CN110397155A - A kind of green balcony for multi-storey building - Google Patents

A kind of green balcony for multi-storey building Download PDF

Info

Publication number
CN110397155A
CN110397155A CN201910540512.XA CN201910540512A CN110397155A CN 110397155 A CN110397155 A CN 110397155A CN 201910540512 A CN201910540512 A CN 201910540512A CN 110397155 A CN110397155 A CN 110397155A
Authority
CN
China
Prior art keywords
fixed
cable wire
platform framework
tube head
anchor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910540512.XA
Other languages
Chinese (zh)
Other versions
CN110397155B (en
Inventor
吴�荣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Jiahe Plant Protection Technology Co.,Ltd.
Original Assignee
Xuzhou Joy Electromechanical Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xuzhou Joy Electromechanical Technology Co Ltd filed Critical Xuzhou Joy Electromechanical Technology Co Ltd
Priority to CN201910540512.XA priority Critical patent/CN110397155B/en
Publication of CN110397155A publication Critical patent/CN110397155A/en
Application granted granted Critical
Publication of CN110397155B publication Critical patent/CN110397155B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/003Balconies; Decks

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Steps, Ramps, And Handrails (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention discloses a kind of green balconies for multi-storey building, including platform framework, it is welded by type steel skeleton, platform framework is connected by the beam column built from concrete in articulated mounting and house, articulated mounting is u-shaped anchor and axial pin type connector, the inside that axial pin type connector is mounted on u-shaped anchor is fixed by pivot pin, so that u-shaped anchor and axial pin type connector are hinged, the axial pin type connector is fixed on one end of platform framework, u-shaped anchor is fixed on the beam column built from concrete in house, also there is removable tube head on front side of platform framework, it is connect with cable wire railing.Exterior design of the invention is beautiful, dismounts and mounts flexibly and easily, and security performance is reliable, and the dismountable rear strange land of balcony, pull rod, pond, leisure platform, guardrail is reused.

Description

A kind of green balcony for multi-storey building
This divisional application original applying number be 201610914428.6, the applying date be on October 20th, 2016, entitled " one Kind is used for the green balcony and preparation method thereof of multi-storey building ".
Technical field
The present invention relates to a kind of green balconies for multi-storey building.
Background technique
With the continuous improvement of people's living standards, urbanization process is accelerated, and skyscraper, intensive transportation network are continuous Ground corrodes the limited green space in city, and it is so to lack that at this moment we, which just really experience life Green,.In order to improve This undesirable development model allows city full of green, and people start to spatial development, when from plot planning, layout design just Start to imagine and a super large green balcony is supplied to each household resident, ancient Chinese style garden love knot is allowed to obtain in high residential building To extend.
Country's residential quarters greening at present, flowers and plants, landscape, trees are generally each provided at the public-land in cell courtyard On, also have situation garden being built on roofing.Community resident can only go to one layer of ground or roofing is ornamental, and can not participate in planting The overall processes such as training, watering, trimming, nursing, it is even more impossible to meet the exclusive privacy of individual character hobby and private savings of the occupant to flowers and plants It is required that.In terms of greening cell environment, changing cityscape, acts in accordance at once for trend, change that thousand city one side in the past Design pattern, set about from the design scheme in Unit Residential building, optimizing design scheme and change old traditional design theory, be society More green buildings can be provided and graceful ecological environment is extremely urgent.
Assembled afforests balcony, and exterior design is beautiful, dismounts and mounts flexible and convenient, and security performance is reliable, balcony, pull rod, pond, It reuses in the dismountable rear strange land of leisure platform, guardrail.
Summary of the invention
In view of the above existing problems in the prior art, the present invention provides a kind of green balconies for multi-storey building, belong to Assembled afforests balcony, and exterior design is beautiful, dismounts and mounts flexibly and easily, and security performance is reliable, and balcony, pull rod, pond, leisure are flat It reuses in the dismountable rear strange land of platform, guardrail.
To achieve the goals above, the technical solution adopted by the present invention is that: a kind of green balcony for multi-storey building, one Kind possesses the detachable green balcony of garden carrier, including platform framework, the platform framework are welded by type steel skeleton, Platform framework is connected by the beam column built from concrete in articulated mounting and house, and the platform framework includes garden areas and aisle, The thickness of platform framework in 5-50cm,.
The articulated mounting is u-shaped anchor and axial pin type connector, and axial pin type connector is mounted on the interior of u-shaped anchor Portion is fixed by pivot pin, so that u-shaped anchor and axial pin type connector are hinged, the axial pin type connector is fixed on One end of platform framework, the u-shaped anchor are fixed on the beam column built from concrete in house, and u-shaped anchor exposes outside hinge bar.
The two sides of platform framework are mounted on several updip formula cable wires and hang nose, and corresponding beam column built from concrete is equipped with dipping type Anchor, dipping type anchor have rectangular anchor slab, and rectangular anchor slab is fixed on inside beam column built from concrete, and updip formula cable wire hangs nose and has a down dip Formula anchor is fixedly connected by cap cable pull rod.
The avris of platform framework is equipped with guardrail grafting pedestal, and the two sides of table frame are respectively equipped with 2 fixed auxiliary tendon tubes Head, auxiliary cable wire pull rod pass through every layer of corresponding fixed auxiliary cable wire tube head, and the both ends of auxiliary cable wire pull rod are fixed on top And the bottom assists on cable wire tube head the fixed of roof panel frame,
There are two the installed in front of the platform framework moves tube head,
Cable wire pull rod passes through corresponding removable tube head, and one end of cable wire pull rod is fixed on Cantilever Beams, and the other end is fixed on bottom On portion's fixture, the removable tube head includes sliding shoe and fixed block, and sliding shoe is connected with fixed block by fixed link, Gu Determine to be fixed with tube head on the outside of block, sliding shoe lower end has clamp rail block, and the clamp rail Kuai Cheng Shang type, the front side of platform framework is equipped with Sliding slot, sliding slot Cheng Shang type, clamp rail block are matched with sliding slot, and the exposed face of the front side of platform framework has rack gear, fixed block and tooth There is fixed chuck, the fixed chuck is connect with fixed block by linear motor between item.
The top of floor is arranged in the Cantilever Beams.
A kind of production method for the detachable green balcony possessing garden carrier: the following steps are included:
(1) Cantilever Beams are set: Cantilever Beams being set on the top of floor, if house is newly constructed house, Cantilever Beams can be with house master Body is made into reinforced beam, and if it is aging blocks room, steelwork can be used, and is reliably connected with room object top layer;
(2) in the metope pre-embedded u-shaped anchor and dipping type anchor of the floor for installing balcony, each floor, dipping type anchor Position height is greater than the position height of u-shaped anchor;
(3) suitable platform framework is selected, and is welded with axial pin type connector close to the two sides of metope one end in platform framework, is put down It is symmetrically installed at least one set of updip formula cable wire on the body of rod of two sides of table frame and hangs nose, the installed in front of platform framework has Removable tube head, the avris of platform framework are equipped with guardrail grafting pedestal, and the two sides of table frame are respectively equipped with 2 fixed auxiliary cable wires Tube head,
And the floor of installation is placed on by hanging device, the two axial pin type connectors and metope pre-embedded u-shaped anchor of platform framework Part is hinged by pivot pin,
Then the updip formula cable wire on the body of rod of two sides of platform framework is hung into nose and dipping type anchor with cap cable pull rod Connection;
(4) selection floor continues to install balcony, repeats step (2) and step (3), up to floor in need platform framework it is equal It is installed, then passes through the corresponding fixed auxiliary cable wire tube head of all platform framework avris with auxiliary cable wire pull rod, will own Platform framework connection be integral, auxiliary cable wire pull rod passes through every layer of corresponding fixed auxiliary cable wire tube head, and auxiliary cable wire is drawn The both ends of bar are fixed on top and the bottom on the fixed auxiliary cable wire tube head of roof panel frame, hang from top is fixed Two cable wire pull rods are drawn on outrigger, each cable wire pull rod passes through the corresponding removable tube head of each platform framework, Zhi Daogang Rope pull rod passes through the corresponding removable tube head of all platform frameworks, finally determines the position of the cable wire pull rod other end, the position It sets on the fixture on ground, so that cable wire pull rod is tight securely, after two cable wire pull rods are all fixed, two cable wire pull rods Angle is formed by between 35-85 °, the removable tube head on each platform framework is finally fixed, so that making movable pipe Head is fixed on platform framework and can not move.
It, will with two cable wire clamps after cable wire pull rod passes through the corresponding removable tube head of all platform frameworks in step (4) Mobile connection tube head is fixed on cable wire pull rod.
The present invention has the following advantages that overhanging type balcony will be completed in processing factory with four adjustable steel ropes Assembled steel balcony oblique pull, horizontally suspend on the outside of building.Because balcony is produced in processing factory's scale, process velocity is fast, Precision is high, high-quality.When transporting in-site installation, noiseless and environment influence condition is small, and security performance is reliable.The greening balcony It can be designed simultaneously with house, construct, be delivered for use simultaneously simultaneously.It can pass through again for existing building to the direction in house, body After the comprehensive analysis such as coefficient, daylighting requirement, carries out special design and produce and customize.The present invention is drawn by Cantilever Beams, a plurality of cable wire Multiple balconies are fixed as an entirety by bar and removable tube head, and structure is firm, since mobile tube head being capable of spirit before fixation Movement living, so the fixed installation of the balcony and floor of various height can be suitble to.
Detailed description of the invention
Attached drawing 1 is floor map of the present invention;
Attached drawing 2 is that lateral side view is installed in greening balcony;
Attached drawing 3 is the side view of steel platform;
Attached drawing 4 is that dipping type anchor and rectangular anchor slab enter concrete node drawing;
Attached drawing 5 is that platform and wall level mount node drawing.
Fig. 6 is the cable wire pull rod connection schematic diagram of multiple balconies.
Fig. 7 is movable pipe header structure figure.
Fig. 8 is the side view of Fig. 7.
1, platform framework;2, lie fallow platform;3, garden;4, aisle;5 axial pin type connectors;6, updip formula cable wire hangs nose;7, U-shaped anchor;8, beam column built from concrete;9, pivot pin;10, guardrail grafting pedestal;11, cap cable pull rod;12, dipping type anchor;13, side Shape anchor slab;14, Cantilever Beams;15, cable wire pull rod;16, fixed auxiliary cable wire pull rod tube head, 17, fixture, 18, removable tube head, 19 auxiliary cable wire pull rods, 20, removable tube head, 101, sliding slot, 102, rack gear, 201, sliding shoe, 202, fixed link, 203, fixation Clamp, 204, fixed block, 205 tube heads, 206, clamp rail block, 207, linear motor.
Specific embodiment
The present invention will be further explained below with reference to the attached drawings.
A kind of green balcony for multi-storey building, including platform framework 1, the platform framework 1 are welded by type steel skeleton It connects, platform framework is connected by the beam column built from concrete 8 in articulated mounting and house, and the platform framework includes 3 He of garden Aisle 4, leisure platform 2.The thickness of platform framework in 5-50cm,
The articulated mounting is u-shaped anchor 7 and axial pin type connector 5, and axial pin type connector is mounted on the inside of u-shaped anchor Fixed by pivot pin 9, so that u-shaped anchor and axial pin type connector are hinged, the axial pin type connector is fixed on One end of platform framework, the u-shaped anchor are fixed on the beam column built from concrete in house, and u-shaped anchor exposes outside hinge bar.
The two sides of platform framework 1 are mounted on several updip formula cable wires and hang nose 6, and corresponding beam column built from concrete 8 is equipped with down Formula of inclining anchor 12, dipping type anchor 12 have rectangular anchor slab 13, and rectangular anchor slab 13 is fixed on inside beam column built from concrete 8, updip formula Cable wire hangs nose 6 and is fixedly connected with dipping type anchor 12 by cap cable pull rod 11.
The two sides of platform framework 1 are equipped with guardrail grafting pedestal 10 and fixed auxiliary cable wire pull rod tube head 16, and every side is equipped with 2 A fixed auxiliary cable wire pull rod tube head 16,
Cable wire pull rod 19 is assisted to pass through every layer of corresponding fixed auxiliary cable wire tube head 16, the both ends of auxiliary cable wire pull rod 19 are fixed on Top and the bottom assist on cable wire tube head 16 the fixed of roof panel frame,
The installed in front of the platform framework is there are two removable tube head, as shown in fig. 7, specific structure is described removable Dynamic tube head includes sliding shoe 201 and fixed block 204, and sliding shoe 201 and fixed block 204 are connected by fixed link 202, fixed block 204 in the outside of platform framework,
Tube head 205 is fixed on the outside of fixed block, sliding shoe lower end has clamp rail block 206, the clamp rail Kuai Cheng Shang type, platform frame The front side of frame is equipped with sliding slot 101, sliding slot Cheng Shang type, and clamp rail block 206 is matched with sliding slot 101, so that clamp rail block 206 and cunning Slot 101 is slidably connected, and the exposed face of the front side of platform framework has rack gear 102, has between fixed block 204 and rack gear 102 solid Determine clamp 203, the fixed chuck 203 is connect with fixed block 204 by linear motor 207, rack gear 102 and fixed chuck 203 are serrated, and the length of rack gear 102 is longer, and fixed chuck 203 is shorter, when the contraction of linear motor 207, fixed chuck 203 Also it shrinks, moving tube head integrally can be free to slide, when linear motor 207 drives fixed chuck 203 to extend, until and rack gear 102 mesh together, then removable tube head is just completely fixed realizes fixed effect in the position.
Cable wire pull rod passes through corresponding removable tube head, and one end of cable wire pull rod is fixed on Cantilever Beams, and the other end is fixed On bottom fixture 17.
The top of floor is arranged in the Cantilever Beams.
A kind of production method of the detachable balcony of multi-storey building: the following steps are included:
(1) Cantilever Beams are set: Cantilever Beams being set on the top of floor, if house is newly constructed house, Cantilever Beams can be with house master Body is made into reinforced beam, and if it is aging blocks room, steelwork can be used, and is reliably connected with room object top layer;
(2) in the metope pre-embedded u-shaped anchor and dipping type anchor of the floor for installing balcony, each floor, dipping type anchor Position height is greater than the position height of u-shaped anchor;
(3) suitable platform framework is selected, and is welded with axial pin type connector close to the two sides of metope one end in platform framework, is put down It is symmetrically installed at least one set of updip formula cable wire on the body of rod of two sides of table frame and hangs nose, the installed in front of platform framework has Removable tube head, the avris of platform framework are equipped with guardrail grafting pedestal, and the two sides of table frame are respectively equipped with 2 fixed auxiliary cable wires Tube head,
And the floor of installation is placed on by hanging device, the two axial pin type connectors and metope pre-embedded u-shaped anchor of platform framework Part is hinged by pivot pin,
Then the updip formula cable wire on the body of rod of two sides of platform framework is hung into nose and dipping type anchor with cap cable pull rod Connection;
(4) selection floor continues to install balcony, repeats step (2) and step (3), up to floor in need platform framework it is equal It is installed, then passes through the corresponding fixed auxiliary cable wire tube head of all platform framework avris with auxiliary cable wire pull rod, will own Platform framework connection be integral, auxiliary cable wire pull rod passes through every layer of corresponding fixed auxiliary cable wire tube head, and auxiliary cable wire is drawn The both ends of bar are fixed on top and the bottom and assist on cable wire tube head the fixed of roof panel frame,
(5) two cable wire pull rods are drawn from the outside of the fixed Cantilever Beams in top, each cable wire pull rod passes through each platform The corresponding removable tube head of frame, until cable wire pull rod pass through the corresponding removable tube head of all platform frameworks, finally determine steel The position of the rope pull rod other end, since removable tube head can be slided freely, this design is so that determine the cable wire pull rod other end Position when more be easy, it is only necessary to determine on the fixture on ground, then the cable wire pull rod other end directly is pulled Straight line can be formed, and two cable wire pull rods can be drawn from the same place of Cantilever Beams, such Cantilever Beams can not Too big width is needed, without big as the area of balcony, it is only necessary to its extension elongation and the extension elongation of platform framework one Cause can reach good fixed effect.
So that cable wire pull rod is tightened securely, after two cable wire pull rods all tighten fixation, two cable wire pull rods are formed Angle between 35-85 °, the structure of triangle is more firm, finally fix the removable tube head on each platform framework, So that removable tube head is fixed on platform framework and can not move, then mobile connection tube head is fixed on two cable wire clamps On cable wire pull rod,
Removable tube head in this way after several platforms, two cable wire pull rods, fixation is just fixed as an entirety, forms one Firm structure, and this removable tube head facilitates adjusting, is suitble to the domestic floor of different height, length, as shown in Figure 6.

Claims (5)

1. a kind of green balcony for multi-storey building, which is characterized in that including multiple balconies, the balcony includes platform frame Frame, platform framework are welded by type steel skeleton, and platform framework is connected by the beam column built from concrete in articulated mounting and house.
2. a kind of detachable balcony of multi-storey building according to claim 1, which is characterized in that the articulated mounting is U-shaped anchor and axial pin type connector, the inside that axial pin type connector is mounted on u-shaped anchor are fixed by pivot pin, so that u-shaped anchor Part and axial pin type connector are hinged, and the axial pin type connector is fixed on one end of platform framework, the u-shaped Anchor is fixed on the beam column built from concrete in house, and u-shaped anchor exposes outside hinge bar.
3. a kind of green balcony for multi-storey building according to claim 1, which is characterized in that the two of platform framework Side is mounted on several updip formula cable wires and hangs nose, and corresponding beam column built from concrete is equipped with dipping type anchor, and dipping type anchor has Rectangular anchor slab, rectangular anchor slab are fixed on inside beam column built from concrete, and updip formula cable wire hangs nose and dipping type anchor and drawn by cap cable Bar is fixedly connected.
4. a kind of green balcony for multi-storey building according to claim 1, which is characterized in that the avris of platform framework Equipped with guardrail grafting pedestal, the two sides of table frame are respectively equipped with 2 fixed auxiliary cable wire tube heads, and auxiliary cable wire pull rod passes through every layer Corresponding fixed auxiliary cable wire tube head, the both ends of auxiliary cable wire pull rod are fixed on top and the bottom to roof panel frame On fixed auxiliary cable wire tube head,
There are two the installed in front of the platform framework moves tube head,
Cable wire pull rod passes through corresponding removable tube head, and one end of cable wire pull rod is fixed on Cantilever Beams, and the other end is fixed on bottom On portion's fixture, the removable tube head includes sliding shoe and fixed block, and sliding shoe is connected with fixed block by fixed link, Gu Determine to be fixed with tube head on the outside of block, sliding shoe lower end has clamp rail block, and the clamp rail Kuai Cheng Shang type, the front side of platform framework is equipped with Sliding slot, sliding slot Cheng Shang type, clamp rail block are matched with sliding slot, and the exposed face of the front side of platform framework has rack gear, fixed block and tooth There is fixed chuck, the fixed chuck is connect with fixed block by linear motor between item.
5. a kind of green balcony for multi-storey building according to claim 4, which is characterized in that the Cantilever Beams are set It sets on the top of floor.
CN201910540512.XA 2016-10-20 2016-10-20 Green balcony for multi-storey house Active CN110397155B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910540512.XA CN110397155B (en) 2016-10-20 2016-10-20 Green balcony for multi-storey house

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN201610914428.6A CN106638934B (en) 2016-10-20 2016-10-20 A kind of green balcony and preparation method thereof for multi-storey building
CN201910540512.XA CN110397155B (en) 2016-10-20 2016-10-20 Green balcony for multi-storey house

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
CN201610914428.6A Division CN106638934B (en) 2016-10-20 2016-10-20 A kind of green balcony and preparation method thereof for multi-storey building

Publications (2)

Publication Number Publication Date
CN110397155A true CN110397155A (en) 2019-11-01
CN110397155B CN110397155B (en) 2020-12-18

Family

ID=58856365

Family Applications (2)

Application Number Title Priority Date Filing Date
CN201610914428.6A Active CN106638934B (en) 2016-10-20 2016-10-20 A kind of green balcony and preparation method thereof for multi-storey building
CN201910540512.XA Active CN110397155B (en) 2016-10-20 2016-10-20 Green balcony for multi-storey house

Family Applications Before (1)

Application Number Title Priority Date Filing Date
CN201610914428.6A Active CN106638934B (en) 2016-10-20 2016-10-20 A kind of green balcony and preparation method thereof for multi-storey building

Country Status (1)

Country Link
CN (2) CN106638934B (en)

Citations (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07268950A (en) * 1994-04-04 1995-10-17 Sekisui Chem Co Ltd Roof balcony unit and lifting lug
JP2000145129A (en) * 1998-11-16 2000-05-26 Nippon Gijutsu Center:Kk Staging provided with load lifter
CN2765979Y (en) * 2005-01-27 2006-03-22 万科企业股份有限公司 Assembled balcony
KR20090054618A (en) * 2007-11-27 2009-06-01 문동해 Crash accident prevention with emergence escape apparatus
CN201801953U (en) * 2010-08-17 2011-04-20 俞天阳 Aerated balcony
CN201908429U (en) * 2011-01-27 2011-07-27 许昌中原建设(集团)有限公司 Assembly integral building overhanging discharging platform
CN202745352U (en) * 2012-05-24 2013-02-20 浙江精工钢结构有限公司 Combined-type high-altitude operation platform easy for assembly and disassembly
CN203429783U (en) * 2013-07-25 2014-02-12 中国建筑第八工程局有限公司 Tower crane driver high-altitude walking passageway
CN104389419A (en) * 2014-11-18 2015-03-04 杭州江润科技有限公司 Cantilevered formwork platform installation structure and construction method
CN104481166A (en) * 2014-12-12 2015-04-01 北京筑福国际工程技术有限责任公司 Additionally assembled type balcony structure for old community and construction method of additionally assembled type balcony structure
CN104712056A (en) * 2015-03-22 2015-06-17 徐林波 Semi-fixed and semi-movable high-rise escape balcony
CN105003070A (en) * 2015-07-31 2015-10-28 重庆渝发建设有限公司 Bilayer extensible unloading platform for building construction
CN105756186A (en) * 2016-05-04 2016-07-13 四川省建筑设计研究院 Assembly type prefabricated truss balcony and installation method therefor

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2693846B2 (en) * 1990-02-15 1997-12-24 積水化学工業株式会社 Prefabricated house with balcony
SE469181B (en) * 1991-05-22 1993-05-24 Weland Aluminium Ab BALCONY DEVICE
CN201297036Y (en) * 2008-11-19 2009-08-26 常州第一建筑工程有限公司 Discharging platform
CN105233433B (en) * 2015-11-02 2018-10-23 袁锡良 The emergent saving oneself activity balcony of building

Patent Citations (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07268950A (en) * 1994-04-04 1995-10-17 Sekisui Chem Co Ltd Roof balcony unit and lifting lug
JP2000145129A (en) * 1998-11-16 2000-05-26 Nippon Gijutsu Center:Kk Staging provided with load lifter
CN2765979Y (en) * 2005-01-27 2006-03-22 万科企业股份有限公司 Assembled balcony
KR20090054618A (en) * 2007-11-27 2009-06-01 문동해 Crash accident prevention with emergence escape apparatus
CN201801953U (en) * 2010-08-17 2011-04-20 俞天阳 Aerated balcony
CN201908429U (en) * 2011-01-27 2011-07-27 许昌中原建设(集团)有限公司 Assembly integral building overhanging discharging platform
CN202745352U (en) * 2012-05-24 2013-02-20 浙江精工钢结构有限公司 Combined-type high-altitude operation platform easy for assembly and disassembly
CN203429783U (en) * 2013-07-25 2014-02-12 中国建筑第八工程局有限公司 Tower crane driver high-altitude walking passageway
CN104389419A (en) * 2014-11-18 2015-03-04 杭州江润科技有限公司 Cantilevered formwork platform installation structure and construction method
CN104481166A (en) * 2014-12-12 2015-04-01 北京筑福国际工程技术有限责任公司 Additionally assembled type balcony structure for old community and construction method of additionally assembled type balcony structure
CN104712056A (en) * 2015-03-22 2015-06-17 徐林波 Semi-fixed and semi-movable high-rise escape balcony
CN105003070A (en) * 2015-07-31 2015-10-28 重庆渝发建设有限公司 Bilayer extensible unloading platform for building construction
CN105756186A (en) * 2016-05-04 2016-07-13 四川省建筑设计研究院 Assembly type prefabricated truss balcony and installation method therefor

Also Published As

Publication number Publication date
CN106638934A (en) 2017-05-10
CN110397155B (en) 2020-12-18
CN106638934B (en) 2019-08-09

Similar Documents

Publication Publication Date Title
CN206053274U (en) The external scaffolding device of the perpendicular BAIYE outer visor of skyscraper and glass curtain wall dual-purpose
CN203334664U (en) Ultra-long cantilever truss structure high formwork supporting system
CN204876578U (en) Building construction system
CN106638934B (en) A kind of green balcony and preparation method thereof for multi-storey building
CN201635377U (en) Rigid suspended type scaffold provided with large-span steel roof equipment pipeline
CN110029764A (en) A kind of decoration cellular board upside-down mounting plug in construction and its construction method
CN106368310B (en) Detachable green balcony for multi-storey building building and preparation method thereof
CN106436891B (en) Detachable balcony of multi-storey building and preparation method thereof
CN204876577U (en) Building construction system
CN106638933A (en) Detachable green terrace with garden carrier and manufacturing method of terrace
CN205476597U (en) Villa is removed in quick simple and convenient environmental protection
CN103015696B (en) Hanging basket outer protective layer for super high-rise building
CN108412033B (en) External vertical forest overhanging balcony structure of building and construction method thereof
CN219118688U (en) Construction frame for construction of building engineering high place
CN110359623A (en) A kind of fabricated structure of Chinese fault
CN215106480U (en) Outdoor spaced wind-resistant suspended ceiling
CN216949409U (en) Lower hanging type operation platform for constructional engineering
CN114086660B (en) Green energy-saving assembled building and construction method
CN2263161Y (en) Self-lifting scaffold
CN218060693U (en) Assembled steel construction building
CN210563311U (en) Building support frame for high-rise building
CN216007949U (en) Double-layer cultural gallery
CN221203482U (en) Landscape garden plant climbing rack
CN221119150U (en) Self-clamping type vertical shaft construction combined operation hanging frame
CN203008349U (en) Basket outer protection layer used for super high-rise building

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20201130

Address after: 233500 next door to Civil Affairs Bureau, west side of Dongcheng Road, Mengcheng County, Bozhou City, Anhui Province

Applicant after: Anhui Jiahe Plant Protection Technology Co.,Ltd.

Address before: 221000 No. 24 Qianjiang Road, Second Industrial Park, Xuzhou High-tech Industrial Development Zone, Xuzhou City, Jiangsu Province

Applicant before: XUZHOU LETAI MECHANICAL AND ELECTRIC TECHNOLOGY Co.,Ltd.

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant