- CN106495026B CN106495026B CN201710013129.XA CN201710013129A CN106495026B CN 106495026 B CN106495026 B CN 106495026B CN 201710013129 A CN201710013129 A CN 201710013129A CN 106495026 B CN106495026 B CN 106495026B
- Authority
- CN
- China
- Prior art keywords
- anchoring ring
- tower body
- pedestal
- attachment
- tower
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C23/00—Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
- B66C23/16—Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes with jibs supported by columns, e.g. towers having their lower end mounted for slewing movements
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C23/00—Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
- B66C23/62—Constructional features or details
- B66C23/72—Counterweights or supports for balancing lifting couples
- B66C23/74—Counterweights or supports for balancing lifting couples separate from jib
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The present invention relates to a kind of construction tower cranes temporarily to build attachment, including tower crane tower body, it further include at least two attachment pedestals ipsilateral positioned at tower crane tower body, pedestal anchoring ring is fixed on the attachment pedestal, tower body anchoring ring I is fixed at the position being generally aligned in the same plane on the tower crane tower body with the pedestal anchoring ring, the tower crane tower body is further fixed on tower body anchoring ring II above or below tower body anchoring ring I, two horizontal Anchored Bars are wherein at least hinged between tower body anchoring ring I and each pedestal anchoring ring, fixed link is fixed between horizontal Anchored Bar in adjacent pedestal anchoring ring, oblique Anchored Bar is hinged between the fixed link and the tower body anchoring ring II.The present invention is set up securely, for the problem that deep basal pit and foundation pit periphery narrow and small place can be set up, efficiently solves tower crane reinforcing.
Description
Technical field
The present invention relates to construction engineering technical fields, and in particular to a kind of construction safety device, especially a kind of construction tower
It hangs and temporarily builds attachment.
Background technique
In Building Construction, tower crane using indispensable, with the construction of architectural engineering, the height of tower crane is not
Disconnected to increase, risk also increases therewith, this just needs to set up rock-steady structure, referred to as tower crane attachment in tower crane corresponding position.When need
When deep basal pit, which is installed, has non-demolition of buildings around tower crane and closing foundation ditch how tower crane attachment is set, tower crane is added
Admittedly being a great problem, adhere to for deep-excavation tower crane, designs a kind of construction tower crane and temporarily build attachment, good can solve
The reinforcing problem of tower crane in deep basal pit.
Summary of the invention
In view of the deficiencies of the prior art, the present invention provides a kind of construction tower cranes temporarily to build attachment, and this attachment device is taken
If efficiently solving tower crane reinforcing securely, for the problem that deep basal pit and foundation pit periphery narrow and small place can be set up.
The present invention is achieved through the following technical solutions:
A kind of construction tower crane is provided and temporarily builds attachment, including tower crane tower body, further includes at least two being located at tower crane tower body
Ipsilateral attachment pedestal, is fixed with pedestal anchoring ring on the attachment pedestal, on the tower crane tower body with the pedestal
Tower body anchoring ring I is fixed at the position that anchoring ring is generally aligned in the same plane, the tower crane tower body is in the top of tower body anchoring ring I
Or lower section is further fixed on tower body anchoring ring II, is wherein at least hinged with two between tower body anchoring ring I and each pedestal anchoring ring
Horizontal Anchored Bar, is fixed with fixed link between the horizontal Anchored Bar in adjacent pedestal anchoring ring, the fixed link with it is described
Tower body anchoring ring II between be hinged with oblique Anchored Bar.
Adhere between the stand anchoring ring of pedestal and the tower body anchoring ring I of tower crane tower body and connected by horizontal Anchored Bar, is filled
Divide the stability using triangle, enhances the stability of tower crane attachment, it is hinged in fixed fixed link between horizontal Anchored Bar
The other end of one oblique Anchored Bar and oblique Anchored Bar and the tower body anchoring ring II on tower crane tower body are hinged, constitute vertical plane triangle
Structure further improves the stability of tower crane attachment.
Preferably, the pedestal anchoring ring, tower body anchoring ring I and tower body anchoring ring II are logical by two adhesion frames
Connection bolt is crossed to be spliced.
Pedestal anchoring ring, tower body anchoring ring I and tower body anchoring ring II are set as the splicing of two adhesion frames, it is easy to disassemble with
Installation, and may be reused.
Preferably, be hinged between the tower body anchoring ring I and each pedestal anchoring ring two horizontal Anchored Bars and
Strengthening support is fixed between horizontal Anchored Bar.
Preferably, being fixed with girt between the attachment pedestal.
Girt is fixed pedestal is adhered to, and further enhances the triangular structure stability of pedestal Yu tower crane tower body.
Preferably, the attachment pedestal is equipped with two and symmetrical centered on tower crane tower body.
Two attachment pedestals, which are arranged, can satisfy the requirement of firm tower crane tower body, symmetrical so that structure is beautiful, more
Aesthetic feeling.
Preferably, the horizontal Anchored Bar and oblique Anchored Bar be respectively adjustable length horizontal Anchored Bar and can
The oblique Anchored Bar of adjustment length.
The horizontal Anchored Bar of adjustable length and the oblique Anchored Bar of adjustable length are set, can according to attachment pedestal with
The distance of tower crane tower body adjusts appropriate length, can be applied to more construction sites, has good general applicability.
Preferably, the horizontal Anchored Bar both ends pass through pin shaft between attachment pedestal and tower body anchoring ring I respectively
Hingedly.
Preferably, the oblique Anchored Bar both ends are cut with scissors between fixed link and tower body anchoring ring II by pin shaft respectively
It connects.
The both ends of horizontal Anchored Bar are respectively equipped with pin shaft hole, match with the pin shaft hole in pedestal anchoring ring and tower body anchoring ring I
It closes, and is realized hingedly by insertion pin shaft;The both ends of oblique Anchored Bar are respectively equipped with pin shaft hole, anchor in fixed link with tower body
Pin shaft hole cooperation on ring II, and realized hingedly by insertion pin shaft, it is easy to disassemble.
Beneficial effects of the present invention:
One, pass through hinged horizontal Anchored Bar and oblique attachment in tower body anchoring ring I, tower body anchoring ring II and pedestal anchoring ring
Bar makes full use of the stability of triangle, substantially increases the security and stability of tower crane;
Two, the adjustable in length of horizontal Anchored Bar and oblique Anchored Bar can satisfy the use of different condition, applicability
Extensively;
Three, it sets up securely, can be set up for deep basal pit and foundation pit periphery narrow and small place, and reusable, effectively solved
The problem of tower crane of having determined is reinforced.
Detailed description of the invention
Fig. 1 is top view of the invention;
Fig. 2 is front view of the invention;
It is as shown in the figure:
1, attachment pedestal, 2, pedestal anchoring ring, 3, connection bolt, 4, horizontal Anchored Bar and pedestal anchoring interannular pin shaft, 5,
Horizontal Anchored Bar, 6, strengthening support, 7, fixed link, 8, oblique Anchored Bar, pin shaft between 9, tower body anchoring ring II and oblique Anchored Bar,
10, tower crane tower body, 11, tower body anchoring ring II, 12, girt, 13, tower body anchoring ring I.
Specific embodiment
In order to clarify the technical characteristics of the invention, being illustrated below by specific embodiment to this programme.
A kind of construction tower crane is provided and temporarily builds attachment, including tower crane tower body 10, further includes at least two being located at tower crane tower
The ipsilateral attachment pedestal 1 of body 10 adheres between pedestal 1 and is fixed with girt 12, and attachment pedestal 1 can be set two, three
It is even more, as one embodiment of the present invention, as shown in Figure 1, set there are two attachment pedestal 1 and with tower crane tower body 10 as
Central symmetry distribution;
It is fixed with pedestal anchoring ring 2 on the attachment pedestal 1, is anchored on the tower crane tower body 10 with the pedestal
Tower body anchoring ring I13 is fixed at the position that ring 2 is generally aligned in the same plane, the tower crane tower body 10 is tower body anchoring ring I13's
Above or below be further fixed on tower body anchoring ring II11, as one embodiment of the present invention, as shown in Fig. 2, tower body anchors
Ring II11 is located at the top of tower body anchoring ring I13, the pedestal anchoring ring 1, tower body anchoring ring I13 and tower body anchoring ring II11
It is spliced by two adhesion frames by connecting bolt 3, tower crane tower body 10 and attachment pedestal 1 are square structure, pedestal
It is also rectangular that anchoring ring 2, tower body anchoring ring I13 and tower body anchoring ring II11 match therewith, so adhesion frame is half square knot
Structure simultaneously passes through connection 3 fixed bit of bolt, one square structure, certain pedestal anchoring ring 2 or other shapes, such as cylinder
The shapes such as shape, triangular prism, adhesion frame and 2 shape of pedestal anchoring ring match;
Two horizontal Anchored Bars 5 are wherein at least hinged between tower body anchoring ring I13 and each pedestal anchoring ring 2, it is adjacent
Pedestal anchoring ring 2 on horizontal Anchored Bar 5 between be fixed with fixed link 7, the fixed link 7 and the tower body anchoring ring
Oblique Anchored Bar 8 is hinged between II11.
It is hinged with two horizontal Anchored Bars 5 between the tower body anchoring ring I13 and each pedestal anchoring ring 2 and level is attached
Be fixed with strengthening support 6 between bar 5.
The horizontal Anchored Bar 5 and oblique Anchored Bar 8 is respectively that the horizontal Anchored Bar of adjustable length is grown with adjustable
The oblique Anchored Bar of degree.
It is cut with scissors between pedestal anchoring ring 2 and tower body anchoring ring I13 by pin shaft 4 respectively at 5 both ends of horizontal Anchored Bar
It connects.
8 both ends of oblique Anchored Bar are hinged by pin shaft 9 between fixed link 7 and tower body anchoring ring II11 respectively.
The present invention can manufacture adhering member according to design drawing, and component production, which finishes, to start to install, and installation procedure is such as
Under:
The position that attached wall frame is filled on tower crane tower body 10 adds provisional mounting platform, performs installation and prepares.Tower crane is installed
When tower body anchoring ring I13 and tower body anchoring ring II11, first the adhesion frame of 10 side of tower body is hung at the attachment point of tower body and (is answered
Sling adhesion frame level), it is fixed on tower crane tower body 10 with iron wire, then slings the other half adhesion frame just
Position, after determining that tower body anchoring ring I13 that two adhesion frames are spliced into or tower body anchoring ring II11 are in a horizontal position again into
Row is fixed;It is fixed after should appropriately adjusting if being not in horizontal position, two lateral frames are linked together with connection bolt 2
It is spliced into tower body anchoring ring I13 or tower body anchoring ring II11.It, will be horizontal attached when horizontal Anchored Bar 5 and oblique Anchored Bar 8 lift
Bar 5 and oblique Anchored Bar 8 be assembled to required length on the ground after be hung at attachment point, the pin shaft being aligned in adhesion frame
Hole is squeezed into connection pin shaft 4 and pin shaft 9, is then adjusted to attachment point adhesion frame again, and installation is completed.
Certainly, above description is also not limited to the example above, technical characteristic of the present invention without description can by or
It is realized using the prior art, details are not described herein;Above embodiments and attached drawing are only used to illustrate the technical scheme of the present invention not
It is limitation of the present invention, is described the invention in detail referring to preferred embodiment, the ordinary skill people of this field
Member is it should be appreciated that variation, remodeling, the addition that those skilled in the art are made within the essential scope of the present invention
Or replacement also should belong to claims of the invention without departure from spirit of the invention.
Claims (6)
1. a kind of construction tower crane temporarily builds attachment, including tower crane tower body, it is characterised in that: further include at least two positioned at tower crane
Tower body ipsilateral attachment pedestal is fixed with girt between the attachment pedestal, is fixed with base on the attachment pedestal
Seat anchoring ring is fixed with tower body anchoring at the position being generally aligned in the same plane on the tower crane tower body with the pedestal anchoring ring
Ring I, is hinged between two horizontal Anchored Bars and horizontal Anchored Bar between the tower body anchoring ring I and each pedestal anchoring ring
It is fixed with strengthening support, the tower crane tower body is further fixed on tower body anchoring ring II above or below tower body anchoring ring I, wherein
Two horizontal Anchored Bars are at least hinged between tower body anchoring ring I and each pedestal anchoring ring, in adjacent pedestal anchoring ring
It is fixed with fixed link between horizontal Anchored Bar, is hinged with oblique attachment between the fixed link and the tower body anchoring ring II
Bar.
2. construction tower crane according to claim 1 temporarily builds attachment, it is characterised in that: the pedestal anchoring ring, tower
Body anchoring ring I and tower body anchoring ring II is spliced by two adhesion frames by connecting bolt.
3. construction tower crane according to claim 1 temporarily builds attachment, it is characterised in that: the attachment pedestal is equipped with two
It is a and symmetrical centered on tower crane tower body.
4. construction tower crane according to claim 1 temporarily builds attachment, it is characterised in that: the horizontal Anchored Bar and tiltedly
It is respectively the horizontal Anchored Bar of adjustable length and the oblique Anchored Bar of adjustable length to Anchored Bar.
5. construction tower crane according to claim 1 or 4 temporarily builds attachment, it is characterised in that: the horizontal Anchored Bar
Both ends are hinged by pin shaft between pedestal anchoring ring and tower body anchoring ring I respectively.
6. construction tower crane according to claim 1 or 4 temporarily builds attachment, it is characterised in that: the oblique Anchored Bar
Both ends are hinged by pin shaft between fixed link and tower body anchoring ring II respectively.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710013129.XA CN106495026B (en) | 2017-01-09 | 2017-01-09 | Construction tower crane temporarily builds attachment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710013129.XA CN106495026B (en) | 2017-01-09 | 2017-01-09 | Construction tower crane temporarily builds attachment |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106495026A CN106495026A (en) | 2017-03-15 |
CN106495026B true CN106495026B (en) | 2019-02-26 |
Family
ID=58345170
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710013129.XA Active CN106495026B (en) | 2017-01-09 | 2017-01-09 | Construction tower crane temporarily builds attachment |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106495026B (en) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107826989B (en) * | 2017-11-07 | 2019-04-19 | 中国化学工程第三建设有限公司 | A kind of double tower for indirect cool tower installation hangs the installation method of adhering bar part |
CN115973932B (en) * | 2022-12-06 | 2023-06-20 | 中建二局第三建筑工程有限公司 | Universal hoop type tower crane attachment support with adjustable size and construction method thereof |
Family Cites Families (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0958975A (en) * | 1995-08-23 | 1997-03-04 | Taisei Corp | Support device with dampting function of crane support |
CN203079591U (en) * | 2013-01-17 | 2013-07-24 | 浙江禹建建设集团有限公司 | Crane wall-attaching steel-structure switch connection support |
CN203639005U (en) * | 2013-12-06 | 2014-06-11 | 上海建工五建集团有限公司 | Reinforcing device of tower crane |
CN203889955U (en) * | 2014-05-12 | 2014-10-22 | 南通庞源机械工程有限公司 | Tower crane attachment device of bridge tower |
CN204237472U (en) * | 2014-11-12 | 2015-04-01 | 中煤建筑安装工程集团有限公司 | Tower crane is adjustable attachment systems |
CN204727501U (en) * | 2015-04-20 | 2015-10-28 | 中国建筑第二工程局有限公司 | Tower crane attachment device for complex building |
CN205397785U (en) * | 2016-03-31 | 2016-07-27 | 海南庞源建筑机械租赁有限公司 | Construction elevator attaches wall interval superelevation subassembly |
CN206427941U (en) * | 2017-01-09 | 2017-08-22 | 山东华邦建设集团有限公司 | Construction tower crane builds attachment temporarily |
-
2017
- 2017-01-09 CN CN201710013129.XA patent/CN106495026B/en active Active
Also Published As
Publication number | Publication date |
---|---|
CN106495026A (en) | 2017-03-15 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP3329071B1 (en) | System and method for installing a tensioning tendon in a wind turbine tower | |
CN104895335B (en) | Method for mounting hanging pillar | |
CN106495026B (en) | Construction tower crane temporarily builds attachment | |
CN112942661B (en) | Construction method of stay cable with flexible cable net boundary | |
CN104060840A (en) | Construction method for lifting large-span dome net rack by using bolt sphere truss lifter | |
CN108915153A (en) | Assembly concrete superposed column installation method and system | |
CN208899886U (en) | Cantilever frame platform | |
CN105464456A (en) | Method and lifting sling for assembling extra-high voltage transmission iron tower through helicopter | |
CN101649683A (en) | Method for hoisting power transmission iron tower by assembly holding pole technology | |
CN201785144U (en) | Gin pole crane | |
CN205576744U (en) | Special jack -up hoist is erect to cable -stay bridge cordless district large -tonnage steel case girder segment section | |
CN205296844U (en) | Precast box girder steel strand wires hoisting point | |
CN206427941U (en) | Construction tower crane builds attachment temporarily | |
CN206720558U (en) | A kind of adjustable steel-reinforcement cage hanger | |
CN205953378U (en) | Tower crane counter weight is from dismouting to put | |
CN208981167U (en) | Suspension type constructing tie beam device | |
CN110040632A (en) | A kind of segmental hoisting construction method of large span section steel beam | |
CN104085832B (en) | A kind of method for improving of flexible member lifting device | |
CN107143198B (en) | A method of UHV transmission steel tower is found suitable for mountain area sternness location group | |
CN202988556U (en) | Special lifting appliance for angle-steel type frame body | |
CN110316649A (en) | A kind of suspender and hanging method suitable for irregular truss | |
CN208265608U (en) | Large-tonnage hoisting device for reinforcement cage | |
CN208981646U (en) | Assembly concrete superposed column installation system | |
CN109113354B (en) | Whole-course cableway type windproof real-time pulled cable wind system and construction method thereof | |
CN109132839B (en) | The boom hoisting of building block unit |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |