CN110080083A - The method for installing basket type steel truss arch main chord - Google Patents

The method for installing basket type steel truss arch main chord Download PDF

Info

Publication number
CN110080083A
CN110080083A CN201910496424.4A CN201910496424A CN110080083A CN 110080083 A CN110080083 A CN 110080083A CN 201910496424 A CN201910496424 A CN 201910496424A CN 110080083 A CN110080083 A CN 110080083A
Authority
CN
China
Prior art keywords
main chord
lifting
lifting lug
chord
guide chain
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910496424.4A
Other languages
Chinese (zh)
Other versions
CN110080083B (en
Inventor
于长彬
李海松
张敏
贺常松
田波
孙立强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 18th Bureau Group Co Ltd
Second Engineering Co Ltd of China Railway 18th Bureau Group Co Ltd
Original Assignee
China Railway 18th Bureau Group Co Ltd
Second Engineering Co Ltd of China Railway 18th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 18th Bureau Group Co Ltd, Second Engineering Co Ltd of China Railway 18th Bureau Group Co Ltd filed Critical China Railway 18th Bureau Group Co Ltd
Priority to CN201910496424.4A priority Critical patent/CN110080083B/en
Publication of CN110080083A publication Critical patent/CN110080083A/en
Application granted granted Critical
Publication of CN110080083B publication Critical patent/CN110080083B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • E01D21/10Cantilevered erection
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D4/00Arch-type bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D2101/00Material constitution of bridges
    • E01D2101/30Metal

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The present invention relates to a kind of methods of installation basket type steel truss arch main chord.This method is completed by cooperations such as steel truss arch main chord, lifting lug, suspender, lateral connection system, hanging devices.The present invention controls main chord leaning angle by being located at the length of lifting lug on main chord: the length difference of inside and outside two lifting lugs is determined by accurately calculating, so that main chord has just been reached the inclined angle of installation positioning in rigid lifting, reduces the disadvantage that main chord leaning angle is not easy adjustment and monitoring measurement hardly possible in the sky;The interior receipts distance of main chord is controlled by setting lateral connection system: respectively drawing steel cable and guide chain in main chord rear and front end, after ground is left in rod piece lifting, by drawing guide chain that the distance of main chord rear and front end is adjusted to setting value, pose adjustment that is simple in the case where not increasing hanging device hoist burden other than main chord, accurately completing receipts distance in main chord, the weight for reducing measure other than bridge rod piece effectively raises the efficiency of rod piece pose adjustment in the sky.

Description

The method for installing basket type steel truss arch main chord
Technical field
The present invention relates to large-span steel braced arch hoisting technology field, specifically a kind of installation basket type steel truss arch main chord Method.
Background technique
Chord member is lifted in Arch Bridge Construction at present and mainly uses the whole segment lifting of shoulder pole girder or single rib, single member erection, it is whole Segment lifting is limited by hanging device, it is desirable that span is big, tonnage is big and needs to be arranged powerful shoulder pole girder, largely On increase additional hoist;Greatly due to the variation of CFST X-type arch direction across bridge span, unilateral member erection needs transverse adjustment device, but One powerful anchor point is set in the high-altitude of cantilever and implements extremely difficult, and is very risky, CFST X-type arch member erection Pose adjustment content is broadly divided into three kinds: the elevation angle, leaning angle, interior receipts distance, wherein leaning angle and interior distance of receiving is the difficulties of lifting Point, rod piece leaning angle is not easy adjustment in the sky and monitoring measurement is difficult.
Summary of the invention
Present invention seek to address that the above problem, to provide a kind of method of installation basket type steel truss arch main chord, the party Method reduces the weight of measure other than bridge rod piece, effectively raises the efficiency of rod piece pose adjustment in the sky.
The present invention solves described problem, the technical solution adopted is that:
A method of installation basket type steel truss encircles main chord, includes the following steps:
(1) two main chord is respectively placed in the two sides of steel truss arch, four lifting lugs of installation on the upper surface of each main chord, and four Lifting lug is arranged in four right angles position of the upper surface of main chord in symmetry shape, positioned at the lifting lug of inside and the lifting lug in outside Length it is different, the leaning angle of main chord is controlled by the length of lifting lug on main chord, by accurately calculate determine in outside The length difference of lifting lug, inclined angle when main chord being made just to have reached installation in rigid lifting;
(2) it is separately connected lifting lug and hanging device up and down using suspender, passes through lateral connection between two main chord inside lugs For system's connection to connect two main chords, lateral connection system includes wirerope and guide chain, one of main chord inside Two lifting lugs be connected separately with wirerope, two on the inside of another main chord lifting lug is connected separately with guide chain, then by steel Cord is connected with corresponding guide chain, and wirerope and guide chain are in relaxed state at this time;
(3) stop lifting by crane after main chord being hung ground using hanging device, construction personnel moves to main chord upper surface, by right Guide chain is drawn to adjust the distance of two main chord rear and front ends to setting value, the interior receipts distance of main chord is to be adjusted at this time Position;
(4) after operator leaves, reach the elevation angle of main chord by adjusting the differences in height of two suspension hooks before and after hanging device Steel truss arch main chord is finally hung to specified position according to desired trajectory by cable crane by setting value.
The present invention by adopting the above technical scheme, compared with prior art, the feature protruded is:
This method controls main chord leaning angle by the way that the length of lifting lug on main chord is arranged in: by accurately calculating inside and outside determining The length difference of two lifting lugs makes main chord just reach the inclined angle of installation positioning in rigid lifting, reduces main chord introversion Angle is not easy the disadvantage of adjustment and monitoring measurement hardly possible in the sky;The interior receipts distance of main chord is controlled by setting lateral connection system: After main chord rear and front end respectively draws steel cable and guide chain, rod piece lifting to leave ground, by drawing guide chain will be before and after main chord The distance at both ends is adjusted to setting value, simple in the case where not increasing hanging device hoist burden other than main chord, accurate The pose adjustment for receiving distance in main chord is completed, reduces the weight of measure other than bridge rod piece, effectively raises rod piece The efficiency of pose adjustment in the sky.
Preferably, the further technical solution of the present invention is:
Main chord is connect with lifting lug by high-strength bolt;Suspender is connect by snap ring with lifting lug, and suspender is using flexible suspender belt;Suspender It hooks on the suspension hook of hanging device, hanging device is cable crane.
Detailed description of the invention
Fig. 1 is schematic view of the front view of the embodiment of the present invention;
Fig. 2 is the partial enlargement structural representation of A in Fig. 1;
Fig. 3 is the overlooking structure diagram of Fig. 1;
Fig. 4 is the left view structural representation of Fig. 1;
In figure: main chord 1;Lifting lug 2;High-strength bolt 3;Deep floor 4;Snap ring 5;Suspender 6;Cable crane suspension hook 7;Wirerope 8;It leads Chain 9.
Specific embodiment:
Below with reference to embodiment, the invention will be further described, and purpose, which is only that, more fully understands the content of present invention, therefore, institute The example of act is not intended to limit protection scope of the present invention.
Referring to Fig. 1, Fig. 2, Fig. 3, Fig. 4, a method of installation basket type steel truss encircles main chord, includes the following steps:
(1) two main chord 1 is respectively placed in the two sides of steel truss arch, and four lifting lugs 2 are installed on the upper surface of each main chord 1, Main chord 1 is connect with lifting lug 2 by high-strength bolt 3, and four lifting lugs 2 are in the upper surface that symmetry shape is arranged in main chord 1 Four right angles position, it is different positioned at the lifting lug 2 of inside and the length of lifting lug 2 in outside, pass through the length of lifting lug 2 on main chord 1 Control the leaning angle of main chord 1, by accurately calculate determine in outside lug 2 length difference, make main chord 1 in rigid lifting Inclined angle when installation is just reached.
(2) it being separately connected lifting lug 2 and cable crane suspension hook 7 using about 6 suspender, suspender 6 is connect by snap ring 5 with lifting lug 2, Suspender 6 is hung on cable crane suspension hook 7 using flexible suspender belt, suspender 6, passes through lateral connection between two 1 inside lugs 2 of main chord For system's connection to connect two main chords 1, lateral connection system includes wirerope 8 and guide chain 9, one of main chord 1 Two lifting lugs 2 of inside are connected separately with wirerope 8, and two lifting lugs 2 of another 1 inside of main chord are connected separately with guide chain 9, Then wirerope 8 is connected with corresponding guide chain 9, wirerope 8 and guide chain 9 are in relaxed state at this time.
(3) stop lifting by crane after main chord 1 being hung ground using cable crane, construction personnel moves to 1 upper surface of main chord, leads to It crosses to drawing guide chain 9 to adjust the distance of two 1 rear and front ends of main chord to setting value, the interior receipts distance of main chord 1 is at this time It is adjusted in place.
(4) after operator leaves, make main string by adjusting the differences in height of main chord 1 former and later two cable crane suspension hooks 7 The elevation angle of bar 1 reaches setting value, and main chord 1 is finally hung to specified position according to desired trajectory by cable crane.
Lifting lug 2 is welded by bottom plate and riser, and deep floor 4 is welded between riser two sides and bottom plate, is processed on bottom plate There is bolt hole, the mounting hole cooperated with snap ring 5 is machined in vertical version, on the deep floor 4 of the lifting lug 2 of 1 inside of main chord It is machined with the connecting hole for connecting steel wire ropes 8 and guide chain 9, each 1 top surface of main chord sets four lifting lugs 2, main chord 1 and lifting lug 2 are connected by high-strength bolt 3, are equipped with bolt hole on main chord 1 and lifting lug 2, are determined by calculation on each lifting lug 2 and are reserved spiral shell The quantity of keyhole, high-strength bolt 3 are each passed through the bolt hole on main chord 1 and lifting lug 2.
Lateral connection system includes wirerope 8 and guide chain 9, inside on 8 one end of wirerope and one of 1 upper surface of main chord Lifting lug 2 be connected, one end of 8 other end of wirerope and guide chain 9 and connection, 9 other end of guide chain and another 1 upper surface of main chord The lifting lug 2 of upper inside connects.
The line of outside two lifting lugs, 2 top lifting hole(eyelet) central point and the angle of 1 top surface of main chord are equal to main chord in main chord 1 1 leaning angle.
This method controls the leaning angle of main chord 1 by the way that the length of lifting lug 2 on main chord 1 is arranged in, by accurately counting The length difference for determining inside and outside two lifting lugs 2 is calculated, so that main chord 1 has just been reached the inclined angle of installation positioning in rigid lifting, reduces 1 leaning angle of main chord is not easy the disadvantage of adjustment and monitoring measurement hardly possible in the sky;This method is controlled by setting lateral connection system Steel cable 8 and guide chain 9 are respectively drawn in the interior receipts distance of main chord 1 processed, 1 rear and front end of main chord, and ground is left in the lifting of main chord 1 Afterwards, by drawing guide chain 9 that the distance of 1 rear and front end of main chord is adjusted to setting value, do not increasing hanging device other than main chord 1 Hoist is simple in the case where bearing, accurately completes the pose adjustment that distance is received in main chord 1, reduces other than bridge rod piece The weight of measure effectively raises the efficiency of rod piece pose adjustment in the sky.
The foregoing is merely preferably feasible embodiment of the invention, not thereby limiting the scope of the invention, It is all to use equivalence changes made by description of the invention and its accompanying drawing content, it is intended to be included within the scope of the present invention.

Claims (2)

1. a kind of method of installation basket type steel truss arch main chord, which comprises the steps of:
(1) two main chord is respectively placed in the two sides of steel truss arch, four lifting lugs of installation on the upper surface of each main chord, and four Lifting lug is arranged in four right angles position of the upper surface of main chord in symmetry shape, positioned at the lifting lug of inside and the lifting lug in outside Length it is different, the leaning angle of main chord is controlled by the length of lifting lug on main chord, by accurately calculate determine in outside The length difference of lifting lug, inclined angle when main chord being made just to have reached installation in rigid lifting;
(2) it is separately connected lifting lug and hanging device up and down using suspender, passes through lateral connection between two main chord inside lugs For system's connection to connect two main chords, lateral connection system includes wirerope and guide chain, one of main chord inside Two lifting lugs be connected separately with wirerope, two on the inside of another main chord lifting lug is connected separately with guide chain, then by steel Cord is connected with corresponding guide chain, and wirerope and guide chain are in relaxed state at this time;
(3) stop lifting by crane after main chord being hung ground using hanging device, construction personnel moves to main chord upper surface, by right Guide chain is drawn to adjust the distance of two main chord rear and front ends to setting value, the interior receipts distance of main chord is to be adjusted at this time Position;
(4) after operator leaves, reach the elevation angle of main chord by adjusting the differences in height of two suspension hooks before and after hanging device Steel truss arch main chord is finally hung to specified position according to desired trajectory by cable crane by setting value.
2. the method for installation basket type steel truss arch main chord according to claim 1, it is characterised in that: main chord and lifting lug It is connected by high-strength bolt;Suspender is connect by snap ring with lifting lug, and suspender is using flexible suspender belt;Suspender hooks hanging in hanging device On hook, hanging device is cable crane.
CN201910496424.4A 2019-06-10 2019-06-10 Method for installing basket type steel truss arch main chord member Active CN110080083B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910496424.4A CN110080083B (en) 2019-06-10 2019-06-10 Method for installing basket type steel truss arch main chord member

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910496424.4A CN110080083B (en) 2019-06-10 2019-06-10 Method for installing basket type steel truss arch main chord member

Publications (2)

Publication Number Publication Date
CN110080083A true CN110080083A (en) 2019-08-02
CN110080083B CN110080083B (en) 2021-08-20

Family

ID=67423860

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910496424.4A Active CN110080083B (en) 2019-06-10 2019-06-10 Method for installing basket type steel truss arch main chord member

Country Status (1)

Country Link
CN (1) CN110080083B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110409322A (en) * 2019-08-27 2019-11-05 中铁二局集团有限公司 A kind of bridge steel upright post hoisting rotary body device and swivel method
CN113668391A (en) * 2021-08-03 2021-11-19 中交路桥建设有限公司 Double-width arch rib synchronous installation method of half-through steel box basket arch bridge

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07196284A (en) * 1994-01-06 1995-08-01 Penta Ocean Constr Co Ltd Suspension having hydraulic cylinder
JPH07252082A (en) * 1994-03-15 1995-10-03 Nippon Steel Corp Plural load lifting device and setting method thereof
CN2644490Y (en) * 2003-06-09 2004-09-29 上海市基础工程公司 Hoisting, installing and adjusting device for large tonnage arch rib
CN202098976U (en) * 2011-05-10 2012-01-04 中交第二航务工程局有限公司 Device capable of freely adjusting sling length and overhead transverse posture of part
CN102556835A (en) * 2012-02-08 2012-07-11 中铁大桥局集团第五工程有限公司 Suspender capable of adjusting spatial angle of rod member of steel truss bridge
CN102733310A (en) * 2012-06-29 2012-10-17 中铁大桥局集团有限公司 Lifting construction method for arch rib segments of steel box handle-basket arch bridge
DE202013104215U1 (en) * 2013-09-16 2013-10-16 Richard Bauer Rohstoff-Großhandel GmbH & Co. KG Lifting frame for holding waste containers
CN204355946U (en) * 2014-12-22 2015-05-27 安徽伟宏钢结构集团股份有限公司 A kind of device lifting large wt pts
CN107338733A (en) * 2017-08-11 2017-11-10 中铁上海工程局集团有限公司 A kind of hanging apparatus and hanging method for adjusting and positioning for steel box arch rib aerial statue
US10259687B2 (en) * 2016-02-25 2019-04-16 Clayton P. Myers End cap and spreader bar system and method for sizing same

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07196284A (en) * 1994-01-06 1995-08-01 Penta Ocean Constr Co Ltd Suspension having hydraulic cylinder
JPH07252082A (en) * 1994-03-15 1995-10-03 Nippon Steel Corp Plural load lifting device and setting method thereof
CN2644490Y (en) * 2003-06-09 2004-09-29 上海市基础工程公司 Hoisting, installing and adjusting device for large tonnage arch rib
CN202098976U (en) * 2011-05-10 2012-01-04 中交第二航务工程局有限公司 Device capable of freely adjusting sling length and overhead transverse posture of part
CN102556835A (en) * 2012-02-08 2012-07-11 中铁大桥局集团第五工程有限公司 Suspender capable of adjusting spatial angle of rod member of steel truss bridge
CN102733310A (en) * 2012-06-29 2012-10-17 中铁大桥局集团有限公司 Lifting construction method for arch rib segments of steel box handle-basket arch bridge
DE202013104215U1 (en) * 2013-09-16 2013-10-16 Richard Bauer Rohstoff-Großhandel GmbH & Co. KG Lifting frame for holding waste containers
CN204355946U (en) * 2014-12-22 2015-05-27 安徽伟宏钢结构集团股份有限公司 A kind of device lifting large wt pts
US10259687B2 (en) * 2016-02-25 2019-04-16 Clayton P. Myers End cap and spreader bar system and method for sizing same
CN107338733A (en) * 2017-08-11 2017-11-10 中铁上海工程局集团有限公司 A kind of hanging apparatus and hanging method for adjusting and positioning for steel box arch rib aerial statue

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
蒋平江等: "蒙华铁路洛河钢管砼拱桥拱肋吊装施工技术", 《河南科学》 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110409322A (en) * 2019-08-27 2019-11-05 中铁二局集团有限公司 A kind of bridge steel upright post hoisting rotary body device and swivel method
CN110409322B (en) * 2019-08-27 2024-05-31 中铁二局集团有限公司 Bridge steel upright post hoisting and turning device and turning method
CN113668391A (en) * 2021-08-03 2021-11-19 中交路桥建设有限公司 Double-width arch rib synchronous installation method of half-through steel box basket arch bridge

Also Published As

Publication number Publication date
CN110080083B (en) 2021-08-20

Similar Documents

Publication Publication Date Title
CN109969946A (en) A kind of diaphram wall steel reinforcement cage hoisting and hanging construction safety method
CN202080812U (en) Dedicated sling system for large-scaled reinforcing cage
CN205489264U (en) Hydraulic pressure assembled crossing structure
CN102733615B (en) Unsymmetrical integral lifting construction method
CN109911770B (en) Construction method for hoisting gantry crane
CN110080083A (en) The method for installing basket type steel truss arch main chord
CN205576744U (en) Special jack -up hoist is erect to cable -stay bridge cordless district large -tonnage steel case girder segment section
CN205296844U (en) Precast box girder steel strand wires hoisting point
CN212270712U (en) Construction device for mounting and dismounting steel box girder by suspension of bridge girder erection machine
CN114314323A (en) Prefabricated part lifting appliance and lifting deviation rectifying method
CN107419665B (en) Large-span steel beam hoisting sling and steel beam hoisting method thereof
CN207078903U (en) It is a kind of to be used to lift the lower spreader assembly of large span arc multilayer steel truss and lower sling system
CN206458074U (en) A kind of aerial work basket outer support support
CN108217429A (en) A kind of assemble type hanger and hanging method
CN110040632A (en) A kind of segmental hoisting construction method of large span section steel beam
CN214301281U (en) Construction platform for connecting steel truss girder and bridge deck slab
CN108755383A (en) Steel construction arch bridge is using short button tower or the segmentation integral hoisting method without button tower
CN104085832A (en) Flexible component lifting device and lifting method thereof
CN106495026B (en) Construction tower crane temporarily builds attachment
CN215160368U (en) Be used for climbing frame and demolish artifical hoisting device
CN112854012B (en) Cable crane for suspension bridge with four main cables
CN110316649A (en) A kind of suspender and hanging method suitable for irregular truss
CN208265608U (en) Large-tonnage hoisting device for reinforcement cage
CN207143742U (en) A kind of large-span steel girder hoisting appliance
CN109132839B (en) The boom hoisting of building block unit

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20210803

Address after: 300000 Shuanggang Township, Jinnan District, Tianjin

Applicant after: CHINA RAILWAY 18TH BUREAU GROUP Co.,Ltd.

Applicant after: THE 2ND ENGINEERING CO., LTD OF CHINA RAILWAY 18TH BUREAU GROUP Co.,Ltd.

Applicant after: China Railway 18th Bureau Group South Engineering Co., Ltd

Address before: 064000 No.14 community, Fengrun District, Tangshan City, Hebei Province (No.8, Guanghua Road)

Applicant before: THE 2ND ENGINEERING CO., LTD OF CHINA RAILWAY 18TH BUREAU GROUP Co.,Ltd.

Applicant before: CHINA RAILWAY 18TH BUREAU GROUP Co.,Ltd.

GR01 Patent grant
GR01 Patent grant