where not departing from the principles of the present invention or spirit, these exemplary embodiments can be made a change, this The range of utility model is limited by claim and its equivalent.

Claims (9)

1. a kind of template system of concrete type seam construction, is erected between the concrete structure for being completed and pouring or is completed Forming seam construction between the formed steel construction set up, which is characterized in that including several panels and support several panels Install structure, wherein the panel is close to be fixed on the completed concrete structure boundary or formed steel construction boundary, institute It includes being laid in built-in fitting inside the completed concrete structure or formed steel construction and one end and institute to state and install structure State the pull rod that panel is fixedly connected, the other end is fixedly connected with the built-in fitting.
2. the template system of concrete type seam construction according to claim 1, which is characterized in where the built-in fitting Plane is mutually perpendicular to plane where the panel.
3. the template system of concrete type seam construction according to claim 1, which is characterized in that the panel is by setting It includes spiral shell to set Screw arbor with nut at both-ends and be fixed on the completed concrete structure boundary or formed steel construction boundary, the Screw arbor with nut at both-ends Bar and the connection support component being connect with screw flight, the connection support component are fixed on the completed concrete Structure boundary outside or formed steel construction outside boundaries.
4. the template system of concrete type seam construction according to claim 3, which is characterized in that the Screw arbor with nut at both-ends is certainly The bottom of seam construction is risen, and interval is laid in the vertical direction;The built-in fitting is from the bottom of the seam construction, in level It being spaced and lays on direction, the screw rod in the Screw arbor with nut at both-ends is connect with the pull rod, and the pull rod is fixed on the built-in fitting, To realize the connection of the panel and the built-in fitting.
5. the template system of concrete type seam construction according to claim 4, which is characterized in that the Screw arbor with nut at both-ends it Between distance and the ratio between the distance between the built-in fitting be 1:1.5.
6. the template system of concrete type seam construction according to claim 4, which is characterized in that be located at the seam knot The panel of structure bottom is directly welded by screw rod and the built-in fitting.
7. the template system of concrete type seam construction according to claim 1, which is characterized in that the pull rod is to drawing Reinforcing bar or to wire drawing pipe, the built-in fitting is embedded bar or shaped steel.
8. the template system of concrete type seam construction according to claim 1, which is characterized in that the seam construction it Between be also erected with scaffold.
9. the template system of concrete type seam construction according to claim 8, which is characterized in that the scaffold bottom Equipped with buttress, the formed steel construction is erected on the buttress.
CN201820427595.2U 2018-03-27 2018-03-27 The template system of concrete type seam construction Active CN208072970U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820427595.2U CN208072970U (en) 2018-03-27 2018-03-27 The template system of concrete type seam construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820427595.2U CN208072970U (en) 2018-03-27 2018-03-27 The template system of concrete type seam construction

Publications (1)

Publication Number Publication Date
CN208072970U true CN208072970U (en) 2018-11-09

Family

ID=64042071

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820427595.2U Active CN208072970U (en) 2018-03-27 2018-03-27 The template system of concrete type seam construction

Country Status (1)

Country Link
CN (1) CN208072970U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108277978A (en) * 2018-03-27 2018-07-13 中交路桥华南工程有限公司 The template system of concrete type seam construction

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108277978A (en) * 2018-03-27 2018-07-13 中交路桥华南工程有限公司 The template system of concrete type seam construction
CN108277978B (en) * 2018-03-27 2024-07-23 中交路桥华南工程有限公司 Form system for concrete type joint structure

Similar Documents

Publication Publication Date Title
CN106639336A (en) Prefabricated concrete wall panel installation and emplacement orientation adjustment device and construction method thereof
CN106480823B (en) Vaulted beam device and its localization method
CN206477585U (en) Tripod falsework
CN204850474U (en) Concrete feeding pump line fixing system
CN208072970U (en) The template system of concrete type seam construction
CN109132843B (en) The installation method of super-section metal bellows in a kind of vertical shaft
CN204875558U (en) Shaped steel runs through inside and outside compound support formula bracket system of encorbelmenting
CN208884991U (en) Deformation slit formwork
CN204254043U (en) Vertical heavy caliber erect riser road adhesion type is encorbelmented support bracket
CN108277978A (en) The template system of concrete type seam construction
CN206859076U (en) For supporting the device of one-time-concreting Inner Moulding Board in Building
CN206971725U (en) Hang the erecting device of mould
CN204876084U (en) Steel column foot crab -bolt fixed bolster
CN204225491U (en) The support chock of formwork keel
CN108240113A (en) Detachably across the support device at hole and method
CN203855988U (en) Post-cast strip steel pipe supporting structure
CN105887692A (en) Arch bridge supporting tool for improving arch bridge construction stability and construction method thereof
CN208087094U (en) A kind of inclined-plane cell cube Lift-on/Lift-off System
CN205617249U (en) Increase arched bridge supporting tool of arched bridge construction stability
CN206607706U (en) A kind of drawing shore for shear wall construction
CN205314367U (en) Prestress wire anchor
CN205224571U (en) Anchor of builder's jack
CN107882019A (en) I-shaped prestressed concrete slabses staking pilework
CN205242267U (en) Hollow thin wall rectangle dun dun pushes up construction structures
CN211850797U (en) Side wall unilateral bearing structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant