CN110359732B - Toilet applied to existing building and installation method thereof - Google Patents

Toilet applied to existing building and installation method thereof Download PDF

Info

Publication number
CN110359732B
CN110359732B CN201910506371.XA CN201910506371A CN110359732B CN 110359732 B CN110359732 B CN 110359732B CN 201910506371 A CN201910506371 A CN 201910506371A CN 110359732 B CN110359732 B CN 110359732B
Authority
CN
China
Prior art keywords
toilet
suspended ceiling
underframe
existing building
corner posts
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201910506371.XA
Other languages
Chinese (zh)
Other versions
CN110359732A (en
Inventor
彭典勇
***
戴小进
娄霓
李扬
贺祥宇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NERC ENGINEERING CONSULTANTS FOR HUMAN & SETTLEMENTS Ltd
Original Assignee
NERC ENGINEERING CONSULTANTS FOR HUMAN & SETTLEMENTS Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NERC ENGINEERING CONSULTANTS FOR HUMAN & SETTLEMENTS Ltd filed Critical NERC ENGINEERING CONSULTANTS FOR HUMAN & SETTLEMENTS Ltd
Priority to CN201910506371.XA priority Critical patent/CN110359732B/en
Publication of CN110359732A publication Critical patent/CN110359732A/en
Application granted granted Critical
Publication of CN110359732B publication Critical patent/CN110359732B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/343Structures characterised by movable, separable, or collapsible parts, e.g. for transport
    • E04B1/34315Structures characterised by movable, separable, or collapsible parts, e.g. for transport characterised by separable parts
    • E04B1/34321Structures characterised by movable, separable, or collapsible parts, e.g. for transport characterised by separable parts mainly constituted by panels
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/343Structures characterised by movable, separable, or collapsible parts, e.g. for transport
    • E04B1/34315Structures characterised by movable, separable, or collapsible parts, e.g. for transport characterised by separable parts
    • E04B1/34326Structures characterised by movable, separable, or collapsible parts, e.g. for transport characterised by separable parts mainly constituted by longitudinal elements
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/38Connections for building structures in general
    • E04B1/388Separate connecting elements
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H1/00Buildings or groups of buildings for dwelling or office purposes; General layout, e.g. modular co-ordination or staggered storeys
    • E04H1/12Small buildings or other erections for limited occupation, erected in the open air or arranged in buildings, e.g. kiosks, waiting shelters for bus stops or for filling stations, roofs for railway platforms, watchmen's huts or dressing cubicles
    • E04H1/125Small buildings, arranged in other buildings

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Working Measures On Existing Buildindgs (AREA)
  • Residential Or Office Buildings (AREA)

Abstract

The invention provides a bathroom applied to an existing building, which is divided into an upper-layer suspended ceiling and a bottom frame, wherein the upper-layer suspended ceiling comprises a top plate and four upper-layer wallboards, and the bottom frame comprises a bottom plate and four lower-layer wallboards; the upper layer suspended ceiling is pre-installed at the top of a dark toilet of an existing building, and the underframe is pushed to the lower side of the upper layer suspended ceiling in a sliding mode, so that four upper layer wallboards of the upper layer suspended ceiling and four lower layer wallboards of the underframe are aligned and spliced. The toilet provided by the invention can effectively accelerate the construction progress and can promote the vertical clear space of the toilet.

Description

Toilet applied to existing building and installation method thereof
Technical Field
The invention relates to the technical field of building reconstruction, in particular to a toilet applied to an existing building and an installation method thereof.
Background
The improvement of the bathroom is particularly important for the improvement of old buildings. In the prior art, the old building is directly dismantled from the old toilet, and then the old toilet is re-constructed and decorated, so that the engineering is time-consuming and labor-consuming, the room use is often influenced by long-time construction, and the surrounding residents are also influenced to a certain extent.
Along with the development of the assembled building, the construction period can be effectively shortened, the field construction effect is improved, and the assembled building is continuously applied to various buildings. In the prior art, due to the existing structural characteristics of the existing building, the existing building is often influenced, and the quick assembly type construction is difficult to realize for the old building transformation.
In the prior art, the floor slab is provided with a beam structure, the integral toilet is difficult to be directly assembled into the dark toilet of the prior building, the requirement of relatively large clean space of the integral toilet is met through the beam, the construction is usually carried out on the dark toilet directly in the prior art, and different parts of the toilet are transported to the dark toilet of the prior building in a slicing way to be assembled. However, this method in the prior art inevitably results in problems such as time consuming construction and complicated construction procedures.
Therefore, in order to effectively solve the problem of the lintel, the bathroom can be constructed quickly, and the clean space of the whole bathroom is increased.
Disclosure of Invention
One aspect of the present invention is to provide a toilet applied to an existing building, the toilet being divided into two parts of an upper ceiling and a lower frame, the upper ceiling including a ceiling and four upper wall panels, the lower frame including a floor and four lower wall panels;
the upper layer suspended ceiling is pre-installed at the top of a dark toilet of an existing building, and the underframe is pushed to the lower side of the upper layer suspended ceiling in a sliding mode, so that four upper layer wallboards of the upper layer suspended ceiling and four lower layer wallboards of the underframe are aligned and spliced.
Preferably, the underframe is provided with four corner posts, and the corner posts are fixed on the adjustable column feet;
the adjustable column base comprises a support, a pulley is arranged below the support, and a connecting plate is arranged on one side of the support; the corner post is erected on the support, and the connecting plate and the corner post are fixed through bolts.
Preferably, the connecting plate is provided with at least one height-adjusting screw hole, and the underframe is leveled by adjusting the position of the bolt in the height-adjusting screw hole.
Preferably, grooves are formed in the splicing surfaces of the four-side lower-layer wallboards, and bumps are arranged on the splicing surfaces of the four-side upper-layer wallboards;
when the underframe is pushed to the lower part of the suspended ceiling, the convex blocks arranged on the splicing surfaces of the four-side upper-layer wallboards are embedded into the grooves formed on the splicing surfaces of the four-side lower-layer wallboards.
Preferably, a wire slot is reserved on at least one wall plate in the four upper wall plates, or a wire slot is reserved on at least one wall plate in the four lower wall plates;
after the four upper wallboards and the four lower wallboards are aligned and spliced, the circuits of the upper wallboards and the circuits of the lower wallboards are connected in the wire slots.
Preferably, after the upper suspended ceiling is aligned and spliced with the underframe, the two corner posts on the outer side of the underframe are fixed with the wall body of the dark toilet through angle steel.
Preferably, the angle steel comprises a first ear part, a second ear part and an intermediate elastic connecting part;
when the chassis pushes to the furred ceiling below, middle elastic connection portion inserts the clearance between dark bathroom wall body and the corner post, first ear is fixed through first bolt and dark bathroom wall body, the second ear is fixed through second bolt and corner post.
Another aspect of the present invention is to provide a toilet installation method applied to an existing building, the method comprising the steps of:
(1) Installing an upper suspended ceiling, wherein the upper suspended ceiling of the bathroom is fixed on the top of a dark bathroom of an existing building, and the upper suspended ceiling of the bathroom is fixed on the top of the dark bathroom by adopting a foam rod and sealant or bolts;
(2) Pushing the toilet underframe to the lower part of the upper suspended ceiling in a sliding manner, so that four upper wall boards of the upper suspended ceiling are aligned with four lower wall boards of the underframe;
(3) And fixing two walls outside the underframe and the wall of the dark toilet through angle steel.
Preferably, the underframe is provided with four corner posts, and the corner posts are fixed on the adjustable column feet;
the adjustable column base comprises a support, a pulley is arranged below the support, and a connecting plate is arranged on one side of the support; the corner post is erected on the support, and the connecting plate and the corner post are fixed through bolts.
Preferably, after the upper suspended ceiling is aligned and spliced with the underframe, the two corner posts on the outer side of the underframe are fixed with the wall body of the dark toilet through angle steel.
The toilet and the installation method thereof applied to the existing building can effectively solve the problems of time and complex construction procedures in construction, realize quick construction and increase the vertical clear space of the whole toilet.
It is to be understood that both the foregoing general description and the following detailed description are exemplary and explanatory only and are not restrictive of the invention as claimed.
Drawings
Further objects, functions and advantages of the present invention will be clarified by the following description of embodiments of the present invention with reference to the accompanying drawings, in which:
fig. 1 schematically shows a sectional view of a base slide of a toilet according to the invention applied to an existing building.
Figure 2 shows a top view of a base slide of the invention applied to a toilet of an existing building.
Fig. 3 shows a schematic view of the invention after the upper ceiling of the toilet and the base are spliced.
Fig. 4 shows a schematic structural view of the adjustable column shoe of the present invention.
Fig. 5 shows a schematic view of the connection of the corner posts of the base of the present invention to the leveling toe.
Fig. 6 shows a schematic structural view of the joint surface of the four-side upper wall panel and the four-side lower wall panel of the present invention.
Fig. 7 shows a schematic diagram of the structure of the reserved wire chase of the present invention.
Fig. 8 shows an a-direction view of fig. 1.
Fig. 9 shows a schematic view of the angle steel structure of the present invention.
Detailed Description
The objects and functions of the present invention and methods for achieving these objects and functions will be elucidated by referring to exemplary embodiments. However, the present invention is not limited to the exemplary embodiments disclosed below; this may be implemented in different forms. The essence of the description is merely to aid one skilled in the relevant art in comprehensively understanding the specific details of the invention.
Hereinafter, embodiments of the present invention will be described with reference to the accompanying drawings. In the drawings, the same reference numerals represent the same or similar components, or the same or similar steps.
The invention is illustrated by the following specific examples. In order to solve the problem that the prefabricated integral bathroom is difficult to be directly installed in the existing building dark bathroom (namely the bathroom space of the original building) in the prior art, the clean space of the bathroom is small. The embodiment adopts the toilet provided by the invention to be applied to the existing building.
A sectional view of a base slide of a toilet applied to an existing building according to the present invention is shown in fig. 1, and a plan view of a base slide of a toilet applied to an existing building according to the present invention is shown in fig. 2. According to an embodiment of the present invention, a toilet applied to an existing building is divided into an upper ceiling and a bottom frame. The upper suspended ceiling is bolted to the top of the dark toilet, and the underframe is pushed into the dark toilet in a sliding mode and is aligned and spliced with the upper suspended ceiling to form a finished toilet.
Specifically, in the present embodiment, the bathroom is divided into two parts of an upper ceiling 1 and a bottom chassis 2, the upper ceiling 1 includes a top plate 101, and four upper wall plates 102, and the bottom chassis 2 includes a bottom plate 201, and four lower wall plates 202.
For a dark toilet enclosed by existing building walls, the prefabricated complete toilet is directly embedded into the dark toilet, and the complete toilet clean space is reduced due to the obstruction of the top cross beam 301 of the building.
According to the embodiment of the invention, the bathroom is divided into the upper layer suspended ceiling 1 and the bottom frame 2, the upper layer suspended ceiling 1 is pre-installed on the top 3 of the dark bathroom of the existing building, and the bottom frame 2 is pushed below the upper layer suspended ceiling 1 in a sliding manner, so that four upper layer wallboards of the upper layer suspended ceiling are aligned and spliced with four lower layer wallboards of the bottom frame, and the clean space of the bathroom can be effectively increased.
According to the embodiment of the invention, the upper suspended ceiling 1 of the bathroom is bolted to the top of the dark bathroom by adopting a foam rod and sealant or bolts, then the underframe 2 is pushed to the lower part of the upper suspended ceiling 1, four corner posts 203 are arranged at the bottom of the underframe, and the corner posts are fixed on the adjustable column feet. As shown in fig. 3, the invention is applied to a schematic diagram of a spliced upper suspended ceiling and a base of a toilet of an existing building, after the upper suspended ceiling 1 is spliced with a bottom frame 2, a connecting part 103 between the upper suspended ceiling 1 and the top of the dark toilet is sealed, the joints 204 of four upper wall boards 102 and four lower wall boards 202 are covered with cement boards, and corner posts 203 are fixed.
As shown in fig. 4, the leveling column base 4 of the present invention comprises a support 401, a pulley 404 is disposed under the support 401, and a connecting plate 402 is disposed on one side of the support 401. As shown in fig. 5, the corner post 203 of the base of the present invention is mounted on the support 401, and the connection plate 402 and the corner post 203 are fixed by bolts 405.
In some embodiments, at least one height-adjusting screw hole 403 is formed in the connecting plate 402, and the position of the bolt 405 in the height-adjusting screw hole 403 is adjusted to level the chassis 2. In specific construction, the positions of the four corner posts of the underframe in the heightening screw holes 403 are adjusted through the adjusting bolts 405, so that the heights of different corner posts are adjusted, and the whole underframe reaches a leveling state.
According to the implementation of the present invention, the four-side upper wall board 102 and the four-side lower wall board 202 are connected by a jogged manner, and as shown in fig. 6, the structure of the joint surface of the four-side upper wall board and the four-side lower wall board of the present invention is schematically shown, wherein (a) is a joint schematic diagram of a longitudinal wall board, and (b) is a joint schematic diagram of a transverse wall board. According to the present invention, the splicing surface of the four lower wall panels 202 is provided with grooves 2021, and the splicing surface of the four upper wall panels 102 is provided with bumps 1021. When the underframe 2 is pushed under the upper suspended ceiling 1, the bumps 1021 provided on the splicing surfaces of the four-side upper wall boards 102 are embedded into the grooves 2021 provided on the splicing surfaces of the four-side lower wall boards 202.
After the upper suspended ceiling 1 is spliced with the underframe, the joints of the four upper wallboards 102 and the four lower wallboards 202 are covered with cement boards.
According to the invention, a wire slot is reserved in at least one wall plate in the four upper wall plates, or a wire slot is reserved in at least one wall plate in the four lower wall plates. In some embodiments, all of the four upper wall panels may be selected to reserve trunking, in some embodiments, one wall panel/two wall panels/three wall panels of the four upper wall panels may be selected to reserve trunking, in some embodiments, all of the four lower wall panels may be selected to reserve trunking, in some embodiments, one wall panel/two wall panels/three wall panels of the four lower wall panels may be selected to reserve trunking.
As shown in fig. 7, the reserved trunking of the present invention connects the lines of the upper wall board and the lower wall board through the reserved trunking. In the embodiment, taking the expected wire slot in the upper wall plate as an example, the wire slot box 1022 is embedded in the upper wall plate 102, the bottom of the wire slot box 1022 is provided with a through hole 1026, and the wire slot box is internally provided with a connector lug 1023. After the four upper wallboards and the four lower wallboards are aligned and spliced, the circuit 1024 of the upper wallboards and the circuit 2022 of the lower wallboards are connected in the wire slot through the connector lug 1023, and after wiring is completed, the wire slot cover 1025 is covered.
According to the embodiment of the invention, the underframe is pushed into the dark toilet to be connected with the upper suspended ceiling of the toilet, and the two corner posts on the outer side of the underframe are fixed through the angle steel. As shown in fig. 8, in the view of fig. 1, when the upper ceiling is spliced with the underframe, the two corner posts outside the underframe are fixed (the two corner posts pushed into the dark toilet may not be fixed). Specifically, in the embodiment, two corner posts outside the chassis are fixed with a wall body of the dark toilet through angle steel, and the angle steel of the invention shown in fig. 9 is a schematic structural diagram, and the angle steel comprises a first ear 601, a second ear 602, and a middle elastic connection part 603.
When the underframe is pushed below the suspended ceiling, the middle elastic connecting part 603 is inserted into the gap 501 between the wall body 5 of the dark toilet and the corner post 203, the first lug 601 is fixed with the wall body 5 of the dark toilet through the first bolt 604a, and the second lug 602 is fixed with the corner post 203 through the second bolt 604 b.
The corner post of the bathroom is arranged at the joint of the wallboards of the whole bathroom, so that the stress support of the structure of the whole bathroom can be effectively improved. The pulley is installed below the corner post, so that the whole bathroom can be conveniently pushed to slide. The leveling column feet can adjust the height difference within 100-150mm by installing the leveling column feet below the corner columns, so that the problem of uneven ground in the toilet caused by uneven ground can be solved.
The following describes a toilet installation method applied to an existing building, and according to an embodiment of the present invention, the toilet installation method applied to the existing building includes the following method steps:
(1) The upper suspended ceiling and the underframe are prefabricated, produced and packaged in a factory, the suspended ceiling is detached in the lifting stage, the upper suspended ceiling and the underframe are lifted into floors respectively, and the suspended ceiling is bolted to the top during construction.
Install upper ceiling, bathroom upper ceiling is fixed in the dark bathroom top of existing building, wherein, adopts the foam rod to add sealant or bolt and is fixed in dark bathroom top with bathroom upper ceiling.
(2) The toilet underframe is pushed to the lower part of the upper suspended ceiling in a sliding mode, so that four upper wall boards of the upper suspended ceiling are aligned with four lower wall boards of the underframe. And the joints of the four-side upper wall boards and the four-side lower wall boards are covered with cement boards.
In this embodiment, four corner posts are provided at the bottom of the chassis, and the corner posts are fixed to the adjustable column feet. The adjustable column base comprises a support, a pulley is arranged below the support, and a connecting plate is arranged on one side of the support; the corner post frame and the support are fixed with the connecting plate and the corner post through bolts.
The four corner posts of the underframe are positioned in the heightening screw holes through adjusting bolts, so that the heights of different corner posts are adjusted, the whole underframe is in a leveling state, and wiring in the wire slot is completed.
(3) And fixing two walls outside the underframe and the wall of the dark toilet through angle steel.
According to the embodiment of the invention, the underframe is pushed into the dark toilet to be connected with the upper suspended ceiling of the toilet, and the two corner posts on the outer side of the underframe are fixed through the angle steel. After the upper suspended ceiling is aligned and spliced with the underframe, the two corner posts on the outer side of the underframe are fixed with the wall body of the dark toilet through angle steel.
The corner post of the bathroom is arranged at the joint of the wallboards of the whole bathroom, so that the stress support of the structure of the whole bathroom can be effectively improved. The pulley is installed below the corner post, so that the whole bathroom can be conveniently pushed to slide. The leveling column feet can adjust the height difference within 100-150mm by installing the leveling column feet below the corner columns, so that the problem of uneven ground in the toilet caused by uneven ground can be solved.
The toilet and the installation method thereof applied to the existing building can effectively solve the problems of time and complex construction procedures in construction, realize quick construction, increase the vertical clear space of the whole toilet and improve the space utilization rate of the whole toilet.
Other embodiments of the invention will be apparent to and understood by those skilled in the art from consideration of the specification and practice of the invention disclosed herein. It is intended that the specification and examples be considered as exemplary only, with a true scope and spirit of the invention being indicated by the following claims.

Claims (9)

1. A toilet applied to an existing building, characterized in that the toilet is divided into an upper suspended ceiling and a bottom frame, the upper suspended ceiling comprises a top plate and four upper wall plates, and the bottom frame comprises a bottom plate and four lower wall plates;
the upper layer suspended ceiling is pre-installed at the top of a dark toilet of an existing building, and the underframe is pushed to the lower side of the upper layer suspended ceiling in a sliding mode, so that four upper layer wallboards of the upper layer suspended ceiling and four lower layer wallboards of the underframe are aligned and spliced.
2. The toilet for an existing building according to claim 1, wherein the underframe is provided with four corner posts, the corner posts being fixed to adjustable leveling feet;
the adjustable column base comprises a support, a pulley is arranged below the support, and a connecting plate is arranged on one side of the support; the corner posts are erected on the support, and the connecting plates and the corner posts are fixed through bolts.
3. The toilet for an existing building according to claim 2, wherein the connecting plate is provided with at least one height adjusting screw hole, and the underframe is leveled by adjusting the position of the bolt in the height adjusting screw hole.
4. The toilet for use in existing buildings according to claim 1 or 2, wherein the splicing surfaces of the four lower wall boards are provided with grooves, and the splicing surfaces of the four upper wall boards are provided with bumps;
when the underframe is pushed to the lower part of the upper suspended ceiling, the convex blocks arranged on the splicing surfaces of the four upper wall boards are embedded into the grooves formed on the splicing surfaces of the four lower wall boards.
5. The toilet for an existing building according to claim 4, wherein a wire slot is reserved in at least one of the four upper wall panels or a wire slot is reserved in at least one of the four lower wall panels;
after the four upper wallboards and the four lower wallboards are aligned and spliced, the circuits of the upper wallboards and the circuits of the lower wallboards are connected in the wire slots.
6. The toilet for an existing building according to claim 2, wherein after the upper suspended ceiling is aligned with the underframe, two corner posts on the outer side of the underframe are fixed with the wall of the dark toilet through angle steel.
7. The toilet of claim 6, wherein the angle steel comprises a first ear, a second ear, and an intermediate elastic connection;
when the chassis is pushed to the lower side of the upper suspended ceiling, the middle elastic connecting part is inserted into a gap between the wall body and the corner post of the dark toilet, the first lug part is fixed with the wall body of the dark toilet through a first bolt, and the second lug part is fixed with the corner post through a second bolt.
8. A method of installing a toilet for an existing building according to any one of claims 2-7, comprising the steps of:
(1) Installing an upper suspended ceiling, wherein the upper suspended ceiling of the bathroom is fixed on the top of a dark bathroom of an existing building, and the upper suspended ceiling of the bathroom is fixed on the top of the dark bathroom by adopting a foam rod and sealant or bolts;
(2) Pushing the toilet underframe to the lower part of the upper suspended ceiling in a sliding manner, so that four upper wall boards of the upper suspended ceiling are aligned and spliced with four lower wall boards of the underframe;
(3) And fixing the two corner posts on the outer side of the underframe and the wall body of the dark toilet through angle steel.
9. The method of installing a toilet for an existing building according to claim 8, wherein the underframe is provided with four corner posts, the corner posts being fixed to the adjustable footing;
the adjustable column base comprises a support, a pulley is arranged below the support, and a connecting plate is arranged on one side of the support; the corner posts are erected on the support, and the connecting plates and the corner posts are fixed through bolts.
CN201910506371.XA 2019-06-12 2019-06-12 Toilet applied to existing building and installation method thereof Active CN110359732B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910506371.XA CN110359732B (en) 2019-06-12 2019-06-12 Toilet applied to existing building and installation method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910506371.XA CN110359732B (en) 2019-06-12 2019-06-12 Toilet applied to existing building and installation method thereof

Publications (2)

Publication Number Publication Date
CN110359732A CN110359732A (en) 2019-10-22
CN110359732B true CN110359732B (en) 2024-03-01

Family

ID=68215961

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910506371.XA Active CN110359732B (en) 2019-06-12 2019-06-12 Toilet applied to existing building and installation method thereof

Country Status (1)

Country Link
CN (1) CN110359732B (en)

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0539675A (en) * 1991-08-07 1993-02-19 Toto Ltd Construction method for prefabricated toilet
CN104806038A (en) * 2015-04-02 2015-07-29 衡水通广塔业有限公司 Combined multifunctional shelter and mounting construction method thereof
CN206091372U (en) * 2016-04-26 2017-04-12 美津(天津)环境设备制造有限公司 Concatenation formula container bathroom
CN206128691U (en) * 2016-07-26 2017-04-26 袁弓夷 Concatenation formula housing unit structure and modularization building structure that has this structure
CN108086719A (en) * 2017-12-30 2018-05-29 浙江亚厦装饰股份有限公司 Assembled toilet and its installation method
CN108533002A (en) * 2018-06-20 2018-09-14 广东金利安建材有限公司 A kind of folding firmly people's container of novel fabricated
CN109162355A (en) * 2018-09-20 2019-01-08 中冶天工(天津)装备制造有限公司 A kind of assembling type steel structure modularization campsite building construction system
CN210396245U (en) * 2019-06-12 2020-04-24 国住人居工程顾问有限公司 Be applied to bathroom of existing building

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20190010692A1 (en) * 2008-03-06 2019-01-10 Stuart Charles Segall Relocatable habitat unit
IT1400061B1 (en) * 2010-05-07 2013-05-17 Db2 S R L "A COMPLEX OF PREFABRICATED ELEMENTS TO FORM A PREFABRICATED BUILDING AT AT LEAST TWO PLANS AND RELATED BUILDING AND INSTALLATION PROCEDURE"

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0539675A (en) * 1991-08-07 1993-02-19 Toto Ltd Construction method for prefabricated toilet
CN104806038A (en) * 2015-04-02 2015-07-29 衡水通广塔业有限公司 Combined multifunctional shelter and mounting construction method thereof
CN206091372U (en) * 2016-04-26 2017-04-12 美津(天津)环境设备制造有限公司 Concatenation formula container bathroom
CN206128691U (en) * 2016-07-26 2017-04-26 袁弓夷 Concatenation formula housing unit structure and modularization building structure that has this structure
CN108086719A (en) * 2017-12-30 2018-05-29 浙江亚厦装饰股份有限公司 Assembled toilet and its installation method
CN108533002A (en) * 2018-06-20 2018-09-14 广东金利安建材有限公司 A kind of folding firmly people's container of novel fabricated
CN109162355A (en) * 2018-09-20 2019-01-08 中冶天工(天津)装备制造有限公司 A kind of assembling type steel structure modularization campsite building construction system
CN210396245U (en) * 2019-06-12 2020-04-24 国住人居工程顾问有限公司 Be applied to bathroom of existing building

Also Published As

Publication number Publication date
CN110359732A (en) 2019-10-22

Similar Documents

Publication Publication Date Title
KR101574253B1 (en) A method for construction using a twin wall structure using a PC panel
CA2515662A1 (en) Pre-cast concrete wall with truss ledge
CN111287326A (en) Fast detachable and re-built assembled composite building and construction method thereof
CN110359732B (en) Toilet applied to existing building and installation method thereof
CN210396245U (en) Be applied to bathroom of existing building
RU2008130001A (en) METHOD OF MANAGEMENT OF MOVEMENTS, SEDIMENTS AND ROLL FOR THE FACILITATION OF FOUNDATIONS ON THE PILES, WHICH ARE MACRO-REGULATORS
KR102172651B1 (en) Simple pool construction method
EP1726728B1 (en) Method of erecting a partition wall integrated with a concrete floor
KR101366139B1 (en) draining plate assembly
JP2003003690A (en) Base isolation building and method for base isolation of exisiting building
US20030167727A1 (en) Building construction method
CN217840442U (en) Wallboard mounting and positioning structure
KR20020062245A (en) assembly type steel frame ladder of reinforcement concrete building and construction method thereof
JP2007217871A (en) Dry foundation and its construction method
KR102452215B1 (en) Method of constructing an unit bathroom using the level adjustment apparatus
KR200388497Y1 (en) A height-regulation style floor frame
KR101854847B1 (en) the hybrid self-positioning connecting structure of column and beam for a horizontal extending a building
KR101325717B1 (en) draining plate assembly
KR20210033787A (en) Column-supported PC staircase
JP3381066B2 (en) Existing building seismic isolation method and seismic isolation building
NL2032447B1 (en) Building and method for constructing the building
FI127725B (en) Precast alignment element and method of mounting a volume module in a building
JPH06200533A (en) Bent pc foundation form and foundation construction method using it
GB2147635A (en) Foundation for suspended floors
KR102297785B1 (en) Method of constructing story height extension and floor impact sound reduction remodeling frame for apartment building

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant