CN110029659A - One-time hole forming construction method for manual hole digging pile combining hollow hole blasting and rotary digging - Google Patents

One-time hole forming construction method for manual hole digging pile combining hollow hole blasting and rotary digging Download PDF

Info

Publication number
CN110029659A
CN110029659A CN201910318882.9A CN201910318882A CN110029659A CN 110029659 A CN110029659 A CN 110029659A CN 201910318882 A CN201910318882 A CN 201910318882A CN 110029659 A CN110029659 A CN 110029659A
Authority
CN
China
Prior art keywords
pile
hole
digging
center hole
emptying aperture
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910318882.9A
Other languages
Chinese (zh)
Inventor
姚大闯
凌峰
柯宇庆
辛涛涛
钱震刚
张银银
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Tiesiju Civil Engineering Group Co Ltd CTCE Group
Original Assignee
China Tiesiju Civil Engineering Group Co Ltd CTCE Group
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Tiesiju Civil Engineering Group Co Ltd CTCE Group filed Critical China Tiesiju Civil Engineering Group Co Ltd CTCE Group
Priority to CN201910318882.9A priority Critical patent/CN110029659A/en
Publication of CN110029659A publication Critical patent/CN110029659A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same
    • E02D5/36Concrete or concrete-like piles cast in position ; Apparatus for making same making without use of mouldpipes or other moulds

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Earth Drilling (AREA)

Abstract

The invention discloses a one-time pore-forming construction method of a manual hole digging pile combining hollow hole blasting and rotary digging, which is characterized in that a pile center hole and peripheral hollow holes of the manual hole digging pile are lofted on the leveled ground, and a top hammer drilling machine is adopted to drill holes to respectively form the peripheral hollow holes and the pile center hole; filling explosive by taking the central hole of the pile as a blast hole and blasting the central hole of the pile, wherein an explosion pressure stress wave is reflected into a tensile stress wave through a peripheral hollow hole, and the rock is fractured at a reflecting surface to break the rock mass; and (4) rotary excavating the broken rock mass by using a rotary drilling rig to realize one-time hole forming of the manual hole digging pile. The invention particularly aims at the complete or more complete rock pile foundation with the depth not more than 15m and the rock mass integrity index not less than 0.55, and obtains remarkable economic and social benefits in various aspects such as accelerating the engineering progress, reducing the construction cost, ensuring the safety of personnel construction and the like.

Description

The artificial digging pile one-step pore-creating construction method of emptying aperture explosion combination rotary digging
Technical field
The present invention relates to manual digging pile construction methods, and more specifically in particular to depth ≯ 15m, rock are continuous whole Or the construction method of more complete artificial digging pile.
Background technique
For the artificial digging pile of rock matter pile foundation, there are mainly two types of construction methods in the prior art, and one is multi-segmentals Explosion, and multi-segmental retaining wall excavates, but the process of its multiple Blasting Excavation is fairly time consuming, work efficiency is very low;Another kind is using height The uninterrupted rotary digging of performance rotary drilling rig is excavated after the completion of grinding rock, and rotary drilling rig makes drill bit because hard grind consumes during this Abrasion is quite serious, causes construction cost high.
Summary of the invention
The present invention is to provide a kind of the artificial of emptying aperture explosion combination rotary digging to avoid above-mentioned deficiency of the prior art Caisson one-step pore-creating construction method, to shorten the caisson pore-forming time, overcome that rotary drilling rig is time-consuming and what bit wear was big lacks Point reduces construction cost.
The present invention adopts the following technical scheme that in order to solve the technical problem
The characteristics of artificial digging pile one-step pore-creating construction method of emptying aperture explosion combination rotary digging of the present invention is as follows It carries out:
Step 1: passing through the pile center hole of surveying and locating artificial digging pile and periphery emptying aperture on grade;
Step 2: drilling being implemented using top hammer drilling machine, drilling carries out one by one by the emptying aperture of periphery, finally to pile center hole Terminate;
Step 3: using the pile center hole as blasthole, explosive is loaded in the pile center hole, and in the upper of pile center hole Section forms plug-hole section by blocking;Implement explosion for the pile center hole, the compression stress wave that explodes is reflected into drawing through periphery emptying aperture Stress wave makes rock crushing by rock drawing crack at reflecting surface;
Step 4: carrying out rotary digging for broken rock mass using rotary drilling rig, realize the one-step pore-creating of artificial digging pile.
The characteristics of artificial digging pile one-step pore-creating construction method of emptying aperture explosion combination rotary digging of the present invention, lies also in: the stake The aperture of centre bore is 90~130mm, and pile center hole is 50~100cm with respect to the ultra-deep h2 of caisson hole baseline;The periphery The aperture of emptying aperture is 70~115mm, and periphery emptying aperture is circumferentially uniformly distributed, and the spacing L of adjacent two periphery emptying apertures is on circumference 40~50cm, periphery emptying aperture are 30~50cm with respect to the ultra-deep h1 of caisson hole baseline.
The characteristics of artificial digging pile one-step pore-creating construction method of emptying aperture explosion combination rotary digging of the present invention, lies also in: setting institute The length for stating plug-hole section is 100~200cm.
The characteristics of artificial digging pile one-step pore-creating construction method of emptying aperture explosion combination rotary digging of the present invention, lies also in: the people Work caisson refers to the complete or more complete rock pile foundation for depth ≯ 15m, rock mass integrity index ≮ 0.55.
Compared with the prior art, the invention has the advantages that:
1, the present invention combines explosion with rotary digging, first passes through explosion for rock blasting fragmentation in artificial digging pile, then benefit Quickly the rock rotary digging of fragmentation is come out with rotary drilling rig, realizes disposal pore-forming;Caisson digging time is substantially reduced, and Therefore the security risk of personnel's underground construction is reduced.
2, the method for the present invention largely reduced the damage of the hard grind to drill bit of drilling machine, effectively reduce the use of drilling bit of rotary-digging drilling rig And maintenance cost, reduce construction cost.
3, implement explosion for pile center hole in the present invention, the compression stress wave that explodes is reflected into tensile stress through periphery emptying aperture Wave makes rock crushing by rock drawing crack at reflecting surface, is convenient for the light spiral-digging pore of rotary drilling rig, periphery is uniformly distributed sky Hole, effective protection artificial digging pile peripheral rock, and smooth arc surface can be created for artificial digging pile pile body.
Detailed description of the invention
Fig. 1 is pile center hole and periphery emptying aperture plan view in the present invention;
Fig. 2 is pile center hole and periphery emptying aperture facade arrangement schematic diagram in the present invention;
Fig. 3 loads explosive schematic diagram as blasthole for pile center hole in the present invention;
Fig. 4 is the method for the present invention construction completion into hole pattern;
Figure label: 1 pile center hole, 2 periphery emptying apertures, 3 explosives, 4 plug-hole sections, 5 hole baselines, H are caisson depth, and h1 is Periphery emptying aperture ultra-deep, h2 are pile center hole ultra-deep.
Specific embodiment
Referring to figure 1, figure 2 and figure 3, the artificial digging pile one-step pore-creating construction party of the present embodiment hollow hole explosion combination rotary digging Method is to carry out as follows:
Step 1: passing through the pile center hole 1 of surveying and locating artificial digging pile and periphery emptying aperture 2 on grade.
Step 2: implementing to drill vertically downward using top hammer drilling machine, drilling carries out one by one by periphery emptying aperture 2, finally extremely Pile center hole 1 terminates;The aperture that pile center hole 1 is arranged is 90~130mm, ultra-deep of the pile center hole 1 with respect to caisson hole baseline 5 H2 is 50~100cm, therefore the hole depth in pile center hole 1 is the sum of caisson depth H and ultra-deep h2;The aperture of periphery emptying aperture 2 is 70~115mm, periphery emptying aperture 2 are circumferentially uniformly distributed, and the spacing L of adjacent two periphery emptying apertures 2 is 40~50cm, week on circumference Side emptying aperture 2 is 30~50cm with respect to the ultra-deep h1 of caisson hole baseline 5, and the hole depth of periphery emptying aperture 2 is caisson depth H and ultra-deep The sum of h1;In specific implementation, the aperture in pile center hole 1 should be greater than the aperture of periphery emptying aperture 2.
Step 3: being blasthole with pile center hole 1, explosive 3 is loaded in pile center hole 1, and logical in the upper section in pile center hole 1 It crosses blocking and forms plug-hole section 4, the length of setting plug-hole section 4 is 100~200cm;Implement explosion for pile center hole 1;Explosive is quick-fried Compression stress wave is transmitted after fried in country rock, generates radial explosion compression, explosion compression stress wave is reflected into through periphery emptying aperture 2 to week The tensile stress wave of side emptying aperture 2, makes rock crushing.
Step 4: rotary digging is carried out for broken rock mass using rotary drilling rig, realizes the one-step pore-creating of artificial digging pile, and And form smooth arc surface.
Construction method of the present invention is particularly suitable for depth ≯ 15m, the complete or more complete rock of rock mass complete exponential ≮ 0.55 Matter pile foundation, can fast pore-creating, not only saved caisson digging time but also reduced artificial underground construction security risk, reduce rotation Dig drill bit reinforcing and maintenance cost.According to " Code for investigation of geotechnical engineering GB50021 ", rock mass integrity index is rock mass compression Square of the ratio between wave velocity and sillar compressional wave, table 1 show rock mass completeness classification.
The classification of 1 rock mass completeness of table
Integrated degree Completely It is more complete It is relatively broken It is broken It is smashed to pieces
Perfection Index Greater than 0.75 0.75-0.55 0.55-0.35 0.35-0.15 Less than 0.15
Construction method of the present invention is applied successfully to Xintai City to the village Tai Er (Lu Sujie) highway Xintai City to the village Tai Er kalimeris and collects It is the caisson of 1.8m, a length of 12m of stake, setting for diameter in artificial digging pile engineering of the three contract section depth of section less than 15m Pile center's bore dia is 130mm, and uniformly distributed 13 periphery emptying apertures, the diameter of periphery emptying aperture are set on the circumferential position that diameter is 1.8m It is set to 115mm, the smooth rounding of pore-forming applies artificial caisson engineering as shown in figure 4, effectively shorten the manual digging pile construction period Work is speeding up the work, is reducing construction cost, ensuring that the various aspects such as personnel's construction safety obtain distinct economic and society It can benefit.

Claims (4)

1. the artificial digging pile one-step pore-creating construction method of emptying aperture explosion combination rotary digging, it is characterized in that carrying out as follows:
Step 1: passing through the pile center hole (1) of surveying and locating artificial digging pile and periphery emptying aperture (2) on grade;
Step 2: drilling being implemented using top hammer drilling machine, drilling carries out one by one by periphery emptying aperture (2), finally to pile center hole (1) terminate;
Step 3: with the pile center hole (1) for blasthole, loading explosive (3) in the pile center hole (1), and in pile center hole (1) upper section forms plug-hole section (4) by blocking;Implement explosion for the pile center hole (1), the compression stress wave that explodes is through periphery Emptying aperture (2) is reflected into tensile stress wave, by rock drawing crack at reflecting surface, makes rock crushing;
Step 4: carrying out rotary digging for broken rock mass using rotary drilling rig, realize the one-step pore-creating of artificial digging pile.
2. the artificial digging pile one-step pore-creating construction method of emptying aperture explosion combination rotary digging according to claim 1, feature It is:
The aperture of the pile center hole (1) is 90~130mm, and pile center hole (1) is with respect to the ultra-deep h2 of caisson hole baseline (5) 50~100cm;The aperture of the periphery emptying aperture (2) is 70~115mm, and periphery emptying aperture (2) is circumferentially uniformly distributed, phase on circumference The spacing L of adjacent two periphery emptying apertures (2) is 40~50cm, and periphery emptying aperture (2) is 30 with respect to the ultra-deep h1 of caisson hole baseline (5) ~50cm.
3. the artificial digging pile one-step pore-creating construction method of emptying aperture explosion combination rotary digging according to claim 1 or 2, special Sign is: the length that the plug-hole section (4) is arranged is 100~200cm.
4. the artificial digging pile one-step pore-creating construction method of emptying aperture explosion combination rotary digging according to claim 1, feature Be: the artificial digging pile refers to the complete or more complete rock stake for depth ≯ 15m, rock mass integrity index ≮ 0.55 Base.
CN201910318882.9A 2019-04-19 2019-04-19 One-time hole forming construction method for manual hole digging pile combining hollow hole blasting and rotary digging Pending CN110029659A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910318882.9A CN110029659A (en) 2019-04-19 2019-04-19 One-time hole forming construction method for manual hole digging pile combining hollow hole blasting and rotary digging

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910318882.9A CN110029659A (en) 2019-04-19 2019-04-19 One-time hole forming construction method for manual hole digging pile combining hollow hole blasting and rotary digging

Publications (1)

Publication Number Publication Date
CN110029659A true CN110029659A (en) 2019-07-19

Family

ID=67239291

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910318882.9A Pending CN110029659A (en) 2019-04-19 2019-04-19 One-time hole forming construction method for manual hole digging pile combining hollow hole blasting and rotary digging

Country Status (1)

Country Link
CN (1) CN110029659A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110595306A (en) * 2019-09-05 2019-12-20 中国科学技术大学 Construction method of efficient blasting pile foundation based on principle that external free surface forms tensile wave superposition boundary region
CN110820726A (en) * 2019-11-18 2020-02-21 中国葛洲坝集团路桥工程有限公司 Pile foundation pore-forming method in environment where disturbance is not suitable for surrounding of hard rock in mountainous area
CN111140168A (en) * 2020-01-02 2020-05-12 中南大学 Hard rock stratum punching pile hole forming pretreatment method
CN111705815A (en) * 2020-05-28 2020-09-25 三明学院 Hard rock stratum pre-drilling static blasting man-cut pile auxiliary construction method
CN113737781A (en) * 2021-09-13 2021-12-03 中建一局集团第二建筑有限公司 Combined type hole digging pile construction structure and construction method thereof

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100676914B1 (en) * 2006-06-13 2007-02-01 주식회사 무진네오테크 Excavating method of tunnel with slight vibration
CN103557758A (en) * 2013-11-01 2014-02-05 中铁四局集团有限公司 Expanded excavation area hole inside and outside combined delay subarea differential initiation network in tunnel blasting
CN106225618A (en) * 2016-08-29 2016-12-14 华北科技学院 The method split is expanded in a kind of semo-infinite rock mass borehole blasting
CN107762399A (en) * 2017-11-24 2018-03-06 中交第二航务工程局有限公司 Explosion coordinates rotary drilling rig deep layer one-step pore-creating construction method
CN108278939A (en) * 2018-01-25 2018-07-13 安徽理工大学 A kind of blasting method for reducing rock convergence measure and reducing blasting vibration
CN109281672A (en) * 2017-07-21 2019-01-29 中国铁建重工集团有限公司 A kind of hard rock tunnel excavation method

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100676914B1 (en) * 2006-06-13 2007-02-01 주식회사 무진네오테크 Excavating method of tunnel with slight vibration
CN103557758A (en) * 2013-11-01 2014-02-05 中铁四局集团有限公司 Expanded excavation area hole inside and outside combined delay subarea differential initiation network in tunnel blasting
CN106225618A (en) * 2016-08-29 2016-12-14 华北科技学院 The method split is expanded in a kind of semo-infinite rock mass borehole blasting
CN109281672A (en) * 2017-07-21 2019-01-29 中国铁建重工集团有限公司 A kind of hard rock tunnel excavation method
CN107762399A (en) * 2017-11-24 2018-03-06 中交第二航务工程局有限公司 Explosion coordinates rotary drilling rig deep layer one-step pore-creating construction method
CN108278939A (en) * 2018-01-25 2018-07-13 安徽理工大学 A kind of blasting method for reducing rock convergence measure and reducing blasting vibration

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110595306A (en) * 2019-09-05 2019-12-20 中国科学技术大学 Construction method of efficient blasting pile foundation based on principle that external free surface forms tensile wave superposition boundary region
CN110820726A (en) * 2019-11-18 2020-02-21 中国葛洲坝集团路桥工程有限公司 Pile foundation pore-forming method in environment where disturbance is not suitable for surrounding of hard rock in mountainous area
CN111140168A (en) * 2020-01-02 2020-05-12 中南大学 Hard rock stratum punching pile hole forming pretreatment method
CN111140168B (en) * 2020-01-02 2021-05-04 中南大学 Hard rock stratum punching pile hole forming pretreatment method
CN111705815A (en) * 2020-05-28 2020-09-25 三明学院 Hard rock stratum pre-drilling static blasting man-cut pile auxiliary construction method
CN113737781A (en) * 2021-09-13 2021-12-03 中建一局集团第二建筑有限公司 Combined type hole digging pile construction structure and construction method thereof

Similar Documents

Publication Publication Date Title
CN110029659A (en) One-time hole forming construction method for manual hole digging pile combining hollow hole blasting and rotary digging
CN1072302C (en) Method for controlled fragmentation of hard rock and concrete by the combination use of impact hammers and small charge blasting
CN107631669B (en) A kind of Cut Blasting optimum design method under large ground pressure
CN101806066B (en) Method for molding vertical wall of deep foundation pit
CN101196117A (en) Non-blasting digging method for tunnel and underground project
CN108729924A (en) A kind of urban hard rock tunnel mechanical excavation rapid constructing method
CN103046931B (en) Method for forming holes of vertical shaft/pilot shaft through impact type drilling machine in impacting mode
CN107313783A (en) Groove presplitting impact type rock breaking method
CN109281672A (en) A kind of hard rock tunnel excavation method
CN109306869A (en) The high-intensitive rock splitting method and mitotic apparatus alternately coupled based on force model
KR102131823B1 (en) Method of excavation
CN107576233B (en) A kind of equivalent ellipsoidal hole setting orientation broken rock method
CN107514263A (en) Impact type TBM
KR101994221B1 (en) Looser blasting method for excavating of hard rock using ripper
CN111911164B (en) Environment-friendly hard rock mass groove excavation method
CN104990467A (en) Digging pile hard rock section combined construction method
CN209961089U (en) Well stroke ization shale geology is bored to explode and is buried medicine structure
CN101886546B (en) Method for inhibiting roof deformation of coal mine underground bolt and anchor cable roadway
CN111335312A (en) Rock-entering construction process for large-diameter lock catch steel pipe pile
KR101286128B1 (en) Method for reaming vertical tunnel
CN112729035B (en) Integral static blasting device for relatively complete rock stratum and construction method thereof
JP7061853B2 (en) A method of manufacturing materials by collecting excavated materials from excavated parts of rocks as materials.
CN109522623B (en) High-strength rock splitting method and splitting device based on weak surface
CN111322070B (en) Stone excavation method based on mine hammer
CN208220631U (en) Improve the pretreatment hole structure of rock stratum impact holing work efficiency

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190719