CN106368310B - Detachable green balcony for multi-storey building building and preparation method thereof - Google Patents

Detachable green balcony for multi-storey building building and preparation method thereof Download PDF

Info

Publication number
CN106368310B
CN106368310B CN201610914344.2A CN201610914344A CN106368310B CN 106368310 B CN106368310 B CN 106368310B CN 201610914344 A CN201610914344 A CN 201610914344A CN 106368310 B CN106368310 B CN 106368310B
Authority
CN
China
Prior art keywords
cable wire
platform framework
tube head
pull rod
fixed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610914344.2A
Other languages
Chinese (zh)
Other versions
CN106368310A (en
Inventor
姜峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Jieen creative Tsukito design Inc
Original Assignee
Shenzhen Jieen Creative Tsukito Design Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Jieen Creative Tsukito Design Inc filed Critical Shenzhen Jieen Creative Tsukito Design Inc
Priority to CN201810393132.3A priority Critical patent/CN108532741B/en
Priority to CN201610914344.2A priority patent/CN106368310B/en
Publication of CN106368310A publication Critical patent/CN106368310A/en
Application granted granted Critical
Publication of CN106368310B publication Critical patent/CN106368310B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/003Balconies; Decks
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/343Structures characterised by movable, separable, or collapsible parts, e.g. for transport
    • E04B1/34315Structures characterised by movable, separable, or collapsible parts, e.g. for transport characterised by separable parts

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Steps, Ramps, And Handrails (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention discloses a kind of for detachable green balcony of multi-storey building building and preparation method thereof, including multiple balconies, balcony includes platform framework, platform framework is welded by type steel skeleton, platform framework is connected by the beam column built from concrete in articulated mounting and house, the platform framework includes garden areas and aisle, the both sides of platform framework are equipped with guardrail grafting pedestal, guardrail is mounted on guardrail grafting pedestal, the both sides of platform framework are respectively provided at least three and fix auxiliary cable wire tube head, cable wire pull rod is assisted to pass through every layer of corresponding fixed auxiliary cable wire tube head, the both ends of auxiliary cable wire pull rod are fixed on top and the bottom on the fixed auxiliary cable wire tube head of roof panel frame, the guardrail is 1 1.5 meters high.The exterior design of the present invention is beautiful, dismounts and mounts flexibly and easily, and security performance is reliable, and the dismountable rear strange land of balcony, pull rod, pond, leisure platform, guardrail is reused.

Description

Detachable green balcony for multi-storey building building and preparation method thereof
Technical field
The present invention relates to a kind of for detachable green balcony of multi-storey building building and preparation method thereof.
Background technology
With the continuous improvement of living standards of the people, urbanization process is accelerated, and skyscraper, intensive transportation network are continuous Ground corrodes the limited green space in city, and it is so to lack that at this moment we, which just really experience life Green,.In order to improve This undesirable development model, allowing city, people start to spatial development full of green, from plot planning, layout design when just Start to imagine and a super large green yard is supplied to each household resident, ancient Chinese style garden love knot is allowed to be obtained in high residential building With extension.
Country's residential quarters greening at present, flowers and plants, landscape, trees are generally each provided at the public-land in cell courtyard On, also have situation garden being built on roofing.Community resident can only go to one layer of ground or roofing watches, and can not participate in planting The overall processes such as training, watering, trimming, nursing, it is even more impossible to meet the exclusive privacy of individual character hobby and private savings of the occupant to flowers and plants It is required that.The particularly residential architecture of early stage can only put several flowerpots on balcony, although balcony area very little, the work(of carrying Can be again especially more, common balcony be both enjoy the cool, the institute of view and laundry, the place for shining clothing, storing sundries.With inhabitation product The continuous improvement of matter and the increase of living space, the present invention are exactly to provide one for resident to meet colourful leisure at home Living space, the living space of this super large can not only cultivate the flowers and plants worm for fishing of personal like, but also as view, body-building, read It reads, receive a visitor, playing chess is used.This courtyard-style greening balcony or the ground of landscape generation, using it as the indoor sky of core structure Between, indoor and outdoor is mutually blended, flowing and it is changeable.
In terms of greening cell environment, change cityscape, act in accordance at once for trend, change that thousand city one in the past The design pattern in face, sets about from the designing scheme in Unit Residential building, and the optimizing design scheme traditional design theory old with change is Society provides more green buildings and graceful ecological environment is extremely urgent.
Assembled afforests balcony, and exterior design is beautiful, dismounts and mounts flexible and convenient, and security performance is reliable, balcony, pull rod, pond, It reuses in the dismountable rear strange land of leisure platform, guardrail.
Invention content
In view of the above existing problems in the prior art, the present invention provides a kind of detachable greens for multi-storey building building Balcony belongs to assembled greening balcony, and exterior design is beautiful, dismounts and mounts flexibly and easily, security performance is reliable, balcony, pull rod, water It reuses in the dismountable rear strange land of pond, leisure platform, guardrail.
To achieve these goals, the technical solution adopted by the present invention is:A kind of detachable green for possessing garden carrier Balcony, a kind of detachable green balcony for possessing garden carrier, including multiple balconies, balcony includes platform framework, platform framework It is welded by type steel skeleton, platform framework is connected by the beam column built from concrete in articulated mounting and house, the platform framework Including garden areas and aisle, the both sides of platform framework are equipped with guardrail grafting pedestal, and guardrail is mounted on guardrail grafting pedestal, is put down The both sides of table frame are respectively provided at least three and fix auxiliary cable wire tube head, and auxiliary cable wire pull rod passes through every layer of corresponding fixed auxiliary Cable wire tube head, the both ends of auxiliary cable wire pull rod are separately fixed at the fixed auxiliary cable wire of the platform framework of top and the bottom On tube head, the guardrail is 1-1.5 meters high.
The articulated mounting is u-shaped anchor and axial pin type connector, and axial pin type connector is mounted on the interior of u-shaped anchor Portion is fixed by pivot pin so that u-shaped anchor and axial pin type connector are hinged, and the axial pin type connector is fixed on One end of platform framework, the u-shaped anchor are fixed on the beam column built from concrete in house, and u-shaped anchor exposes outside hinge bar.
The both sides of platform framework are mounted on several updip formula cable wires and hang nose, and corresponding beam column built from concrete is equipped with dipping type Anchor, dipping type anchor have rectangular anchor slab, and rectangular anchor slab is fixed on inside beam column built from concrete, and updip formula cable wire hangs nose and has a down dip Formula anchor is fixedly connected by cap cable pull rod.
There are two the installed in front of the platform framework moves tube head,
Cable wire pull rod passes through corresponding removable tube head, and one end of cable wire pull rod is fixed on Cantilever Beams, and the other end is fixed On the fixture of bottom, the removable tube head includes sliding shoe and the tube head on the outside of sliding shoe, platform framework Front side be equipped with sliding slot, sliding shoe can move along sliding slot, and evenly distributed mounting hole is additionally provided on front side of platform framework, Gu Determine hole and be parallel to sliding slot, be hingedly equipped with card hole bar on sliding shoe, card hole bar can be put in mounting hole.
The Cantilever Beams are arranged on the top of floor.
A kind of production method of detachable green balcony for multi-storey building building:Include the following steps:
(1)Cantilever Beams are set:Cantilever Beams are set on the top of floor, if house is newly constructed house, Cantilever Beams can be with room House owner's body makes reinforced beam, if aging blocks room, can be used steelwork, is reliably connected with room object top layer;
(2)In the installation metope pre-embedded u-shaped anchor of floor of balcony and dipping type anchor, each floor, dipping type anchor The position height of part is more than the position height of u-shaped anchor;
(3)(3)Suitable platform framework is selected, and is welded with axial pin type close to the both sides of metope one end in platform framework and connects Fitting is symmetrically installed at least one set of updip formula cable wire on the body of rod of two sides of platform framework and hangs nose, before platform framework There are two side installations moves tube head,
The both sides of platform framework are equipped with guardrail grafting pedestal, and 3 fixed auxiliary cable wire tube heads are mounted on per side,
And pass through the floor that hanging device is placed on installation, two axial pin type connectors and the metope pre-embedded u of platform framework Type anchor is hinged by pivot pin,
Then the updip formula cable wire on the body of rod of two sides of platform framework is hung into nose and dipping type with cap cable pull rod Anchor connects;
(4)Selection floor continues to install balcony, repeats step(2)And step(3), until floor in need platform frame Frame is respectively mounted completion, then passes through the corresponding fixed auxiliary cable wire tube head of all platform framework avris with auxiliary cable wire pull rod, will All platform framework connections are integral, and auxiliary cable wire pull rod passes through every layer of corresponding fixed auxiliary cable wire tube head, assists steel The both ends of rope pull rod are fixed on top and the bottom on the fixed auxiliary cable wire tube head of roof panel frame, being fixed from top Cantilever Beams on draw two cable wire pull rods, each cable wire pull rod pass through the corresponding removable tube head of each platform framework, directly The corresponding removable tube head of all platform frameworks is passed through to cable wire pull rod, finally determines the position of the cable wire pull rod other end, it is described Position on the fixture on ground so that cable wire pull rod is tight securely, after two cable wire pull rods are all fixed, two cable wires The angle that pull rod is formed finally fixes the removable tube head on each platform framework so that so that removable between 30-90 ° Dynamic tube head, which is fixed on platform framework, to be moved.
Step(4)In, it, will with two cable wire clamps after cable wire pull rod passes through the corresponding removable tube head of all platform frameworks Mobile connection tube head is fixed on cable wire pull rod.
The present invention has the following advantages that overhanging type green balcony is will to be made of four adjustable steel ropes in processing factory The assembled steel balcony oblique pull of completion is horizontally suspended on the outside of building.Because balcony is in processing factory's scale production, process velocity Soon, precision is high, high-quality.When transporting in-site installation, noiseless and environment influence condition is small, and security performance is reliable.The greening It can simultaneously design with house, construct simultaneously, be delivered for use simultaneously in balcony.Can be directed to again existing building by direction to house, After the comprehensive analysis such as body coefficient, daylighting requirement, carry out special design and produce and customize.The present invention passes through Cantilever Beams, a plurality of steel Multiple balconies are fixed as an entirety by rope pull rod and removable tube head, and structure is firm, due to mobile tube head energy before fixation It is enough flexible mobile, so the fixed installation of the balcony and floor of various height can be suitble to.
Description of the drawings
Attached drawing 1 is floor map of the present invention;
Attached drawing 2 installs lateral side view for greening balcony;
Attached drawing 3 is the side view of steel platform;
Attached drawing 4 enters concrete node drawing for dipping type anchor and rectangular anchor slab;
Attached drawing 5 mounts node drawing for platform and wall level.
Fig. 6 is the cable wire pull rod connection diagram of multiple balconies.
Fig. 7 is movable pipe header structure figure.
1st, platform framework;2nd, lie fallow platform;3rd, garden;4th, aisle;5 axial pin type connectors;6th, updip formula cable wire hangs nose;7、 U-shaped anchor;8th, beam column built from concrete;9th, pivot pin;10th, guardrail grafting pedestal;11st, cap cable pull rod;12nd, dipping type anchor;13rd, side Shape anchor slab;14th, Cantilever Beams;15th, cable wire pull rod;16th, fixed auxiliary cable wire pull rod tube head, 17, fixture, 18, removable tube head, 19 auxiliary cable wire pull rods, 20, removable tube head, 101, sliding slot, 102, mounting hole, 201, sliding block, 202, tube head, 203, card hole Bar.
Specific embodiment
The invention will be further described below in conjunction with the accompanying drawings.
A kind of detachable green balcony for multi-storey building building, including platform framework 1, the platform framework 1 by Type steel skeleton is welded, and platform framework is connected by the beam column built from concrete 8 in articulated mounting and house, the platform framework packet Include garden 3 and aisle 4, leisure platform 2.
The articulated mounting is u-shaped anchor 7 and axial pin type connector 5, and axial pin type connector is mounted on u-shaped anchor Inside is fixed by pivot pin 9 so that u-shaped anchor and axial pin type connector are hinged, and the axial pin type connector is consolidated One end of platform framework is scheduled on, the u-shaped anchor is fixed on the beam column built from concrete in house, and u-shaped anchor exposes outside hinge bar.
The both sides of platform framework 1 are mounted on several updip formula cable wires and hang nose 6, and corresponding beam column built from concrete 8 is equipped with down Formula of inclining anchor 12, dipping type anchor 12 have rectangular anchor slab 13, and rectangular anchor slab 13 is fixed on inside beam column built from concrete 8, updip formula Cable wire hangs nose 6 and is fixedly connected with dipping type anchor 12 by cap cable pull rod 11.
The both sides of platform framework 1 are equipped with guardrail grafting pedestal 10 and fixed auxiliary cable wire pull rod tube head 16, have 3 per side Fixed auxiliary cable wire pull rod tube head 16, guardrail grafting pedestal 10 is equipped with guardrail, and guardrail is 1-1.5 meters high.
Cable wire pull rod 19 is assisted to pass through every layer of corresponding fixed auxiliary cable wire tube head 16, the both ends of auxiliary cable wire pull rod 19 are consolidated It is scheduled on the fixed auxiliary cable wire tube head 16 of the platform framework of top and the bottom,
The installed in front of the platform framework is there are two removable tube head, as shown in fig. 7, specific structure is removable Tube head includes sliding shoe 201 and the tube head 202 on the outside of sliding shoe, and the front side of platform framework is equipped with sliding slot 101, sliding Motion block can be moved along sliding slot, evenly distributed mounting hole 102 is additionally provided on front side of platform framework, mounting hole is parallel to cunning Slot is hingedly equipped with card hole bar 203 on sliding shoe, and card hole bar can be put in mounting hole, and the mobile fixation of sliding block has been achieved, When shelves need sliding block fixation at the desired position, it is only necessary to before sliding block is moved to the mounting hole for changing position, card hole bar 203 be stretched Fixation is realized into mounting hole is changed, and in order to preferably fix, card hole rod end head is provided with lockhole, and card hole bar 203, which is put in, changes mounting hole Afterwards, then with lock by lockhole it locks, reaches better fixed effect.
Cable wire pull rod passes through corresponding removable tube head, and one end of cable wire pull rod is fixed on Cantilever Beams, and the other end is fixed On bottom fixture 17.
The Cantilever Beams are arranged on the top of floor.
A kind of production method for the detachable green balcony for possessing garden carrier:Include the following steps:
(1)Cantilever Beams are set:Cantilever Beams are set on the top of floor, if house is newly constructed house, Cantilever Beams can be with room House owner's body makes reinforced beam, if aging blocks room, can be used steelwork, is reliably connected with room object top layer;
(2)In the installation metope pre-embedded u-shaped anchor of floor of balcony and dipping type anchor, each floor, dipping type anchor The position height of part is more than the position height of u-shaped anchor;
(3)Suitable platform framework is selected, and axial pin type connection is welded with close to the both sides of metope one end in platform framework Part is symmetrically installed at least one set of updip formula cable wire on the body of rod of two sides of platform framework and hangs nose, the front side of platform framework There are two installations moves tube head,
The both sides of platform framework are equipped with guardrail grafting pedestal, and 3 fixed auxiliary cable wire tube heads are mounted on per side,
And pass through the floor that hanging device is placed on installation, two axial pin type connectors and the metope pre-embedded u of platform framework Type anchor is hinged by pivot pin,
Then the updip formula cable wire on the body of rod of two sides of platform framework is hung into nose and dipping type with cap cable pull rod Anchor connects;
(4)Selection floor continues to install balcony, repeats step(2)And step(3), until floor in need platform frame Frame is respectively mounted completion, then passes through the corresponding fixed auxiliary cable wire tube head of all platform framework avris with auxiliary cable wire pull rod, will All platform framework connections are integral, and auxiliary cable wire pull rod passes through every layer of corresponding fixed auxiliary cable wire tube head, assists steel The both ends of rope pull rod are fixed on top and the bottom and the fixed of roof panel frame are assisted on cable wire tube head,
Two cable wire pull rods are drawn from the outside of the fixed Cantilever Beams in top, each cable wire pull rod passes through each platform The corresponding removable tube head of frame, until cable wire pull rod pass through the corresponding removable tube head of all platform frameworks, finally determine steel The position of the rope pull rod other end, since removable tube head can be slided freely, this design is so that determine the cable wire pull rod other end Position when it is more easy, it is only necessary to determine on the fixture on ground, then by the cable wire pull rod other end directly pull come Straight line can be formed, and two cable wire pull rods can be drawn from the same place of Cantilever Beams, such Cantilever Beams can not Too big width is needed, without big as the area of balcony, it is only necessary to its extension elongation and the extension elongation of platform framework one Cause, with regard to good fixed effect can be reached.
So that cable wire pull rod is tightened securely, after two cable wire pull rods all tighten fixation, two cable wire pull rods are formed Angle between 30-90 °, the structure of triangle is more firm, finally fixes the removable tube head on each platform framework, So that removable tube head is fixed on platform framework and can not move, then mobile connection tube head is fixed on two cable wire clamps On cable wire pull rod,
Removable tube head in this way after several platforms, two cable wire pull rods, fixation is just fixed as an entirety, forms One firm structure, and this removable tube head facilitates adjusting, be suitble to different height, length domestic floor, such as Fig. 6 It is shown.

Claims (2)

1. a kind of detachable green balcony for multi-storey building building, which is characterized in that including multiple balconies, balcony includes flat Table frame, platform framework are welded by type steel skeleton, and platform framework is connected by the beam column built from concrete in articulated mounting and house, The platform framework includes garden areas and aisle, and the both sides of platform framework are equipped with guardrail grafting pedestal, and guardrail is mounted on shield On column grafting pedestal, the both sides of platform framework are respectively provided at least three and fix auxiliary cable wire tube head, and auxiliary cable wire pull rod passes through every layer Corresponding fixed auxiliary cable wire tube head, the both ends of auxiliary cable wire pull rod are separately fixed at top and the corresponding platform of the bottom On the fixed auxiliary cable wire tube head of frame, the guardrail is 1-1.5 meters high;The articulated mounting is u-shaped anchor and pivot pin Formula connector, the inside that axial pin type connector is mounted on u-shaped anchor are fixed by pivot pin so that u-shaped anchor and axial pin type connect Fitting is hinged, and the axial pin type connector is fixed on one end of platform framework, and the u-shaped anchor is fixed on house Beam column built from concrete on, u-shaped anchor exposes outside hinge bar;The both sides of platform framework are mounted on several updip formula cable wires and hang nose, Corresponding beam column built from concrete is equipped with dipping type anchor, and dipping type anchor has rectangular anchor slab, and rectangular anchor slab is fixed on concrete Inside beam column, updip formula cable wire hangs nose and is fixedly connected with dipping type anchor by cap cable pull rod;Before the platform framework There are two side installations moves tube head,
Cable wire pull rod passes through corresponding removable tube head, and one end of cable wire pull rod is fixed on Cantilever Beams, and the other end is fixed on bottom On portion's fixture, the removable tube head includes sliding shoe and the tube head on the outside of sliding shoe, before platform framework Side is equipped with sliding slot, and sliding shoe can be moved along sliding slot, and evenly distributed mounting hole, mounting hole are additionally provided on front side of platform framework Sliding slot is parallel to, is hingedly equipped with card hole bar on sliding shoe, card hole bar can be put in mounting hole;The Cantilever Beams are arranged on building The top of layer.
2. a kind of production method of detachable green balcony for multi-storey building building:It is characterized by comprising the following steps:
(1)Cantilever Beams are set:Cantilever Beams are set on the top of floor, if house is newly constructed house, Cantilever Beams can be with house master Body makes reinforced beam, if aging blocks room, can be used steelwork, is reliably connected with room object top layer;
(2)In the installation metope pre-embedded u-shaped anchor of floor of balcony and dipping type anchor, each floor, dipping type anchor Position height is more than the position height of u-shaped anchor;
(3)Suitable platform framework is selected, and axial pin type connector is welded with close to the both sides of metope one end in platform framework, is put down At least one set of updip formula cable wire is symmetrically installed on the body of rod of two sides of table frame and hangs nose, the installed in front of platform framework has Two removable tube heads,
The both sides of platform framework are equipped with guardrail grafting pedestal, and 3 fixed auxiliary cable wire tube heads are mounted on per side,
And pass through the floor that hanging device is placed on installation, two axial pin type connectors and the metope pre-embedded u-shaped anchor of platform framework Part is hinged by pivot pin,
Then the updip formula cable wire on the body of rod of two sides of platform framework is hung into nose and dipping type anchor with cap cable pull rod Connection;
(4)Selection floor continues to install balcony, repeats step(2)And step(3), until floor in need platform framework it is equal Installation is complete, then passes through the corresponding fixed auxiliary cable wire tube head of all platform framework avris with auxiliary cable wire pull rod, will be all Platform framework connection be integral, auxiliary cable wire pull rod passes through every layer of corresponding fixed auxiliary cable wire tube head, and auxiliary cable wire is drawn The both ends of bar are fixed on top and the bottom is corresponded on the fixed auxiliary cable wire tube head of platform framework, fixed outstanding from top Two cable wire pull rods are drawn on outrigger, each cable wire pull rod passes through the corresponding removable tube head of each platform framework, Zhi Daogang Rope pull rod passes through the corresponding removable tube head of all platform frameworks, finally determines the position of the cable wire pull rod other end, described another The position at end is on the fixture on ground so that and cable wire pull rod is tight securely, after two cable wire pull rods are all fixed, two bar steels The angle that rope pull rod is formed finally fixes the removable tube head on each platform framework so that removable between 30-90 ° Tube head, which is fixed on platform framework, to be moved.
CN201610914344.2A 2016-10-20 2016-10-20 Detachable green balcony for multi-storey building building and preparation method thereof Active CN106368310B (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN201810393132.3A CN108532741B (en) 2016-10-20 2016-10-20 Detachable green terrace for building
CN201610914344.2A CN106368310B (en) 2016-10-20 2016-10-20 Detachable green balcony for multi-storey building building and preparation method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610914344.2A CN106368310B (en) 2016-10-20 2016-10-20 Detachable green balcony for multi-storey building building and preparation method thereof

Related Child Applications (1)

Application Number Title Priority Date Filing Date
CN201810393132.3A Division CN108532741B (en) 2016-10-20 2016-10-20 Detachable green terrace for building

Publications (2)

Publication Number Publication Date
CN106368310A CN106368310A (en) 2017-02-01
CN106368310B true CN106368310B (en) 2018-07-03

Family

ID=57894830

Family Applications (2)

Application Number Title Priority Date Filing Date
CN201610914344.2A Active CN106368310B (en) 2016-10-20 2016-10-20 Detachable green balcony for multi-storey building building and preparation method thereof
CN201810393132.3A Active CN108532741B (en) 2016-10-20 2016-10-20 Detachable green terrace for building

Family Applications After (1)

Application Number Title Priority Date Filing Date
CN201810393132.3A Active CN108532741B (en) 2016-10-20 2016-10-20 Detachable green terrace for building

Country Status (1)

Country Link
CN (2) CN106368310B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111519754A (en) * 2020-05-08 2020-08-11 黄炳江 Detachable green terrace for multi-storey building and manufacturing method thereof

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU757666A1 (en) * 1978-05-15 1980-08-23 Kh Gorodskoe Zhilishchnoe Upra Apparatus for insuring balconys
CN1936205A (en) * 2006-10-18 2007-03-28 李建明 Extending suspension platform reinforced by multiple skew cables
CN201801953U (en) * 2010-08-17 2011-04-20 俞天阳 Aerated balcony
CN103174303A (en) * 2011-12-23 2013-06-26 五冶集团上海有限公司 Movable overhung unloading platform and manufacture and installation method thereof
CN203429783U (en) * 2013-07-25 2014-02-12 中国建筑第八工程局有限公司 Tower crane driver high-altitude walking passageway
CN203499258U (en) * 2013-08-19 2014-03-26 中国建筑第八工程局有限公司 Prefabricated overhanging type discharging platform

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202990098U (en) * 2012-11-25 2013-06-12 陈科 Terrace capable of moving automatically
CN203320689U (en) * 2013-07-12 2013-12-04 鲍红琴 Building landscape balcony
CN204385883U (en) * 2014-11-25 2015-06-10 张跃 A kind of Fabricated balcony
CN105233433B (en) * 2015-11-02 2018-10-23 袁锡良 The emergent saving oneself activity balcony of building

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU757666A1 (en) * 1978-05-15 1980-08-23 Kh Gorodskoe Zhilishchnoe Upra Apparatus for insuring balconys
CN1936205A (en) * 2006-10-18 2007-03-28 李建明 Extending suspension platform reinforced by multiple skew cables
CN201801953U (en) * 2010-08-17 2011-04-20 俞天阳 Aerated balcony
CN103174303A (en) * 2011-12-23 2013-06-26 五冶集团上海有限公司 Movable overhung unloading platform and manufacture and installation method thereof
CN203429783U (en) * 2013-07-25 2014-02-12 中国建筑第八工程局有限公司 Tower crane driver high-altitude walking passageway
CN203499258U (en) * 2013-08-19 2014-03-26 中国建筑第八工程局有限公司 Prefabricated overhanging type discharging platform

Also Published As

Publication number Publication date
CN106368310A (en) 2017-02-01
CN108532741B (en) 2020-05-15
CN108532741A (en) 2018-09-14

Similar Documents

Publication Publication Date Title
CN205777664U (en) Urban forests high level villa
CN107288370A (en) Urban forests high level villa
CN106368310B (en) Detachable green balcony for multi-storey building building and preparation method thereof
CN106638933A (en) Detachable green terrace with garden carrier and manufacturing method of terrace
CN106436891B (en) Detachable balcony of multi-storey building and preparation method thereof
CN106638934B (en) A kind of green balcony and preparation method thereof for multi-storey building
CN210856905U (en) Pedestrian landscape cable-stayed bridge based on bridge tower structure of sightseeing tower
CN209145351U (en) A kind of case type sports training type heat preservation energy-saving house
CN110485254B (en) Pedestrian landscape cable-stayed bridge based on sightseeing tower bridge tower structure
CN221203482U (en) Landscape garden plant climbing rack
CN113026932A (en) A balcony structure for full aluminium building of green assembled
CN103015696A (en) Hanging basket outer protective layer for super high-rise building
CN216123580U (en) Low water tank drainage type multi-span split plastic greenhouse
CN112064891A (en) Beam structure with planting function
CN205511147U (en) Automatic three -dimensional flower culture device that surplus water of water spray was collected
CN211646699U (en) Three-dimensional balcony garden
CN109348926A (en) A kind of three-dimensional more floor greenhouse methods of construction of Tulou formula
CN206070729U (en) A kind of overhanging type green balcony
CN220088052U (en) Greening landscape building
CN214531083U (en) Multi-functional gardens corridor frame
CN219344233U (en) Bath tent
CN212130120U (en) Assembled yurt structure
CN211257933U (en) Building with trapezoidal step-shaped roof and quadrangle composed of building
CN219909550U (en) Greening building roof structure
CN216752935U (en) Sunlight greenhouse big-arch shelter

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Jiang Feng

Inventor before: Sun Yue

TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20180524

Address after: 518000 13, B4 unit, Kexing Science Park, 15 Keyuan Road, Nanshan District, Shenzhen, Guangdong.

Applicant after: Shenzhen Jieen creative Tsukito design Inc

Address before: 221000 No. 23 Qianjiang Road, Second Industrial Park, Xuzhou hi tech Industrial Development Zone, Xuzhou, Jiangsu

Applicant before: Xuzhou joy Electromechanical Technology Co., Ltd.

GR01 Patent grant
GR01 Patent grant