CN109538216A - Pass through mined out and subsidence area constructing tunnel technique - Google Patents

Pass through mined out and subsidence area constructing tunnel technique Download PDF

Info

Publication number
CN109538216A
CN109538216A CN201811574889.9A CN201811574889A CN109538216A CN 109538216 A CN109538216 A CN 109538216A CN 201811574889 A CN201811574889 A CN 201811574889A CN 109538216 A CN109538216 A CN 109538216A
Authority
CN
China
Prior art keywords
grouting
steel
hole
cement
slip casting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811574889.9A
Other languages
Chinese (zh)
Other versions
CN109538216B (en
Inventor
朱连臣
王有旗
刘普前
辛柱桥
李苗
宋昱宇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 25th Bureau Group Co Ltd
Fifth Engineering Co Ltd of China Railway 25th Bureau Group Co Ltd
Original Assignee
China Railway 25th Bureau Group Co Ltd
Fifth Engineering Co Ltd of China Railway 25th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 25th Bureau Group Co Ltd, Fifth Engineering Co Ltd of China Railway 25th Bureau Group Co Ltd filed Critical China Railway 25th Bureau Group Co Ltd
Priority to CN201811574889.9A priority Critical patent/CN109538216B/en
Publication of CN109538216A publication Critical patent/CN109538216A/en
Application granted granted Critical
Publication of CN109538216B publication Critical patent/CN109538216B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/001Improving soil or rock, e.g. by freezing; Injections
    • E21D9/002Injection methods characterised by the chemical composition used
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/14Lining predominantly with metal
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/14Lining predominantly with metal
    • E21D11/18Arch members ; Network made of arch members ; Ring elements; Polygon elements; Polygon elements inside arches
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/006Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries by making use of blasting methods
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/12Devices for removing or hauling away excavated material or spoil; Working or loading platforms

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Geology (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Structural Engineering (AREA)
  • Architecture (AREA)
  • Environmental & Geological Engineering (AREA)
  • Civil Engineering (AREA)
  • Chemical & Material Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • General Chemical & Material Sciences (AREA)
  • Soil Sciences (AREA)
  • Lining And Supports For Tunnels (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

Mined out and subsidence area constructing tunnel technique is passed through the invention discloses a kind of, it is related to the technical field of constructing tunnel, solve the problems, such as that the construction of existing mined out and subsidence area is easy to appear collapsing danger, its key points of the technical solution are that the following steps are included: (one) goaf and subsidence area injecting treatment: a. fixed point;B. drilling;C. orifice closing device is buried;D. grouting construction;(2) three benching tunnelling methods excavate: a. explosion;B. it slags tap;C. preliminary bracing;D. advance support;(3) circulate operation;Cement-flying ash mortar forms entirety with the rock mass on periphery after hardening, so that the stabilization that rock mass becomes, is not easy the danger for occurring collapsing during carrying out tunnel excavation construction.

Description

Pass through mined out and subsidence area constructing tunnel technique
Technical field
The present invention relates to the technical fields of constructing tunnel, more specifically, it be related to it is a kind of pass through it is mined out and subsidence area Constructing tunnel technique.
Background technique
Tunnel often faces the prominent mud of gushing water, face collapses when passing through goaf and subsidence area is constructed Risk, the construction to tunnel brings very big difficulty of construction in this way, and the stratum of goaf and subsidence area is relatively soft, is in Unstable state passes through the tunnel of goaf and subsidence area though being easy to appear the danger collapsed greatly after tunnel excavation disturbance Construction is a great problem in present constructing tunnel.
Engineering is when passing through goaf and subsidence area constructing tunnel at this stage, using first grout injection, then carries out again The method of constructing tunnel, cement slurry have that slurries calculus rate is low, water resistant bad dispersibility, carry out constructing tunnel in the later period Can in, be still easy the disturbance because of tunnel excavation, occur collapsing dangerous, need a kind of passing through goaf and collapsing now Area is fallen into carry out being not easy dangerous constructing tunnel technique of collapsing occur when constructing tunnel.
Summary of the invention
In view of the deficiencies of the prior art, the present invention intends to provide a kind of to pass through mined out and subsidence area tunnel Construction technology, by using cement-flying ash mortar, cement-flying ash mortar forms entirety with the rock mass on periphery after hardening, So that the stabilization that rock mass becomes, is not easy the danger for occurring collapsing during carrying out tunnel excavation construction.
To achieve the above object, the present invention provides the following technical scheme that a kind of pass through mined out and subsidence area tunnel and apply Work technique, it is characterised in that: the following steps are included:
(1) goaf and subsidence area injecting treatment:
A. it pinpoints: needing to pinpoint injected hole before drilling, field survey is carried out using total station when fixed point and is put Sample, the deviations of actual position of drilling should not be more than 0.5m;
B. suitable drill bit and brill drilling: are selected according to the drilling depth and diameter of injected hole and inspection hole before probing Machine first uses the drill bit aperture of major diameter to designated depth, then the tripping in wellhead casing pipe in hole, in the outside and hole of wellhead casing pipe It is tamped between wall with clay, the drill bit for then using minor diameter instead continues drilling to projected depth;
C. it buries orifice closing device: after drilling terminates and carries out abundant hole flushing, burying orifice closing device, locking device For the aperture Grouting Pipe with flange pallet;The water mortar that water-solid ratio is 1:1.5~1:2.0 is injected into hole, slurries are in hole Height be 4~6m, 2% accelerator of cement weight is added in cement grout, then extracts orifice sleeve;
D. grouting construction: injection slurry is made of using cement and flying ash grout water, cement, flyash, accelerator and sand;Slip casting concentration First dilute rear thick, when slip casting, slip casting pump pressure should be greater than 1.5 times of slip casting maximum design pressure, after slip casting starts, time sight pump Midge amount and pump pressure, when pump pressure gradually rises, grouting amount is less than 70L/min, and aperture pipe pressure is between 1.O~3.0Mpa, surely When having grout phenomenon around fixed 10~15min or injected hole, the mortar depositing construction in the hole can be terminated;
(2) three benching tunnelling methods excavate: three steps are divided into upper, middle and lower three-level, the high 3m of top bar, and middle step is top bar to spring line Above section, rest part are to get out of a predicament or an embarrassing situation, the wide 5m of every grade of step, and left and right sides mutually staggers 2m;Three benching tunnelling methods excavation include with Lower step:
A. explosion: first snubber after snubber terminates, fills explosive in slotted eyes, carries out explosion;
B. it slags tap: the various body refuses and rubble that generate in blasting process is transported on the outside of tunnel;
C. preliminary bracing preliminary bracing: is carried out to country rock;Support joint answers firm welding, and every steel arch-shelf face is connected with reinforcing bar; Steel arch-shelf should be set up by design position, and arch springing must necessarily be placed in firm foundations;Steel arch-shelf should perpendicular to tunnel middle line, it is upper and lower, Left and right tolerance 5cm, and vertical gradient is not greater than 2 °, and arch springing height should be lower than 15~20cm of upper half section baseline; The gap in steel arch-shelf and first pneumatically placed concrete face must be filled closely knit with gunite concrete;When gap is excessive, with steel form or it can mix Solidifying soil wedge block is held out against, and is counted unilateral inaccurate less than 8;Gunite concrete should symmetrically be sprayed upwards by two sides arch springing, and by steel Arch covering;Plasticity failure by shear easily occurs for arch springing position, and the position steelframe is in addition to bolt, it is necessary to the weldering of four sides side, to ensure The stiffness and strength of connector;The depth of section of steelframe should be adapted with gunite concrete thickness;For the monolithic stability for enhancing steelframe Steelframe with longitudinally connected muscle, structural anchor bar, positioning is that muscle and lock foot anchoring stock are connected firmly by property;Because lock foot anchoring stock is in control work Word steel sedimentation aspect, plays decisive role, so having laid lock foot anchoring stock at upper, middle and lower step arch springing, locks foot anchor Bar squeezes into angle and country rock is at 45 ° is advisable, and with I-steel firm welding;In shear-zone or country rock opposed breaker, preliminary bracing The relatively large paragraph of convergent deformation is locked foot at upper, middle and lower step arch springing and is reinforced using 42 slip casting ductule of φ;It is small to lead Pipe range 4m, 2, every place, it is at 45 ° with country rock that lock foot conduit squeezes into angle, and with I-steel firm welding;
D. advance support: for the excavation safety for guaranteeing face, advance support uses diameter for the hot rolling seamless steel of 42 × 4 ㎜ of φ Pipe, front end be it is cone-shaped, tube wall surrounding bore 8 ㎜ mud jacking holes, pitch of holes 15cm, tail portion 1.2m do not set mud jacking hole, longitudinally adjacent Two rows of floor projection laps of splice is not less than 100cm, and outer limb is 15 °;Then ductule installation is carried out, ductule, which is installed, to be adopted Method is squeezed into drilling, i.e., is first drilled by design requirement, bore diameter is 3~5mm bigger than diameter of steel tube, and ductule is then passed through steel Frame is headed into hammering or drilling machine, heads into length is not less than length of steel pipe 90%, and blown out the sandstone in steel pipe with high-pressure blast; After ductule is installed, with mudding plug-hole mouth and surrounding crack, when necessary near ductule and working face gunite concrete, to prevent Heavy roof fall;The excavation length in tunnel should be less than the slip casting length of ductule, wall for grouting of the reserved part as subsequent cycle; The cement grout that the selection of grouting ratio of mud when slip casting is 1:1, in order to obtain good consolidation effect, it is necessary to inject enough slurries Liquid measure, it is ensured that valid diffusion area, range of grouting is designed by the outer 0.3~0.5m of excavation contour line and slurries are uniform in the earth formation Diffusion, the stop grouting plug that grouting pressure control uses during 0.5~1Mpa, slip casting when slip casting is 5~10cm thickness injection coagulation Soil;
(3) circulate operation: circulation carry out explosion, slag tap, preliminary bracing and advance support are until constructing tunnel is completed.
By using above-mentioned technical proposal, grouting operation is carried out using cement-flying ash mortar, and grouting pressure uses 1.5 times of slip casting maximum design pressure, enable cement-flying ash mortar to be adequately diffused into the rock mass of surrounding, and Crowd in-out effects can be generated to rock mass by the continuous increase of cement-flying ash mortar volume in lasting pressure process, And make the contact between cement-flying ash mortar and rock mass even closer so that the cement-flying ash mortar after solidifying with The rock mass on periphery forms an entirety, plays the role of reinforcing and support, so that working as in the subsequent process for carrying out tunnel excavation In, it is not easy to there is the risk collapsed.
The present invention is further arranged to: the step C, when burying orifice closing device, after mounting hole Grouting Pipe, It is put into a small amount of sandstone in hole for blocking biggish gap, then thoroughly blocks in gap being put into a small amount of clay.
By using above-mentioned technical proposal, by aperture locking device, and it is using sandstone and clay that gap is clogging, So that in the process for carrying out cement-flying ash mortar perfusion, it can be preferably to the cement-flying ash mortar in fill orifice Pressure is controlled, so that cement-flying ash mortar is more easier in the rock mass for being diffused into surrounding under the effect of the pressure.
The present invention is further arranged to: the step d, and when carrying out grouting construction, the water-solid ratio of injection slurry is according to 1:1.0 ~1:1.5 is prepared, and the ratio control of cement, flyash and sand adds the speed of cement weight 2% in 3:7:2 in slurries Solidifying agent.
By using above-mentioned technical proposal, cement-flying ash mortar can speed up by addition accelerator and be filled into injected hole In after can be solidified within the shorter time.
The present invention is further arranged to: the step d, and when carrying out grouting construction, injecting paste material selection is the need to ensure that water Be it is clean, do not contain harmful substance, cement use ordinary portland cement, portland slag cement, accelerator select water glass Glass, flyash should meet (GB/T1596-2005) III grade of flyash requirement, sand " for the flyash in cement and concrete soil " Answer it is clean, hard, dry, without weathering, free from admixture, meet specified grading, soil sundries content should be less than 5%.
By using above-mentioned technical proposal, by selecting suitable cement and accelerator, and to flyash, water and sandstone Quality carry out stringent control, can preferably improve cement-flying ash mortar solidification after fixed effect so that subsequent It carries out more being not easy the danger for occurring collapsing in the process of tunnel excavation.
The present invention is further arranged to: the step d, when carrying out grouting construction, when groundwater increment is more than drilling design slip casting Amount, when pressure is not played in aperture still, can be used intermittent grouting process;Intermittent time controls in 10~12h or so;It is infused after interval Slurry, still using the grouting with plunger of first dilute rear thick;Secondary grouting is controlled 25% or so of design flow, if not playing pressure still, again Interval slip casting is carried out, until reaching satisfactory stopping slip casting standard.
It can be more than that drilling is related to the perfusion of grouting amount to groundwater increment by interval slip casting by using above-mentioned technical proposal Good perfusion effect is played in hole, so that cement-flying ash mortar can also exist with the good combination in rock stratum around the injected hole Together.
The present invention is further arranged to: the step a, carry out explosion when, by the way of compound straight eye V-cut come Snubber, that is, the mode that shallow slotting and deep slotting be combined with each other;Periphery hole is also classified into two-stage, level-one periphery hole on the outside, Depth is the half of second level periphery hole, while reducing outer insert eye.
By using above-mentioned technical proposal, the mode by using compound straight eye V-cut is carried out snubber, can either be subtracted The usage amount of few explosive, additionally it is possible to be more easier the distance of control driving.
The present invention is further arranged to: the step c, carry out preliminary bracing when, the I-steel used for 20A I-steel, The production of every Pin spacing 60cm arrangement steel arch-shelf presses standardized processing using cold bending process, and size should meet design requirement.
By using above-mentioned technical proposal, the intensity of 20A I-steel is higher, can reach better supporting effect.
The present invention is further arranged to: the step c, when carrying out preliminary bracing, when arch absolute altitude deficiency, not handy soil, Stone backfill, and steel plate should be set and be adjusted, concrete strengthening substrate can be used when necessary.
By using above-mentioned technical proposal, substrate is reinforced and is adjusted by setting steel plate and concrete, it can The stability for guaranteeing arch, guarantees the supporting effect of arch.
In conclusion the present invention has the advantages that compared with the prior art
1, the present invention uses 1.5 times of slip casting maximum design pressure by using cement-flying ash mortar and grouting pressure, makes Obtaining cement-flying ash mortar can adequately be diffused into the rock mass of surrounding, and can lead in lasting pressure process It crosses the continuous increase of cement-flying ash mortar volume and crowd in-out effects is generated to rock mass, and make cement-flying ash mortar and rock Contact between body is even closer, so that the rock mass of the cement-flying ash mortar and periphery after solidifying forms an entirety, rises The effect reinforced and supported is arrived, so that in the subsequent process for carrying out tunnel excavation, it is not easy to the risk collapsed occur;
2, the present invention carrys out snubber by using the mode of compound straight eye V-cut, can either reduce the usage amount of explosive, also It can be more easier the distance of control driving.
Specific embodiment
Embodiment: a kind of to pass through mined out and subsidence area constructing tunnel technique, comprising the following steps:
(1) goaf and subsidence area injecting treatment:
A. it pinpoints: needing to pinpoint injected hole before drilling, field survey is carried out using total station when fixed point and is put Sample, the deviations of actual position of drilling should not be more than 0.5m;
B. suitable drill bit and brill drilling: are selected according to the drilling depth and diameter of injected hole and inspection hole before probing Machine first uses the drill bit aperture of major diameter to designated depth, then the tripping in wellhead casing pipe in hole, in the outside and hole of wellhead casing pipe It is tamped between wall with clay, the drill bit for then using minor diameter instead continues drilling to projected depth;
C. it buries orifice closing device: after drilling terminates and carries out abundant hole flushing, burying orifice closing device, locking device For the aperture Grouting Pipe with flange pallet, it is put into a small amount of sandstone in hole for blocking biggish gap, is then being put into less Amount clay thoroughly blocks in gap;The water mortar that water-solid ratio is 1:1.5~1:2.0, height of the slurries in hole are injected into hole Degree is 4~6m, and 2% accelerator of cement weight is added in cement grout, then extracts orifice sleeve;
D. grouting construction: injection slurry is made of using cement and flying ash grout water, cement, flyash, accelerator and sand, and wherein water is solid Than to be prepared according to 1:1.0~1:1.5, the ratio of cement, flyash and sand is controlled in 3:7:2, added in slurries The accelerator of cement weight 2%, accelerator select waterglass;Injecting paste material selection be the need to ensure that water be it is clean, without containing having Evil substance, cement use ordinary portland cement, portland slag cement, and flyash should meet " for cement and concrete soil In flyash " requirement of (GB/T1596-2005) III grade of flyash, sand answer it is clean, hard, dry, without weathering, free from admixture, accord with Specified grading is closed, soil sundries content should be less than 5%;The first dilute rear thick of slip casting concentration, when slip casting, slip casting pump pressure should be greater than infusing 1.5 times of maximum design pressure of slurry, after slip casting starts, the midge amount and pump pressure of time sight pump, when pump pressure gradually rises, grouting amount Less than 70L/min, for aperture pipe pressure between 1.O~3.0Mpa, stablizing has grout phenomenon around 10~15min or injected hole When, the mortar depositing construction in the hole can be terminated;When groundwater increment is more than that drilling design grouting amount can be used when pressure is not played in aperture still Intermittent grouting process;Intermittent time controls in 10~12h or so;Interval grouting behind shaft or drift lining, still using the grouting with plunger of first dilute rear thick; Secondary grouting is controlled 25% or so of design flow, if not playing pressure still, is carried out interval slip casting again, is conformed to until reaching Until the stopping slip casting standard asked;
(2) three benching tunnelling methods excavate: three steps are divided into upper, middle and lower three-level, the high 3m of top bar, and middle step is top bar to spring line Above section, rest part are to get out of a predicament or an embarrassing situation, the wide 5m of every grade of step, and left and right sides mutually staggers 2m;Three benching tunnelling methods excavation include with Lower step:
A. explosion: when snubber by the way of compound straight eye V-cut, that is, shallow slotting and deep slotting be combined with each other Mode;Periphery hole is also classified into two-stage, and on the outside, depth is the half of second level periphery hole to level-one periphery hole, while reducing outer insert eye, It can reduce to the greatest extent and backbreak;After snubber terminates, explosive is filled in slotted eyes, carries out explosion;
B. it slags tap: the various body refuses and rubble that generate in blasting process is transported on the outside of tunnel;
C. preliminary bracing: preliminary bracing is carried out to country rock, the I-steel that when preliminary bracing uses is 20A I-steel, every Pin spacing 60cm arranges that the production of steel arch-shelf presses standardized processing using cold bending process, and size should meet design requirement;Support joint should weld Securely, every steel arch-shelf face is connected with reinforcing bar;Steel arch-shelf should be set up by design position, and arch springing must necessarily be placed in firm foundations; Steel arch-shelf should be perpendicular to tunnel middle line, upper and lower, left and right tolerance 5cm, and vertical gradient is not greater than 2 °, arch mark When high insufficient, not handy soil, stone backfill, and steel plate should be set and be adjusted, concrete strengthening substrate can be used when necessary, and arch springing is high Degree should be lower than 15~20cm of upper half section baseline;The gap in steel arch-shelf and first pneumatically placed concrete face must be filled close with gunite concrete It is real;It when gap is excessive, can be held out against, be counted unilateral inaccurate less than 8 with steel form or concrete voussoir;Gunite concrete should be by Two sides arch springing symmetrically sprays upwards, and steel arch-shelf is covered;Plasticity failure by shear easily occurs for arch springing position, which removes bolt It connects outer, it is necessary to the weldering of four sides side, to ensure the stiffness and strength of connector;The depth of section of steelframe should be with gunite concrete thickness phase It adapts to;It is that muscle and lock foot anchoring stock connect by steelframe and longitudinally connected muscle, structural anchor bar, positioning for the overall stability for enhancing steelframe It connects securely;Because lock foot anchoring stock is in terms of controlling I-steel sedimentation, decisive role is played, so in upper, middle and lower step arch springing Place, has laid lock foot anchoring stock, and lock foot anchoring stock squeezes into angle and country rock is at 45 ° is advisable, and with I-steel firm welding;In tomography Band or country rock opposed breaker, the relatively large paragraph of preliminary bracing convergent deformation lock foot at upper, middle and lower step arch springing and use φ 42 slip casting ductules are reinforced;The long 4m of ductule, 2, every place, it is at 45 ° with country rock that lock foot conduit squeezes into angle, and and I-shaped Steel firm welding;
D. advance support: for the excavation safety for guaranteeing face, advance support uses diameter for the hot rolling seamless steel of 42 × 4 ㎜ of φ Pipe, front end be it is cone-shaped, tube wall surrounding bore 8 ㎜ mud jacking holes, pitch of holes 15cm, tail portion 1.2m do not set mud jacking hole, longitudinally adjacent Two rows of floor projection laps of splice is not less than 100cm, and outer limb is 15 °;Then ductule installation is carried out, ductule, which is installed, to be adopted Method is squeezed into drilling, i.e., is first drilled by design requirement, bore diameter is 3~5mm bigger than diameter of steel tube, and ductule is then passed through steel Frame is headed into hammering or drilling machine, heads into length is not less than length of steel pipe 90%, and blown out the sandstone in steel pipe with high-pressure blast; After ductule is installed, with mudding plug-hole mouth and surrounding crack, when necessary near ductule and working face gunite concrete, to prevent Heavy roof fall;The excavation length in tunnel should be less than the slip casting length of ductule, wall for grouting of the reserved part as subsequent cycle; The cement grout that the selection of grouting ratio of mud when slip casting is 1:1, in order to obtain good consolidation effect, it is necessary to inject enough slurries Liquid measure, it is ensured that valid diffusion area, range of grouting is designed by the outer 0.3~0.5m of excavation contour line and slurries are uniform in the earth formation Diffusion, the stop grouting plug that grouting pressure control uses during 0.5~1Mpa, slip casting when slip casting is 5~10cm thickness injection coagulation Soil;
(3) circulate operation: circulation carry out explosion, slag tap, preliminary bracing and advance support are until constructing tunnel is completed.
The above is only a preferred embodiment of the present invention, protection scope of the present invention is not limited merely to above-mentioned implementation Example, all technical solutions belonged under thinking of the present invention all belong to the scope of protection of the present invention.It should be pointed out that for the art Those of ordinary skill for, several improvements and modifications without departing from the principles of the present invention, these improvements and modifications It should be regarded as protection scope of the present invention.

Claims (8)

1. a kind of pass through mined out and subsidence area constructing tunnel technique, it is characterised in that: the following steps are included:
(1) goaf and subsidence area injecting treatment:
A. it pinpoints: needing to pinpoint injected hole before drilling, field survey is carried out using total station when fixed point and is put Sample, the deviations of actual position of drilling should not be more than 0.5m;
B. suitable drill bit and brill drilling: are selected according to the drilling depth and diameter of injected hole and inspection hole before probing Machine first uses the drill bit aperture of major diameter to designated depth, then the tripping in wellhead casing pipe in hole, in the outside and hole of wellhead casing pipe It is tamped between wall with clay, the drill bit for then using minor diameter instead continues drilling to projected depth;
C. it buries orifice closing device: after drilling terminates and carries out abundant hole flushing, burying orifice closing device, locking device For the aperture Grouting Pipe with flange pallet;The water mortar that water-solid ratio is 1:1.5~1:2.0 is injected into hole, slurries are in hole Height be 4~6m, 2% accelerator of cement weight is added in cement grout, then extracts orifice sleeve;
D. grouting construction: injection slurry is made of using cement and flying ash grout water, cement, flyash, accelerator and sand;Slip casting concentration First dilute rear thick, when slip casting, slip casting pump pressure should be greater than 1.5 times of slip casting maximum design pressure, after slip casting starts, time sight pump Midge amount and pump pressure, when pump pressure gradually rises, grouting amount is less than 70L/min, and aperture pipe pressure is between 1.O~3.0Mpa, surely When having grout phenomenon around fixed 10~15min or injected hole, the mortar depositing construction in the hole can be terminated;
(2) three benching tunnelling methods excavate: three steps are divided into upper, middle and lower three-level, the high 3m of top bar, and middle step is top bar to spring line Above section, rest part are to get out of a predicament or an embarrassing situation, the wide 5m of every grade of step, and left and right sides mutually staggers 2m;Three benching tunnelling methods excavation include with Lower step:
A. explosion: first snubber after snubber terminates, fills explosive in slotted eyes, carries out explosion;
B. it slags tap: the various body refuses and rubble that generate in blasting process is transported on the outside of tunnel;
C. preliminary bracing preliminary bracing: is carried out to country rock;Support joint answers firm welding, and every steel arch-shelf face is connected with reinforcing bar; Steel arch-shelf should be set up by design position, and arch springing must necessarily be placed in firm foundations;Steel arch-shelf should perpendicular to tunnel middle line, it is upper and lower, Left and right tolerance 5cm, and vertical gradient is not greater than 2 °, and arch springing height should be lower than 15~20cm of upper half section baseline; The gap in steel arch-shelf and first pneumatically placed concrete face must be filled closely knit with gunite concrete;When gap is excessive, with steel form or it can mix Solidifying soil wedge block is held out against, and is counted unilateral inaccurate less than 8;Gunite concrete should symmetrically be sprayed upwards by two sides arch springing, and by steel Arch covering;Plasticity failure by shear easily occurs for arch springing position, and the position steelframe is in addition to bolt, it is necessary to the weldering of four sides side, to ensure The stiffness and strength of connector;The depth of section of steelframe should be adapted with gunite concrete thickness;For the monolithic stability for enhancing steelframe Steelframe with longitudinally connected muscle, structural anchor bar, positioning is that muscle and lock foot anchoring stock are connected firmly by property;Because lock foot anchoring stock is in control work Word steel sedimentation aspect, plays decisive role, so having laid lock foot anchoring stock at upper, middle and lower step arch springing, locks foot anchor Bar squeezes into angle and country rock is at 45 ° is advisable, and with I-steel firm welding;In shear-zone or country rock opposed breaker, preliminary bracing The relatively large paragraph of convergent deformation is locked foot at upper, middle and lower step arch springing and is reinforced using 42 slip casting ductule of φ;It is small to lead Pipe range 4m, 2, every place, it is at 45 ° with country rock that lock foot conduit squeezes into angle, and with I-steel firm welding;
D. advance support: for the excavation safety for guaranteeing face, advance support uses diameter for the hot rolling seamless steel of 42 × 4 ㎜ of φ Pipe, front end be it is cone-shaped, tube wall surrounding bore 8 ㎜ mud jacking holes, pitch of holes 15cm, tail portion 1.2m do not set mud jacking hole, longitudinally adjacent Two rows of floor projection laps of splice is not less than 100cm, and outer limb is 15 °;Then ductule installation is carried out, ductule, which is installed, to be adopted Method is squeezed into drilling, i.e., is first drilled by design requirement, bore diameter is 3~5mm bigger than diameter of steel tube, and ductule is then passed through steel Frame is headed into hammering or drilling machine, heads into length is not less than length of steel pipe 90%, and blown out the sandstone in steel pipe with high-pressure blast; After ductule is installed, with mudding plug-hole mouth and surrounding crack, when necessary near ductule and working face gunite concrete, to prevent Heavy roof fall;The excavation length in tunnel should be less than the slip casting length of ductule, wall for grouting of the reserved part as subsequent cycle; The cement grout that the selection of grouting ratio of mud when slip casting is 1:1, in order to obtain good consolidation effect, it is necessary to inject enough slurries Liquid measure, it is ensured that valid diffusion area, range of grouting is designed by the outer 0.3~0.5m of excavation contour line and slurries are uniform in the earth formation Diffusion, the stop grouting plug that grouting pressure control uses during 0.5~1Mpa, slip casting when slip casting is 5~10cm thickness injection coagulation Soil;
(3) circulate operation: circulation carry out explosion, slag tap, preliminary bracing and advance support are until constructing tunnel is completed.
2. according to claim 1 pass through mined out and subsidence area constructing tunnel technique, it is characterised in that: the step C, When embedded orifice closing device, after mounting hole Grouting Pipe, a small amount of sandstone is put into hole for blocking biggish gap, so Gap is thoroughly blocked being put into a small amount of clay afterwards.
3. according to claim 1 pass through mined out and subsidence area constructing tunnel technique, it is characterised in that: the step d, When carrying out grouting construction, the water-solid ratio of injection slurry is to be prepared according to 1:1.0~1:1.5, the ratio of cement, flyash and sand Control adds the accelerator of cement weight 2% in 3:7:2 in slurries.
4. according to claim 1 pass through mined out and subsidence area constructing tunnel technique, it is characterised in that: the step d, Carry out grouting construction when, injecting paste material selection be the need to ensure that water be it is clean, do not contain harmful substance, cement use ordinary silicon Acid salt cement, portland slag cement, accelerator select waterglass, and flyash should meet " in cement and concrete soil Flyash " requirement of (GB/T1596-2005) III grade of flyash, sand answer it is clean, hard, dry, without weathering, free from admixture, meet rule Deciding grade and level is matched, and soil sundries content should be less than 5%.
5. according to claim 1 pass through mined out and subsidence area constructing tunnel technique, it is characterised in that: the step d, When carrying out grouting construction, when groundwater increment is more than that intermittent Cementer can be used when pressure is not played in aperture still in drilling design grouting amount Skill;Intermittent time controls in 10~12h or so;Interval grouting behind shaft or drift lining, still using the grouting with plunger of first dilute rear thick;Secondary grouting control 25% or so of design flow, if not playing pressure still, interval slip casting is carried out again, until reaching satisfactory stopping slip casting Until standard.
6. according to claim 1 pass through mined out and subsidence area constructing tunnel technique, it is characterised in that: the step a, When carrying out explosion, come snubber by the way of compound straight eye V-cut, that is, shallow slotting and deep slotting be combined with each other Mode;Periphery hole is also classified into two-stage, and on the outside, depth is the half of second level periphery hole to level-one periphery hole, while reducing outer insert eye.
7. according to claim 1 pass through mined out and subsidence area constructing tunnel technique, it is characterised in that: the step c, When carrying out preliminary bracing, for the I-steel used for 20A I-steel, the production of every Pin spacing 60cm arrangement steel arch-shelf uses clod wash work Skill presses standardized processing, and size should meet design requirement.
8. according to claim 1 pass through mined out and subsidence area constructing tunnel technique, it is characterised in that: the step c, When carrying out preliminary bracing, when arch absolute altitude deficiency, not handy soil, stone backfill, and steel plate should be set and be adjusted, it can be used when necessary Concrete strengthening substrate.
CN201811574889.9A 2018-12-21 2018-12-21 Tunnel construction process for crossing mining and subsidence areas Active CN109538216B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811574889.9A CN109538216B (en) 2018-12-21 2018-12-21 Tunnel construction process for crossing mining and subsidence areas

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811574889.9A CN109538216B (en) 2018-12-21 2018-12-21 Tunnel construction process for crossing mining and subsidence areas

Publications (2)

Publication Number Publication Date
CN109538216A true CN109538216A (en) 2019-03-29
CN109538216B CN109538216B (en) 2020-11-03

Family

ID=65856539

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811574889.9A Active CN109538216B (en) 2018-12-21 2018-12-21 Tunnel construction process for crossing mining and subsidence areas

Country Status (1)

Country Link
CN (1) CN109538216B (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110005435A (en) * 2019-05-05 2019-07-12 中交第三航务工程局有限公司 A kind of construction technology of tunnel trunk preliminary bracing
CN110130317A (en) * 2019-05-07 2019-08-16 中铁十六局集团第一工程有限公司 Goaf Treatment Methods are lied prostrate on a kind of freeway tunnel
CN111236884A (en) * 2020-03-10 2020-06-05 华北有色工程勘察院有限公司 Grouting stopping device for grouting broken rock mass and grouting method
CN113982597A (en) * 2021-09-29 2022-01-28 中铁七局集团有限公司 Tunnel excavation construction method suitable for strong-water-permeability unconsolidated formation in karst subsidence area
CN114233378A (en) * 2021-12-17 2022-03-25 中国十七冶集团有限公司 Goaf self-walking drilling and grouting integrated equipment and installation and use method
CN116677417A (en) * 2023-08-03 2023-09-01 中铁十六局集团有限公司 Treatment device and treatment method for tunnel collapse cavity
CN116971788A (en) * 2023-09-22 2023-10-31 中铁十六局集团有限公司 Method for hydraulic filling of karst cave of underwater tunnel

Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101041301B1 (en) * 2010-07-29 2011-06-14 이평우 Method for digging tunnel
CN102383806A (en) * 2011-07-18 2012-03-21 广东华盟路桥工程有限公司 Construction technology for allowing tunnel to pass through ultra-large karst cave
CN102720508A (en) * 2012-04-28 2012-10-10 中铁二局股份有限公司 Shield construction method for continuously under-passing dense buildings in silty-soil and silty-sand formation
KR101437882B1 (en) * 2013-10-25 2014-09-04 최진원 Tunnel excavating method having various cross sectional shapes
CN104100272A (en) * 2014-07-11 2014-10-15 中国路桥工程有限责任公司 Quick construction method of tunnels traversing unfavorable geology
CN104481548A (en) * 2014-11-01 2015-04-01 中铁一局集团有限公司 Tunnel face cavity processing method for shield tunnel construction
CN104806256A (en) * 2015-04-16 2015-07-29 粤水电轨道交通建设有限公司 In-tunnel processing method for unexpected dissolving cavity meeting during shield tunneling
CN106401600A (en) * 2016-10-28 2017-02-15 招商局重庆交通科研设计院有限公司 Tunnel strengthening treatment method and support structure based on positions of dissolving cavities
CN106522981A (en) * 2016-10-25 2017-03-22 招商局重庆交通科研设计院有限公司 Support method for tunnel passing through goaf
CN106593467A (en) * 2016-11-09 2017-04-26 大唐陇东能源有限公司 Supporting method for underground soft rock roadway of coal mine
CN106968676A (en) * 2017-03-27 2017-07-21 山西潞安环保能源开发股份有限公司 The method that cavity is passed through in tunnelling
CN106988758A (en) * 2017-05-08 2017-07-28 中铁五局集团第五工程有限责任公司 One kind is used to pass through large-scale vertical solution cavity group method for tunnel construction

Patent Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101041301B1 (en) * 2010-07-29 2011-06-14 이평우 Method for digging tunnel
CN102383806A (en) * 2011-07-18 2012-03-21 广东华盟路桥工程有限公司 Construction technology for allowing tunnel to pass through ultra-large karst cave
CN102720508A (en) * 2012-04-28 2012-10-10 中铁二局股份有限公司 Shield construction method for continuously under-passing dense buildings in silty-soil and silty-sand formation
KR101437882B1 (en) * 2013-10-25 2014-09-04 최진원 Tunnel excavating method having various cross sectional shapes
CN104100272A (en) * 2014-07-11 2014-10-15 中国路桥工程有限责任公司 Quick construction method of tunnels traversing unfavorable geology
CN104481548A (en) * 2014-11-01 2015-04-01 中铁一局集团有限公司 Tunnel face cavity processing method for shield tunnel construction
CN104806256A (en) * 2015-04-16 2015-07-29 粤水电轨道交通建设有限公司 In-tunnel processing method for unexpected dissolving cavity meeting during shield tunneling
CN106522981A (en) * 2016-10-25 2017-03-22 招商局重庆交通科研设计院有限公司 Support method for tunnel passing through goaf
CN106401600A (en) * 2016-10-28 2017-02-15 招商局重庆交通科研设计院有限公司 Tunnel strengthening treatment method and support structure based on positions of dissolving cavities
CN106593467A (en) * 2016-11-09 2017-04-26 大唐陇东能源有限公司 Supporting method for underground soft rock roadway of coal mine
CN106968676A (en) * 2017-03-27 2017-07-21 山西潞安环保能源开发股份有限公司 The method that cavity is passed through in tunnelling
CN106988758A (en) * 2017-05-08 2017-07-28 中铁五局集团第五工程有限责任公司 One kind is used to pass through large-scale vertical solution cavity group method for tunnel construction

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
刘彦文: "《隧道穿越采空区同时下穿既有隧道设计》", 《隧道/地下工程》 *
李勇良: "《云桂客专营盘山隧道穿越巨型溶洞处治技术研究》", 《隧道/地下工程》 *
胥崇峰: "《地铁隧道穿越溶洞的施工处理技术》", 《科技咨询》 *

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110005435A (en) * 2019-05-05 2019-07-12 中交第三航务工程局有限公司 A kind of construction technology of tunnel trunk preliminary bracing
CN110005435B (en) * 2019-05-05 2020-07-07 中交第三航务工程局有限公司 Construction process for primary support of tunnel body
CN110130317A (en) * 2019-05-07 2019-08-16 中铁十六局集团第一工程有限公司 Goaf Treatment Methods are lied prostrate on a kind of freeway tunnel
CN111236884A (en) * 2020-03-10 2020-06-05 华北有色工程勘察院有限公司 Grouting stopping device for grouting broken rock mass and grouting method
CN113982597A (en) * 2021-09-29 2022-01-28 中铁七局集团有限公司 Tunnel excavation construction method suitable for strong-water-permeability unconsolidated formation in karst subsidence area
CN113982597B (en) * 2021-09-29 2023-06-23 中铁七局集团有限公司 Tunneling construction method suitable for karst subsidence area strong water permeability unconsolidated formation tunnel
CN114233378A (en) * 2021-12-17 2022-03-25 中国十七冶集团有限公司 Goaf self-walking drilling and grouting integrated equipment and installation and use method
CN114233378B (en) * 2021-12-17 2023-11-10 中国十七冶集团有限公司 Goaf self-walking drilling grouting integrated equipment and installation and use method
CN116677417A (en) * 2023-08-03 2023-09-01 中铁十六局集团有限公司 Treatment device and treatment method for tunnel collapse cavity
CN116677417B (en) * 2023-08-03 2023-09-22 中铁十六局集团有限公司 Treatment device and treatment method for tunnel collapse cavity
CN116971788A (en) * 2023-09-22 2023-10-31 中铁十六局集团有限公司 Method for hydraulic filling of karst cave of underwater tunnel
CN116971788B (en) * 2023-09-22 2023-12-01 中铁十六局集团有限公司 Method for hydraulic filling of karst cave of underwater tunnel

Also Published As

Publication number Publication date
CN109538216B (en) 2020-11-03

Similar Documents

Publication Publication Date Title
CN109538216A (en) Pass through mined out and subsidence area constructing tunnel technique
CN109098733B (en) Rapid grouting reinforcement method for large-section tunnel in fracture zone rock stratum
CN105041325B (en) Construction method of high-tension water-rich extra-large-section weak breccia tunnel
CN103334770B (en) One is grown up reverse-slope tunnel ultra high water pressure rich water zone of fracture construction method
CN104453913B (en) A kind of Shaft Stopes front pre-grouting method
CN100591866C (en) Drifting sand layer and gravel stratum water-moving double-liquid high pressure slip-casting water-blocking construction method
CN102518135B (en) Horizontal jet grouting soil anchor and castinplace pile Composite Foundation Pit supporting construction engineering method
CN104453946B (en) Advanced reinforcing construction method for building tunnel in soft surrounding rock
CN103899323B (en) A kind of construction method of shield crossing rail yard
CN109854255A (en) The processing method of type landslide is not restrained in tunnel
CN109083682A (en) A kind of construction method of mine working antiseepage high intensity fire dam
CN109083649B (en) It is applicable in the water-rich sand layer pre-grouting reinforcement means of complicated urban environment subway tunnel
JP7257086B2 (en) Comprehensive Construction Method for Low Overburden Sections of Tunnels
CN114233385B (en) Treatment method for mud-bursting water of inclined shaft
CN103321235A (en) Composite soil nailing wall slope support method
CN108798702A (en) A kind of method for protecting support of big cross section large-deformation tunnel in soft rock
CN108265706A (en) A kind of engineering pile and pile-formation process in solution cavity geology
CN110284885A (en) Shield inspection-pit construction method
CN103089276A (en) Deep-shallow hole and high-low pressure coupling grouting technology
CN108678781A (en) One kind closing on river shield launching end stratum consolidation method
CN109209443A (en) A kind of construction method of breaking surrounding rock tunnel structure
CN109057802A (en) Shallow tunnel with big cross-section underpass of freeways construction method
CN112177635A (en) Construction method of step multiple advanced small guide pipe and construction method of overlapped tunnel
CN107191206B (en) A kind of six step construction method of Shallow-buried Large-span Tunnel Unit two
CN102877470A (en) Combined soil nailing construction method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant