CN110130317A - Goaf Treatment Methods are lied prostrate on a kind of freeway tunnel - Google Patents

Goaf Treatment Methods are lied prostrate on a kind of freeway tunnel Download PDF

Info

Publication number
CN110130317A
CN110130317A CN201910377610.6A CN201910377610A CN110130317A CN 110130317 A CN110130317 A CN 110130317A CN 201910377610 A CN201910377610 A CN 201910377610A CN 110130317 A CN110130317 A CN 110130317A
Authority
CN
China
Prior art keywords
goaf
tunnel
volt
freeway
rock stratum
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910377610.6A
Other languages
Chinese (zh)
Inventor
马栋
李建旺
周喻
高永涛
焦冬梅
朱纯慧
冯仕文
王莉
钟月建
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
University of Science and Technology Beijing USTB
China Railway 16th Bureau Group Co Ltd
First Engineering Co Ltd of China Railway 16th Bureau Group Co Ltd
Original Assignee
University of Science and Technology Beijing USTB
China Railway 16th Bureau Group Co Ltd
First Engineering Co Ltd of China Railway 16th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by University of Science and Technology Beijing USTB, China Railway 16th Bureau Group Co Ltd, First Engineering Co Ltd of China Railway 16th Bureau Group Co Ltd filed Critical University of Science and Technology Beijing USTB
Priority to CN201910377610.6A priority Critical patent/CN110130317A/en
Publication of CN110130317A publication Critical patent/CN110130317A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D3/00Improving or preserving soil or rock, e.g. preserving permafrost soil
    • E02D3/12Consolidating by placing solidifying or pore-filling substances in the soil
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F15/00Methods or devices for placing filling-up materials in underground workings

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Structural Engineering (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Agronomy & Crop Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Soil Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

The present invention relates to goaf Treatment Methods are lied prostrate on a kind of freeway tunnel, the implementation process of the Treatment Methods specifically includes that (1) first, the discrimination formula for establishing freeway tunnel and the upper mined out section rock stratum stability critical distance of volt, determines the punishment region and non-punishment region that goaf is lied prostrate on freeway tunnel;(2) region is punished for volt goaf on freeway tunnel, section is disclosed in hole tunnel excavation goaf to be filled using concrete, the non-exposure section in goaf is filled using cement mortar, while while applying wall for grouting between concrete and cement mortar fill area to prevent water cement mortar slip casting generates spillage, running pulp phenomenon;(3) it for the non-punishment region in goaf is lied prostrate on freeway tunnel, can not punish temporarily, but tunnel excavation construction period must observe on goaf table deformation of throwing oneself on the ground, and separately punish when necessary.Meet Treatment Methods when upper volt mined-out area hazard in the process the present invention provides a kind of Optimization of Expressway Tunnel Construction, has many advantages, such as that low in cost, easy to operate, punishment effect is good.

Description

Goaf Treatment Methods are lied prostrate on a kind of freeway tunnel
Technical field
Goaf Treatment Methods are lied prostrate on a kind of freeway tunnel, are related to geotechnical engineering, traffic engineering, mining engineering etc. It punishes in the goaf in field.
Background technique
As economy grows continuously and fast, China just goes into overdrive to carry out infrastructure construction.Wherein, highway tunnel Road is as the important link for linking up city, and urgently engineers and technicians capture many construction difficult problems.Freeway tunnel exists The various unfavorable geological conditions such as goaf, karst, tomography are often met in work progress, often induce Tunnel Landslide, rock burst, The disasters such as prominent mud, gushing water, harmful gases diffusion, not only influence construction speed, and can also jeopardize human life and wealth sometimes Produce safety.Therefore, it is rationally and effectively punished, is had for all kinds of problems encountered during Optimization of Expressway Tunnel Construction Important scientific research meaning and engineering application value.
The mountain ridge that freeway tunnel route selection is passed through, the exploitation that mineral resources are commonly present when previous utilize.And at present at a high speed The goaf problem being commonly encountered when in Highway Tunnel Construction, usually the goaf tunnel Shang Chuan, handle measure are usually Concrete match ratio grouting filling sets up viaduct leap.For goaf problem is worn under freeway tunnel, rarely has report both at home and abroad Road.Therefore, the temporary handle measure of not formed effective economy, it would be highly desirable to establish on a kind of reliable freeway tunnel lie prostrate it is mined out Area's Treatment Methods.
Summary of the invention
It is an object of the invention to establish to lie prostrate goaf Treatment Methods on a kind of freeway tunnel, highway is ensured Tunnel safety construction passes through the mined out region of volt.For this purpose, the present invention provides following technical schemes.
Goaf Treatment Methods are lied prostrate on a kind of freeway tunnel, which is characterized in that main implementation steps include: (1) structure Freeway tunnel and the upper mined out section rock stratum stability Computational Mechanics model of volt are built, is built based on non-linear cusp catastrophe theory Vertical 10 discrimination formula of rock stratum stability critical distance determines the punishment region that goaf is lied prostrate on freeway tunnel and non-punishment Region;(2) region is punished for volt goaf on freeway tunnel, tunnel excavation meets goaf exposure section when hole, adopts Filling 11 is carried out with concrete;When tunnel excavation is constructed to the non-exposure area in goaf, wall for grouting 12 is applied, to prevent subsequent water Spillage, running pulp phenomenon are generated when cement mortar mortar depositing construction;When tunnel excavation is in the non-exposure section in goaf, using cement bonded sand Slurry carries out filling 13.(3) it for the non-punishment region in goaf is lied prostrate on freeway tunnel, can not punish temporarily, but tunnel is opened Table deformation of throwing oneself on the ground must be observed on goaf during excavation construction, separately punished when necessary.
Freeway tunnel and the mined out section rock stratum of upper volt are approximately a rectangular slab by step (1), and when calculating is reduced to One clamped beam, is then based on non-linear cusp catastrophe theory, considers the curved strain energy of rock beam, the increase of potential energy of system and outer Load constructs potential function and carries out relevant calculation to function made by rock beam, obtains freeway tunnel and the upper mined out section rock of volt 10 discrimination formula (formula 1) of layer stability critical distance:
In formula,P=pw+pg-q.Wherein, L is tunnel and upper volt mined out section rock stratum span 9, and E is Rock stratum elasticity modulus, N are horizontal crustal stress 6, and pw is goaf water-filling pressure and pg is rock beam self weight 7, and tunnel roof is to rock stratum Support force is reduced to evenly load q and acts on rock stratum 8.
Substitution Practical Project parameter calculating can obtain freeway tunnel and the upper mined out section rock stratum stability of volt is critical Distance 10.When tunnel and upper volt goaf distance are less than rock stratum stability critical distance 10, it can be determined as that goaf is punished Region;When tunnel and upper volt goaf distance are greater than rock stratum stability critical distance 10, it can be determined as the non-punishment in goaf Region.
Step (2) punishes region for volt goaf on freeway tunnel: when meeting goaf in hole tunnel excavation Section is disclosed, carries out pumping C15 concrete filling 11 in a certain range after excavation;When tunnel excavation is constructed to the non-exposure in goaf Area applies wall for grouting 12 using 89 steel pipe of Φ pumping C20 concrete;When tunnel excavation is in the non-exposure section in goaf, adopting It throws oneself on the ground to do fill orifice within the scope of table on dead zone, grouting filling is carried out to goaf using 89 steel pipe of Φ pumping M5.0 cement mortar Processing 13,14 spacing of fill orifice are 5m × 5m;Concrete 11, the filling of cement mortar 13 and wall for grouting 12 apply, and must reach Barrel construction can be carried out after design strength.
Step (3) is for the volt non-punishment region in goaf on freeway tunnel: can not punish temporarily, but tunnel is opened Table deformation of throwing oneself on the ground must be observed on goaf during excavation construction, separately punished when necessary.
The purposes of the above method is also claimed in the present invention, for geotechnical engineering, traffic engineering, mining engineering field Goaf punishment.
The present invention can make up the deficiency that goaf Treatment Methods are lied prostrate on existing freeway tunnel, have low in cost, behaviour Make the advantages that convenient, punishment effect is good.
Detailed description of the invention
Fig. 1 is the method for the present invention flow chart;
Fig. 2 is the Chongli Yu Dushan end tunnel and upper volt goaf spatial relation graph;
Fig. 3 is tunnel and the upper mined out section rock stratum stability Computational Mechanics model of volt;
Fig. 4 is that punishment sectional view in goaf is lied prostrate in left tunnel line;
Fig. 5 is the tunnel goaf Shang Fu punishment plan view;
Fig. 6 is that goaf discloses section concrete filling punishment (being subordinate to goaf punishment region);
Fig. 7 is that wall for grouting applies and (is subordinate to goaf punishment region);
Fig. 8 is the non-exposure section cement mortar filling punishment in goaf (being subordinate to goaf punishment region);
In figure: 1- slopes;The goaf 2- punishment area;The non-punishment area in the goaf 3-;The left threaded list road 4-;The right threaded list road 5-;6- Horizontal crustal stress N;The goaf 7- water-filling pressure p w and rock beam self weight pg;8- tunnel roof is to rock stratum support force q;The tunnel 9- with Upper volt mined out section rock stratum span L;10- rock stratum stability critical distance h;11-C15 concrete filling;12-C20 concrete stops Starch wall;The filling of 13-M5.0 cement mortar;14- fill orifice.
Specific embodiment
It introduces and lies prostrate goaf Treatment Methods on a kind of freeway tunnel.Prolong the 6th bid section of high highway (Beijing Section) 1 tunnel is set, is the tunnel Yu Dushan.Go to the capital 4 mileage ZK16+346.6~ZK20+965 of line (left line) in tunnel, long 4618.4m, tunnel go out capital line (right line) 5 mileage YK16+342~YK21+022, long 4680m, are two-way four-lane tunnel.Tunnel Road list hole 11.0 × 5.5m of building line is separate tunnel.Tunnel's entrance and exit plane is respectively positioned on curve, and face of indulging is 2.6% Unidirectional slope.Tunnel surveying designs initial stage, it is found that volt has camp gate exhausted area of iron mine hole exposed on the tunnel Yu Dushan Chongli end.Root According to the position distribution at existing hole, elevation distribution situation, tentatively judge that camp gate exhausted area of iron mine will cause proposed tunnel line position Construction and operation security hidden danger, as shown in Figure 2.
Volt goaf on the freeway tunnel is punished using the present invention, the specific steps of which are as follows:
(1) consider tunnel and upper volt mined out section rock stratum span 9, horizontal crustal stress 6, goaf water-filling pressure and rock beam Self weight 7, tunnel roof construct freeway tunnel and the upper mined out section rock stratum stability meter of volt to factors such as rock stratum support forces 8 Mechanical model is calculated, as shown in Figure 3.
(2) it is based on non-linear cusp catastrophe theory, considers the curved strain energy of rock beam, the increase of potential energy of system and outer lotus It carries to function made by rock beam, construct potential function and carries out relevant calculation, obtain freeway tunnel and the upper mined out section rock stratum of volt 10 discrimination formula of stability critical distance, such as shown in (formula 1).Highway tunnel can be obtained by substituting into the calculating of Practical Project parameter Road and the upper mined out section rock stratum stability critical distance 10 of volt.When tunnel faces with upper volt goaf distance less than rock stratum stability When boundary's distance 10, it can be determined as that region is punished in goaf;When tunnel and upper volt goaf distance are critical greater than rock stratum stability When distance 10, it can be determined as the non-punishment region in goaf.
In this project, according to related data, goaf water-filling pressure 7 is pw=1.2MPa, edpth of tunnel 80m, side Pressure coefficient is 1.5, and tunnel roof support force 8 is taken as 0, and elastic modulus E=1GPa, rock beam length 9 takes 30m, by each parameter generation Enter critical safe distance formula, can acquire fast vcehicular tunnel and the upper mined out section rock stratum stability critical distance 10 of volt is 13.5m (note: can be converted by edpth of tunnel and lateral pressure coefficient and acquire horizontal crustal stress 6).13.5m model is lied prostrate i.e. on freeway tunnel Goaf in enclosing need to be punished, and the goaf of 13.5m or more is not required to be punished, as shown in Figure 3,4.
(3) region is punished for volt goaf on freeway tunnel: disclosing when meeting goaf in hole tunnel excavation Section, pumping C15 concrete filling 11 is carried out in a certain range after excavation, as shown in Figure 6.It is strong that concrete filling must reach design Barrel construction can be carried out after degree.
(4) region is punished for volt goaf on freeway tunnel: when tunnel excavation is constructed to the non-exposure in goaf Area applies wall for grouting 12 using 89 steel pipe of Φ pumping C20 concrete, as shown in Figure 7.Wall for grouting must reach design strength rear It can carry out barrel construction.
(8) region is punished for volt goaf on freeway tunnel: being in the non-exposure section in goaf in tunnel excavation When, fill orifice 14 is done within the scope of table of throwing oneself on the ground on goaf, and goaf is carried out using 89 steel pipe of Φ pumping M5.0 cement mortar Grouting filling processing 13,14 spacing of fill orifice are 5m × 5m;, as shown in Figure 8.After cement mortar filling must reach design strength It can carry out barrel construction.
(9) for the volt non-punishment region in goaf on freeway tunnel: can not punish temporarily, but tunnel excavation is applied Table deformation of throwing oneself on the ground must be observed on goaf between duration, separately punished when necessary.Table arrangement of throwing oneself on the ground on this region goaf 5m × 5m Concrete pier monitoring point periodically carries out earth's surface monitoring using total station daily.
Although above-mentioned be described specific implementation process of the invention in conjunction with attached drawing, not the present invention is protected The limitation of range.It should regard example as exemplary, and be non-limiting, the scope of the present invention has appended right to want Ask rather than above description limit.

Claims (5)

1. lying prostrate goaf Treatment Methods on a kind of freeway tunnel, which is characterized in that main implementation steps are as follows:
(1) building freeway tunnel and the upper mined out section rock stratum stability Computational Mechanics model of volt, it is prominent based on non-linear cusp Become theory and establish rock stratum stability critical distance (10) discrimination formula, determines the punishment region for lying prostrate goaf on freeway tunnel With non-punishment region;
(2) region is punished for volt goaf on freeway tunnel, tunnel excavation meets goaf exposure section when hole, uses Concrete is filled (11);When tunnel excavation is constructed to the non-exposure area in goaf, wall for grouting (12) are applied;At tunnel excavation When the non-exposure section in goaf, (13) are filled using cement mortar;
(3) it is not punished for the volt non-punishment region in goaf on freeway tunnel.
2. lying prostrate goaf Treatment Methods on a kind of freeway tunnel according to claim 1, which is characterized in that further include Following steps, table deformation of throwing oneself on the ground on tunnel excavation construction period observation goaf, as thrown oneself on the ground on occurring, table deformation is punished.
3. lying prostrate goaf Treatment Methods on a kind of freeway tunnel according to claim 1, which is characterized in that high speed is public Road tunnel and upper mined out section rock stratum stability critical distance (10) discrimination formula of volt are as follows:
In formula,P=pw+pg-q;Wherein, L is tunnel and upper volt mined out section rock stratum span (9), and E is rock stratum Elasticity modulus, N are horizontal crustal stress (6), and pw is goaf water-filling pressure and pg is rock beam self weight (7), and tunnel roof is to rock stratum Support force is reduced to evenly load q and acts on rock stratum (8);
Freeway tunnel and the upper mined out section rock stratum stability critical distance of volt can be obtained by substituting into the calculating of Practical Project parameter (10);When tunnel and upper volt goaf distance are less than rock stratum stability critical distance (10), it can be determined as that goaf is punished Region;When tunnel and upper volt goaf distance are greater than rock stratum stability critical distance (10), it can be determined as the non-place in goaf Control region.
4. lying prostrate goaf Treatment Methods on a kind of freeway tunnel according to claim 1-3, feature exists In for volt goaf punishment region on freeway tunnel:
(1) it when meeting goaf exposure section in hole tunnel excavation, carries out pumping C15 concrete filling in a certain range after excavation (11);
(2) when tunnel excavation is constructed to the non-exposure area in goaf, wall for grouting is applied using 89 steel pipe of Φ pumping C20 concrete (12);
(3) it when tunnel excavation is in the non-exposure section in goaf, throws oneself on the ground to do fill orifice within the scope of table on goaf, using Φ 89 Steel pipe pumps M5.0 cement mortar (13) and carries out grouting filling processing to goaf, and fill orifice (14) spacing is 5m × 5m;
(4) concrete (11), cement mortar (13) filling and wall for grouting (12) apply, and can carry out after must reaching design strength Barrel construction.
5. lying prostrate the purposes of goaf Treatment Methods, feature on a kind of described in any item freeway tunnels of claim 1-4 It is, the goaf for geotechnical engineering, traffic engineering, mining engineering field is punished.
CN201910377610.6A 2019-05-07 2019-05-07 Goaf Treatment Methods are lied prostrate on a kind of freeway tunnel Pending CN110130317A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910377610.6A CN110130317A (en) 2019-05-07 2019-05-07 Goaf Treatment Methods are lied prostrate on a kind of freeway tunnel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910377610.6A CN110130317A (en) 2019-05-07 2019-05-07 Goaf Treatment Methods are lied prostrate on a kind of freeway tunnel

Publications (1)

Publication Number Publication Date
CN110130317A true CN110130317A (en) 2019-08-16

Family

ID=67576639

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910377610.6A Pending CN110130317A (en) 2019-05-07 2019-05-07 Goaf Treatment Methods are lied prostrate on a kind of freeway tunnel

Country Status (1)

Country Link
CN (1) CN110130317A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117077244A (en) * 2023-07-03 2023-11-17 中国地质大学(北京) Method and device for optimizing tunnel structure of bending zone penetrating through mining subsidence area

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102418513A (en) * 2011-08-19 2012-04-18 山西省交通规划勘察设计院 Method for detecting treatment effect of road goaf
RU2495245C1 (en) * 2012-05-05 2013-10-10 Федеральное государственное бюджетное учреждение науки ИНСТИТУТ ПРОБЛЕМ КОМПЛЕКСНОГО ОСВОЕНИЯ НЕДР РОССИЙСКОЙ АКАДЕМИИ НАУК (ИПКОН РАН) Method for development of ore deposits
CN103498697A (en) * 2013-10-18 2014-01-08 中铁二十四局集团安徽工程有限公司 Filling and construction method for goaf below tunnel
CN105089043A (en) * 2015-07-24 2015-11-25 北京科技大学 Spatial isolation type runway pavement underlying goaf treatment method
CN105715296A (en) * 2016-01-25 2016-06-29 赵立财 Blowing sand backfill and grouting construction method of tunnel crossing coal mine goaf
CN109538216A (en) * 2018-12-21 2019-03-29 中铁二十五局集团第五工程有限公司 Pass through mined out and subsidence area constructing tunnel technique

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102418513A (en) * 2011-08-19 2012-04-18 山西省交通规划勘察设计院 Method for detecting treatment effect of road goaf
RU2495245C1 (en) * 2012-05-05 2013-10-10 Федеральное государственное бюджетное учреждение науки ИНСТИТУТ ПРОБЛЕМ КОМПЛЕКСНОГО ОСВОЕНИЯ НЕДР РОССИЙСКОЙ АКАДЕМИИ НАУК (ИПКОН РАН) Method for development of ore deposits
CN103498697A (en) * 2013-10-18 2014-01-08 中铁二十四局集团安徽工程有限公司 Filling and construction method for goaf below tunnel
CN105089043A (en) * 2015-07-24 2015-11-25 北京科技大学 Spatial isolation type runway pavement underlying goaf treatment method
CN105715296A (en) * 2016-01-25 2016-06-29 赵立财 Blowing sand backfill and grouting construction method of tunnel crossing coal mine goaf
CN109538216A (en) * 2018-12-21 2019-03-29 中铁二十五局集团第五工程有限公司 Pass through mined out and subsidence area constructing tunnel technique

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
孙洪硕: "《穿越既有采空区隧道施工控制技术》", 《中国优秀硕士学位论文全文数据库 工程科技Ⅱ辑》 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117077244A (en) * 2023-07-03 2023-11-17 中国地质大学(北京) Method and device for optimizing tunnel structure of bending zone penetrating through mining subsidence area
CN117077244B (en) * 2023-07-03 2024-05-10 中国地质大学(北京) Method and device for optimizing tunnel structure of bending zone penetrating through mining subsidence area

Similar Documents

Publication Publication Date Title
Yu et al. Field investigations of high stress soft surrounding rocks and deformation control
CN107130613B (en) Large span tunnel is just wearing the retaining structure and its construction method of existing barricade
Chen et al. Recent advances in high slope reinforcement in China: Case studies
CN111058855A (en) Deformation control method and evaluation system for shield underpassing structure
CN110617067B (en) Low-risk construction method for full-section boundary advanced pipe shed of extremely-soft surrounding rock tunnel
CN209924998U (en) Shallow earthing shield tunnel is worn road reinforcement protection architecture down
CN103362513A (en) Transformation and construction method for existing cavity in underground excavation region
CN107201913A (en) A kind of fine vibration-reducing blasting construction method of cross-over tunnel
CN107965325A (en) Just branch bow member replaces construction method to a kind of small interval shallow tunnel
CN108561139A (en) A kind of horizontal reinforcement concrete steel pile pile pre support method
CN110362932A (en) Shallow-depth-excavation tunnel pipe curtain structure computation model under a kind of complicated environmental condition
CN109706945A (en) Come down fracture belt tunnel construction method
CN100513705C (en) Underground Beam-Pile Frame Structure for Slope Reinforcement
CN106096162A (en) A kind of method determining shield support pressure and mathematical model thereof and construction method
CN105804097A (en) Cantilever structure way for treating landslides in cooperation with h-shaped anti-sliding piles and construction method of cantilever structure way
CN107448204A (en) Closely wear construction method of deep foundation ditch down in sandy gravel accumulation horizon shallow burial hidden digging tunnel
CN114893233A (en) Coupling cooperative control method for deep tunnel bolting-grouting support system
CN107339109A (en) The construction method of existing road is worn under super Shallow tunnel with large cross-section
CN114278313A (en) Supporting system based on interval different excavation construction method conversion and construction method
CN110130317A (en) Goaf Treatment Methods are lied prostrate on a kind of freeway tunnel
CN103615012B (en) Steel construction self-drilling hollow anchor bars reinforces the most wired gear safeguard structure
Wittke et al. Upgrading the stability of three masonry dams in different ways
CN203891047U (en) Equipment equipped with steel platform for foundation construction of land bridge
CN206917657U (en) A kind of shallow buried covered excavation benching tunnelling method constructing structure
CN115952578A (en) Method for analyzing deformation influence of existing railway passing through sand-gravel stratum tunnel

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190816