CN201729581U - Bridge crane hook overhauling fixing apparatus - Google Patents

Bridge crane hook overhauling fixing apparatus Download PDF

Info

Publication number
CN201729581U
CN201729581U CN2010202334875U CN201020233487U CN201729581U CN 201729581 U CN201729581 U CN 201729581U CN 2010202334875 U CN2010202334875 U CN 2010202334875U CN 201020233487 U CN201020233487 U CN 201020233487U CN 201729581 U CN201729581 U CN 201729581U
Authority
CN
China
Prior art keywords
overhauling
hook
bridge crane
crane
fixing apparatus
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2010202334875U
Other languages
Chinese (zh)
Inventor
王广伟
李阳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Angang Steel Co Ltd
Original Assignee
Angang Steel Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Angang Steel Co Ltd filed Critical Angang Steel Co Ltd
Priority to CN2010202334875U priority Critical patent/CN201729581U/en
Application granted granted Critical
Publication of CN201729581U publication Critical patent/CN201729581U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Load-Engaging Elements For Cranes (AREA)

Abstract

The utility model relates to special equipment for overhauling crane hooks in the metallurgical bridge crane industry, and in particular to a bridge crane hook overhauling fixing apparatus, which is a cuboid frame structure. Tie bars are disposed on two sides of the frame and fixedly connected with a widened portion at the bottom of the cuboid frame, and a movable hook head fixed locking crossbeam is disposed at the top of the frame. The bridge crane hook overhauling fixing apparatus has the advantages that when used for fixing a hook, the bridge crane hook overhauling fixing apparatus can avoid the shortage that the hook can not be safely and stably located on the ground when a winch is overhauled, and then can further guarantee safety overhauling of crane equipment and increase overhauling quality and work efficiency.

Description

Crane in bridge type suspension hook maintenance fixer
Technical field
The utility model relates to the specialized equipment of metallurgical crane in bridge type industry crane hook maintenance, can be widely used in enterprise's suspension hook maintenance such as Ferrous Metallurgy.
Background technology
In the prior art, crane in bridge type is when the upkeep operation that change steel rope, reel, top sheave group and hoisting system are correlated with, the suspension hook gib head need be put and fall to the ground, but gib head can not independently stand on ground, need look for the fixing object of reference of solution space, usual way is suspension hook to be welded with steel fixed at present, just can change steel cable and other relevant upkeep operation, but there is following shortcoming in this method: limited by the place when 1, overhauling, having stop position to rely on fixture influences other crane operation; 2, gib head is conducted oneself with dignity nearly 2 tons, and external force effect gib head occurs or tilts easily to have an accident during change steel rope; 3, lose time; 4, increase labor strength; 5, waste material.
Summary of the invention
The purpose of this utility model provides a kind of crane in bridge type suspension hook maintenance fixer, adopt this device fixedly suspension hook can avoid gib head when hoisting mechanism overhauls, can not safely, steadily be seated in ground-surface original design defective, thereby can further guarantee crane device security maintenance and improve the quality and the work efficiency of maintenance.
For achieving the above object, the utility model is achieved through the following technical solutions:
Crane in bridge type suspension hook maintenance fixer, this device is the cuboid framed structure, and the framework both sides are provided with lacing wire, and lacing wire is widened the position with the cuboid base of frame and is captiveed joint; Frame roof is provided with removable gib head fixing and locking crossbeam.
Compared with prior art, the beneficial effects of the utility model are:
1) simple in structure, be easy to make, be convenient to operation and maintenance, the suspension hook fixer is not limited by or not the place, can park anywhere and position and carry out the crane upkeep operation;
2) time that can save the weldering gib head during upkeep operation and remove the weldering gib head; Save material, reduce labor strength; Safe and reliable, it is incessantly upright to eliminate gib head, avoids the generation and the economic loss of various device, fatal accident; The real-world operation effect is very good.
Description of drawings
Fig. 1 is a structural representation of the present utility model.
The specific embodiment
See Fig. 1, crane in bridge type suspension hook maintenance fixer, this device is the cuboid framed structure, and framework 1 both sides are provided with lacing wire 3, and lacing wire 3 is widened position 4 with the cuboid base of frame and is captiveed joint; Framework 1 top is provided with removable gib head fixing and locking crossbeam 2.
Concrete method for making is: with long 1500mm of 50mm angle steel weldering, high 1100mm, the framework of wide 700mm, according to geometrical principle and be subjected to force direction to be made into cuboid, there is lacing wire 3 both sides, the bottom is widened, have two angle steel to do gib head fixing and locking crossbeam 2 above, the locked position of crossbeam 2 can move according to the size of gib head, prevents that gib head from tilting and the gib head stabilized conditions, the suspension hook fixer is a mobile device, all is suitable in place, any place.

Claims (1)

1. crane in bridge type suspension hook maintenance fixer is characterized in that, this device is the cuboid framed structure, and the framework both sides are provided with lacing wire, and lacing wire is widened the position with the cuboid base of frame and captiveed joint; Frame roof is provided with removable gib head fixing and locking crossbeam.
CN2010202334875U 2010-06-23 2010-06-23 Bridge crane hook overhauling fixing apparatus Expired - Fee Related CN201729581U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010202334875U CN201729581U (en) 2010-06-23 2010-06-23 Bridge crane hook overhauling fixing apparatus

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010202334875U CN201729581U (en) 2010-06-23 2010-06-23 Bridge crane hook overhauling fixing apparatus

Publications (1)

Publication Number Publication Date
CN201729581U true CN201729581U (en) 2011-02-02

Family

ID=43520737

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010202334875U Expired - Fee Related CN201729581U (en) 2010-06-23 2010-06-23 Bridge crane hook overhauling fixing apparatus

Country Status (1)

Country Link
CN (1) CN201729581U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107098236A (en) * 2016-02-23 2017-08-29 奥的斯电梯公司 Overhauling elevator panel

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107098236A (en) * 2016-02-23 2017-08-29 奥的斯电梯公司 Overhauling elevator panel
US10544009B2 (en) 2016-02-23 2020-01-28 Otis Elevator Company Elevator service panel

Similar Documents

Publication Publication Date Title
CN205932941U (en) A device for handling of precast box girder template
CN103406528B (en) Slab caster bale panoramic tables modularization construction method of installation
CN202594610U (en) I-shaped beam hoisting device for hoisting of pressure steel pipe tiles
CN201729581U (en) Bridge crane hook overhauling fixing apparatus
CN210262742U (en) Large cantilever bent cap template demolishs device
CN101787687B (en) Offshore oil drilling platform sledge block and hoisting technology thereof
CN204096935U (en) Lifting mechanism and use the hoisting crane of this lifting mechanism
CN203330385U (en) Mould-opening hoisting and overturning device for sand-coated casting of steel mould
CN202744961U (en) Hoisting mechanism of anti-falling beam stop block
CN214167159U (en) Hoisting system for installing anti-falling beam stop block in box girder
CN205590168U (en) Overturning lifting device
CN210528252U (en) Novel crane hook structure
CN105317031B (en) A kind of ship lift main equipment room bridge main beam hanging method
CN210214588U (en) Grab bucket bridge crane
CN211646007U (en) Bridge pier hanging surrounding basket construction platform
CN210280657U (en) Molten iron watering device convenient to empty
CN202657825U (en) Device for lifting guyed tower in integrally assembled mode
CN201686458U (en) Movable operating platform used for quickly processing welding seam at end opening of steel box girder
CN209210255U (en) A kind of swivel bearing of continuous casting machine revolving platform more changing device
CN202358811U (en) Hoisting fixture
CN105060124A (en) Intra-frame portal crane system and hoisting use method thereof
CN213622850U (en) Eccentric column turnover device and hoisting structure
CN214879986U (en) Construction platform for deep shaft lining and track installation
CN216471716U (en) 3600 ton hangs row
CN203530863U (en) Liftable operating platform for tensioning of hanging basket

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110202

Termination date: 20130623