CN2263161Y CN 96215065 CN96215065U CN2263161Y CN 2263161 Y CN2263161 Y CN 2263161Y CN 96215065 CN96215065 CN 96215065 CN 96215065 U CN96215065 U CN 96215065U CN 2263161 Y CN2263161 Y CN 2263161Y
Authority
CN
China
Prior art keywords
steel
bearing post
transverse tube
scaffold
otic placode
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 96215065
Other languages
Chinese (zh)
Inventor
刘绍基
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 96215065 priority Critical patent/CN2263161Y/en
Application granted granted Critical
Publication of CN2263161Y publication Critical patent/CN2263161Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Movable Scaffolding (AREA)

Abstract

The utility model relates to a self-lifting scaffold which comprises a support column, a small horizontal tube, a big horizontal tube and a scaffold tube. The utility model also comprises an H-shaped coupling rod which is connected with the support column, a suspension bracket otic placode which is installed on the H-shaped coupling rod, a top transverse beam installed at the upper layer of the support column and a ground transverse beam which is installed at the lower layer of the support column. The support column comprises a steel upright tube and channel steel, and the suspension bracket otic placode comprises a soleplate, a frame-shaped short steel beam, two reinforcing plates and a short steel pipe. The utility model is effectively suitable for storied buildings of a shear wall system or a frame system, and the independent lifting and dropping of the entirety or the slicing or a single frame can be conducted. The building is easy, and the operation is convenient.

Description

From lifting false work
The utility model relates to the building operations scaffold, and particularly a kind of high-rise building building operations is used from the lifting exterior wall scaffold.
The construction of high-rise building agent structure and decoration of exterior wall generally must be set up scaffold.Traditional way is to set up full hall scaffold from ground, though this way can satisfy construction requirement, need expend a large amount of labours and scaffolding, the operating expenses costliness.
In order to reduce construction cost, a kind of way commonly used is to adopt climbing scaffold, and promptly scaffold is with the rising gradually of the architecture construction rising of climbing.China Patent No. 86203954 disclosed a kind of attached walls self Liftable type scaffold is commonly used one type, and it utilizes two pairs of attached wall supports to replace lifting mutually so that the lifting of a separate single Pin scaffold.Though this way can be carried out structure or decoration construction, be only applicable to the high-rise building of shear wall system, for a large amount of structures be frame system highrise building then in the use comparatively the difficulty.
Also have a kind of China Patent No. 93219468.0 disclosed mutual lifting exterior wall scaffolds, it is by coming independently single Pin scaffold in the middle of the lifting hanging Chain block on two adjacent fixing scaffolds, but like this repeatable operation with regard to the whole scaffolds of ascending, descending.Though this way is suitable for the highrise building of frame system, can only carry out the lifting of separate single Pin scaffold, can not accomplish integral body or burst lifting, and this point to be institute of present numerous construction enterprises generally expect.
The purpose of this utility model provides a kind of from lifting false work, and it can be applicable to the building of shear wall system or frame system effectively, accomplishes that integral body or sheet or single Pin rise and fall independently.
Described in the utility modelly a kind ofly comprise bearing post from lifting false work, level is installed in the little transverse tube of bearing post two sides, be installed in the big transverse tube that intersects with little transverse tube below the little transverse tube, and be installed in the scaffold tubes that intersects with little transverse tube above the little transverse tube, it also comprises and being connected with bearing post, wherein interior bar is a stock, outer bar is the I-shaped coupling bar of quarter butt, the hanger otic placode of installing in interior bar two sides of I-shaped coupling bar, and install on the bearing post upper strata, be shelved on sky crossbeam on the hanger otic placode connector of upper strata and install in bearing post lower floor, hang the ground crossbeam on lower floor's hanger otic placode connector; Described bearing post comprise wherein one group be vertically set on four steel standpipes of inboard four jiaos of two little transverse tube one ends and wherein another group be vertically set on two steel standpipes at diagonal angles, two little transverse tube other end inboards, and be oppositely arranged four steel standpipe inboards vertical and be higher than two channel-section steels of steel standpipe, two steel standpipes of each channel-section steel two side are connected and fixed by fastener with the linking steel tubes of the channel-section steel base plate back side by setting at a certain distance; Outer bar two ends of described I-shaped coupling bar respectively are equipped with can be at the roller of the channel-section steel inboard of bearing post roll-sliding, and the interior bar of I-shaped coupling bar and outer bar all have scaffold tubes; Described hanger otic placode comprises the base plate that can be connected with building by through-wall bolt and be provided with bolt hole, at the short girder steel of the shaped as frame of base plate top center fixed installation, that install and that be provided with circular hole relatively two stiffeners in short girder steel bottom surface, and install in the middle of below two stiffeners, wherein an end is fixed on the short steel pipes at place in the middle of the base plate bottom, each is connected interior bar two sides of I-shaped coupling bar by fastener with the short steel pipes of two hanger otic placodes.
Because each component and the bearing post of scaffold are connected as a single entity, scaffold aloft just is fixed, and I-shaped coupling bar then can make bearing post remain on the fixing vertical plane, and scaffold inwardly or is outwards toppled in lifting or use.The utility model can be applicable to the building of shear wall system or frame system effectively, builds easily, and is easy to operate.
Below in conjunction with accompanying drawing the utility model is elaborated.
Fig. 1 is a kind of structural representation from lifting false work.
Fig. 2 is above-mentioned scheme of installation from lifting false work.
Fig. 3 is the enlarged diagram that the hanger otic placode is connected with bearing post among Fig. 1.
Fig. 4 is the vertical view that I-shaped coupling bar is connected with bearing post.
Fig. 5 is the structural representation of hanger otic placode.
Fig. 6 schematic diagram that to be lower floor's hanger otic placode be connected by connector with the ground crossbeam.
Fig. 7 is the schematic diagram after on the scaffold large form being installed.
Referring to Fig. 1 to Fig. 5, a kind ofly comprise bearing post 8 from lifting false work, level is installed in the little transverse tube 41 of bearing post 8 two sides, is installed in the big transverse tube 42 that intersects with little transverse tube 41 below the little transverse tube 41, and is installed in the scaffold tubes 43 that intersects with little transverse tube 41 above the little transverse tube 41.It also comprise 8 that be connected with bearing post, wherein in bar 31 be the I-shaped coupling bar 12 of quarter butt for stock, outer bar 32, the hanger otic placode of installing in interior bar 31 2 sides of I-shaped coupling bar 12 30, and install on bearing post 8 upper stratas, be shelved on the sky crossbeam 5 on hanger otic placode 30 connectors of upper strata and install in bearing post 8 lower floors, hang the ground crossbeam 16 on lower floor's hanger otic placode 30 connectors.
Bearing post 8 comprises steel standpipe 23 and channel-section steel 22.Steel standpipe 23 is provided with two groups, and wherein one group has four steel standpipes 44, is vertically set on four jiaos of two little transverse tube 41 1 end inboards; Wherein another group has two steel standpipes 45, is vertically set on the diagonal angle of two little transverse tube 41 other end inboards.Channel-section steel 22 is two, is oppositely arranged on the inboard of four steel standpipes 44, in height is higher than four steel standpipes 44.Two steel standpipes 44 of each channel-section steel 22 2 side and the channel-section steel 22 base plate back sides are connected and fixed by fastener by the linking steel tubes that is provided with at a certain distance 7.
Outer bar 32 2 ends of I-shaped coupling bar 12 respectively are equipped with roller 21, and roller 21 can be at the channel-section steel 22 inboard roll-slidings of bearing post 8, thereby channel-section steel 22 is fixed on the position of determining, can inwardly or outwards not produce and topple.The interior bar 31 and the outer bar 32 of I-shaped coupling bar 12 all have scaffold tubes.
Hanger otic placode 30 comprises can be by through-wall bolt 18 and building 17 that be connected and be provided with the base plate 24 of bolt hole 25, the short girder steel 10 of shaped as frame in base plate 24 top center fixed installations, that install and that be provided with circular hole 19 relatively two stiffeners 20 in short girder steel 10 bottom surfaces, and install in the middle of below two stiffeners 20, wherein an end is fixed on the short steel pipes 11 at place in the middle of base plate 24 bottoms.Each is connected interior bar 31 2 sides of I-shaped coupling bar 12 by fastener with the short steel pipes 11 of two hanger otic placodes 30, the bottom side that interior bar 31 is installed in short steel pipes 11.
As depicted in figs. 1 and 2, the upper, middle and lower-ranking of building 17 is all by through-wall bolt 18 each fixing a pair of hanger otic placode 30.Shelve day crossbeam 5 on the short girder steel 10 of the shaped as frame of upper strata hanger otic placode 30, the short girder steel of the shaped as frame of lower floor's hanger otic placode 30 is hung ground crossbeam 16 for 10 times, thus scaffold is played the security insurance effect.The scaffold of solid line part is basic frame among the figure, and dotted portion is for treating scaffolding 2, and label 1 is a building yet to be built, the 3rd, and scaffold guard rail, the 6th, safety net, the 9th, bamboo basketry scaffold floor, the 13rd, scaffold skirt basketry.
But the mid portion of it crossbeam 5 is equipped with the cap 15 of a cover cap on two channel-section steel 22 tops of bearing post 8, so that a day crossbeam 5 fixedly is shelved on the short girder steel 10 of two the hanger otic placodes 30 in upper strata.Each installs and fixes two sides of cap 15 by bolt 4 with the top base plate of two channel-section steels 22.
Referring to Fig. 6, two sides of ground crossbeam 16 are equipped with two suspension rods 14, and hang in short girder steel 10 stiffeners 20 circular holes 19 of two hanger otic placodes 30 of lower floor by junction plate 33 and jack 26 upper end of suspension rod 14.
By pin 34 jack 26 of being convenient to the scaffold lifting is housed in the short girder steel stiffener circular hole 19 of lower floor's hanger otic placode 30, be installed in be equipped with on the junction plate 33 of jack 26 lower ends can be fixed on the stiffener pin 34, and can regulate the collapsible tube 35 of hanging height.Two ends in the collapsible tube 35 are equipped with two screwed pipes 36 that can shrink adjusting relatively.During use, pull jack chain 36, lifting false work and arrive the precalculated position after, collapsible tube 35 is hung on the stiffener pin 34, regulating screwed pipe 36 can install and fix.
Referring to Fig. 7, when to the shear wall system building construction, on the scaffold large form 28 can be installed, solid purlin 29 is housed on the large form 28, large form 28 fuses by fastener and bearing post 8.Number in the figure 27 is body of wall reinforcing bars.When hoisting scaffold, large form 28 promotes thereupon, and scaffold promotes and to finish, large form 28 state in place, with the construction that can enter next procedure, treat that building structure is bound after, large form 28 is removed immediately.
During operation the utility model, when on the needs during lifting scaffold, at first a pair of hanger otic placode on the substrustion thing is taken off, promote on each bearing post each then synchronously to jack, scaffold is risen slowly, when treating that scaffold is raised to the precalculated position, be about to this hanger otic placode is packed on the superstructure, shelve for a day crossbeam.When descending, then presses on scaffold the above-mentioned steps contrary operation.

Claims (6)

1. one kind from lifting false work, it comprises bearing post, level is installed in the little transverse tube of bearing post two sides, be installed in the big transverse tube that intersects with little transverse tube below the little transverse tube, and be installed in the scaffold tubes that intersects with little transverse tube above the little transverse tube, it is characterized in that, it also comprises and being connected with bearing post, wherein interior bar is a stock, outer bar is the I-shaped coupling bar of quarter butt, the hanger otic placode of installing in interior bar two sides of I-shaped coupling bar, and install on the bearing post upper strata, be shelved on sky crossbeam on the hanger otic placode connector of upper strata and install in bearing post lower floor, hang the ground crossbeam on lower floor's hanger otic placode connector; Described bearing post comprise wherein one group be vertically set on four steel standpipes of inboard four jiaos of two little transverse tube one ends and wherein another group be vertically set on two steel standpipes at diagonal angles, two little transverse tube other end inboards, and be oppositely arranged four steel standpipe inboards vertical and be higher than two channel-section steels of steel standpipe, two steel standpipes of each channel-section steel two side are connected and fixed by fastener with the linking steel tubes of the channel-section steel base plate back side by setting at a certain distance; Outer bar two ends of described I-shaped coupling bar respectively are equipped with can be at the roller of the channel-section steel inboard of bearing post roll-sliding, and the interior bar of I-shaped coupling bar and outer bar are scaffold tubes; Described hanger otic placode comprises the base plate that can be connected with building by through-wall bolt and be provided with bolt hole, at the short girder steel of the shaped as frame of base plate top center fixed installation, that install and that be provided with circular hole relatively two stiffeners in short girder steel bottom surface, and install in the middle of below two stiffeners, wherein an end is fixed on the short steel pipes at place in the middle of the base plate bottom, each is connected interior bar two sides of I-shaped coupling bar by fastener with the short steel pipes of two hanger otic placodes.
2. according to claim 1ly it is characterized in that, but the mid portion of described day crossbeam is equipped with the cap of a cover cap on two channel-section steel tops of bearing post, so that a day crossbeam fixedly is shelved on the short girder steel of two the hanger otic placodes in upper strata from the lifting foot trick.
3. according to claim 2ly it is characterized in that each installs and fixes two sides of described cap by bolt with the top base plate of two channel-section steels from lifting false work.
4. according to claim 1ly it is characterized in that from lifting false work two sides of described ground crossbeam are equipped with two suspension rods, hang in the short girder steel stiffener circular hole of two hanger otic placodes of lower floor by junction plate and jack the upper end of suspension rod.
5. according to claim 1 from lifting false work, it is characterized in that, by pin the jack of being convenient to the scaffold lifting is housed in the short girder steel stiffener circular hole of described lower floor hanger otic placode, be installed in be equipped with on the junction plate of jack lower end can be fixed on the stiffener pin, and can regulate the collapsible tube of hanging height.
6. according to claim 5ly it is characterized in that two ends in the described collapsible tube are equipped with two and can shrink the screwed pipe of adjusting relatively from lifting false work.
CN 96215065 1996-06-20 1996-06-20 Self-lifting scaffold Expired - Fee Related CN2263161Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 96215065 CN2263161Y (en) 1996-06-20 1996-06-20 Self-lifting scaffold

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 96215065 CN2263161Y (en) 1996-06-20 1996-06-20 Self-lifting scaffold

Publications (1)

Publication Number Publication Date
CN2263161Y true CN2263161Y (en) 1997-09-24

Family

ID=33896981

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 96215065 Expired - Fee Related CN2263161Y (en) 1996-06-20 1996-06-20 Self-lifting scaffold

Country Status (1)

Country Link
CN (1) CN2263161Y (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101892742A (en) * 2010-06-21 2010-11-24 陕西省第三建筑工程公司 High low building-cross deformation joint low section shear wall construction method
CN103452303A (en) * 2013-09-22 2013-12-18 江苏申锡建筑机械有限公司 Adjustable relief fastener for attached lift scaffolds
CN103485526A (en) * 2013-09-12 2014-01-01 云南中一重工建筑机械有限公司 Double-lifting falling-protection scaffold

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101892742A (en) * 2010-06-21 2010-11-24 陕西省第三建筑工程公司 High low building-cross deformation joint low section shear wall construction method
CN101892742B (en) * 2010-06-21 2011-10-26 陕西省第三建筑工程公司 High low building-cross deformation joint low section shear wall construction method
CN103485526A (en) * 2013-09-12 2014-01-01 云南中一重工建筑机械有限公司 Double-lifting falling-protection scaffold
CN103452303A (en) * 2013-09-22 2013-12-18 江苏申锡建筑机械有限公司 Adjustable relief fastener for attached lift scaffolds

Similar Documents

Publication Publication Date Title
CN112267556B (en) Large-span steel structure corridor assembling construction process for narrow space
CN213329955U (en) Flower basket diagonal rod type overhanging scaffold
CN206581577U (en) Using housing construction builder's jack
CN215803108U (en) Attached beam type hanging basket
CN114753611A (en) Curtain wall construction platform
CN2263161Y (en) Self-lifting scaffold
CN113175089A (en) Construction method of large-span heavy cantilever truss
CN107035037B (en) Tower top curtain wall frame and mounting method thereof
CN86203954U (en) Wall bearing self-lifting scaffold
CN111997345B (en) Lifting scaffold hangs hoist system upside down
CN114635554A (en) Non-vertical outer vertical face curtain wall construction hanging basket
CN211201184U (en) Assembled steel structure system
CN113756558A (en) High-rise assembled steel structure system externally hung hanging basket installation structure and construction method thereof
CN111350359A (en) Method and rhombic device for integrally lifting large-span structure
CN206581578U (en) Double-layer basket constructing device for overhanging scaffold
CN217027984U (en) Movable overhanging construction platform
CN220014395U (en) Can have enough to meet need mounting bracket by intelligent integrated platform system bailey frame of equipping
CN212688719U (en) Bridge vase-shaped pier body protective bracket
CN213115437U (en) Wall-attached type operation platform module under overhanging roof
CN217557608U (en) Non-vertical outer vertical face curtain wall construction hanging basket
CN212336763U (en) Curtain wall installation guide rail device fixed on roof flower frame beam
CN216974120U (en) High-order scaffold that hangs
CN219931752U (en) Assembled cat ladder
CN216810887U (en) Suspension operation platform and hydraulic climbing formwork system
CN2350472Y (en) All assembly-type cradle track lifting scaffold

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C19 Lapse of patent right due to non-payment of the annual fee
CF01 Termination of patent right due to non-payment of annual fee