CN114893233A - Coupling cooperative control method for deep tunnel bolting-grouting support system - Google Patents

Coupling cooperative control method for deep tunnel bolting-grouting support system Download PDF

Info

Publication number
CN114893233A
CN114893233A CN202210512640.5A CN202210512640A CN114893233A CN 114893233 A CN114893233 A CN 114893233A CN 202210512640 A CN202210512640 A CN 202210512640A CN 114893233 A CN114893233 A CN 114893233A
Authority
CN
China
Prior art keywords
grouting anchor
grouting
roadway
interval
deep
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202210512640.5A
Other languages
Chinese (zh)
Inventor
王雷
鹿伟
宋克志
孙会彬
吴怡林
蔺维南
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Qicheng Engineering Technology Co ltd
Ludong University
Original Assignee
Shandong Qicheng Engineering Technology Co ltd
Ludong University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Qicheng Engineering Technology Co ltd, Ludong University filed Critical Shandong Qicheng Engineering Technology Co ltd
Priority to CN202210512640.5A priority Critical patent/CN114893233A/en
Publication of CN114893233A publication Critical patent/CN114893233A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D20/00Setting anchoring-bolts
    • E21D20/02Setting anchoring-bolts with provisions for grouting
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/14Lining predominantly with metal
    • E21D11/15Plate linings; Laggings, i.e. linings designed for holding back formation material or for transmitting the load to main supporting members
    • E21D11/152Laggings made of grids or nettings
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F17/00Methods or devices for use in mines or tunnels, not covered elsewhere
    • E21F17/18Special adaptations of signalling or alarm devices
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0639Performance analysis of employees; Performance analysis of enterprise or organisation operations
    • G06Q10/06393Score-carding, benchmarking or key performance indicator [KPI] analysis

Landscapes

  • Engineering & Computer Science (AREA)
  • Business, Economics & Management (AREA)
  • Mining & Mineral Resources (AREA)
  • Human Resources & Organizations (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Educational Administration (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Strategic Management (AREA)
  • Development Economics (AREA)
  • Structural Engineering (AREA)
  • Economics (AREA)
  • Marketing (AREA)
  • Game Theory and Decision Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The invention discloses a coupling cooperative control method for a deep roadway bolting-grouting support system, which is characterized by comprising the following steps of: collecting the stress of grouting anchor rods and grouting anchor cables at two sides, two shoulders and a top plate of a roadway tunneling section, a working face stoping section and a roadway retaining section, carrying out standardized dimensionless processing on monitoring data, respectively calculating a weight value and a comprehensive evaluation index, establishing an average coupling degree model and an average coupling synergy model, and carrying out coupling synergy evaluation on a deep roadway bolting-grouting support system; and optimizing the bolting-grouting support parameters of the tunnel, evaluating the coupling cooperative control of bolting-grouting support systems in different sections of the tunnel, and ensuring the stability of the whole process of the deep tunnel.

Description

Coupling cooperative control method for deep tunnel bolting-grouting support system
Technical Field
The invention relates to the technical field of safety in underground engineering, in particular to a coupling cooperative control method for a deep roadway bolting-grouting support system.
Background
The deep tunnel ground stress is high, the surrounding rock receives stress disturbance and leading pressure influence, and the surrounding rock is loose broken, and self-supporting ability is weak, and the supporting component does not have stable anchor rock stratum, and the supporting component can't exert the support latent energy, causes the tunnel roof to sink, the bottom heave and two group internal extrusions, and the tunnel is out of shape seriously greatly, directly influences tunnel transportation equipment operation, staff's safety and the normal back production of working face.
The grouting anchor rod and the grouting anchor rope are utilized to support weak broken surrounding rocks, cement grout is filled into cracks, the broken rocks are cemented into a whole again, the self-bearing capacity of the surrounding rocks is improved, prestress is applied to the cemented surrounding rocks by the grouting anchor rod and the grouting anchor rope, the active supporting strength of the surrounding rocks is increased, the stability of the roadway is enhanced, the grouting anchor rod and the grouting anchor rope support in a cooperative mode, supporting parameters are optimized, the supporting capacity of the grouting anchor rod and the grouting anchor rope is fully exerted, therefore, the coupling cooperation degree of a deep roadway anchor-grouting supporting system determines the deep roadway anchor-grouting supporting control effect, and the stability of the deep roadway is directly influenced.
The prior art has the following problems:
1. the control condition of the deep anchor-grouting supporting roadway is only evaluated through parameters such as displacement convergence, and the coupling cooperation degree of a grouting anchor rod and a grouting anchor cable of an anchor-grouting supporting system cannot be evaluated;
2. and (4) determining anchor-grouting support parameters in a roadway excavation region, and not dynamically adjusting according to the coupling cooperation degree of the grouting anchor rod and the grouting anchor cable.
Disclosure of Invention
The invention aims to overcome the defects in the prior art and provide a deep roadway bolting-grouting support system coupling cooperative control method.
The technical scheme provided by the invention is as follows: the deep roadway bolting-grouting support system coupling cooperative control method is characterized by comprising the following steps:
a, grouting anchor rods and grouting anchor cables are applied to two sides, two shoulders and a top plate of a driving roadway, grouting anchor rods and grouting anchor cable dynamometers are installed, and the stress of the grouting anchor rods and the grouting anchor cables of the two sides, the two shoulders and the top plate in a driving section, a working face extraction section and a roadway retaining section of the roadway is collected;
b, carrying out standardized dimensionless processing on stress data of the grouting anchor rod and the grouting anchor cable at each position and each interval every day, and calculating the weight values of the grouting anchor rod and the grouting anchor cable in the roadway in a tunneling interval, a working face stoping interval and a roadway retaining interval by using an entropy method;
c, calculating comprehensive evaluation indexes of the grouting anchor rods and the grouting anchor cables in the deep roadway at different moments, different positions and different intervals, and establishing an average coupling degree model of the grouting anchor rods and the grouting anchor cables;
d, establishing a grouting anchor rod and grouting anchor cable average coupling cooperation model, evaluating the coupling cooperation condition of a deep roadway bolting-grouting support system, carrying out comparative analysis on the coupling cooperation degree of a deep roadway tunneling section, a stoping section and a roadway retaining section, adjusting the bolting-grouting support parameters of the deep roadway, and ensuring the stability of the whole process of the deep roadway.
Preferably, the grouting anchor rod and grouting anchor cable dynamometer on the two sides, two shoulders and the top plate of the roadway in the step a are on one monitoring section.
Preferably, in the step b, the stress data of the grouting anchor rod and the grouting anchor cable are subjected to standardized dimensionless processing every day, every position and every interval, and the calculation formula is
Figure DEST_PATH_IMAGE002
Uij is the original stress data of each roadway grouting anchor rod and each grouting anchor cable, each part and each interval, in (uj) is the initial value of each grouting anchor rod and each grouting anchor cable in different intervals at the beginning, max (uj) is the maximum value of each grouting anchor rod and each grouting anchor cable in different intervals, i is the number of monitoring days, and j is the number of grouting anchor rods and each grouting anchor cable in each interval;
the weight values of grouting anchor rods and grouting anchor cables at different parts of the roadway in the tunneling section, the working face stoping section and the entry retaining section are respectively
Figure DEST_PATH_IMAGE004
Ej is entropy values of grouting anchor rods and grouting anchor cables at different positions of a roadway in a tunneling interval, a working face stoping interval and a roadway retaining interval, and m is total days for monitoring;
the entropy values of grouting anchor rods and grouting anchor cables at different parts of the roadway in the tunneling interval, the working face stoping interval and the entry retaining interval are
Figure DEST_PATH_IMAGE006
Kij is the index specific gravity of the roadway grouting anchor rod and the grouting anchor rope every day, every part and every interval;
the index specific gravity of each day, each part and each interval of the roadway grouting anchor rod and the grouting anchor rope is
Figure DEST_PATH_IMAGE008
Preferably, the comprehensive evaluation index of the grouting anchor rod in different sections of the roadway in the step c is
Figure DEST_PATH_IMAGE010
The comprehensive evaluation index of the grouting anchor cable in different sections of the roadway is
Figure DEST_PATH_IMAGE012
N total number of grouting anchor cables
Preferably, the average coupling degree model of the grouting anchor rod and the grouting anchor cable in the step c is
Figure DEST_PATH_IMAGE014
Preferably, the average coupling degree of cooperation model of the grouting anchor rod and the grouting anchor cable in the step d is
Figure DEST_PATH_IMAGE016
Evaluating anchor injection branch of deep tunnelThe protection system is coupled with the cooperative grade, delta and epsilon are importance coefficients, and the importance degrees of a grouting anchor rod and a grouting anchor cable are important.
The invention has the beneficial effects that:
1. evaluating a deep roadway bolting-grouting supporting system by utilizing the average coupling synergy, optimizing roadway bolting-grouting supporting parameters, and fully exerting the supporting potential of a bolting-grouting supporting member under reasonable supporting parameters;
2. and evaluating the coupling cooperative control of the bolting-grouting support system in different intervals of the roadway, analyzing the relationship between the coupling cooperative degree and the safety value in different intervals, and pertinently adjusting the bolting-grouting support parameters in the intervals to ensure the stability of the whole process of the deep roadway.
Drawings
FIG. 1 is a flow chart of the present invention;
FIG. 2 is a schematic diagram of a deep anchor grouting supporting roadway excavation section of the invention;
FIG. 3 is a schematic diagram of a deep-bolting-grouting supporting roadway stoping section of the invention;
fig. 4 is a schematic diagram of a deep-bolting-grouting supporting roadway entry retaining section.
In the figure: the method comprises the following steps of 1 coal seam, 2 working faces, 3 goafs, 4 monitoring sections, 5 tunneling roadways, q tunneling sections, c working face stoping sections and h roadway retaining sections.
Detailed Description
The present invention will be described in detail with reference to the accompanying drawings.
As shown in fig. 1, 2, 3 and 4, taking an anchoring and grouting support system of a deep roadway of a coal mine as an example, the anchoring and grouting support system of the deep roadway comprises a coal seam 1 and a gob 3; the deep roadway bolting-grouting support system coupling cooperative control method comprises the following steps:
firstly, grouting anchor rods and anchor cables on two sides, two shoulders and a top plate of a driving tunnel 5, installing grouting anchor rods and anchor cable dynamometers, and collecting the stress of the grouting anchor rods and the anchor cables on two sides, two shoulders and the top plate of a tunneling section q, a stoping section c of a working face 2 and a roadway retaining section h;
after the deep tunnel is excavated, performing anchor-grouting support on the tunnel immediately, mounting a grouting anchor rod and a grouting anchor cable dynamometer on two sides, two shoulders and a top plate of the tunnel, wherein the grouting anchor rod and the grouting anchor cable dynamometer are required to be arranged on a monitoring section 4, and acquiring the stress of the grouting anchor rod and the grouting anchor cable at the same time point every day to ensure the stress time consistency of the grouting anchor rod and the grouting anchor cable;
the whole process of monitoring the stress of a grouting anchor rod and a grouting anchor cable to penetrate through a tunneling roadway 5 is divided into three different sections, namely a roadway tunneling section q is formed by beginning tunneling the roadway to a working face 2 and beginning to recover, a roadway tunneling section c is formed by beginning to recover the working face 2 to a monitoring section, and a roadway is stabilized to a roadway remaining section h after the working face 2 recovers to the monitoring section 4 to the working face 2;
the method comprises the following steps that stress monitoring of a grouting anchor rod and a grouting anchor cable penetrates through the whole process of a roadway, the roadway is divided into three different sections, namely a roadway tunneling section q from the beginning of tunneling to the beginning of mining on a working face, a working face mining section c from the beginning of mining to the beginning of mining on a monitoring section, and the roadway is stabilized to a roadway retaining section h after the mining on the working face reaches the working face;
step 2, carrying out standardized dimensionless processing on stress data of each day, each part and each section of the grouting anchor rod and the grouting anchor cable, and calculating the weight values of the grouting anchor rod and the grouting anchor cable in a roadway of a tunneling section q, a working face 2 recovery section c and a roadway retaining section h by using an entropy method;
counting the monitoring data of the grouting anchor rods and the grouting anchor rods, respectively collecting the stress monitoring data of each grouting anchor rod and each grouting anchor cable, and sorting and summarizing the monitoring data of the grouting anchor rods and the grouting anchor cables into three databases according to three sections divided by a roadway to finally form a monitoring data set and a database of the grouting anchor rods and the grouting anchor cables;
the data set and the monitoring data of the grouting anchor rod and the grouting anchor cable in the database are subjected to standardized dimensionless processing, and the calculation formula is
Figure DEST_PATH_IMAGE018
u ij Monitoring original data of a roadway grouting anchor rod and a grouting anchor cable every day, every part and every interval,in(u j )for each of different intervalsInitial value at the beginning of root slip casting anchor rod and slip casting anchor cable, max (u) j ) The maximum value of each grouting anchor rod and each grouting anchor cable in different intervals, i is the number of monitoring days, and j is the number of the grouting anchor rods and the grouting anchor cables in each interval;
calculating the index specific gravity of the grouting anchor rod and the grouting anchor cable at each position and each interval every day by using the monitoring data of standardized dimensionless processing, wherein the index specific gravity is
Figure DEST_PATH_IMAGE020
Figure DEST_PATH_IMAGE022
The method is the sum of dimensionless data of a grouting anchor rod or a grouting anchor cable every day in a certain interval range;
calculating entropy values of the grouting anchor rod and the grouting anchor cable in a roadway q tunneling interval, a working face 2 recovery interval c and a roadway retaining interval h by using index specific gravity of the grouting anchor rod and the grouting anchor cable, wherein the entropy values are
Figure DEST_PATH_IMAGE024
k ij The specific gravity is the index specific gravity of the grouting anchor rod and the grouting anchor cable;
calculating the weight values of a roadway grouting anchor rod and a grouting anchor cable in a tunneling interval q, a working face stoping interval c and a roadway retaining interval h into entropy values of the grouting anchor rod and the grouting anchor cable
Figure DEST_PATH_IMAGE026
e j Entropy values of a grouting anchor rod and a grouting anchor cable for the deep roadway;
step 3, calculating comprehensive evaluation indexes of the grouting anchor rods and the grouting anchor cables in different moments, different positions and different sections of the deep roadway, and establishing an average coupling degree model of the grouting anchor rods and the grouting anchor cables;
respectively calculating comprehensive evaluation indexes of grouting anchor rods in different sections of the deep roadway by using the weights and standard dimensionless values of the grouting anchor rods and the grouting anchor cables
Figure DEST_PATH_IMAGE028
In different intervals noteThe comprehensive evaluation index of the slurry anchor cable is as follows
Figure DEST_PATH_IMAGE030
The average coupling degree model of the grouting anchor rod and the grouting anchor cable is
Figure DEST_PATH_IMAGE032
f i For the comprehensive evaluation index of all grouting anchor rods in a certain interval,g i the comprehensive evaluation indexes of all grouting anchor cables in a certain interval are shown, and m is the total number of days for monitoring;
step 4, establishing a grouting anchor rod and grouting anchor cable average coupling cooperation degree model, evaluating the coupling cooperation condition of a deep roadway bolting-grouting support system, carrying out comparative analysis on the coupling cooperation degree of a deep roadway tunneling section q, a working face mining section c and a roadway retaining section h, adjusting the deep roadway bolting-grouting support parameters, and ensuring the stability of the whole process of the deep roadway;
the average coupling degree of synergy model of the grouting anchor rod and the grouting anchor cable is
Figure DEST_PATH_IMAGE034
,δ、εThe undetermined coefficient represents the importance degree of a grouting anchor rod and a grouting anchor cable, and delta + epsilon =1, in a deep roadway anchor grouting support system, the importance degree of the grouting anchor rod and the importance degree of the grouting anchor cable are the same, delta =0.5, and epsilon = 0.5;
evaluating the coupling cooperation grade of a deep roadway anchor-grouting support system by using a grouting anchor rod and grouting anchor cable average coupling cooperation model; when p is more than or equal to 1 and more than or equal to 0.8, the deep roadway bolting-grouting support system is cooperated; when p is more than 0.8 and more than 0.5, the deep roadway bolting-grouting support system is basically cooperated; p is less than 0.5, and the anchor grouting supporting system of the deep roadway is disordered;
comparing and analyzing the coupling cooperation degree of a deep roadway driving section q, a working face 2 stoping section c and a roadway retaining section h by using a grouting anchor rod and grouting anchor cable average coupling cooperation degree model; p is a radical of q >p c >p h The depth roadway bolting-grouting support system is basically cooperated as a whole when the depth roadway bolting-grouting support system is larger than 0.5, and roadway bolting-grouting support parameters are not required to be adjusted; p is a radical of q >p c >0.5>p h, The anchor-grouting support system of the deep roadway tunneling section q and the stoping section c is basically cooperated, the anchor-grouting support system of the roadway h in the roadway-remaining section is out of order, anchor-grouting support parameters of the deep roadway h in the roadway-remaining section are adjusted, and a grouting anchor rod and a grouting anchor rope are additionally arranged; p is a radical of q >0.5>p c >p h, The method comprises the following steps that (1) a q-bolting-grouting support system in a deep roadway driving section is basically cooperated, a h-roadway bolting-grouting support system in a stoping section c and a retained section is out of order, the h-deep roadway bolting-grouting support parameters in the stoping section c and the retained section are adjusted, and a grouting anchor rod and a grouting anchor cable are additionally arranged; 0.5 > p q >p c >p h, The whole deep tunnel anchor-grouting support system is out of order, the whole process anchor-grouting support parameters of the tunnel are adjusted, a grouting anchor rod and a grouting anchor cable are additionally arranged, and the stability of the deep tunnel is guaranteed.
As will be realized, the invention is capable of other embodiments and its several details are capable of modifications in various obvious respects, all without departing from the spirit and essential attributes thereof. All changes which come within the scope of or are equivalent to the scope of the invention are intended to be embraced therein.

Claims (6)

1. The deep roadway bolting-grouting support system coupling cooperative control method is characterized by comprising the following steps:
a, grouting anchor rods and grouting anchor cables are applied to two sides, two shoulders and a top plate of a driving roadway, grouting anchor rods and grouting anchor cable dynamometers are installed, and the stress of the grouting anchor rods and the grouting anchor cables of the two sides, the two shoulders and the top plate in a driving section, a working face extraction section and a roadway retaining section of the roadway is collected;
b, carrying out standardized dimensionless processing on stress data of the grouting anchor rod and the grouting anchor cable at each position and each interval every day, and calculating the weight values of the grouting anchor rod and the grouting anchor cable in the roadway in a tunneling interval, a working face stoping interval and a roadway retaining interval by using an entropy method;
c, calculating comprehensive evaluation indexes of the grouting anchor rods and the grouting anchor cables in the deep roadway at different moments, different positions and different intervals, and establishing an average coupling degree model of the grouting anchor rods and the grouting anchor cables;
d, establishing a grouting anchor rod and grouting anchor cable average coupling cooperation model, evaluating the coupling cooperation condition of a deep roadway bolting-grouting support system, carrying out comparative analysis on the coupling cooperation degree of a deep roadway tunneling section, a stoping section and a roadway retaining section, adjusting the bolting-grouting support parameters of the deep roadway, and ensuring the stability of the whole process of the deep roadway.
2. The deep tunnel bolting-grouting support system coupling cooperative control method according to claim 1, wherein in the step a, grouting anchor rods and grouting anchor cable forcemeters at two sides, two shoulders and a top plate of a tunnel are on one monitoring section.
3. The deep roadway bolting-grouting support system coupling cooperative control method according to claim 1, wherein in the step b, the force data of each day, each part and each interval of the grouting anchor rod and the grouting anchor cable are subjected to standardized dimensionless processing, and the calculation formula is
Figure 538769DEST_PATH_IMAGE002
Uij is the stress original data of each roadway grouting anchor rod and each grouting anchor cable, each part and each interval every day, in (uj) is the initial value of each grouting anchor rod and each grouting anchor cable in different intervals when starting, max (uj) is the maximum value of each grouting anchor rod and each grouting anchor cable in different intervals, i is the number of monitoring days, and j is the number of grouting anchor rods and each grouting anchor cable in each interval;
the weight values of grouting anchor rods and grouting anchor cables at different parts of the roadway in the tunneling section, the working face stoping section and the entry retaining section are respectively
Figure 987068DEST_PATH_IMAGE004
The ej is entropy values of grouting anchor rods and grouting anchor cables at different positions of the roadway in a tunneling interval, a working face stoping interval and a roadway retaining interval, and the m is the total monitoring days;
the entropy values of grouting anchor rods and grouting anchor cables at different parts of the roadway in the tunneling interval, the working face stoping interval and the entry retaining interval are
Figure 32384DEST_PATH_IMAGE006
Kij is the index specific gravity of the roadway grouting anchor rod and the grouting anchor rope every day, every part and every interval;
the index specific gravity of each day, each part and each interval of the roadway grouting anchor rod and the grouting anchor rope is
Figure 958752DEST_PATH_IMAGE008
4. The deep roadway bolting-grouting support system coupling cooperative control method according to claim 1, wherein the comprehensive evaluation index of grouting anchor rods in different sections of the roadway in the step c is
Figure 304283DEST_PATH_IMAGE010
The comprehensive evaluation index of the grouting anchor cable in different sections of the roadway is
Figure 657904DEST_PATH_IMAGE012
And n is the total number of grouting anchor cables.
5. The cooperative control method for the deep roadway bolting-grouting support system according to claim 1, wherein the average coupling degree model of the grouting anchor rod and the grouting anchor cable in step c is
Figure 456095DEST_PATH_IMAGE014
6. The deep roadway bolting-grouting support system coupling cooperative control method according to claim 1, wherein said average coupling cooperative degree model of grouting anchor rod and grouting anchor cable in step d is
Figure 920575DEST_PATH_IMAGE016
And evaluating the coupling cooperation grade of the deep roadway bolting-grouting support system, wherein delta and epsilon are importance coefficients and the importance degrees of a grouting anchor rod and a grouting anchor cable.
CN202210512640.5A 2022-05-12 2022-05-12 Coupling cooperative control method for deep tunnel bolting-grouting support system Pending CN114893233A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202210512640.5A CN114893233A (en) 2022-05-12 2022-05-12 Coupling cooperative control method for deep tunnel bolting-grouting support system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202210512640.5A CN114893233A (en) 2022-05-12 2022-05-12 Coupling cooperative control method for deep tunnel bolting-grouting support system

Publications (1)

Publication Number Publication Date
CN114893233A true CN114893233A (en) 2022-08-12

Family

ID=82721343

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202210512640.5A Pending CN114893233A (en) 2022-05-12 2022-05-12 Coupling cooperative control method for deep tunnel bolting-grouting support system

Country Status (1)

Country Link
CN (1) CN114893233A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116046063A (en) * 2023-01-05 2023-05-02 安徽建筑大学 Method for monitoring prestress anchor bolt support of deep soft rock roadway
CN117780446A (en) * 2024-02-26 2024-03-29 山东焱鑫矿用材料加工有限公司 Safety performance monitoring method and system for coal mine support

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116046063A (en) * 2023-01-05 2023-05-02 安徽建筑大学 Method for monitoring prestress anchor bolt support of deep soft rock roadway
CN116046063B (en) * 2023-01-05 2023-07-07 安徽建筑大学 Method for monitoring prestress anchor bolt support of deep soft rock roadway
CN117780446A (en) * 2024-02-26 2024-03-29 山东焱鑫矿用材料加工有限公司 Safety performance monitoring method and system for coal mine support
CN117780446B (en) * 2024-02-26 2024-05-28 山东焱鑫矿用材料加工有限公司 Safety performance monitoring method and system for coal mine support

Similar Documents

Publication Publication Date Title
CN114893233A (en) Coupling cooperative control method for deep tunnel bolting-grouting support system
CN111058855B (en) Deformation control method and evaluation system for shield underpassing structure
CN105401947B (en) The large deformation of high-ground stress Support System in Soft Rock Tunnels controls construction method
CN104215748B (en) Comprehensive quantitative determination method for grouting reinforcement effect of underground engineering crushed surrounding rocks
CN105350972B (en) A kind of high-ground stress Support System in Soft Rock Tunnels excavation construction method
CN103293560B (en) A kind of method of testing adopting triple stress court
CN107423524B (en) Method for pre-judging risk level of long-buried-depth tunnel water inrush disaster
CN103953392B (en) Rockburst risk position method of discrimination on deep tunnel section
CN103225509B (en) Large-mining-height fully-mechanized mining stope roof classification and support resistance determination method
CN103790577B (en) Depth Domain based on the virtual straight well of horizontal well horizontal segment constraint inversion method
CN201714307U (en) Heavy air drill auxiliary support
Wang et al. Du XL Analysis on deformation development of open-pit slope under the influence of underground mining
CN109268072A (en) Mine floor water bursting disaster intelligence, the big data cloud platform of real-time prediction and warning
CN111695790A (en) Mining method for security pillar
CN109387244A (en) A kind of intelligent monitoring method and system of mine fault stability
CN116733480A (en) Construction method for underpass of highway tunnel through existing water tunnel
Coşar Application of rock mass classification systems for future support design of the Dim Tunnel near Alanya
Mussin et al. Reduction of ore dilution when mining low-thickness ore bodies by means of artificial maintenance of the mined-out area
CN102733817B (en) Method for determining construction sizes of tunnel and cavern
Xia et al. Study on shear strength characteristics of columnar jointed basalt based on in-situ direct shear test at Baihetan hydropower station
CN116777083A (en) Tunnel lining caving prediction method based on gray correlation projection
CN115952578A (en) Method for analyzing deformation influence of existing railway passing through sand-gravel stratum tunnel
CN115655197A (en) Multi-factor quantitative analysis method for small clear distance mountain tunnel deformation
CN110130317A (en) Goaf Treatment Methods are lied prostrate on a kind of freeway tunnel
CN203114292U (en) Up-and-down separation type underground excavation station construction passageway structure provided with muck transporting equipment

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination