CN101886546B - Method for inhibiting roof deformation of coal mine underground bolt and anchor cable roadway - Google Patents

Method for inhibiting roof deformation of coal mine underground bolt and anchor cable roadway Download PDF

Info

Publication number
CN101886546B
CN101886546B CN2010102176310A CN201010217631A CN101886546B CN 101886546 B CN101886546 B CN 101886546B CN 2010102176310 A CN2010102176310 A CN 2010102176310A CN 201010217631 A CN201010217631 A CN 201010217631A CN 101886546 B CN101886546 B CN 101886546B
Authority
CN
China
Prior art keywords
anchor cable
roof
drilling
top board
roadway
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2010102176310A
Other languages
Chinese (zh)
Other versions
CN101886546A (en
Inventor
李井坤
孙洪峰
刘国锋
王德民
丘其祥
陶松利
石海东
田占东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tiefa Coal Industry (group) Co Ltd Daxing Coal Mine
Original Assignee
Tiefa Coal Industry (group) Co Ltd Daxing Coal Mine
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tiefa Coal Industry (group) Co Ltd Daxing Coal Mine filed Critical Tiefa Coal Industry (group) Co Ltd Daxing Coal Mine
Priority to CN2010102176310A priority Critical patent/CN101886546B/en
Publication of CN101886546A publication Critical patent/CN101886546A/en
Application granted granted Critical
Publication of CN101886546B publication Critical patent/CN101886546B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The invention discloses a method for inhibiting roof deformation of a coal mine underground bolt and anchor cable roadway, which is characterized in that tracking drilling is performed on a roof after the roof of a roadway is supported by a bolt and an anchor cable, wherein drilling positions are arranged and spread with a radius of 0.2 to 0.3 meter centering on the bolt and the anchor cable; the distance between holes of the drilling is 0.4 to 0.8 meter; the drilling depth is 1 meter from an upper roof to ensure that not only the anchoring strength of the anchor cable is not influenced but also the deformation of the roof can be effectively inhibited; the drilling angle is parallel with adjacent bolt and anchor cable; and the drilling diameter is the same as the diameter of the anchor cable. The method enhances the pressure resistance of the roof, inhibits the deformation of the roof to the utmost extent, reduces the probability of roof caving, and enhances the safety and the stability of the roadway. The method needs no new equipment and additional pipelines, is simple to operate, prolongs the service life of the roadway, and reduces the maintenance frequency and the maintenance cost of the roadway, the later period input of support materials, and the labor cost. The method is suitable for roadways with a sandstone roof, a composite layer roof and a coal roof.

Description

A kind of method that is used for inhibiting roof deformation of coal mine underground bolt and anchor cable roadway
Technical field:
The invention belongs to a kind of method that suppresses back distortion under the coal mine, particularly a kind of method of utilizing drilling technique to suppress the distortion of top board.
Background technology
In long-term process of coal mining, roadway support is one of mine production most important work, be to enhance productivity and the basic guarantee of mine safety ordinary production, since coal-mining technique improve constantly increasing with mining rate, drift section strengthens, impel digging laneway to speed up to adapt to the fast extraction work of mechanization, from before the supporting of metal frame develop into present anchor shaft anchor cable supporting, great change takes place in support form, the anchor shaft anchor cable supporting improves digging laneway speed greatly, alleviate working strength of workers, weak point is in various degree an appearance roof deformation situation in using anchor shaft anchor cable supporting process, and the generation that causes the roof collapse accident owing to reasons such as distortion are serious.
Because serious phenomenon will appear being out of shape in top board when country rock is unstable, as the composite bed country rock, fault belt, large-section underground triangulation point etc., the capital anchor pole occurs and fractures frequently, roof rock is sent out shortcake, the anchor pole pallet is absorbed in top board, anchor cable breaks, move back lock, draw lots, wire lath bursts, sheet, the piece avalanche, top board pocket goods is serious etc., in the roof deformation process, the pressure quadratic distribution state that the surrouding rock stress of the equilibrium state of tunnel before never digging after dig carried out, anchor shaft anchor cable can not retrain it and expand and the rock stratum shearing changing of the relative positions perpendicular to axial direction the rock stratum vertically, can not retrain the fracture area of roadway surrounding rock, the plastic zone, the elastic region, impel country rock to face space-variant shape and mobile, because the inner acceleration deformation stage that slows down that exists of country rock, the surface, tunnel exists heavily stressed corrosion, sheet, the piece avalanche, structural instability, the reaction tunnel is in unsteady state, remarkable METHOD FOR LARGE DEFORMATION ELASTOPLASTIC has taken place in country rock depths, and the decay of intensity aggravates with distortion, and inner microcosmic carefully sees the joint and dilatation further takes place in the crack, expansion, wherein most cuttings mutually, connect, take place to shear strongly and back and forth rubbing between the inner level rock of country rock, if develop as one pleases, top board then has the backward fruit that collapses.
At above-mentioned situation, generally take following method at present: 1. complement anchor shaft anchor cable increases roadway support intensity.2. set up the metal canopy.Two kinds of methods are the cost height in practice, has high input complex procedures.
Summary of the invention
The objective of the invention is problem according to the prior art existence, a kind of drilling technique method is provided, technology is simple, easy to operate, do not increase equipment substantially, the saving personnel, cost is low, make top board obtain discharging than depths country rock internal energy, high concentrated stress point shifts, and suppresses the too fast purpose of roof deformation thereby reach.Strengthen tunnel safety stability.
Technical scheme provided by the invention is as follows: back carries out tracking drilling to top board after using the anchor shaft anchor cable supporting, and bore position is that radius centered 0.2-0.3 rice begins to arrange expansion with anchor pole, anchor cable, boring distance between borehole 0.4-0.8 rice; 1 meter, the old top of drilling depth distance, the anchoring strength that so neither influences anchor cable can effectively suppress the distortion of top board again; Bore angle is parallel with adjacent anchor shaft anchor cable; Bore diameter is identical with the anchor cable diameter.
Above-mentioned when top board is carried out the tracking drilling operation, back does not have the crack, is shaped, and is smooth, and 50 meters begin the tracking drilling that lags behind after top board has been played anchor pole, anchor cable.
Above-mentioned when top board is carried out the tracking drilling operation, back is shaped bad, and top board has the crack, and tracking drilling is carried out in out-of-flatness immediately after top board has been played anchor pole, anchor cable.
Advantage of the present invention: after adopting the tunnel to use the anchor shaft anchor cable supporting top board is carried out tracking drilling, with the pressure that decomposes and weakening is brought to top board by the quadratic distribution state of tunnel from the equilibrium state to pressure, strengthen the top board anti-pressure ability, suppress roof deformation to greatest extent, reduce the probability of roof collapse, strengthen tunnel safety stability.This method does not need newly added equipment, does not need to establish in addition pipeline, and is simple to operate, prolongs the tunnel useful life, reduces road maintenance number of times and maintenance cost, reduces the later stage of support material and drops into, and reduces cost of labor, has excellent generalization values.This method is applicable to the tunnel of sandstone top board, composite bed top board, coal top board.
Description of drawings
Fig. 1 is a drift section structural representation of the present invention.
Fig. 2 is back supporting state and drill holes schematic diagram.
The specific embodiment
See Fig. 1,2, method provided by the invention is determined two kinds of specific embodiment according to the back rock behavio(u)r:
Embodiment 1
Sandstone roadway in the roof top board does not have the crack, is shaped, and is smooth.When excavation operation, top board has been beaten anchor pole 1, anchor cable 2 back 50 meters begin the tracking drilling that lags behind, do not influence the normal driving speed of work plane like this, along with moving ahead of heading equipment, bore operation carries out subsequently.3 degree of depth of holing will surpass false roof, directly push up, 1 meter, the old top of distance, the anchoring strength that so neither influences anchor cable can effectively suppress the distortion of top board again, and the layout of boring 3 is the center with anchor pole 1, anchor cable 2, radius N is that 0.2-0.3 rice begins to launch, and distance between borehole L is 0.8 meter.Bore angle is parallel with adjacent anchor shaft anchor cable.Bore diameter is identical with the anchor cable diameter.
Embodiment 2
Composite bed top board and coal plate forming are bad, top board has the crack, out-of-flatness, when excavation operation, carry out tracking drilling after top board having been played anchor pole 1, anchor cable 2 immediately, 3 degree of depth of holing will be apart from 1 meter, old top, and the layout of boring 3 is the center with anchor pole 1, anchor cable 2, radius N is that 0.2 meter begins to launch, and distance between borehole L is 0.4 meter.Bore angle is parallel with adjacent anchor shaft anchor cable.Bore diameter is identical with anchor cable 2 diameters.

Claims (3)

1. method that is used for inhibiting roof deformation of coal mine underground bolt and anchor cable roadway, it is characterized in that: after back uses the anchor shaft anchor cable supporting, top board is carried out tracking drilling, bore position is that radius centered 0.2-0.3 rice begins to arrange expansion with anchor pole, anchor cable, boring distance between borehole 0.4-0.8 rice; Drilling depth will surpass false roof, directly push up, 1 meter, the old top of distance, and the anchoring strength that so neither influences anchor cable can effectively suppress the distortion of top board again; Bore angle is parallel with adjacent anchor shaft anchor cable; Bore diameter is identical with the anchor cable diameter.
2. the method that is used for inhibiting roof deformation of coal mine underground bolt and anchor cable roadway according to claim 1, it is characterized in that: when top board was carried out the tracking drilling operation, back did not have the crack, was shaped, smooth, 50 meters begin the tracking drilling that lags behind after top board has been played anchor pole, anchor cable.
3. the method that is used for inhibiting roof deformation of coal mine underground bolt and anchor cable roadway according to claim 1, when top board was carried out the tracking drilling operation, back was shaped bad, and top board has the crack, tracking drilling is carried out in out-of-flatness immediately after top board has been played anchor pole, anchor cable.
CN2010102176310A 2010-07-06 2010-07-06 Method for inhibiting roof deformation of coal mine underground bolt and anchor cable roadway Expired - Fee Related CN101886546B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010102176310A CN101886546B (en) 2010-07-06 2010-07-06 Method for inhibiting roof deformation of coal mine underground bolt and anchor cable roadway

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010102176310A CN101886546B (en) 2010-07-06 2010-07-06 Method for inhibiting roof deformation of coal mine underground bolt and anchor cable roadway

Publications (2)

Publication Number Publication Date
CN101886546A CN101886546A (en) 2010-11-17
CN101886546B true CN101886546B (en) 2011-12-28

Family

ID=43072613

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010102176310A Expired - Fee Related CN101886546B (en) 2010-07-06 2010-07-06 Method for inhibiting roof deformation of coal mine underground bolt and anchor cable roadway

Country Status (1)

Country Link
CN (1) CN101886546B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102606181B (en) * 2012-03-19 2014-08-20 中国矿业大学 Hyperstatic scour prevention four-dimensional roadway support device and support method thereof
CN102777196A (en) * 2012-08-09 2012-11-14 大同煤矿集团有限责任公司 Complementary supporting method of zoom backstopping roadway
CN109211180B (en) * 2018-09-14 2021-01-26 华北科技学院 Fully mechanized caving mining roadway surrounding rock deformation stage division and determination method
CN114861370B (en) * 2022-07-05 2022-10-04 中煤科工开采研究院有限公司 Design method for roadway anchor rod and anchor cable support in corrosive mine environment

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3335039C1 (en) * 1983-09-28 1984-10-31 Klöckner-Becorit GmbH, 4620 Castrop-Rauxel Rock anchor
US6957931B2 (en) * 2003-07-14 2005-10-25 Slater Bert W Roof bolt bearing plate and method for an underground mine
CN2779066Y (en) * 2005-03-11 2006-05-10 中国矿业大学 Equipment capable of drilling coal bed for pressure relief and reinforcing supports of key positions
CN100434655C (en) * 2003-08-01 2008-11-19 新汶矿业集团汶南煤矿有限责任公司 Advanced supporting and protecting technology for cracked top plate of digging operation face
CN101713290A (en) * 2009-12-10 2010-05-26 天地科技股份有限公司 Method for clearing rock burst of full-mine laneway deep in mine

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3335039C1 (en) * 1983-09-28 1984-10-31 Klöckner-Becorit GmbH, 4620 Castrop-Rauxel Rock anchor
US6957931B2 (en) * 2003-07-14 2005-10-25 Slater Bert W Roof bolt bearing plate and method for an underground mine
CN100434655C (en) * 2003-08-01 2008-11-19 新汶矿业集团汶南煤矿有限责任公司 Advanced supporting and protecting technology for cracked top plate of digging operation face
CN2779066Y (en) * 2005-03-11 2006-05-10 中国矿业大学 Equipment capable of drilling coal bed for pressure relief and reinforcing supports of key positions
CN101713290A (en) * 2009-12-10 2010-05-26 天地科技股份有限公司 Method for clearing rock burst of full-mine laneway deep in mine

Also Published As

Publication number Publication date
CN101886546A (en) 2010-11-17

Similar Documents

Publication Publication Date Title
CN106368701B (en) The method and device in lane is stayed using hydraulic fracturing release control stope drift active workings
CN102536239B (en) Long-wall working face coal pillar-free mining method
CN102844522B (en) underground mining
CN104594899A (en) Method for determining reasonable width of gob-side entrydriving narrow coal pillar
CN103557000B (en) Method for preventing gob-side entry rock burst through side-drawing filling
CN102536240B (en) Method for preventing rock burst by adopting high-pressure fracturing
CN103821558A (en) Coal mine gob filling mining system and gob-side entry retaining filling process
CN108343418B (en) Method for controlling mining influence range from surface directional hydraulic fracturing pre-cracked bedrock
CN110173264A (en) Lane bump method is stayed with conventional release prevention and treatment tight roof in disconnected top
CN103306713A (en) Networked reinforcement method for cross-layer drilling of outburst coal seam
CN104481539A (en) Extruding blasting caving mining method for self-pulling slot
CN103899348A (en) Method for fast extracting gas on coalface
CN102777180A (en) Method for actively and regionally preventing and controlling rock burst in coal mines
WO2016150188A1 (en) Method for fracturing filler wall left behind in adjacent coal-mining face
CN110966002B (en) Roof cutting pressure relief method based on intensive drilling
CN102587915A (en) Induction caving mining method under artificial false roof
CN102777185A (en) Inclined well shaft construction technology
CN105239964A (en) Protective coal seam decompressing ground and underground three-dimensional coal and coal seam gas coordinated development method
CN103510958A (en) Gentle dip super-high seam rock cross-cut coal uncovering method
CN101886546B (en) Method for inhibiting roof deformation of coal mine underground bolt and anchor cable roadway
US11976557B2 (en) Coal bump control method for sectional hydraulic fracturing regions of near vertical ultra thick coal seam
CN108266226A (en) A kind of rock burst solution danger method based on hydraulic machinery splitting
CN110173295A (en) A method of utilizing concordant directional drilling mash gas extraction and fire extinguishing
CN103147759B (en) Prospecting and short-hole shrinkage mining method of small inclined ore body
CN103061732A (en) Hydraulic fracturing method of 2-3 meter hard medium sandstone stratum of roof of coal seam

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20111228

Termination date: 20140706

EXPY Termination of patent right or utility model