CN110356965A - A kind of winch head sheave with boom hoisting - Google Patents

A kind of winch head sheave with boom hoisting Download PDF

Info

Publication number
CN110356965A
CN110356965A CN201910778988.7A CN201910778988A CN110356965A CN 110356965 A CN110356965 A CN 110356965A CN 201910778988 A CN201910778988 A CN 201910778988A CN 110356965 A CN110356965 A CN 110356965A
Authority
CN
China
Prior art keywords
head sheave
head
main shaft
boom hoisting
suspension hook
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910778988.7A
Other languages
Chinese (zh)
Inventor
方祝友
操礼发
何维斌
王全效
杨雪
曹彬
黄友虎
王健
王征
平静
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huainan Mining Group Co Ltd
Original Assignee
Huainan Mining Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huainan Mining Group Co Ltd filed Critical Huainan Mining Group Co Ltd
Priority to CN201910778988.7A priority Critical patent/CN110356965A/en
Publication of CN110356965A publication Critical patent/CN110356965A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C1/00Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles
    • B66C1/10Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles by mechanical means
    • B66C1/12Slings comprising chains, wires, ropes, or bands; Nets
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C1/00Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles
    • B66C1/10Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles by mechanical means
    • B66C1/62Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles by mechanical means comprising article-engaging members of a shape complementary to that of the articles to be handled
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C13/00Other constructional features or details
    • B66C13/04Auxiliary devices for controlling movements of suspended loads, or preventing cable slack
    • B66C13/08Auxiliary devices for controlling movements of suspended loads, or preventing cable slack for depositing loads in desired attitudes or positions

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Jib Cranes (AREA)

Abstract

The winch head sheave with boom hoisting that the invention discloses a kind of, including wheel hub, main shaft, to prevent winch head sheave from turning over impaired boom hoisting and drawstring;The wheel hub is socketed in spindle shaft;The boom hoisting is detachably connected on the first end end face of main shaft;The drawstring is set on the axle body of main shaft second end;First suspension hook head is connect with the boom hoisting;Second suspension hook head is connect with the drawstring;When winch head sheave is turned over, crane is by suspension hook head to the active force of winch head sheave, all it is applied on main shaft, entire lifting process is contacted with head sheave wheel hub without any, the active force is effectively prevented to act on wheel hub, so that wheel hub deforms, the present invention ensure that the integrality of winch head sheave after turning over.

Description

A kind of winch head sheave with boom hoisting
Technical field
The present invention relates to winch head sheaves to turn over technical field, specially a kind of winch head sheave with boom hoisting.
Background technique
It all refers to carry out head sheave turn work in the installation of head sheave and replacement process, i.e., it is the main shaft of head sheave is vertical It is turned in ground to be parallel to ground form, then lifted using 500t crane to derrick." turn " is a dangerous journey Biggish work is spent, the unreasonable wheel hub damage or bearing damage for easilying lead to head sheave of the methods of use is even more serious It may cause wheel hub or bearing breaking etc., serious to destroy head sheave quality, what we used in the past carries out at reinforcing head sheave wheel hub It carries out lifting turn using two crane cooperation wire line hitch after reason, turn is time-consuming and laborious, and reinforces position and may cause weldering Connect deformation.
- a, Fig. 1-b and Fig. 1-c refering to fig. 1 have welded distance bolt between the wheel hub 1 of rope groove 11 in winch head sheave, When lifting winch head sheave is turned over, wirerope, then two suspension hooks different from suspension hook power are respectively interposed in the two sides of wheel hub 1 Head connection, later under the running of crane, turns over winch head sheave, and it is horizontal that main shaft 2 is changed to from vertical state State.
Before the lifting of winch head sheave, the distance bolt welded first is in order to prevent during turn, and wheel hub is in steel wire Under the pulling force effect of rope, deform, so that the distance between wheel hub changes, but when welding distance bolt, with wheel hub Weld easily deform in welding, and steel wire penetrating wheel hub, although have distance bolt keep between wheel hub away from From not changing, but the active force that crane is given still acts on wheel hub, and distance bolt can only prevent to a certain extent Wheel hub deforms, and can not prevent the generation of deformation completely.
Summary of the invention
Technical problem to be solved by the present invention lies in: when how to solve the turn of winch head sheave, boom hoisting is to head sheave Wheel hub or bearing damage, and then the problem of influencing its use of deforming.
In order to solve the above technical problems, the invention provides the following technical scheme: a kind of winch head sheave with boom hoisting, Including wheel hub, main shaft, to prevent winch head sheave from turning over the impaired boom hoisting and drawstring of wheel hub;The wheel hub is socketed in main shaft On axle body;The boom hoisting is detachably connected on the first end end face of main shaft;The drawstring is set in main shaft second end On axle body;First suspension hook head is connect with the boom hoisting;Second suspension hook head is connect with the drawstring.
When head sheave is lifted by crane, the first suspension hook head is by boom hoisting pulling main shaft run-off the straight, the then connect with drawstring Two suspension hook heads give the power of one horizontal direction of the main shaft other end, auxiliary spindle inclination, until the axis direction of main shaft is from vertical Horizontal direction is changed into direction, and pulley frame is set on the sleeper pre-set, then the first suspension hook of removal head, second is hung Gib head, drawstring and boom hoisting complete the turn work of winch head sheave, turn over compared to traditional winch head sheave, this strand When vehicle head sheave is turned over, crane, to the active force of winch head sheave, is all applied on main shaft by suspension hook head, it is entire lift by crane process with Head sheave wheel hub is effectively prevented from the active force and acts on wheel hub without any contact, so that wheel hub deforms, to influence to twist The use of vehicle head sheave.
Preferably, the boom hoisting includes cover clamp, at least two gussets, plays davit, hanging ring and be used for cover clamp The retaining mechanism being locked on main shaft end face;The retaining mechanism is arranged between main shaft end face and the plate face of cover clamp;It is described Davit is played to be welded at the plate face center of cover clamp;The shape of the gusset is right-angled trapezium, and right-angle side is fixed on cover clamp Plate face on;The larger bottom edge of the gusset has been fixed on the surrounding of davit centered on playing davit in radiation;The lifting Column offers the ring mounting hole of perforation in its width direction;The hanging ring passes through ring mounting hole;The hanging ring and first The connection of suspension hook head.
Preferably, the retaining mechanism includes clamping screw and the hold-down bolt hole being provided on cover clamp;The locking Bolt is threadedly engaged with hold-down bolt hole;The threaded hole being threadedly engaged with clamping screw is provided on the main shaft end face;It is described Threaded hole and hold-down bolt hole are coaxial.
Clamping screw is successively screwed in hold-down bolt hole and threaded hole, so that the cover clamp in boom hoisting is locked to main shaft On, drawstring is tied up on main shaft second end axle body, the first suspension hook head is connect with hanging ring, the second suspension hook head is connect with drawstring, First suspension hook head applies 100t suspension hook power, and the second suspension hook head applies 50t suspension hook power, and slow hoisting and overturning, suspension hook acts on when turn Power acts on the both ends of main shaft, and wheel hub is contacted with boom hoisting without any, and when the winch head sheave is turned over, without to wheel hub Between weld distance bolt, prevent weld from deforming, the turn of winch head sheave carried out by the boom hoisting of setting, protect Integrality of wheel hub during turn is protected, convenient for the subsequent use of wheel hub.
Preferably, the retaining mechanism is mounted on the end face of main shaft first end;The retaining mechanism includes activity lock And the limit assembly of limitation activity lock rotation;The quantity of the activity lock has axle center that are multiple, and surrounding main shaft, and passes through Shaft is rotatably connected at the end face edge of main shaft first end;The side of activity lock is arranged in the limit assembly.
Preferably, the limit assembly includes that the fixation bumping post that activity lock side is arranged in, setting are another in activity lock The movable bumping post and spring of side;The fixed bumping post is fixed at the end face edge of main shaft first end;The activity bumping post It is connected to by spring on the end face of main shaft first end.
After being bonded cover clamp with main shaft first end end face, rotation activity latches and locks cover clamp, prevents cover clamp It is detached from, while spring promotion activity bumping post rises, prevents activity lock rotation, promote the convenient degree of boom hoisting dismounting.
Preferably, the boom hoisting further includes elastic component;One end of the elastic component is fixed on the hole of ring mounting hole On wall;The other end of the elastic component is welded on hanging ring.
When crane drives hanging ring to rise by the first suspension hook head, so that hanging ring and the elastic component risen between davit are drawn Elastic deformation occurs for power, and under its elastic reaction, which has slowly been transmitted on davit and cover clamp, last pull-up The first end of winch head sheave main shaft prevents crane operation person's operation too quickly, to hanging ring or the wirerope connecting with the first suspension hook head It damages, and then winch head sheave is caused to fall off from the first suspension hook head, cause the generation of peril.
Preferably, the main shaft further includes the shaft-cup for being connected to main shaft both ends.
A kind of turn-over method of the winch head sheave with boom hoisting, comprising:
Step 1: for initial placement on head sheave retainer, head sheave main-shaft axis along the vertical direction, will be on the shaft-cup of main shaft one end Bolt unload, shaft-cup and bolt are placed into the place for not interfering construction, used when head sheave to install after turning over;
Step 2: boom hoisting is hung to head sheave retainer upper end using crane, and carries out the connection work of boom hoisting;
Step 3: the end face of cover clamp in boom hoisting and the spindle end face paste of removal shaft-cup are combined together, and used The two is locked jail by retaining mechanism;
Step 4: the first suspension hook head is connected with the hanging ring risen on davit;After the completion of suspension hook head connects work, constructor Member, which enters, cuts off the head sheave retainer part fixed with head sheave in head sheave retainer, separate head sheave with retainer;
Step 5: head sheave is simultaneously slowly sling and disengages it from head sheave retainer by the first suspension hook headband strength, hangs out guarantor to head sheave After holding frame, stay cord button is caught head sheave lower end main shaft portion and locked rear and the second suspension hook head of sling is connected simultaneously band by construction personnel Strength, the cooperation of two cranes lift head sheave to being tilted a certain angle;
Step 6: so that after the first suspension hook head above proposes head sheave to proper height, the laterally slowly movement second of the second suspension hook head Drawstring sling on suspension hook head, until after head sheave main-shaft axis is in a horizontal position, while two cranes make head sheave be erected at ground It is fixed on upper cut-and-dried sleeper;The turn work of head sheave is completed at this time.
When winch head sheave is turned over, hoist lifting hook head is connect with two, main shaft shaft ends, and the active force of suspension hook head is applied to strand On the main shaft of vehicle head sheave, suspension hook head and head sheave hub contacts are avoided, and then is effectively prevented suspension hook active force and makes wheel hub Deformation guarantees the integrality after winch head sheave wheel hub turns over.
Preferably, the first suspension hook head is connect with 100 tons of cranes;The second suspension hook head is connect with 55 tons of cranes.
Preferably, the drawstring is the ¢ 48mm wirerope of a root long 12m.
Compared with prior art, the beneficial effects of the present invention are:
A. when winch head sheave is turned over, crane, to the active force of winch head sheave, is all applied on main shaft by suspension hook head, whole A lifting process is contacted with head sheave wheel hub without any, is effectively prevented from the active force and is acted on wheel hub, so that wheel hub becomes Shape, to influence the use of winch head sheave;
B. it prevents crane operation person's operation too quickly, hanging ring or the wirerope connecting with the first suspension hook head is damaged, into And winch head sheave is caused to fall off from the first suspension hook head, cause the generation of peril;Using rotation activity lock come to rise Device for hoisting is installed, and installation speed is fast, and convenient degree is high when disassembly.
Detailed description of the invention
Fig. 1-a is the status diagram in background of invention before the turn of winch head sheave;
Fig. 1-b is status diagram when winch head sheave is turned in background of invention;
Fig. 1-c is the status diagram in background of invention after the turn of winch head sheave;
Fig. 2 is winch head sheave and its overall structure diagram of boom hoisting in the embodiment of the present invention one;
Fig. 3 is the concrete structure schematic diagram of boom hoisting in the embodiment of the present invention one;
Fig. 4-a is the status diagram in the embodiment of the present invention one before the turn of winch head sheave;
Fig. 4-b is the status diagram in the embodiment of the present invention one before the turn of winch head sheave;
Fig. 4-c is the status diagram in the embodiment of the present invention one before the turn of winch head sheave;
Fig. 5 is retaining mechanism scheme of installation in the embodiment of the present invention three;
Fig. 6 is a-quadrant partial enlargement diagram in Fig. 5 of the present invention.
Specific embodiment
For convenient for those skilled in the art understand that technical solution of the present invention, now in conjunction with Figure of description to the technology of the present invention side Case is described further.
Term " first ", " second " be used for descriptive purposes only and cannot be understood as indicating or suggesting relative importance or Implicitly indicate the quantity of indicated technical characteristic." first " is defined as a result, the feature of " second " can be expressed or imply Ground includes one or more of the features.In the description of the present application, the meaning of " plurality " is two or more, unless Separately there is clearly specific restriction.
Embodiment one
Referring to Fig.2, present embodiment discloses a kind of winch head sheave with boom hoisting, including wheel hub 1, main shaft 2, to Prevent winch head sheave from turning over the impaired boom hoisting 3 and drawstring 4 of wheel hub 1.The wheel hub 1 is socketed on 2 axle body of main shaft.Described Device for hoisting 3 is detachably connected on the first end end face of main shaft 2.The drawstring 4 is set on the axle body of 2 second end of main shaft.The One suspension hook head is connect with the boom hoisting 3.Second suspension hook head is connect with the drawstring 4.The suspension hook power of the first suspension hook head Greater than the suspension hook power of the second suspension hook head.
When head sheave is lifted by crane, the first suspension hook head pulls 2 run-off the straight of main shaft by boom hoisting 3, then connect with drawstring 4 Second suspension hook head gives the power of 2 one horizontal direction of second end of main shaft, and auxiliary spindle 2 tilts, until the axis direction of main shaft 2 from Vertical direction changes into horizontal direction, and pulley frame is set on the sleeper pre-set, then the first suspension hook of removal head, Two suspension hook heads, drawstring 4 and boom hoisting 3 are completed the turn work of winch head sheave, are turned over compared to traditional winch head sheave Body, when this winch head sheave is turned over, crane, to the active force of winch head sheave, is all applied on main shaft 2 by suspension hook head, entire to rise It hangs process and is contacted with head sheave wheel hub 1 without any, be effectively prevented from the active force and act on wheel hub 1, so that wheel hub 1 becomes Shape, to influence the use of winch head sheave.
Refering to Fig. 3, the boom hoisting 3 includes cover clamp 31, at least two gussets 32, plays davit 33, hanging ring 34 and use In the retaining mechanism being locked to cover clamp 31 on 2 end face of main shaft.The first end and gland of main shaft 2 is arranged in the retaining mechanism Between plate 31.Described davit 33 is welded at the plate face center of cover clamp 31.The shape of the gusset 32 is right-angled trapezium, Right-angle side is fixed in the plate face of cover clamp 31.The larger bottom edge of the gusset 32 is fixed centered on playing davit 33 in radiation In the surrounding for playing davit 33.Described davit 33 offers the ring mounting hole of perforation in its width direction.The hanging ring 34 Across ring mounting hole.The hanging ring 34 is connect with the first suspension hook head.
The retaining mechanism includes clamping screw and the hold-down bolt hole 35 being provided on cover clamp 31.The clamping screw It is threadedly engaged with hold-down bolt hole 35.The threaded hole being threadedly engaged with clamping screw is provided on the main shaft end face (to scheme not Show).The threaded hole (not shown) and hold-down bolt hole 35 are coaxial.
The main shaft 2 further includes the shaft-cup for being connected to 2 both ends of main shaft.
Clamping screw is successively screwed in hold-down bolt hole 35 and threaded hole, so that the cover clamp 31 in boom hoisting 3 is locked Onto main shaft 2, drawstring 4 is tied up on 2 second end axle body of main shaft, the first suspension hook head is connect with hanging ring 34, by the second suspension hook head It is connect with drawstring 4, the first suspension hook head applies 100t suspension hook power, and the second suspension hook head applies 50t suspension hook power, and slow hoisting and overturning turns over Suspension hook active force acts on the both ends of main shaft 2 when body, and wheel hub 1 is contacted with boom hoisting 3 without any, and turns in the winch head sheave When body, without welding distance bolt between wheel hub 1, prevents weld from deforming, carried out by the boom hoisting 3 of setting The turn of winch head sheave protects integrality of wheel hub during turn, convenient for the subsequent use of wheel hub.
Refering to Fig. 4-a, Fig. 4-b and Fig. 4-c, winch head sheave turn-over method, comprising:
Step 1: for initial placement on head sheave retainer, head sheave main-shaft axis along the vertical direction, will be on the shaft-cup of main shaft one end Bolt unload, shaft-cup and bolt are placed into the place for not interfering construction, used when head sheave to install after turning over;
Step 2: boom hoisting is hung to head sheave retainer upper end using crane, and carries out the connection work of boom hoisting;
Step 3: the end face of cover clamp in boom hoisting and the spindle end face paste of removal shaft-cup are combined together, and used The two is locked jail by retaining mechanism;
Step 4: the first suspension hook head is connected with the hanging ring risen on davit;After the completion of suspension hook head connects work, constructor Member, which enters, cuts off the head sheave retainer part fixed with head sheave in head sheave retainer, separate head sheave with retainer;
Step 5: head sheave is simultaneously slowly sling and disengages it from head sheave retainer by the first suspension hook headband strength, hangs out guarantor to head sheave After holding frame, stay cord button is caught head sheave lower end main shaft portion and locked rear and the second suspension hook head of sling is connected simultaneously band by construction personnel Strength, the cooperation of two cranes lift head sheave to being tilted a certain angle;
Step 6: so that after the first suspension hook head above proposes head sheave to proper height, the laterally slowly movement second of the second suspension hook head Drawstring sling on suspension hook head, until after head sheave main-shaft axis is in a horizontal position, while two cranes make head sheave be erected at ground It is fixed on upper cut-and-dried sleeper;The turn work of head sheave is completed at this time.
When winch head sheave is turned over, hoist lifting hook head is connect with two, main shaft shaft ends, and the active force of suspension hook head is applied to strand On the main shaft of vehicle head sheave, suspension hook head and head sheave hub contacts are avoided, and then is effectively prevented suspension hook active force and makes wheel hub Deformation guarantees the integrality after winch head sheave wheel hub turns over.
The first suspension hook head is connect with 100 tons of cranes.The second suspension hook head is connect with 55 tons of cranes.So that head sheave is turned over When body, run-off the straight.
The drawstring is the ¢ 48mm wirerope of a root long 12m, and wirerope bearing capacity is big, can the big article of suspension hook quality.
Cover clamp 31 in boom hoisting 3 is pulled tight with lock spindle, and is locked with drawstring 4 and the main shaft other end, when lifting, Active force acts on the both ends of main shaft, and wheel hub 1 is with boom hoisting 3 without any without contacting, and when the winch head sheave is turned over, nothing Distance bolt need to be welded between wheel hub 1, prevent weld from deforming, winch day is carried out by the boom hoisting 3 of setting The turn of wheel protects integrality of the wheel hub 1 during turn, convenient for the subsequent use of wheel hub 1.
Embodiment two
The present embodiment two is what is different from the first embodiment is that the boom hoisting 3 further includes elastic component (not shown).The bullet One end of property part is fixed on the hole wall of ring mounting hole.The other end of the elastic component is welded on hanging ring 34.
When crane drives hanging ring 34 to rise by the first suspension hook head, so that the elastic component between hanging ring 34 and davit 33 Elastic deformation occurs under tension, and under its elastic reaction, which has slowly been transmitted to davit 33 and cover clamp 31 On, one end of last pull-up winch head sheave main shaft 2, prevent crane operation person operation it is too quickly, to hanging ring 34 or with the first suspension hook head The wirerope of connection damages, and then winch head sheave is caused to fall off from the first suspension hook head, causes the generation of peril.
Embodiment three
Refering to Fig. 5 and Fig. 6, the retaining mechanism is mounted on one end end face of main shaft 2.The retaining mechanism includes activity The limit assembly of 5 rotation of lock 5 and limitation activity lock.The quantity of the activity lock 5 has axis that are multiple, and surrounding main shaft 2 The heart, and be rotatably connected at the end face edge of main shaft by shaft.The side of activity lock 5 is arranged in the limit assembly.
The limit assembly includes the fixation bumping post 6 that 5 sides of activity lock are arranged in, setting in 5 other sides of activity lock Movable bumping post 7 and spring 71.The fixed bumping post 6 is fixed at the end face edge of main shaft.The activity bumping post 7 passes through bullet Spring 71 is connected on the end of main shaft.
After being bonded cover clamp 31 with spindle end, rotation activity lock 5 simultaneously locks cover clamp 31, prevents cover clamp 31 It is detached from, while 71 promotion activity bumping post 7 of spring rises, prevents 5 rotation of activity lock, promote the convenient degree that boom hoisting 3 dismounts.
It is obvious to a person skilled in the art that invention is not limited to the details of the above exemplary embodiments, Er Qie In the case where without departing substantially from spirit or essential attributes of the invention, the present invention can be realized in other specific forms.Therefore, no matter From the point of view of which point, the present embodiments are to be considered as illustrative and not restrictive, and the scope of the present invention is by appended power Benefit requires rather than above description limits, it is intended that all by what is fallen within the meaning and scope of the equivalent elements of the claims Variation is included within the present invention, and any reference signs in the claims should not be construed as limiting the involved claims.
Embodiment described above only indicates that the embodiment of invention, protection scope of the present invention are not only limited to above-mentioned implementation Example without departing from the inventive concept of the premise, can also make several deformations and change for those skilled in the art Into these belong to the scope of the present invention.

Claims (10)

1. a kind of winch head sheave with boom hoisting, it is characterised in that: including wheel hub, main shaft, to prevent winch head sheave from turning over Body wheel hub impaired boom hoisting and drawstring;The wheel hub is socketed in spindle shaft;The boom hoisting is detachably connected on On the first end end face of main shaft;The drawstring is set on the axle body of main shaft second end;First suspension hook head and the boom hoisting Connection;Second suspension hook head is connect with the drawstring.
2. a kind of winch head sheave with boom hoisting according to claim 1, it is characterised in that: the boom hoisting packet It includes cover clamp, at least two gussets, play davit, hanging ring and the retaining mechanism for being locked to cover clamp on main shaft end face;Institute Retaining mechanism is stated to be arranged between main shaft end face and the plate face of cover clamp;Described davit is welded on the plate face center of cover clamp Place;The shape of the gusset is right-angled trapezium, and right-angle side is fixed in the plate face of cover clamp;The larger bottom edge of the gusset with It rises and has been fixed on the surrounding of davit in radiation centered on davit;Described davit offers hanging for perforation in its width direction Ring mounting hole;The hanging ring passes through ring mounting hole;The hanging ring is connect with the first suspension hook head.
3. a kind of winch head sheave with boom hoisting according to claim 2, it is characterised in that: the retaining mechanism packet The hold-down bolt hole for including clamping screw and being provided on cover clamp;The clamping screw is threadedly engaged with hold-down bolt hole;It is described The threaded hole being threadedly engaged with clamping screw is provided on main shaft end face;The threaded hole and hold-down bolt hole are coaxial.
4. a kind of winch head sheave with boom hoisting according to claim 2, it is characterised in that: the retaining mechanism peace On the end face of main shaft first end;The retaining mechanism includes the limit assembly of activity lock and limitation activity lock rotation; The quantity of the activity lock has axle center that are multiple, and surrounding main shaft, and the end of main shaft first end is rotatably connected on by shaft Face edge;The side of activity lock is arranged in the limit assembly.
5. a kind of winch head sheave with boom hoisting according to claim 4, it is characterised in that: the limit assembly packet Include the movable bumping post and spring that the fixation bumping post of activity lock side is set, the activity lock other side is set;It is described solid Determine bumping post to be fixed at the end face edge of main shaft first end;The activity bumping post is connected to the end face of main shaft first end by spring On.
6. according to a kind of any one of winch head sheave with boom hoisting of claim 2-5, it is characterised in that: described Boom hoisting further includes elastic component;One end of the elastic component is fixed on the hole wall of ring mounting hole;The elastic component it is another One end is welded on hanging ring.
7. a kind of winch head sheave with boom hoisting according to claim 2, it is characterised in that: the main shaft further includes It is connected to the shaft-cup at main shaft both ends.
8. a kind of turn-over method of winch head sheave with boom hoisting according to claim 7, it is characterised in that: packet It includes:
Step 1: initial placement on head sheave retainer, head sheave main-shaft axis along the vertical direction, by the spiral shell on the shaft-cup of main shaft one end Bolt unloads, and shaft-cup and bolt are placed into the place for not interfering construction, uses when head sheave to install after turning over;
Step 2: boom hoisting is hung to head sheave retainer upper end using crane, and carries out the connection work of boom hoisting;
Step 3: the end face of cover clamp in boom hoisting and the spindle end face paste of removal shaft-cup are combined together, and use locking The two is locked jail by mechanism;
Step 4: the first suspension hook head is connected with the hanging ring risen on davit;Suspension hook head connect work after the completion of, construction personnel into Enter to cut off the head sheave retainer part fixed with head sheave in head sheave retainer, separates head sheave with retainer;
Step 5: head sheave is simultaneously slowly sling and disengages it from head sheave retainer by the first suspension hook headband strength, hangs out retainer to head sheave Afterwards, construction personnel by stay cord button catch head sheave lower end main shaft portion by sling it is locked after connected with the second suspension hook head and energetic, The cooperation of two cranes lifts head sheave to being tilted a certain angle;
Step 6: so that after the first suspension hook head above proposes head sheave to proper height, lateral slowly mobile second suspension hook of the second suspension hook head Drawstring sling on head, until after head sheave main-shaft axis is in a horizontal position, while two cranes make head sheave be erected at thing on ground It is fixed on the sleeper first prepared;The turn work of head sheave is completed at this time.
9. a kind of turn-over method of winch head sheave with boom hoisting according to claim 8, it is characterised in that: described First suspension hook head is connect with 100 tons of cranes;The second suspension hook head is connect with 55 tons of cranes.
10. a kind of turn-over method of winch head sheave with boom hoisting according to claim 9, it is characterised in that: institute State the ¢ 48mm wirerope that drawstring is a root long 12m.
CN201910778988.7A 2019-08-22 2019-08-22 A kind of winch head sheave with boom hoisting Pending CN110356965A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910778988.7A CN110356965A (en) 2019-08-22 2019-08-22 A kind of winch head sheave with boom hoisting

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910778988.7A CN110356965A (en) 2019-08-22 2019-08-22 A kind of winch head sheave with boom hoisting

Publications (1)

Publication Number Publication Date
CN110356965A true CN110356965A (en) 2019-10-22

Family

ID=68225079

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910778988.7A Pending CN110356965A (en) 2019-08-22 2019-08-22 A kind of winch head sheave with boom hoisting

Country Status (1)

Country Link
CN (1) CN110356965A (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101254884A (en) * 2008-03-12 2008-09-03 渤海船舶重工有限责任公司 Screw-propeller turning-over device
CN201582039U (en) * 2009-11-13 2010-09-15 天津市天发重型水电设备制造有限公司 Turn-over device of hydraulic generator roller
EP2423147A1 (en) * 2010-08-31 2012-02-29 Demag Cranes & Components GmbH Assembly for rotating a load
CN205998868U (en) * 2016-08-23 2017-03-08 中国航空工业集团公司沈阳发动机设计研究所 A kind of rotor overturns hoisting mechanism
CN207108236U (en) * 2017-06-07 2018-03-16 安徽富乐泰水泵***有限公司 A kind of new pump group boom hoisting
CN207483171U (en) * 2017-09-30 2018-06-12 江苏金通灵流体机械科技股份有限公司 A kind of tooling turned over for turbine rotor with lifting by crane vertically
CN210854998U (en) * 2019-08-22 2020-06-26 淮南矿业(集团)有限责任公司 Winch head sheave with hoisting accessory

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101254884A (en) * 2008-03-12 2008-09-03 渤海船舶重工有限责任公司 Screw-propeller turning-over device
CN201582039U (en) * 2009-11-13 2010-09-15 天津市天发重型水电设备制造有限公司 Turn-over device of hydraulic generator roller
EP2423147A1 (en) * 2010-08-31 2012-02-29 Demag Cranes & Components GmbH Assembly for rotating a load
CN205998868U (en) * 2016-08-23 2017-03-08 中国航空工业集团公司沈阳发动机设计研究所 A kind of rotor overturns hoisting mechanism
CN207108236U (en) * 2017-06-07 2018-03-16 安徽富乐泰水泵***有限公司 A kind of new pump group boom hoisting
CN207483171U (en) * 2017-09-30 2018-06-12 江苏金通灵流体机械科技股份有限公司 A kind of tooling turned over for turbine rotor with lifting by crane vertically
CN210854998U (en) * 2019-08-22 2020-06-26 淮南矿业(集团)有限责任公司 Winch head sheave with hoisting accessory

Similar Documents

Publication Publication Date Title
WO2011142823A2 (en) Detachable ears rope thimble
CN109231023B (en) Method for installing jib system of portal crane
CN201614242U (en) Deck crane hoisting mechanism with emergency luffing function
CN112340590A (en) Steel pipe column swivel hoisting device and steel pipe column swivel hoisting method
CN207566717U (en) A kind of I-shaped floor steel beam lifting structure
CN110356965A (en) A kind of winch head sheave with boom hoisting
CN210854998U (en) Winch head sheave with hoisting accessory
CN211056541U (en) Lorry-mounted crane davit
CN108975181A (en) A kind of method for dismounting of derrick crane
JP2009263020A (en) Weight structure for crane
CN210528252U (en) Novel crane hook structure
CN111173522A (en) Construction method for hoisting and descending air shaft shield machine
JP4703205B2 (en) Structure lifting jig and structure lifting method using the same
CN210001478U (en) Arm frame assembly and crane
CN209275701U (en) A kind of flexible composition system of double leval jib floating type ship unloading machine
CN202657825U (en) Device for lifting guyed tower in integrally assembled mode
JP2006056695A (en) Crane
CN109534187A (en) A kind of hanging method suitable for radial type A-frame on full circle swinging floating-crane ship
CN217780615U (en) Tower machine rises reel position flee and prevents spacing connection structure that became invalid of superelevation
CN201914880U (en) Upper limit structure of crane
CN212609058U (en) Lifting hook assembly with protection function
CN104326375A (en) Four-bar link gantry crane
CN216471903U (en) Lifting protection device for hoisting
CN201729581U (en) Bridge crane hook overhauling fixing apparatus
CN201095564Y (en) Movable pulley component for crane hanging beam

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination