CN110344386A - A kind of grid sand-protecting barrier sand-fixation method - Google Patents

A kind of grid sand-protecting barrier sand-fixation method Download PDF

Info

Publication number
CN110344386A
CN110344386A CN201910564955.2A CN201910564955A CN110344386A CN 110344386 A CN110344386 A CN 110344386A CN 201910564955 A CN201910564955 A CN 201910564955A CN 110344386 A CN110344386 A CN 110344386A
Authority
CN
China
Prior art keywords
sand
protecting barrier
centimetres
dead volume
master tape
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910564955.2A
Other languages
Chinese (zh)
Inventor
池树学
岳丽华
刘春海
何会宾
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CHENGDE YUHANGREN ALPINE PLANTS APPLIED TECHNOLOGY Co Ltd
Original Assignee
CHENGDE YUHANGREN ALPINE PLANTS APPLIED TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CHENGDE YUHANGREN ALPINE PLANTS APPLIED TECHNOLOGY Co Ltd filed Critical CHENGDE YUHANGREN ALPINE PLANTS APPLIED TECHNOLOGY Co Ltd
Priority to CN201910564955.2A priority Critical patent/CN110344386A/en
Publication of CN110344386A publication Critical patent/CN110344386A/en
Pending legal-status Critical Current

Links

Classifications

    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01BSOIL WORKING IN AGRICULTURE OR FORESTRY; PARTS, DETAILS, OR ACCESSORIES OF AGRICULTURAL MACHINES OR IMPLEMENTS, IN GENERAL
    • A01B79/00Methods for working soil
    • A01B79/02Methods for working soil combined with other agricultural processing, e.g. fertilising, planting
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D3/00Improving or preserving soil or rock, e.g. preserving permafrost soil

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Soil Sciences (AREA)
  • Structural Engineering (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Environmental & Geological Engineering (AREA)
  • Agronomy & Crop Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Environmental Sciences (AREA)
  • Cultivation Of Plants (AREA)
  • Revetment (AREA)

Abstract

The present invention relates to a kind of grid sand-protecting barrier sand-fixation methods, the following steps are included: master tape dead volume sand-protecting barrier is arranged according to the landform of sandy land, master tape dead volume sand-protecting barrier includes multiple groups master tape basic unit, the dead sand-protecting barrier material of the first row of master tape basic unit is arranged with chaste tree, and the dead volume sand-protecting barrier material of the second row to fifth line is the branch of hazel bavin or poplar or the branch of elm;Subband dead volume sand-protecting barrier is set, and subband dead volume sand-protecting barrier is vertical with master tape dead volume sand-protecting barrier, and material is hazel bavin or branch, and master tape dead volume sand-protecting barrier and subband dead volume sand-protecting barrier constitute multiple grids;Setting master tape living body sand-protecting barrier: master tape Huang willow buries dry, the yellow willow of living body sand-protecting barrier selection;Subband living body sand-protecting barrier is arranged: subband sea-buckthorn is planted seedlings, and living body sand-protecting barrier is sea-buckthorn;Arbor species are transplanted in grid.The present invention once administers sand dune and sand ground, once takes effect, once grow into forest with respect to traditional technology, and less investment is quick.

Description

A kind of grid sand-protecting barrier sand-fixation method
Technical field
The present invention relates to sand control field more particularly to a kind of grid sand-protecting barrier sand-fixation methods.
Background technique
There are three types of citation forms for the movement of the grains of sand in stream: the compacted shifting of suspended, saltation and surface layer is in for dune sand The sand that suspended state is carried measures only account for whole carrying amounts 5% hereinafter, even less than 1%.Therefore, the grains of sand of sand dune movement are constituted Mainly jump and compacted shifting movement, 90% or more the grains of sand do saltation and compacted shifting movement in husky 30 cm height of surface, and 80% It is above that the grains of sand do saltation and compacted shifting movement at 10 centimetres or less.
Sand-protecting barrier is that various forms of obstacles are arranged on Shamian Island using materials such as bavin, grass, branch, clay, cobble, laths Object, controls direction, speed and the structure of wind-driven sediment with this, changes erosion cumuliformis condition, reach wind prevention and sand resistance, change wind action and The purpose of microrelief situation, it is one of major measure of engineering sand control.
Traditional technology only emphasizes engineering control measure, or only emphasizes plant in treating measure.The latticed barrier of this programme fixes the sand new The Comprehensive Management Model that method combines flowing and the engineering measure taken of semi-mobile dune or sand ground and biological control measure, relatively Traditional technology, once administers sand dune and sand ground, once takes effect, once grow into forest, and less investment is quick.
Summary of the invention
It is an object of the present invention in place of solving the above deficiencies in the existing technologies.
To achieve the above object, inventive embodiments provide a kind of grid sand-protecting barrier sand-fixation method, comprising the following steps: step 101, master tape dead volume sand-protecting barrier is arranged according to the landform of sandy land, master tape dead volume sand-protecting barrier includes multiple groups master tape basic unit, wherein Master tape dead volume sand-protecting barrier is arranged along contour in sand dune, and sand ground is vertically arranged master tape dead volume sand-protecting barrier, master tape basic unit along main wind direction The dead sand-protecting barrier material of the first row arranged with chaste tree, the dead volume sand-protecting barrier material of the second row to fifth line is hazel bavin or branch, wherein branch is The branch of poplar or elm, 4 meters of the sand-protecting barrier spacing of the first row to fifth line, in every a line of the second row to fifth line, extremely The spacing distance of body sand-protecting barrier is 5 centimetres, in insertion soil/sand;Step 102, subband dead volume sand-protecting barrier, subband dead volume sand-protecting barrier and master are set Band dead volume sand-protecting barrier is vertical, and 4 meters of spacing, material is hazel bavin or branch, and the spacing distance of dead volume sand-protecting barrier is 5 centimetres between same row, In insertion soil/sand, master tape dead volume sand-protecting barrier and subband dead volume sand-protecting barrier constitute multiple grids;Step 103, master tape living body sand-protecting barrier is set: Master tape Huang willow is buried dry, and living body sand-protecting barrier selects yellow willow, and the distance of master tape living body sand-protecting barrier and master tape dead volume sand-protecting barrier is 30 centimetres;Step 104, subband living body sand-protecting barrier is arranged: subband sea-buckthorn is planted seedlings, and living body sand-protecting barrier is sea-buckthorn, subband living body sand-protecting barrier and subband dead volume sand-protecting barrier Distance is 30 centimetres;Step 105, arbor species are transplanted in grid.
In a kind of possible embodiment, the yellow willow in step 103 selects biennial healthy and strong branch, is cut into 25 centimetres Section is 20 centimetres with the spacing between the yellow willow of a line;Sea-buckthorn in step 104 selects annual level-one sea-buckthorn seedling, between nursery stock Away from being 20 centimetres;Arbor species 8 years raw pinus sylvestris var. mongolica container seedlings of selection in step 105,150 centimetres of height of seedling or more, 2 lis of ground diameter Meter or more, 26 centimetres of nutrition cup diameter, 26 centimetres high, planting point position is in the cornerwise crosspoint of sand-protecting barrier grid.
600 centimetres of chaste tree platoon leader, 60 centimetres wide in step 101 in a kind of possible embodiment, chaste tree row buries the depth of soil Minimum 30 centimetres are spent, ground level is 30 centimetres.
In a kind of possible embodiment, in step 101, the insertion depth of the dead volume sand-protecting barrier of the second row to fifth line is most Small is 30 centimetres, and ground level is 30 centimetres.
In a kind of possible embodiment, in step 102, minimum 30 centimetres of insertion depth, ground level is 30 lis Rice.
In a kind of possible embodiment, in step 103, the cuttage depth of Huang Liu is 20 centimetres, upper 5 centimetres of dew.
In a kind of possible embodiment, in step 104, wall approach is vertically leaned on to transplant nursery stock with pitting.
The present invention once administers sand dune and sand ground, once takes effect, once grow into forest with respect to traditional technology, and less investment takes effect Fastly.
Detailed description of the invention
In order to illustrate the technical solution of the embodiments of the present invention more clearly, required use in being described below to embodiment Attached drawing be briefly described, it should be apparent that, drawings in the following description are only some embodiments of the invention, for this For the those of ordinary skill of field, without creative efforts, it can also be obtained according to these attached drawings others Attached drawing.
Fig. 1 is a kind of latticed sand-protecting barrier schematic diagram provided in an embodiment of the present invention.
Specific embodiment
With reference to the accompanying drawings and examples, technical scheme of the present invention will be described in further detail.
Such as Fig. 1, the embodiment of the present invention provides a kind of grid sand-protecting barrier sand-fixation method, comprising the following steps:
The configuration of dead volume sand-protecting barrier, specifically includes:
101, according to the landform of sandy land, master tape dead volume sand-protecting barrier is set along contour or main wind direction, master tape is dead Body sand-protecting barrier includes multiple groups master tape basic unit.Wherein, the arrow direction in Fig. 1 is main wind direction.
It should be noted that Fig. 1 is the master tape dead volume sand-protecting barrier to be arranged along main wind direction, this is only applicable to sand ground, husky It needs to mound that master tape dead volume sand-protecting barrier is arranged along contour.
The dead sand-protecting barrier material of the first row of master tape basic unit is arranged with chaste tree, and the dead volume sand-protecting barrier material of the second row to fifth line is hazel Bavin or branch, 4 meters of the dead volume sand-protecting barrier spacing of the first row to fifth line, in every a line of the second row to fifth line, dead volume sand-protecting barrier Spacing distance be 5 centimetres, insertion soil/sand in.
In one example, 600 centimetres of the chaste tree platoon leader in step 101,60 centimetres wide, chaste tree row buries the depth minimum 30 of soil Centimetre, ground level is 30 centimetres, wherein chaste tree row mechanical can weave, fixed specification, convenient for construction.
In one example, the second row in step 101 is to minimum 30 lis of insertion depth of dead volume sand-protecting barrier of fifth line Rice, ground level are 30 centimetres.
102, subband dead volume sand-protecting barrier is set, and subband dead volume sand-protecting barrier is vertical with master tape dead volume sand-protecting barrier, and 4 meters of spacing, material is hazel Bavin or branch, the spacing distance of dead volume sand-protecting barrier is 5 centimetres between same row, in insertion soil/sand, master tape sand-protecting barrier and dead volume sand-protecting barrier structure At multiple grids.
In one example, minimum 30 centimetres of the insertion depth in step 102, ground level are 30 centimetres.
On the basis of step 101 and step 102, the above method further includes the configuration of living body sand-protecting barrier:
103, master tape living body sand-protecting barrier is arranged: master tape Huang willow buries dry, the yellow willow of living body sand-protecting barrier selection, the biennial healthy and strong branch of selection Item is cut into 25 centimetres of section, is 20 centimetres with the spacing between the yellow willow of a line, the distance between living body sand-protecting barrier and dead volume sand-protecting barrier It is 30 centimetres.
In one example, the cuttage depth of the yellow willow in step 103 is 20 centimetres, upper 5 centimetres of dew.
104, subband living body sand-protecting barrier is arranged: subband sea-buckthorn is planted seedlings, and living body sand-protecting barrier is sea-buckthorn, selects annual level-one sea-buckthorn Seedling, nursery stock spacing are 20 centimetres, and the distance between living body sand-protecting barrier and dead volume sand-protecting barrier are 30 centimetres.
In one example, in step 104, wall approach is vertically leaned on to transplant nursery stock with pitting, specific practice is: along the ditch held successfully It digs pit, specification is to cheat 6~10 centimetres wide, 20~25 centimetres long, deep 16~25 centimetres (depending on root system length).Plant When, seedling root is against the crater wall of upper vertical, and then earthing is treaded.
On the basis of step 103 and step 104, the above method further include:
Step 105, arbor species are transplanted in grid, select 8 years raw pinus sylvestris var. mongolica container seedlings, 150 centimetres of height of seedling or more, ground 2 centimetres of diameter or more, 26 centimetres of nutrition cup diameter, 26 centimetres high, planting point position is in the cornerwise crosspoint of sand-protecting barrier grid.
Sand-protecting barrier maintenance: after sand-protecting barrier is built up, Yao Jiaqiang is patrolled, and prevents people and animals from destroying.When plant sand block damages, it should repair in time It is multiple.
In Fig. 1,For chaste tree row, ▲ be hazel bavin or branch, ● be Huang Liu, ■ is sea-buckthorn,For pinus sylvestris var. mongolica.
Above specific embodiment has carried out further in detail the purpose of the present invention, technical scheme and beneficial effects Illustrate, it should be understood that the above is only a specific embodiment of the invention, the protection model that is not intended to limit the present invention It encloses, all within the spirits and principles of the present invention, any modification, equivalent substitution, improvement and etc. done should be included in the present invention Protection scope within.

Claims (7)

1. a kind of grid sand-protecting barrier sand-fixation method, which comprises the following steps:
Step 101, master tape dead volume sand-protecting barrier is arranged according to the landform of sandy land, master tape dead volume sand-protecting barrier includes that multiple groups master tape is substantially single Member, wherein master tape dead volume sand-protecting barrier is arranged along contour in sand dune, and sand ground is vertically arranged master tape dead volume sand-protecting barrier, master tape along main wind direction The dead sand-protecting barrier material of the first row of basic unit is arranged with chaste tree, and the dead volume sand-protecting barrier material of the second row to fifth line is hazel bavin or branch, In, branch is the branch of poplar or elm, 4 meters of the sand-protecting barrier spacing of the first row to fifth line, in the every of the second row to fifth line In a line, the spacing distance of dead volume sand-protecting barrier is 5 centimetres, in insertion soil/sand;
Step 102, subband dead volume sand-protecting barrier is set, and subband dead volume sand-protecting barrier is vertical with master tape dead volume sand-protecting barrier, and 4 meters of spacing, material is hazel Bavin or branch, the spacing distance of dead volume sand-protecting barrier is 5 centimetres between same row, and in insertion soil/sand, master tape dead volume sand-protecting barrier and subband are dead Body sand-protecting barrier constitutes multiple grids;
Step 103, master tape living body sand-protecting barrier is arranged: master tape Huang willow buries dry, the yellow willow of living body sand-protecting barrier selection, master tape living body sand-protecting barrier and master tape The distance between dead volume sand-protecting barrier is 30 centimetres;
Step 104, subband living body sand-protecting barrier is arranged: subband sea-buckthorn is planted seedlings, and living body sand-protecting barrier is sea-buckthorn, and subband living body sand-protecting barrier and subband are dead 30 centimetres of the distance between body sand-protecting barrier;
Step 105, arbor species are transplanted in grid.
2. grid sand-protecting barrier sand-fixation method according to claim 1, which is characterized in that the yellow willow in step 103 selects 2 years Raw stalwartness branch, is cut into 25 centimetres of section, is 20 centimetres with the spacing between the yellow willow of a line;
Sea-buckthorn in step 104 selects annual level-one sea-buckthorn seedling, and nursery stock spacing is 20 centimetres;
Arbor species 8 years raw pinus sylvestris var. mongolica container seedlings of selection in step 105,150 centimetres of height of seedling or more, 2 centimetres of ground diameter or more, 26 centimetres of nutrition cup diameter, 26 centimetres high, planting point position is in the cornerwise crosspoint of sand-protecting barrier grid.
3. grid sand-protecting barrier sand-fixation method according to claim 1, which is characterized in that in step 101,600 centimetres of chaste tree platoon leader, 60 centimetres wide, chaste tree row buries minimum 30 centimetres of depth of soil, and ground level is 30 centimetres.
4. grid sand-protecting barrier sand-fixation method according to claim 1, which is characterized in that in step 101, the second row to fifth line Minimum 30 centimetres of insertion depth of dead volume sand-protecting barrier, ground level is 30 centimetres.
5. grid sand-protecting barrier sand-fixation method according to claim 1, which is characterized in that in step 102, insertion depth is minimum 30 centimetres, ground level is 30 centimetres.
6. grid sand-protecting barrier sand-fixation method according to claim 1, which is characterized in that in step 103, the cuttage depth of Huang Liu It is 20 centimetres, upper 5 centimetres of dew.
7. grid sand-protecting barrier sand-fixation method according to claim 1, which is characterized in that in step 104, vertically lean on wall with pitting Method transplants nursery stock.
CN201910564955.2A 2019-06-27 2019-06-27 A kind of grid sand-protecting barrier sand-fixation method Pending CN110344386A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910564955.2A CN110344386A (en) 2019-06-27 2019-06-27 A kind of grid sand-protecting barrier sand-fixation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910564955.2A CN110344386A (en) 2019-06-27 2019-06-27 A kind of grid sand-protecting barrier sand-fixation method

Publications (1)

Publication Number Publication Date
CN110344386A true CN110344386A (en) 2019-10-18

Family

ID=68183318

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910564955.2A Pending CN110344386A (en) 2019-06-27 2019-06-27 A kind of grid sand-protecting barrier sand-fixation method

Country Status (1)

Country Link
CN (1) CN110344386A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111034408A (en) * 2019-12-24 2020-04-21 中国科学院新疆生态与地理研究所 Grassland patch sand land repairing method
CN111937661A (en) * 2020-07-17 2020-11-17 神华国能集团有限公司 Vegetation planting method suitable for arid saline-alkali soil coal mine area
CN112913555A (en) * 2021-01-19 2021-06-08 中国科学院西北生态环境资源研究院 Comprehensive sand control method for gobi desert area

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7674071B2 (en) * 2006-07-11 2010-03-09 Ultratech International, Inc. Method of beach renourishment using sand-entrapping wattles
CN103243700A (en) * 2013-06-01 2013-08-14 王学全 Sand stabilization method for utilizing covering plates to guide formation of plant sand barriers
CN103556618A (en) * 2013-11-25 2014-02-05 甘肃省林业科学研究院 Method for promoting quick ecological restoration of moving dune
CN206599772U (en) * 2017-01-17 2017-10-31 内蒙古自治区林业科学研究院 A kind of cover type biological checkboard

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7674071B2 (en) * 2006-07-11 2010-03-09 Ultratech International, Inc. Method of beach renourishment using sand-entrapping wattles
CN103243700A (en) * 2013-06-01 2013-08-14 王学全 Sand stabilization method for utilizing covering plates to guide formation of plant sand barriers
CN103556618A (en) * 2013-11-25 2014-02-05 甘肃省林业科学研究院 Method for promoting quick ecological restoration of moving dune
CN206599772U (en) * 2017-01-17 2017-10-31 内蒙古自治区林业科学研究院 A kind of cover type biological checkboard

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
姚庆渭: "《实用林业词典》", 31 December 1990, 中国林业出版社 *
桑劲峰: "《工程固沙小班设计》", 《现代农村科技》 *
隋瑞清: "《浅谈工程固沙的办法》", 《现代农村科技》 *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111034408A (en) * 2019-12-24 2020-04-21 中国科学院新疆生态与地理研究所 Grassland patch sand land repairing method
CN111034408B (en) * 2019-12-24 2021-08-13 中国科学院新疆生态与地理研究所 Grassland patch sand land repairing method
CN111937661A (en) * 2020-07-17 2020-11-17 神华国能集团有限公司 Vegetation planting method suitable for arid saline-alkali soil coal mine area
CN112913555A (en) * 2021-01-19 2021-06-08 中国科学院西北生态环境资源研究院 Comprehensive sand control method for gobi desert area
CN112913555B (en) * 2021-01-19 2022-08-02 中国科学院西北生态环境资源研究院 Comprehensive sand control method for gobi desert area

Similar Documents

Publication Publication Date Title
CN105145107B (en) Stable vegetation method of ecological construction for hills type reservoir storage estuarine wetland
CN102511270B (en) Method for planting Cinnamomum camphora in north
Gaudig et al. Sphagnum farming on cut-over bog in NW Germany: Long-term studies on Sphagnum growth.
CN110344386A (en) A kind of grid sand-protecting barrier sand-fixation method
CN105325260B (en) Using naked seedling of Sandy shrubs mulberry in the method for sandy land in the arid area planting by stock and its special nursery stock plant feed unit
CN105075792A (en) Earth-rock mountain region low-interference artificial afforestation and soil preparation method
Mo et al. Water and sediment runoff and soil moisture response to grass cover in sloping citrus land, Southern China.
Holden et al. Irrigation of sugarcane manual
Zhang et al. Advances in research on relationships between soil pore structure and soil microenvironment and organic carbon turnover
Gilman et al. Impact of tree size and container volume at planting, mulch, and irrigation on Acer rubrum L. growth and anchorage
CN109699382A (en) A kind of low cost Subalpine region degeneration forest quickly grows into forest recovery technology
Shan et al. Influence of moisture on the growth and biomass allocation in Haloxylon ammodendron and Tamarix ramosissima seedlings in the shelterbelt along the Tarim Desert Highway, Xinjiang, China
CN204570710U (en) A kind of ecological revetment system
Nord et al. Effects of several factors on saltbush establishment in California
CN107996372B (en) Method for constructing densely-burred tape grass submerged vegetation in moderate subsidence wetland in coal mining subsidence area
CN109479608A (en) It is a kind of with salt reduction improve the soil function locust tree mixed forest build method
CN109644762A (en) A kind of feeding sacsaoul sand-fixation forest low-density planting and establishing method of rain
CN105900791A (en) Semi-arid hilly area low-disturbance soil preparation rainwater harvesting vegetation recovery method
CN110024655A (en) A kind of semifixed husky area low yield forest rebuilding strip tillage method of forestation
CN109661983A (en) A kind of two plant community hight method of land and water with purifying water body function
CN104770197B (en) A kind of sloping upland ramie cultural method
CN104982168B (en) Vegetation configuration method for reducing soil erosion
Yildiz et al. Design and operation analysis of drip irrigation systems used in the irrigation of cherry (Prunus avium L.) orchards in Isparta-Uluborlu region, Turkey.
Guo et al. Fine root distribution pattern of different aged Leucaena leucocephala trees in debris flow source area in Jiangjia Gully, China
Himmelbauer et al. Soil water and turfgrass growth under defined climate and soil conditions

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20191018